Combating fraud and energy theft: An integrated field force and management approach Nirlei Aparecida Ferreira Newton Augusto Magalhães dos Santos. AES Eletropaulo in Numbers. Cajamar. Pirapora do Bom Jesus. Santana do Parnaiba. Anhembi. Barueri. Osasco. Leste. JAN. Itapevi. CAB. - PowerPoint PPT PresentationTRANSCRIPT
Combating fraud and energy theft: An integrated field force and management approach
Nirlei Aparecida Ferreira Newton Augusto Magalhes dos Santos
AES Eletropaulo in Numbers
OESTEOperational Structure
14 ETTs102 delivery pointsElectric SystemDISTRIBUTION SECUNDARY 127/220 185.000 DISTRIBUTION TRANSFORMS6 Fraud Dispatch Center RESIDENTIAL COMMERCIAL / INDUSTRIAL -MT10.000 CUSTOMERSDISTRIBUTION PRIMARY CIRCUITS 13.800 V Substransmission Lines 138.000 V or 88.000 VETDETC INDUSTRY IN HVCOSSystem Operation CenterTransmission over 230.000 V.CODDistribution Operation Center1.000.000 POLE140 ETDs106 ETCSUSINAS 5.000.000 CONNECTIONS4 Public Ilumination Dispatch Center530.000 LIGHT BULBS (SP)281.000 LIGHT BULBS (ABC E OESTE)1700 PRIMARY CIRCUITS18.700KM GRIDCTEEP
Eletropaulo Operation CenterCOS System Operation CenterCEAC Customer Attendance CenterCODDistribution Operation CenterArea: 13.139 m2Employees: 335
ET 80249ET 96582RUA COLNIA DA GLORIAVMA 11CH 60874RUA TUBARANAAV. LINS DE VASCONCELOSEP 2193JGL 2Energy: 2182 GWh (5,6%)Cost: R$ 195 MMEnergy: 1730 GWh (4,4%)Cost: R$ 600 MMEnergy: 1233 GWh (3,2%)Cost: R$ 430 MMTotal Losses
Energy Loss Evolution (%)
Total Losses - LTM12,26%12,54%12,41%12,84%12,84%12,84%13,09%12,48%12,67%12,77%12,50%12,23%12,34%10,0%10,5%11,0%11,5%12,0%12,5%13,0%13,5%Dec-03Jan-04Feb-04Mar-04Apr-04May-04Jun-04Jul-04Aug-04Sep-04Oct-04Nov-04Dec-04Energy Loss Evolution (%)
MAIN ACTIONS Loss Reduction Program - 2004
Theft and Fraud of Electric Energy;Illegal Connections and Minimum Fee;Register Errors;Reactive Energy Collection. Loss Reduction ProgramMain Initiatives 2004setembro842.758MWh RecoveredTotal Recovered2004 Energy Recovered 2005320 Crews at Fraud Combat500000 inspections
Loss Reduction Program Campaigns
Loss Reduction Program Other Actions
Loss Reduction Program Other Actions
Loss Reduction Program Other Actions
The Atende CI system allows a corporate management of field inspections, enabling a higher control of the steps of detection, action and collection of the irregularity, increasing the company Losses Program efficiency. The integrated management of crews turn the process of fraud combat more efficient once it standardizes the criteria, the methodologies for irregularities identification and the entire detection history record.ATENDE CIAtende CI - Loss Reduction Program
Integration of Systems
Operation FlexibilityAny Unit is able to audit areas already inspected with no fraud detected, by just changing the radio frequency.Audits through cross-inspections
Reallocation of the Inspections from the Unit that is below Target to help neighbor UnitsOperation Flexibility
The system allows areas unification on the weekends and night shift (smaller inspections flow). It is a 24-hour / seven-day operation.Operation Flexibility
InspDW System - Generation of Suggestions for Inspections
InspDW System - Generation of Suggestions for Inspections
InspDW System - Generation of Suggestions for Inspections
on line CountersFraud Management Terminal
Plan1
Total Unidade: xxxxxxxxPerodo:23-Nov22-Nov01/Nov 22/Nov01/Out 22/OutVariao (%)Total Eletropaulo23-Nov22-Nov01/Nov 22/Nov01/Out 22/OutVariao (%)
Qte. Gerada19172,08930
Total Inspeo17161,37328
Em Ordem161627323
TOI111241
Anomalia3191
No Inspecionada112003
MWh
Acertividade (%)TOIAnomTOIAnomTOIAnomTOIAnomTOIAnomTOIAnomTOIAnomTOIAnom
5.213.15.93.57.1
1 casa decimal
Productivity per Electrician, Unit
Productivity per Crew, Unit
Localization Spans, Repair per Record
Management Fraud Terminal Graph Picture
Management Fraud Terminal Graph Picture
Indexes - Fraud
Inspection Attendance Time TAITIME INTERVAL BETWEEN THE START OF DISPLACEMENT AND THE END OF INSPECTION.
Displacement Time TD TIME INTERVAL BETWEEN THE MOMENT OF AUTHORIZATION FOR DISPLACEMENT OF THE INSPECTION CREW THROUGH THE MOMENT OF ARRIVAL AT THE INSPECTION SITE.
Inspection Time TITIME INTERVAL BETWEEN THE ARRIVAL OF CREW AT THE SITE AND END OF INSPECTION.
Time Non Aggregated TNATIME INTERVAL BETWEEN THE END OF INSPECTION AND START OF OTHER INSPECTION AND THE TIME OF THE BEGINNING OF THE JOURNEY UP TO THE FIRST DISPLACEMENT AND THE END HOUR OF THE LAST INSPECTION OF THE JOURNEY.TDTD