agenda item 1 real examples of impact of wind turbines on radar operations
DESCRIPTION
Agenda item 1 Real examples of impact of wind turbines on radar operations. Daan Rabijns, Belgocontrol. 4 cases. measurable effects of a single turbine at 60 km from the radar severe operational impact: Büchel (GE) severe operational impact: Villancien (Fr) - PowerPoint PPT PresentationTRANSCRIPT
Agenda item 1
Real examples of impact of windturbines on radar operations
Daan Rabijns, Belgocontrol
2 Sustainable Energy – Sustainable ATC Surveillance Workshop Eurocontrol, Brussels, April 2010
4 cases
1. measurable effects of a single turbine at 60 km from the radar
2. severe operational impact: Büchel (GE)
3. severe operational impact: Villancien (Fr)
4. example with tolerable operational impact
3 Sustainable Energy – Sustainable ATC Surveillance Workshop Eurocontrol, Brussels, April 2010
case 1: a single turbine (142m) at 60 km
4 Sustainable Energy – Sustainable ATC Surveillance Workshop Eurocontrol, Brussels, April 2010
case 1: measured impact
primary only
mode S only
combined
5 Sustainable Energy – Sustainable ATC Surveillance Workshop Eurocontrol, Brussels, April 2010
Case 2: unacceptable impact
No track initiation within the cells
Only update of existing tracks
100 200 300 400 500 600 700 800 900
100
200
300
400
500
600
ASR
Cells 200 x 200 m2
6 Sustainable Energy – Sustainable ATC Surveillance Workshop Eurocontrol, Brussels, April 2010
Radar
Case 2: example 1, Airliner FL350
wind turbine
plot (not shown to ATCO)
Track (shown to ATCO)
Track initiation delay: 3 scansCoasting : 3 scans
7 Sustainable Energy – Sustainable ATC Surveillance Workshop Eurocontrol, Brussels, April 2010
Radar
Case 2: example 1, Fighter Approach
wind turbine
plot (not shown to ATCO)
Track (shown to ATCO)
Track initiation delay: 3 scansCoasting : 3 scans
8 Sustainable Energy – Sustainable ATC Surveillance Workshop Eurocontrol, Brussels, April 2010
Case 3: turbines 34 km from the radar
4/6 turbines
142m
radar
test flight
9 Sustainable Energy – Sustainable ATC Surveillance Workshop Eurocontrol, Brussels, April 2010
Case 3: turbines 34 km from the radar
10 Sustainable Energy – Sustainable ATC Surveillance Workshop Eurocontrol, Brussels, April 2010
Case 4: tolerable operational impact
11 Sustainable Energy – Sustainable ATC Surveillance Workshop Eurocontrol, Brussels, April 2010
Case 4: tolerable operational impact
landing
aircraft
10 turbines
149m
aircraft
w/o
transponder
Cessna
12 Sustainable Energy – Sustainable ATC Surveillance Workshop Eurocontrol, Brussels, April 2010
Case 4: tolerable operational impact
13 Sustainable Energy – Sustainable ATC Surveillance Workshop Eurocontrol, Brussels, April 2010
Conclusions
case 1: Impact on PSR can extend to end of radar range
case 2 and 3: Impact not tolerable
case 4: Tolerable impact on ATCO screen
examples can not be generalized