AGENDA NOTES FOR 455th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC
TO BE HELD ON 16TH JANUARY & 17TH JANUARY 2014 AT DIU ITEM No. 1: CONFIRMATION OF THE MINUTES
Minutes of 454TH meeting of Operation & Coordination Sub-Committee of WRPC
held on 10th December 2013 at CSPGCL, Raipur, were forwarded vide letter No.
WRPC/OPN/OCC-Minutes/2013-14/13637 dated 24.12.2013.
No comments have been received. OCC may confirm the same. ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTH OF
DECEMBER 2013. 2.1 Frequency Particulars
During December 2013 the system frequency was below 49.7 Hz for 1.93 % of
time against 1.27 % of time during November 2013. The system frequency was within
the IEGC range of 49.7 Hz -50.2 Hz for 88.51 % of the time against 90.89 % of time
during November 2013. The average monthly frequency was 50.02 Hz during
December 2013, whereas it was 50.01 Hz in the month of November 2013. Regarding
operation in high frequency range, frequency during the month of December 2013 was
above 50.20 Hz for 9.56 % of time against 7.84 % of time during November 2013.
The detailed frequency particulars are enclosed at Annex- 2.1.
The Sub-Committee may like to note.
2.2 Operational Discipline
There was a net inter-regional export of 2330.0 MUs by WR against net export
schedule of 1986.0 MUs. The Sub-Committee may like to discuss.
2.3 Voltage Profile Voltage profile at some of 765/400 kV sub-stations during the month of
December 2013 furnished by WRLDC is enclosed at Annex-2.3.
During the month, the deviations of voltages from the accepted limit on either
side were recorded at the following locations in WR grid: -
S.No. 765/400kV Max. Voltage Date of Min. voltage Date of
-
2
455th OCCM AGENDA
Sub-station observed (kV)
incidence observed (kV)*
incidence
1 Indore 426 04.12.13 - - 2 Itarsi 426 17.12.13 - - 3 Karad 436 05.12.13 - - 4 Dhule 429 21.12.13 - - 5 Asoj 420 18.12.13 - - 6 Kasor 422 25.12.13 - - 7 Bhilai 430 13.12.13 - - 8 Jetpur 421 31.12.13 - - 9 Bina 427 24.12.13 - - 10 Gwalior 421 21.12.13 - - 11 Nagda 428 07.12.13 - - 12 Khandwa 433 28.12.13 - - 13 765kV Bina 815 21.12.13 - - 14 765 kV
Gwalior 810 21.12.13 - -
The Sub-Committee may like to discuss as above.
2.4 U/F Relay Operations
As per WRLDC records during December 2013 the system frequency didn’t touch
49.2 Hz. The details of UFR operation received from constituents for the month of
December 2013 is enclosed at Annexure 2.4.
GETCO has reported, AUFLS on five occasions in December 2013. Matter was
discussed in 453rd & 454th OCC and Gujarat was advised to check the relay setting.
GETCO may review the relay setting to avoid unintentional operation of UFR.
As per CERC order dt 19.12.13 and dt.23.12.2013 , petition filed by SRLDC and
NRLDC, following shall be strictly complied.
i) UFRs and df/dt relays are to be mapped on the SCADA system of each
state so that it can be monitored from RLDC.
ii) All STUs and SLDCs to map/network the UFR and df/dt on their SCADA
system within 3 months
iii) Load relief quantum shall be computed on average load.
Strict compliance of IEGC regulation of 5.2(n) and 5.4.2(e) and non-compliance of
regulation shall be reported to CERC by RLDC.
The Sub-Committee may like to discuss.
2.5 Power Cuts / Load Restrictions
-
3
455th OCCM AGENDA
Details of Power Cuts and Regulatory measures during December 2013 as furnished
by the state utilities are given in Annex. 2.5. The Sub-Committee may note.
2.6 Details of Generating Units under Forced outages Details of generating units under forced outages during December 2013 are given in
Annex-2.6. The Sub-Committee may discuss.
2.7 Details of Generating Units under Planned outages
The details of generating units under Planned Outages during December 2013 are given in Annex-2.7
The Sub-Committee may discuss.
ITEM NO.3: OPERATIONAL PLANNING 3.1 Proposed Planned maintenance programme of generating units.
The proposed maintenance programme of generating units for January 2014 &
February 2014 is given in Annex 3.1. The Sub-Committee may discuss and finalize the outage schedule of
generating units for the above period. 3.2 A. Outage Programme of Transmission Lines/elements
Maintenance programme for transmission lines during the months of January 2014
& February 2014 is given in Annex 3.2 A & B. The Sub-Committee may discuss and finalise the maintenance
programme proposed above. B. Line outages planned vs. implemented:
In 453rd OCC meeting it was decided that WRLDC shall submit the list of
planned transmission element outages vs. actual availed or emergency outages
during the December 2013. WRLDC had submitted the list of emergency
outages(Attached at Annexure-3.2-C1).
WRLDC submitted the status of planned transmission element outages vs.
actual availed or emergency outages during the December 2013(Attached at
Annexure-3.2-C2).
-
4
455th OCCM AGENDA
As agreed during the 453rd OCC meeting the respective utilities may apprise the sub-
committee regarding reason for failing to avail approved outages.
WRLDC furnished the statistics for planned vs availed outage during December 2013 is summarized below:
S No. Particulars of OCC approved Outage Number1 Number of transmission element outage
approved in OCC meeting 216
2 Number of transmission elements for which reliability consent was available
208
3 Number of outage availed 934 Availed Outage as a % of Approved Outage 44.7%
There were 8 cases where the outages were advised by Reliability Coordinators for rescheduling due to system constraints. Respective utilities may apprise the OCC-members on the reason for not availing the planned outages approved by the OCC. The complete Break up Agency wise will be shown during the OCC. The Sub-Committee may discuss.
3.3 Anticipated Power Supply Position for the months – January 2014 & February
2014 Details of anticipated restricted & un-restricted demands for the months of January 2014 & February 2014 are given in Annex 3.3 (A). The details of anticipated regional deficit are given below: (All figures in MW)
State/ Region
January 2014 February 2014 Anticipated Availability
Anticipated Peak Demand
Shortage AnticipatedAvailability
Anticipated Peak Demand
Shortage
GETCO 11500 11540 40 11580 11640 60 MPPTCL 10237 10237 0 10200 10200 0 CSEB 3032 3100 68 3154 3250 96 MSETCL 17250 17850 600 17200 17680 480 GOA 425 425 0 409 410 1 DD 350 350 0 335 335 0 DNH 610 635 25 605 620 15 WR 41530 42645 1115 40890 42438 1548 Constituents may furnish the anticipated station wise Availability & Energy for the months of January 2014 & February 2014. ITEM NO. 4: OPERATIONAL STATISTICS FOR THE MONTH OF DECEMBER 2013 The details of actual generation, demand, drawl of power from grid; exchanges etc. are given in the following Annexures:
-
5
455th OCCM AGENDA
Annex 4.1 - Actual Generation and Requirement for December 2013 Annex 4.2 - Peak Demand: Schedule Vs Actual for December 2013 Annex 4.3 - Integrated Operation of the System and Operation of Inter State Tie lines for December 2013 Annex 4.7 – Details of level of Major Reservoirs in Western Region for December
2013
The Sub-Committee may like to note. ITEM NO. 5: SYSTEM DISTURBANCES IN WESTERN REGION There was no major grid disturbance in the Western Region during the month. The
tripping details and Voltage profiles have to be furnished by WRLDC to WRPC on first
working day of the month as same have to be reported to MOP via GM division of
CEA. Accordingly WRLDC may kindly furnish the tripping details to WRPC for
necessary action. The tripping details during the month received from WRLDC is
enclosed at Annexure-5.
ITEM NO. 6 Healthiness status of SERs/DRs of equipment in the system.
Constituents have furnished the status of healthiness of SER/DRs in their systems on the dates below :
Sl No. Name of
constituents Date of Receipt
1 PGCIL,WRTS-I 03.01.2014 2 PGCIL,WRTS-II 08.01.2014 3 MPPTCL 16.01.2014 4 NTPC 08.01.2014 5 CSPTCL 06.01.2014 6 GETCO 09.01.2014 7 MSETCL 16.01.2014
Constituents of WR are requested to ensure healthiness and sent information to this
office regularly as per the recommendation of enquiry committee of Grid disturbances on
25.02.2007 and 28.02.2007.
The sub-Committee may like to note.
ITEM NO. 7: STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS, TRANSMISSION LINES AND GENERATING UNITS IN WR.
7.1 Status of completion of ongoing Schemes for Commissioning of reactors. As per the approval of 33rd standing committee of WR and subsequently discussion in 23rd WRPC meeting the following reactors have to be installed at the various occasions in WR. Accordingly the information regarding the commissioning schedule is as below:
-
6
455th OCCM AGENDA
S. No.
400 kV Sub/stn.
Size (MVAR)
Implementing agency
Expected commissioning date
1 Ranchodpura 125 MVAR GETCO Commd. On 8th July 2013 2 Varsana 125 MVAR GETCO Commd. On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd. On 5th August 2013 4 Amreli 125 MVAR GETCO Commd. On 12.07.2013 5 Jetpur 63 MVAR GETCO Commd. on 11.07.2013 6 Zerda 125 MVAR GETCO Commd. in July 2013 7 Kosmba 80 MVAR GETCO Commissioned on 29.11.2013 8 Limbdi
(Chornia) 125 MVAR GETCO 25th July 2013
9 Jabalpur 125 MVAR PGCIL June 2014 10 Khandwa 125 MVAR PGCIL June 2014 11 Shujalpur 125 MVAR PGCIL June 2014 12 Bhatapara 125 MVAR PGCIL June 2014 13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014 16 Sholapur 125 MVAR MSETCL 2014 17 Kolhapur 125 MVAR MSETCL 2014 18 Akola 125 MVAR MSETCL 2014 19 India bull 80mvar BR MSETCL Commissioned 26.11.2013 20 Nagda 125 MVAR MPPTCL September 2014 21 Bhopal 80 MVAR MPPTCL March 2014 22 Damoh 125 MVAR PGCIL August 2014 23 Bachau 125 MVAR PGCIL August 2014 24 Pirana 125 MVAR PGCIL August 2014 25 Itarsi 2X125
MVAR PGCIL August 2014
26 Seoni 125 MVAR PGCIL August 2014 27 Parli 125 MVAR PGCIL August 2014 28 Raipur 125 MVAR PGCIL August 2014 29 Gwalior 125 MVAR PGCIL August 2014 30 Nagda 50 MVAR MPPTCL 2014 31 ISP 125 MVAR NHDC 2014 32 Satpura 50 MVAR MPPTCL 2014
Utilities are requested to ensure that reactors are installed and commissioned according to the schedule agreed as above. Utilities may give update on the status of implementation.
-
7
455th OCCM AGENDA
7.2 Status of completion of 765/400 kV and above on going Transmission Schemes being executed/implemented by Transmission Agencies.
The updated status on various ongoing transmission schemes for the year 2013-14 as per the current information available is as follows: - S. No.
Name of the Line Target Completion Date
Remarks
POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on
16.03.2013 2 400 kV Navsari - Navi Mumbai D/C
Line Feb- 2014 ROW problem
3 765kV S/C Satna-Gwalior line (Ckt.-I) Dec - 2013 4 765kV S/C Satna-Gwalior line
(359Km + 60Km D/C Portion) Ckt.-II Feb.- 2014
5 765 kV Sasan-Satna-II Commissioned on 01.06.13
GUJARAT 1 400 kV D/C Kosamba-Chorania line
(Package I)(From Chorania S/S to AP-54)
December -2013
2 400 kV D/C Kosamba-Chorania line (Package II)(From Kosamba S/S to AP-54)
December -2013
3 400 kV D/C Mundra-Zerda line No. 1 December -2013
4 400 kV D/C Mundra-Zerda line No. 2 December -2013
5 400 kV D/C Vadinar-Amreli line December -2013
6 400kV Mundra-Hadala LILO to Halvad
December -2013
7 400 kV D/C Amreli-Kasor line(Part-1) December -2013
8 315 MVA IInd ICT at Kosamba S/S Charged on 15.11.2013 MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV
DCDS Line 23,24.10.2013
2 Malwa TPH-Chhegaon 400 KV DCDS Line
Ckt –I on 22.03.2013 Ckt-II on 11.07.2013
3 Chhegaon-Julwania 400 KV DCDS Line
March - 2014
4 Pithampur- Indore 400KV DCDS Line March- 2014
5 Satpura TPH-Ashta 400KV DCDS Line
December – 2014
CSPTCL 1 400 kV Korba (W)-Khedamara
DCDS Ckt II LILOed at Marwa August 2013 Test charged on
20.08.2013
-
8
455th OCCM AGENDA
2 400 kV Khedamara- Raita DCDS January -
2014
3 400kV DCDS Marwa-Raipur(Raita) January -2014
Test charge from Raipur end in August 2013
4 LILOof 400kV K(W)-Khedamara line at Marwa (one ckt.)
January -2014
MAHARASHTRA(STU)
1 400KV Chandrapur- II- Warora D/C Dec - 2013 end.
2 400KV D/C line from Koradi-II to Wardha S/S(PG) D/C
March - 2014
MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt. Ltd
1 400 kV Parli(PG)-Pune D/C Commissioned Ckt - 1 on 08.11.2013 Commissioned Ckt - 2 on 10.11.2013
2 400 kV Pune (PG)-Aurangabad (MSETCL) D/C
November-13 Commissioned Ckt - 1 on 05.12.2013 Commissioned Ckt - 2 on 04.12.2013
3 LILO Lonikhand –Kalwa at Pune(PG) Lonikhand-Pune charged on 21:30 on 09.07.2013 and Kalwa –Pune at 21:45 on 09.07.2013.
GUJARAT (IPTC route) by WR Transmission (Guj) Pvt. Ltd
1 400 kV Rajgarh(PG)-Karamsad (GETCO) D/C
February -2014
The Sub-Committee may note/discuss.
7.3 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2013-14.
The status regarding Generating units, commissioned /expected to be commissioned during the current year 2013-14 according the available information is as below:
Name of the Power Projects Unit No. Capacity (MW)
Date of Commissioning /Schedule Date
GUJARAT Ukai 6 500 COD on 08.06.2013 Pipavav CCPP- GPCL & GSPC joint venture Block-1 350 March- 2014 Bhavnagar Lignite TPP-JV I 250 Jan 2013 II 250 Jan 2013 UNO SUGEN 1 382.5 COD on 04.04.2013
-
9
455th OCCM AGENDA
CHHATTISGARH Marwa TPS I 500 December 2013 Korba (w) Ext-5 500 COD on 05.09.2013 KSK Mahanadi 3 600 COD on 14.08.2013
VEDANTA VIDYUT 1 135 Synchronized on 11.08.2013
MAHARASHTRA
INDIABULLS (Amaravati) 1 270 Synchronized on 03.06.2013
INDIABULLS (Amaravati) 2 270 January-2014 INDIABULLS (Sinnar) 1 270 March-2014 VIPL(Butibori) 1 300 COD on 05.04.2013
VIPL (Butibori) 2 300
First synchronized on 02.01.2013 Full load on 19.03.2013
GMR EMCO 2 300 COD on 27.08.2013 Dhariwal 1 300 Synd. On 2.9.13 MADHYA PRADESH
SINGAJI TPP 1 600
Synchronized on 31.08.2013 Coal fired on 30.09.2013
2 600 June-2014 M/s Jhabua Power, Seoni 1 300 JANUARY – 2014 MB Power, Anuppur 1 300 JANUARY – 2014 Satpura 11 250 Synchronized on 02.10.2013 SATPURA 10 250 COD on 18.08.2013 CENTRAL SECTOR Vindhyachal TPP IV 12 500 Feb-14 MAUDA 2 500 Feb-14
The WR utilities may intimate the current status on above. ITEM NO. 8: MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP 8.1 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN
All the constituents are requested to submit the CMP report for the Third quarter
(October 2013 to December 2013) for the year 2013-14.
The Sub-Committee members may like to note and furnish details in respect of above. 8.2 STATUS OF PHYSICAL & CYBER SECURITY IN POWER SECTOR REGARDING
Status of physical & cyber security in Power Sector for the Third quarter (October
2013 to December 2013) have not been received from some of the constituents.
-
10
455th OCCM AGENDA
In 454th OCC meeting it was decided that PGCIL to prepare and issue guidelines
for all transmission licensees for implementation of CMP.
PGCIL may present give the presentation on CMP for transmission systems.
The constituents/utilities may like to furnish the status.
The Sub-Committee may like to note and furnish details in respect of above. 8.3 COMMISSIONING OF 400 KV PUNE (PG)-AURANGABAD (MSETCL) D/C LINES: Vice president, WRTMPL vide letter WRTMPL/UKG/PUNE/2013 dated 02.01.2014 intimated regarding commissioning of 400 KV PUNE (PG)-AURANGABAD (MSETCL) D/C that :
• RETML had completed construction of Pune Aurangabad line on 30.11.2013
• Could not test the line on 30.11.2013 as MSETCL's 400 kV D/C-Q
Aurangabad-Babhleshwar line crossing work was in progress at our Pune-
Aurangabad line location no-98/0-98A/0.
• However after completion of MSETCL's crossing work on 01.12.2013, we
completed final testing of line on the same day. Line was handed over to
PGCIL for commissioning on 01.12.2013
• Due to testing of PGCIL Bays at 400kV MSETCL substation at Waluj
Aurangabad, the Pune Aurangabad line circuit-II was commissioned on
04.12.2013 & Circuit-I on 05.12.2013
The Sub-Committee may like to note/discuss. 8.4 TAKING 220 KV KOLHAPUR-MUDSINGHI-CHIKODI-BELGAM LINE IN SERVICE: Chief Engineer(STU), MSETCL vide letter Dated 02.01.2014(copy attached at Annexure-8.4A) requested to WRLDC for consent to avail the 220 kV Kolhapur-
Mudsinghi-Chikodi-Belgam line in operation for radial mode operation. WRLDC vide
letter dated 06.01.2014 (copy enclosed at Annexure-8.4B) appreciated the initiative
taken by MSETCL & advised to examine the proposal in detailed and forwarded to
WRLDC/WRPC for further needful. MSETCL may give status of proposal.
The Sub-Committee may like to discuss.
-
11
455th OCCM AGENDA
ITEMS FROM WRLDC: ITEM NO. 9.1: SYNCHRONIZATION OF NEW GRID WITH SR GRID The N-E-W grid got synchronized to the southern regional (SR) grid by 765 kV Raichur-Sholapur-I feeder at 20:25 hrs. on 31st Dec 2013. WR hydro-generators viz. SSP and Koyna HEPs contributed in frequency matching of the grids during the event. The 765 kV Raichur-Sholapur-I tripped at 05:32 hrs on 2.1.2014 on over current causing separation of NEW grid from SR grid. The following issues needs attention from the concerned agencies.
During the tripping there was over huge under drawl by Chhattisgarh. The trend of Chhattisgarh of doing UD in the range of 50-60% of their normal schedule has become a daily phenomenon.
The Sub-Committee may like to discuss. ITEM NO. 9.2: IMPLEMENTATION OF THE REVISED AUFLS
Pursuant to the meeting taken by Chairperson, CEA on 3rd October,2013 regarding synchronization of the Southern Region with NEW grid, feeder wise details of AUFLS scheme including expected load relief through automatic under frequency relay based load shedding scheme of WR have been received from Maharashtra, Madhya Pradesh, Chhattisgarh and Gujarat . Western Region
States Required Load relief
Implemented Load relief
Required Load relief
Implemented Load relief
Required Load relief
Implemented Load relief
Required Load relief
Implemented Load relief
GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1108 810 1200 815 765 820 851GOA 25 * 25 * 25 * 25 *UT: DD 10 * 15 * 15 * 15 *UT: DNH 30 * 30 * 35 * 35 *Total load relief 2060 2459 2070 2490 2085 2460 2105 2457
* Not received
Stage - I 49.2 Hz Stage - II 49.0 Hz Stage - III 48.8 Hz Stage - IV 48.6 Hz
Status of implementation as available with WRLDC is as under:
• Gujarat, Madhya Pradesh, Maharashtra and Chhattisgarh have confirmed implementation of the recommended settings under all four stages.
• GOA, DD and DNH have not implemented any stage of AUFLS
-
12
455th OCCM AGENDA
Matter has been discussed with Chief Engineer, GOA, Executive Engineer, DD and DNH but no information received so far. As per the information received, these UFR relays are under procurement but on query with GOA ,DD and DNH it has been confirmed that no such procurement is being done. Though this issue has been raised in earlier OCC meetings but no action has been taken so far. Goa, DD and DNH may appraise their action plan. The Sub-Committee may like to discuss. ITEM NO. 9.3: ISSUES IN OUTAGE COORDINATION: It is being observed on several occasions that the D-3 procedure for outage coordination approved in 446th & 447th OCC is not being followed in letter and spirit causing a lot of difficulty in outage coordination. Further while proposing the outages the utilities may avoid planning for multiple element outages emanating from a single node or in a single corridor. For example on 10-Dec-13 the following outages were planned by WRTS-I & 2 and got approved also in OCC.
SN KV Line From Date Time To
Date Time Basis Reason Agency
57 765
Seoni-Bina Line with Reactor & Seoni-Wardha # 2
10-Dec-13
08:0020-
Dec-13
17:00 Daily
Modification (raising bus height) & extension of 765KV auxillary Bus at Seoni
WRTS-I & WRTS-II
60 765
Seoni-Bilaspur # 1 with Line reactor
10-Dec-13
10:0013-
Dec-13
18:00 Daily
Construction warranty test of reactor of line equipments & jumpering of spare reactor aux. bus
WRTS-I
In Real time, facilitating these outages would have utterly depleted the transmission system at Seoni S/S thereby reducing the system reliability to a great extent. Hence the utilities are kindly requested to plan in a reasonable manner so as to help the Reliability Coordinators facilitate the outages in a smooth manner. The background in which all these were got approved in OCC also needs to be deliberated and corrective measures to be adopted.
-
13
455th OCCM AGENDA
Also sometimes outage requests come on the evening of the previous day to avail outage on important elements. For instance the outage request on 765 kV Wardha Bus-I for construction activities on 27.12.13(from 9:30 to 21:30 hrs) came to WLRDC from WRTS 1 at 17:22 hrs on 26.12.13. The requesting agencies may kindly appreciate that such unplanned outage proposals distort the outage planning and coordination. The Sub-Committee may like to discuss. ITEM NO 9.4: MOCK BLACK START EXERCISE
As per sec 5.8(b) of IEGC the users/STUs etc. need to conduct Black start mock
exercises in their respective systems once in every six month under intimation to
RLDC. Also the all the black start Diesel Generator (DG) sets are [as per sec 5.8(b) of
IEGC] required to be tested weekly and the test report needs to be sent to RLDC on
quarterly basis. The following table summarizes the status of mock exercises in
respect of black start facilities in western region.
Sl No Power Station Installed Cap. (MW) Unit Type Black Start Source
Capacity of Black start source
Last BS Capabili
ty demonstrated on
Receipt of DG set testing
report at RLDC
GUJARAT 1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA 22.12.13 Y 2 Mini Hydro 2 x 2.5 Hydro Diesel 50 KW ?? N
3 Kadana 4 x 60 Hydro Diesel 500 KVA 2.4.13 Y (2.4.13)
4
Dhuvaran
1 x 107 (68+39) + 1 x 112 (72+40)
Gas
Details to be furnished by Gujarat
Details to be furnished by Gujarat.
??
N
5 GIPCL-I 3 x 32 + 1 x49 Gas / Steam Diesel
141 KW 07.09.12
Y
6 GIPCL-II 1x104+1x56 Gas / Steam Diesel 500 kVA ?? N
7
Torrent Power Stn. C Stn.- D,E,F,CCPP
StnC:2x30 StnD:120 Stn.E,F(110MW each)CCPP:100MW
Thermal (Units-C,D,E,F)/ Gas(CCPP)
Stn-C islands Diesel
Stn.C:15kVA; Stn.D,E ,F and CCPP(500 kVA each)
28.11.12
Y
8 GPEC 3x138+1x241 Thermal Natural Gas 3000 kVA ?? N
9 Sugen 3x382.5 MW Gas Diesel 2x6MVA ?? N Madhya Pradesh
10 Gandhisagar 5 x 23 Hydro DG set 100 kVA ?? N
11 Birsinghpur 1 x 20 Hydro Battery 220 Volt Battery ??
N
-
14
455th OCCM AGENDA
Sl No Power Station Installed Cap. (MW) Unit Type Black Start Source
Capacity of Black start source
Last BS Capabili
ty demonstrated on
Receipt of DG set testing
report at RLDC
12 Pench 2 x 80 Hydro DG set 250 kVA 12.10.12 Y
13 Bargi 2 x 45 Hydro DG set 250 kVA 10.02.12 Y
14 Bansagar Stage-I 3 x 105 Hydro DG set 250 kVA ?? N
15 Indira Sagar 8x125 Hydro DG set 2x1000 KVA 22.5.11 Y
Chhattisgarh 16
Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA 25.08.12
N
17
Korba(E)-phse-I
Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly
DG Set 1500 kW(3.3kV) ??
N
Maharashtra
18
Koyna I & II
4 x 65 4 x 75 Hydro
House generator
2 MVA 23.10.13 N
19 KDPH 2 x20 Hydro DG set 310 KW ??
N
20 Eldari 3 x 7.5 Hydro DG set 6 KW ??
N
21
Uran (Gas)
4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR
Gas DG set
4 MW PH1:412kVA PH2:450kVA WH:520kVA
16.10.12
N
22 RGPPL
Block 1: 640MW+Block 2: 663.54MW+Block 3: 663.54MW
Gas
Gas Turbine (Frame-6)
35 MW (Under testing): Details to be provided by RGPPL.
??
N
23 Ghatghar 2x125 Hydro DG set 1x1250 kVA 5.10.12
N
24 Khopoli 3x24+2x12 Hydro
DC Governor & bearing oil pumps
DC power (self start)
27.10.13 (detailed report awaited)
N
25 Bhivpuri
3 x 24 + 2 x 1.5 +2x12 Hydro
DC Governor & bearing
-do- ??
N
26 Bhira 6 x 25 Hydro
1 No.of 500 KVA house generator with water turbine
500 kVA
20.10.13 (detailed
report awaited)
N
-
15
455th OCCM AGENDA
Sl No Power Station Installed Cap. (MW) Unit Type Black Start Source
Capacity of Black start source
Last BS Capabili
ty demonstrated on
Receipt of DG set testing
report at RLDC
27 Bhira PSS 1 x 150 Hydro DG set 500 kVA ??
N
28 Trombay 1 x 120
Gas Turbine DG Set 2.5 MW ??
N
1 x 60 Steam Turbine
NTPC
29 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW 15.10.13
N
30 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW ??
N
NCA
31 SSP(RBPH & CHPH) 6x200+5*50 Hydro Diesel 2x1000kVA 08.04.12 N
Accordingly the Black start capable stations may forward their tentative plan for conducting Black start exercises in compliance to sec 5.8(b) of IEGC. There is a proposal from NCA /SSP (Ref: letter ref 3/17/011/BSMD/Power/1722 dated 28th Nov 2013) for conducting a black start exercise using generators at (5x50 MW) canal head power house (CHPH) station of SSP. Details of the radial load to be provided to the proposed island by GETCO and other issues may be discussed by the sub-committee. The Sub-Committee may like to discuss. ITEM NO 9.5: EXTENSION OF START-UP POWER FOR JP-BINA TPS In the 451st and 452nd OCC, a proposal for devising a restoration plan for JP Bina TPS with start-up power from Rajghat / Medikheda HPS was discussed. MPPTCL may kindly intimate the committee on the progress in the issue. The Sub-Committee may like to discuss.
ITEM NO 9.6: NTPC SUGGESTION ON THE INCIDENT DURING GPEC-GANDHAR S/C CHARGING:
NTPC vide its letter dated 12.12.13 addressed to GM, WRLDC has (in reference to the unfortunate incident during the charging of 400 kV GPEC-Jhanor S/C line on 23.11.13), suggested for a “ Cross Permit software/hardware lockable mechanism to
-
16
455th OCCM AGENDA
be implemented at all s/s and switch yards so as to avoid the recurrence of such unfortunate incidents in future. NTPC representative may kindly elaborate on the proposed scheme for understanding of the members. The Sub-Committee may like to discuss. ITEM NO 9.7: FREQUENCY RESPONSE AND RGMO The frequency response from WR generators and demand areas are tabulated under for two distinct events during December 2013 and January 2014. Sl. No.
Event Frequency Change (Hz)
Frequency Response of WR (MW/Hz)
1 1340 MW generation loss at Anpara in NR at 06:12 hrs. on 23.12.13.
(0.47 Hz fall) 49.80 Hz
to 49.33 Hz
685
2 Tripping of 765kV Raichur-Sholapur line-I at 0533 hrs. on 2.1.2014
(0.25 Hz rise) 50.25 Hz
to 50.50 Hz
1932
The frequency response from the ISGS /IPP generators based on WRLDC SCADA data are given under. The complete list is enclosed as Annexure and being mailed to all constituents. All are requested to come with the status of RGMO status as same has to be submitted to CERC.
Sl. No Generating Station Response (MW/Hz) for event-1
Response (MW/Hz) for event-2
1 KSTPS 10 27 2 VSTPS -9 -57 3 SIPAT 83 78 4 NSPCL -5 -3 5 JPL TAMNAR 8 -1 6 LANCO PATHADI 12 3 7 KAWAS 55 2 8 GAND-HAR 0 0 9 SSP -2 0 10 CGPL -13 -24 11 RGPPL 7 0 12 TAPS 0 -6 13 KAPP 7 -2 14 KSK No Data No Data 15 SASAN No Data No Data
The Sub-Committee may like to discuss.
-
17
455th OCCM AGENDA
ITEM NO 9.8: STATUS OF REAL-TIME DATA AND TELEMETRY
SCADA data are the eye and ears of the real-time operator at SLDC/RLDC/NLDC. The status of the availability of real-time data at WRLDC from the generating and transmission substations in Western Region is tabulated below. The respective utilities are requested ensure that real-time data from stations within their jurisdiction is made available at WRLDC. The following table summarizes the status of telemetry in western region as on 3.1.14
SCADA/Telemetry Status in WR
Status as on : 03.01.14
Sl. No.
User Name
Total Nos of Station
s
Telemetry not Provided Telemetry Intemittent
Total non-availability of data in %
(Telemetry not provided plus
Telemetry intermittency)
Total nos of station
Non-availability of data in % (wrt
total nos of stations)
Total nos of statio
n
Non-availability of data due
to intermittency
in % (wrt total nos of
stations)
GS SS
GS SS GS SS
GS SS GS SS GS SS
1 Maharashtra
31 189 2 44 6.5% 23.3% 1 9 3.2% 4.8% 9.7% 28.0%
2 Chhattisgarh 8 22 1 - - 12.5- - - 12.5% -
3 Madhya Pradesh
19 65 - - - - - - - - - -
4 Gujarat 25 117 - 1 - 0.9% - 2 - 1.7% - 2.6%
5 Goa - 7 - 2 - 28.6% - 5 - 71.4% - 100.0%
6 DD - 1 - 1 - 100.0% - - - - - 100.0%
7 DNH - 2 - 2 - 100.0% - - - - - 100.0%
8 ISGS 8 - - - - - - - - - -
9 POWERGRID - 32 - 3 - 9.4% - - - 9.4%
10 IPP 18 - - - - - - - - - - -
TOTAL
109
435 2 53 1.8% 12.2% 3 21 2.8% 4.8% 4.6% 17.0%
Total (over all) 544 55 10.1% 24 4.4% 14.5%
WRLDC intimated that the Constituent wise detail are as under A) Maharashtra—During last OCC, Maharashtra informed that fresh Order on M/S
Tata Teleservices has been awarded. B) Chhattisgarh—Non availability from Korba West station. Only MW data is being
received. C) Gujarat-- Non availability from 220 kV Nano of Tata—(not available).
Intermittent- Kansari 400 kV s/s and Navsari 220 kV… PLCC Problem.
-
18
455th OCCM AGENDA
D) Goa- Not at all 1. Amona 220 Kv 2. Cuncolin 220 Kv Intermittent 2. Kadamba 110 kv 2.Tivim 220 Kv 3.Ponda 220 Kv 4. Xeldam-220 Kv 5.
Verna-110 Kv E) DD- Data not being received from Magarwada 220 kV station F) DNH- Data not being received from Karadpada 220 kV and Khadoli
G ) Powergrid - Data from the following stations are not being received: 1. Tamnar 765 kV 2. Durg 765 kV 3. Kotra 765 kV
Also, the telemetry at newly commissioned stations viz. Durg Pooling Station (PS), Kotra PS, Tamnar PS, Jabalpur PS, Sholapur and Singhaji generating station may be made available to WRLDC at the earliest for reliable monitoring and operation. The Sub-Committee may like to discuss. ITEM NO 9.9: UP-DATION OF POWER MAPS The matter was taken up in the 454th OCC and the following table summarizes the status of information submission by different utilities. Sl. No Utility Status of Receipt of
CBIP map on email by the utility(Y/N
Status of information submission to WRLDC for Power Map Updation ( Y/N)
1 CSPTCL Y Y 2 MPPTCL Y Partially submitted 3 GETCO Y Y 4 MSETCL Y Y 5 Goa Y Y 6 DNH Y y 7 DD Y N
WRLDC shall compile the feedback and forward it to NLDC for incorporation in the final version delivered by the vendor. The Sub-Committee may like to discuss. ITEM NO 9.10: IMPLEMENTATION STATUS OF SPS UNDER PROGRESS:
a. SPS for 765 kV Gwalior-Agra D/C (Generation Run back Scheme in WR)
An SPS was envisaged for ensuring backing down WR generation by 500 MW ( VSTPS - 200 MW, KSTPS - 120 MW, CGPL - 180 MW) in case of sudden reduction of NR import from WR on Bina-Gwalior-Agra link by 1500 MW. The matter was already discussed in 449th, 450th, 451st and 454th OCC and 22nd
-
19
455th OCCM AGENDA
WRPC meeting. NTPC, CGPL, Power Grid may apprise the members on the progress on the issue. NTPC---In the 454th OCC, NTPC intimated that they have got the approval from their corporate centre and it was confirmed that implementation will be done by December-2013. On 6th Jan 14,it was informed that work is in progress and it will be completed by 10th Jan14. PGCIL had confirmed that potential free contacts have been made available till gantry point. NTPC may kindly apprise the status of implementation. CGPL-Regarding CGPL, as intimated by CGPL representative, primary testing was done on 4.12.13 and final testing was scheduled on 27.12.13. CGPL may update the status.
b. SPS at APL Tiroda
M/S APL have requested for review of their SPS at Tiroda. During last OCC it was decided that Status quo to be maintained till new line comes. MSETCL/APML may apprise the progress in commissioning of the second 400 kV Warora-Chandrapur-stg-2 line.
c. SPS at 4x300 MW Balco IPP
The SPS at Blaco was scheduled for commissioning by Nov 2013 after commissioning of first unit of 4x300 MW Balco IPP. It was also reported that as a consequence of disconnection from Chhattisgarh, a revised islanding scheme would be in place at Balco. Further as per MOM of 17th meeting of WR regarding connectivity/OA applications held on 03.01.13, Balco was asked to implement SPS to trip selected units from 4x135MW in case of load throw off of Aluminium refinery load.
a. As understood from the deliberations in the 454th OCC from the representative from Balco, at present there is provision for generation reduction to the tune of 4x65 MW (approx.) by HP/LP by-pass scheme of the 4x135 MW plant in case of load throw-off (due to tripping of two rectifier transformers feeding the smelter plant load).
b. For the new SPS scheme envisaged for the Balco 2010 MW (4x67.5MW + 4x135 MW + 4x300 MW) CTU connection, namely the Grid Islanding and Load Management Scheme (GILMS), Balco have placed an order with M/s SEL. The present status may be updated by Balco representatives.
-
20
455th OCCM AGENDA
d. Defense mechanism for high frequency
With reference to item 9.3 of 450th OCC minutes , 9.15 of 451st OCC minutes, and item 9.5.(d) of 454th OCC minutes, the status of implementation automatic tripping of generation at KSTPS (unit-7:500 MW), VSTPS (unit-7: 500 MW), at high frequency may be apprised to the committee. WRLDC have intimated that matter was discussed on 6th Jan 2014 wherein it was reported by NTPC that Korba STPS has been done and Vindhyachal will be done in a day or two. NTPC may indicate current status of implementation.
The Sub-Committee may like to discuss.
ITEM NO. 9.11: ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS UNDER LONG OUTAGE As per the information available at WRLDC following elements are out for more than
10 days:
Sl. No Date of
outage
Reason
ISTS/IPP
1 80 MVAR BR at ESSAR(Mahan) 23.12.13 Oil leakage
2 125 MVAR BR at JPL 12.05.13 Hydrogen formation
3 50 MVAR LR of Indore-Asoj-II at
Indore
19.06.13 R phase bushing burst
MSETCL
400 kV Deepnagar-Aurangbad-
I
14.11.2013 Voltage Regulation
MPPTCL
400 kV Birsinghpur-Katni-I 14.02.2013 Gas leakage in B-ph
CB
CSPTCL
400/220 kV Bhilai-III 14.04.2013 Buchholz operated
The Sub-Committee may like to discuss.
-
21
455th OCCM AGENDA
ITEM NO. 9.12: STATUS OF TRANSMISSION ELEMENTS AT 765 KV SASAN
During last OCC, the revised schedule of the following elements was given By M/S Reliance is as under: Tentative Plan Status Expected by 1. 765 kV Sasan-
Satna line-1 reactor
By September 2013
Not available End December 2013
2 765 kV Sasan-Satna line-2 reactor
By December 2013
Not available By Feb 2014
3 765/400 kV ICT-2 December 2013 In service
4 765 kV Bus-1 Reactor
January 2014 Not available By Mar 2014
5 765 kV Bus-2 Reactor
January 2014 Not available By Mar 2014
Representative from Sasan may apprise the OCC-members on the progress of commissioning of reactors at 765 kV. Also the over current trip setting of 765/400 kV ICT-2 may be intimated by SASAN representatives. The Sub-Committee may like to discuss. ITEM NO. 9.13: TRIPPING OF LINES DUE TO FOG IN WINTER SEASON The following lines tripped in Indore area due to heavy fog on 31.12.2013. Sr. No
Volt (kV)
Line Name TrippingTime
Reason Restoration status/ Remarks
1 220 Indore-Jetpura-I 22:27/ 31.12.13
Y Phase Fault 23:03/ 31.12.13
2 400 Indore-Nagda S/C 23:28/ 31.12.13
R Phase Fault Trail charged at 23:50HRS did not hold
3 400 Satpura-ISP S/C 23:28/ 31.12.13
R Phase Fault 06:11/ 01.01.14
4 220 Rajgarh-Pitampura-I 23:36/ 31.12.13
B phase fault Trail charged at 00:37HRS did not hold
5 220 Ratlam-Badnagar-I 00:54/ 01.01.14
B phase fault Trail charged at 01:07HRS did not hold
6 400 Indore-Asoj-II 00:41/ 01.01.14
Y phase fualt Trail charged at 01:21HRS did not hold
7 220 Indore-Jetpura-I 01:36/ 01.01.14
R phase fault Trail charged at 02:05HRS did not hold
8 220 Indore-Burwaha-I 01:57/ 01.01.14
R phase fualt Trail charged at 03:42HRS did not hold
9 400 Nagda-Rajgarh-II 02:10/ B phase fault Trail charged at 04:58HRS
-
22
455th OCCM AGENDA
Sr. No
Volt (kV)
Line Name TrippingTime
Reason Restoration status/ Remarks
01.01.14 did not hold 10 400 Indore-Itarsi-I 02:56/
01.01.14 B phase fault Trail charged at 05:26HRS
did not hold 11 220 Pitampur-Badnagar-
S/C 03:11/ 01.01.14
Earth fault Trail charged at 03:30HRS did not hold
12 400 Indore(PG)-Indore-I 04:34/ 01.01.14
Y-ph to B-ph fault
Trail charged at 05:18HRS did not hold
Tripping of transmission elements have also occurred during the last winter fog in Saurashtra, South Gujarat of Gujarat and Satara area of Maharashtra. The utilities may kindly apprise the action being taken to prevent such multiple tripping due to fog in winter. Following general measures may be looked into in view of the foggy weather:
a. The voltages in fog prone areas are to be maintained close to 1.0 p.u.
b. At least two alternate paths to each sub-station are to be made available
wherever possible to ensure availability of supply in case of tripping of a line
on fog.
To control the voltages in Satara area, running more (more than present 2) units in condenser mode at Koyna-IV to absorb VARS to be explored. The Sub-Committee may like to discus. ITEM NO. 10: DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting, the 456th OCC Meeting
will be hosted by Gujarat and may be scheduled on 13.02.2014 and 14.02.2014.
GETCO, Gujarat may confirm the same.
*****************
-
Anaulagnak 2.1
maah idsambar 2013
1. INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat
1.1 MAXIMUM FREQUENCY 50.50 Hz. BETWEEN 0200 Hrs & 0300 Hrs Hrs. ON 31.12.2013AiQaktma AavaRi%t
1.2 MINIMUM FREQUENCY 49.69 Hz. BETWEEN 1000 Hrs & 1100 Hrs Hrs. ON 25.12.2013nyaUnatma AavaRi%t
1.3 AVERAGE FREQUENCY 50.02 Hz.AaOsat AavaRi%t
2. INSTANTANEOUS ta%kailak
2.1 MAXIMUM FREQUENCY 50.69 Hz. AT 02:30 Hrs. ON 31.12.2013AiQaktma AavaRi%t
2.2 MINIMUM FREQUENCY 49.33 Hz. AT 06:15:00 Hrs. ON 23.12.2013nyaUnatma AavaRi%t
3. %AGE OF TIME WHEN FREQUENCY WAS DECEMBER 2013 NOVEMBER 2013 OCTOBER 2013
AavaRi%t ka samaya p`itSat maoM
3.1 BELOW 48.5 Hz. 0.00 0.00 0.00 48.5 hT\ja ko naIcao3.2 BETWEEN 48.5 Hz. AND 48.8 Hz. 0.00 0.00 0.00 48.5 hT\ja AaOr 48.8 hT\ja ko baIca3.3 BETWEEN 48.8 Hz. AND 49.2 Hz. 0.00 0.00 0.00 48.8 hT\ja AaOr 49.2 hT\ja ko baIca3.4 BETWEEN 49.2 Hz. AND 49.5 Hz. 0.05 0.00 0.07
49.2 hT\ja AaOr 49.5 hT\ja ko baIca3.5 BETWEEN 49.5 Hz. AND 49.7 Hz. 1.88 1.27 0.94 49.5 hT\ja AaOr 49.7 hT\ja ko baIca3.6 BETWEEN 49.7 Hz. AND 50.2 Hz. 88.51 90.89 89.19 49.7 hT\ja AaOr 50.2 hT\ja ko baIca3.7 BETWEEN 50.2 Hz. AND 51 Hz. 9.56 7.84 9.80
50.2 hT\ja AaOr 50.3 hT\ja ko baIca0.00 0.00 0.00 0.00
50.3 hT\ja AaOr 51.0 hT\ja ko baIca3.8 BETWEEN 51.0 Hz. AND 51.5 Hz. 0.00 0.00 0.00
51.0 hT\ja AaOr 51.5 hT\ja ko baIca3.9 ABOVE 51.5 Hz. 0.00 0.00 0.00
51.5 hT\ja ko }pr
4.1 NO. OF TIMES FREQUENCY 0 0 0 TOUCHED 48.80 Hz. AavaRi%t 48.80 hT\ja kao CUhI
4.2 NO. OF TIMES FREQUENCY 0 0 0 TOUCHED 48.60 Hz. AavaRi%t 48.60 hT\ja kao CUhI
4.3 NO. OF TIMES FREQUENCY 0 0 0 TOUCHED 51.00 Hz. AavaRi%t 51.00 hT\ja kao CUhI
maoM AavaRi%t ko AaMkD,aoM ka ivavarNa
FREQUENCY PARTICULARS DURING DECEMBER 2013
(AS PER FREQUENCY REPORT OF WRLDC)
(piScama xao~ Baar p`oYaNa kond` kI AavaRi%t irpaoT- ko AaQaar pr )
-
Voltage Profile during the month of Dec. 2013
दनांकDate
अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतमMax. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv
1 422 398 423 496 427 408 426 405 418 403 419 406 419 407 417 3972 421 394 424 395 428 404 424 398 414 401 420 407 420 409 415 3963 424 396 426 396 423 423 412 412 416 403 416 403 428 414 414 3994 426 400 424 400 428 403 427 399 417 399 414 402 422 413 417 3995 422 399 419 395 436 414 426 404 415 402 417 405 426 413 416 4006 423 399 424 400 423 423 412 412 416 400 414 405 428 417 415 4017 423 399 424 400 423 423 412 412 416 400 414 405 428 417 415 4018 423 394 423 394 423 423 412 412 416 398 416 401 430 415 415 3989 424 393 424 393 429 411 426 408 415 404 421 409 420 409 415 398
10 424 393 424 393 431 410 425 406 418 402 417 404 420 409 415 39811 424 393 424 393 423 423 412 412 418 402 417 404 430 416 415 39812 422 401 424 403 425 420 415 408 415 399 418 401 428 412 416 40313 424 393 424 393 423 423 412 412 418 402 417 404 430 416 415 39814 423 399 423 400 423 423 412 412 418 400 417 403 429 415 415 39615 424 395 423 423 423 423 412 412 419 403 416 406 427 415 417 39916 423 396 424 398 423 423 412 412 417 403 417 406 426 413 415 39917 422 399 426 401 434 412 427 405 419 405 422 410 419 409 416 39918 423 396 423 399 432 409 427 406 420 400 418 403 419 410 417 39919 423 399 425 400 423 423 412 412 418 403 418 404 426 413 416 39920 424 400 425 400 431 410 427 403 416 403 415 405 426 415 416 39921 423 394 423 396 432 425 429 410 419 399 417 403 425 412 415 40022 423 398 425 399 423 423 412 412 417 402 418 404 425 413 416 39923 423 398 425 399 423 423 412 412 417 402 418 404 425 413 416 39924 424 400 424 404 423 423 412 412 416 399 422 403 426 417 417 39725 420 396 423 398 427 407 426 403 416 400 422 406 426 416 418 39926 422 397 423 398 431 408 425 402 416 398 421 406 422 412 420 39927 422 399 425 399 423 423 412 412 417 400 415 403 427 414 416 39928 423 397 426 399 423 423 412 412 418 400 416 403 427 416 418 40229 423 398 425 399 423 423 412 412 418 403 416 405 428 415 419 40030 424 400 423 399 423 423 412 412 417 402 417 403 427 413 420 40131 425 404 425 403 423 423 412 412 417 402 416 405 428 413 421 400
426 393 426 393 436 403 429 398 420 398 422 401 430 407 421 396
जेतपुरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur
व तूदाब परेखा दस बर 2013 सं नक Annex-2.3
इंदौर इटारसी कराड धलुे असोज कासोर िभलाई
-
दनांकDate
अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतमMax. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv
1 423 397 416 398 426 399 429 399 759 739 790 750 800 768 806 7562 426 397 417 394 425 395 430 397 759 738 796 751 803 753 811 7563 426 397 419 398 425 400 433 397 761 739 798 750 801 766 811 7564 423 403 416 401 428 402 431 396 762 742 792 752 803 771 808 7775 419 399 415 395 426 400 427 394 759 740 783 754 794 761 798 7676 422 404 418 396 428 400 431 401 759 740 791 458 804 761 806 7717 423 397 414 395 428 400 431 401 759 740 788 750 796 759 804 7568 424 396 417 399 427 396 429 396 759 740 791 756 803 765 807 7569 426 396 417 398 427 394 430 397 765 745 794 752 800 763 811 75610 422 397 416 395 427 394 430 397 765 745 792 753 802 760 804 75611 423 399 416 397 427 394 430 397 765 745 790 753 800 763 806 76112 424 396 420 400 425 398 431 399 768 747 794 762 808 770 810 75613 421 400 416 395 427 394 430 397 765 745 791 758 801 759 802 77214 420 397 418 393 426 397 429 402 767 747 792 762 805 758 802 75615 422 396 418 399 426 396 429 397 759 741 790 755 802 766 806 75616 423 401 414 396 427 399 431 398 761 740 794 766 793 762 800 76917 425 397 417 396 426 400 431 404 761 741 789 752 803 767 810 75518 425 402 414 391 426 399 428 399 760 735 779 745 797 762 810 77419 424 406 418 397 425 399 430 402 760 740 780 752 804 765 810 77720 424 404 420 400 426 400 431 402 760 742 781 754 807 772 812 77821 425 398 421 399 424 396 428 397 758 740 784 753 810 765 815 76622 423 403 421 397 425 399 430 402 762 741 789 756 809 765 810 77423 423 403 421 397 425 399 430 402 762 741 789 756 809 765 810 77424 427 409 417 400 426 399 431 406 766 749 799 765 804 770 810 78425 424 400 417 394 424 398 430 402 764 744 787 755 800 762 810 76826 425 400 417 394 424 398 428 402 766 746 794 757 802 759 812 76727 425 400 417 393 425 402 431 404 764 743 791 757 801 758 810 77028 424 403 418 398 426 397 433 399 765 746 795 765 805 765 810 77429 425 400 418 401 426 397 430 399 764 743 793 753 803 772 809 77030 425 404 418 390 424 400 429 400 763 741 799 758 805 753 809 75731 426 406 419 396 427 405 431 403 769 751 800 763 804 769 808 770
427 396 421 390 428 394 433 394 769 735 800 458 810 753 815 755
वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina
बना वािलयर नागदा खंडवा िसपत िसविन
-
No. of Occasions
Max Load Relief at 49.2 Hz
No. of Occasions
Max Load Relief at 49.2 Hz
No. of Occasions
Max Load Relief at 49.2 Hz
No. of Occasions
Max Load Relief at 49.2 Hz
1 01-Dec-13 0 0 0 0 0 0 0 02 02-Dec-13 0 0 0 0 0 0 0 03 03-Dec-13 0 0 0 0 0 0 0 04 04-Dec-13 0 0 0 0 0 0 0 05 05-Dec-13 0 0 0 0 0 0 0 06 06-Dec-13 0 0 0 0 0 0 0 07 07-Dec-13 0 0 0 0 0 0 0 08 08-Dec-13 0 0 0 0 0 0 0 09 09-Dec-13 0 0 0 0 0 0 0 0
10 10-Dec-13 0 0 0 0 0 0 0 011 11-Dec-13 1 77.8 0 0 0 0 0 012 12-Dec-13 0 0 0 0 0 0 0 013 13-Dec-13 0 0 0 0 0 0 0 014 14-Dec-13 0 0 0 0 0 0 0 015 15-Dec-13 0 0 0 0 0 0 0 016 16-Dec-13 0 0 0 017 17-Dec-13 0 0 0 0 0 0 0 018 18-Dec-13 0 0 0 0 0 0 0 019 19-Dec-13 0 0 0 0 0 0 0 020 20-Dec-13 0 0 0 0 0 0 0 021 21-Dec-13 1 33.5 0 0 0 0 0 022 22-Dec-13 0 0 0 0 0 0 0 023 23-Dec-13 1 2.18 0 0 0 0 0 024 24-Dec-13 0 0 0 0 0 0 0 025 25-Dec-13 0 0 0 0 0 0 0 026 26-Dec-13 1 71.9 0 0 0 0 0 027 27-Dec-13 1 24.9 0 0 0 0 0 028 28-Dec-13 0 0 0 0 0 0 0 029 29-Dec-13 0 0 0 0 0 0 0 030 30-Dec-13 0 0 0 0 0 0 0 031 31-Dec-13 0 0
Max 1 77.8 0 0 0 0.0 0 0Total 5 210.28 0 0 0 0 0 0
220 38 152 550
ANNEX -2.4
DateSl. No Madhya Pradesh( Compiled from the data received from the constituents)
Chhattisgarh
Under Frequency Operation in various Constituent System of Western Region during the month DECEMBER 2013
Recommonded Load relief at 48.8 Hz / 48.6 Hz
Gujarat
NIL NIL
Maharashtra
-
Annexure 2.5
Power Cut/Restrictions in Western Region for the month of December-2013
k : gaujarat Gujarat
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut/ Restriction on Industries a) All industries are allowed to run their units on all days of week & if they want to avail staggered holiday,
then they will have to staggered on notified day only & cannot avail as per their choice. b) All industries are required to keep their recess timings staggered. 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2. Power supply to Agricultural & Rural Sectors
a) Only 8 Hrs. Power supply in staggered form in rotation of day & night is given to Ag. Single Phase supply during rest of 16 Hrs by providing LSTC.
b) Jyotigram Yojana 24 hrs. 3 Anya jaanakarI 3. Any other information: NIL. K : maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid 1 Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of
power cut (MW)
pabandI ka samayaRestriction Timing
p`it idna kula }jaa- kTaOtITotal Energy Cut
(MUs /day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HT/LT IndustriesM (b) Baar inayamana Load Shedding
SaUnya Nil SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
(c) Anya jaanakarI Other information 1.Weekly Off 2.Staggering of power supply
SaUnya Nil SaUnya Nil
SaUnya Nil SaUnya Nil
SaUnya Nil SaUnya Nil
SaUnya Nil SaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit- 2. Power supply to Agricultural Sector: -
ivavarNa Details sao From idnaaMk Date
tk To idnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per day Max. (Hrs) Min. (Hrs) Average (Hrs)
2.1 Three-Phase Supply(DLF)
01.12.2013 31.12.2013 23:54 23:13 23:38
2.1 Three-Phase Supply(Irrigation)
01.12.2013 31.12.2013 09:55 09:43 09:51
2.1 Three-Phase Supply(Mixed)
01.12.2013 31.12.2013 23:53 23:13 23:35
-
3 Anya jaanakarI 3. Any other information
SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From
idnaaMk Date tk To idnaaMk
Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day
Max. (Hrs)
Min. (Hrs) Average (Hrs)
3.1 Commissionary H. Qtrs. 01.12.2013 31.12.2013 23:58 23:31 23:50 3.2 District Head Qtrs. 01.12.2013 31.12.2013 23:59 23:35 23:50 3.3 Tehsil Head Qtrs. 01.12.2013 31.12.2013 23:55 23:29 23:44
ga : maharaYT/ Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid 1. Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of
power cut (MW)
pabandI ka samayaRestriction Timing
p`it idna kula }jaa- kTaOtITotal Energy Cut
(MUs /day From To (a) Power Cuts/Restriction on HT/ LT Industries (b) Load Shedding From 01.12.13 to 31.12.13
SaUnya Nil
@ 0-970MW
SaUnya Nil
00.00
SaUnya Nil 24.00
SaUnya Nil
@ 10.5 MUs/day
(c) Any other information 1.Weekly Off 2. Staggering of power supply Industrial Staggering LS withdrawn from 03/02/2012
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit- 2. Power supply to Agricultural Sector
ivavarNa Details sao From idnaaMk Date
tk To idnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per day
Max. (Hrs) Min. (Hrs) Average (Hrs) 2.1 Three-Phase Supply 01.12.2013 31.12.2013 10:00 08:00 09:00
2.2 Single-Phase Supply 01.12.2013 31.12.2013 18:00 18:00 18:00 3 Anya jaanakarI Any other information: There is no load shedding on industrial feeders in Maharashtra
-
Ga : C%tIsagaZ, Chhattisgarh: 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid 1 Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)
pabandI ka samaya Restriction Time
p`it idna kula }jaa- kTaOtI
Total Energy Cut (MUs /day)
sao From tk To
(A) Scheduled (a) (i) Power Cuts/ Restriction on HT Industries (ii) Power Cuts/Restriction on LT Industries (iii) Power Cuts/Restriction on Rural (iv) Agriculture pump* (v)Urban/ Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding
00.00(Av)
00.00(Av)
00.00 (Av)
45.67 (Av) of 28 days 00.00(Av) 00.00 (Av)
1.Rural 73.28 (Av) 2.Town Feeders (C-1to C-6 & X) : 0.00(Av)
- - -
17.00 - - -
- - -
23.00 - - - -
- - -
0.274 - -
0.130 -
3. HT Industries 82.50 (Av) 0.018 Total Energy Cut/day ( b) Any other information 1.Weekly Off/staggering of power supply
1day (In a week as per consumer’s option) 50MW(Av.)
-
-
0.422
2 kRiYa xao~ kao ivaVut AapUit- 2. Power supply to Agricultural Sector
ivavarNa Details sao From idnaaMk Date
tk To idnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per day Max. (Hrs) Min. (Hrs) Average (Hrs)
2.1 Three-Phase Supply 01.12.13 to 31.12.13, 6.00 Hrs (Power cut)
18.00
2.2 Single-Phase Supply - - - - - 2.3 Remarks/Note/ - - - - -
*-up till 28/12/2013, as conveyed to SLDC, CSPTCL for power cut under Atal Jyoti scheme by Raipur & Durg region, CSPDCL 3 Anya jaanakarI / Any other information: SaUnya Nil ca : gaaovaa Goa: SaUnya Nil
-
प म े ऽय भार ूेषण कि, मु बई ूणाली ूचालन-ISO-I
संल नकAnnex-2.6 पावर िसःटम ऑपरेशन कारपोरेशन िलिमटेड
(पावरिमड क एक पूण ःवािम व वाली कंपनी)
प म े ऽय भार ूेषण के ि,मु बई Power System Operation Corporation Ltd. (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentre,Mumbai
अिनवाय युिनट आऊटेज का दस बर2013का वःता रत यौरा Details of forced unit outages during the month ofDec.2013
अन ुबमांक Sl.No
यिुनट Unit
सघंटक Constituent/IPP
मता मेगावॉटCap.MW
स o From
समय दनांक
स o From
समय दनांक
कारण Reason
Time Date Date
1. एपीएल APL-4 गुरा विनिल GSECL
330 0:55 1-Dec-13 19:31 27-Dec-13 Heavy hydrogen leakage
2. एसएलपीपी SLPP-4
गुरा विनिल GSECL
125 12:45 5-Dec-13 15:30 9-Dec-13 BTL
3. डब यटू पीएस WTPS-5
गुरा विनिल GSECL
210 23:28 5-Dec-13 4:06 20-Dec-13 BTL
4. एपीएल APL-2
गुरा विनिल GSECL
330 0:54 19-Dec-13 3:52 22-Dec-13 CTL
5. एपीएल APL-1
गुरा विनिल GSECL
330 4:41 22-Dec-13 1:32 30-Dec-13 HP heater tube leakage
6. एसएलपीपी SLPP - 3
गुरा विनिल GSECL
125 23:30 25-Dec-13 11:22 29-Dec-13 Coal handling problem
7. एपीएल APL - 8 गुरा विनिल GSECL
660 1:34 27-Dec-13 1:43 30-Dec-13 BTL
8. आरजीपीपीएल RGPPL-3B
मारा वउकंिल MSPGCL
320 21:58 28-May-13 00:19 07-Dec-13 No requisition
9. आरजीपीपीएल RGPPL-2A
मारा वउकंिल MSPGCL
350 9:10 6-Jun-13 Ready Ready No requisition
10. आरजीपीपीएल RGPPL-3A
मारा वउकंिल MSPGCL
320 8:28 6-Jun-13 Ready Ready No requisition
11. आरजीपीपीएल RGPPL-1B
मारा वउकंिल MSPGCL
320 22:30 25-Jun-13 Ready Ready No requisition
12. आरजीपीपीएल RGPPL-1A
मारा वउकंिल MSPGCL
320 21:47 27-Jun-13 Ready Ready No requisition
13. टाटा TATA-6
मारा वउकंिल MSPGCL
500 23:52 19-Jul-13 अनपुल ध Still out
अनपुल ध Still out
For Economy S/D
14. आरजीपीपीएल RGPPL-2B
मारा वउकंिल MSPGCL
230 15:03 8-Aug-13 Ready Ready No requisition
-
प म े ऽय भार ूेषण कि, मु बई ूणाली ूचालन-ISO-I
15. वीआईपीएल VIPL-I
मारा वउकंिल MSPGCL
300 1:05 2-Oct-13 अनपुल ध Still out
अनपुल ध Still out
Turbine bearing vibration probl em
16. इं डयाबुल India Bull-1
मारा वउकंिल MSPGCL
270 14:59 22-Nov-13 15:23 20-Dec-13 PG test
17. खापरखेड़ा Khaperkheda-1
मारा वउकंिल MSPGCL
210 12:20 24-Nov-13 12:20 07-Dec-13 Coal shortage
18. एपीएमएल APML-3
मारा वउकंिल MSPGCL
660 23:49 1-Dec-13 5:53 21-Dec-13 Bearing problem
19. भुसावल Bhusawal-5
मारा वउकंिल MSPGCL
500 12:01 1-Dec-13 3:43 5-Dec-13 Bearing Oil temp high
20. पल Parli-5
मारा वउकंिल MSPGCL
210 20:50 4-Dec-13 2:37 8-Dec-13 Cooling Water System Leakage.
21. खापरखेड़ा Khaperkheda-3
मारा वउकंिल MSPGCL
210 2:14 7-Dec-13 16:56 12-Dec-13 Furnace Pressure high.
22. चंिपरु Chandrapur-4
मारा वउकंिल MSPGCL
210 23:21 11-Dec-13 8:55 14-Dec-13 BTL
23. कोराड Koradi-6
मारा वउकंिल MSPGCL
210 12:49 13-Dec-13 8:19 16-Dec-13 PA fan problem
24. चंिपरु Chandrapur-2
मारा वउकंिल MSPGCL
210 3:56 16-Dec-13 23:25 19-Dec-13 BTL
25. कोराड Koradi-5
मारा वउकंिल MSPGCL
200 1:29 19-Dec-13 08:45 06-Jan-14 ID fan problem
26. जेएसडब य ूJSW-1
मारा वउकंिल MSPGCL
300 19:43 20-Dec-13 18:09 24-Dec-13 CW line leakage
27. चंिपरु Chandrapur-2
मारा वउकंिल MSPGCL
210 8:42 22-Dec-13 0:28 26-Dec-13 Furnace pressure low
28. भुसावल Bhusawal-2
मारा वउकंिल MSPGCL
210 11:57 22-Dec-13 13:10 24-Dec-13 ID bearing temp high
29. डब यूपीसीएल WPCL-4
मारा वउकंिल MSPGCL
135 0:07 22-Dec-13 अनपुल ध Still out
अनपुल ध Still out
Generation Water cooler leakage
30. कोराड Koradi-6
मारा वउकंिल MSPGCL
210 18:30 27-Dec-13 3:57 31-Dec-13 Station board problem
31. सातपुरा Satpura-7
मू वउकंिल MPPGCL
210 23:50 14-Dec-13 10:15 19-Dec-13 BTL
32. सातपुरा Satpura-10
मू वउकंिल MPPGCL
250 19:49 16-Dec-13 5:36 20-Dec-13 Tripped due to air heater problem
33. कोरबा पूव Korba(E)-5
छरा वउकंिल CSPGCL
120 22:28 5-Dec-13 4:25 9-Dec-13 Eccentricity problem
34. Korba(W)-5 छरा वउकंिल CSPGCL
500 6:54 14-Dec-13 9:33 19-Dec-13 Turbine side problem
35. एःसार महान Essar-Mahan-1
एःसार ESSAR
600 0:00 9-Nov-13 Ready Ready Less requisi tion
36. लॅ को Lanco-2
लॅ को Lanco
300 12:20 21-Aug-13 अनपुल ध Still out
अनपुल ध Still out
Coal shortage
37. एमको EMCO - 2
जीएमआर GMR
300 17:07 21-Oct-13 NA 07-Dec-13 BTL
38. सीजीपीएल CGPL-10
सीजीपीएल CGPL
800 11:53 14-Nov-13 14:47 23-Dec-13 Fire on coal conveyer belt
-
प म े ऽय भार ूेषण कि, मु बई ूणाली ूचालन-ISO-I
39. सीजीपीएल CGPL-10
सीजीपीएल CGPL
800 21:15 24-Dec-13 9:37 3-Jan-14 BTL
40. वंदना Vandana-1
वंदना VANDANA 135 4:04 17-Nov-13 NA 08-Dec-13 Turbine problem
41. एसीबीआईएल ACBIL II
एसीबीआईएल ACBIL
135 18:05 11-Dec-13 3:05 14-Dec-13 BTL
42. कावास Kawas 2B
एनट पीसीNTPC 164 22:12 2-Nov-13 7:38 14-Dec-13 Less requisi tion
43. कावास KAWAS GT 1B
एनट पीसीNTPC 164 0:12 3-Nov-13 Ready Ready Less requisi tion
44. कावासKawas 2A एनट पीसीNTPC 164 21:17 26-Nov-13 5:20 15-Dec-13 Less requisition
45. मौदाMouda-1 एनट पीसीNTPC 500 13:45 30-Nov-13 12:40 3-Dec-13 BTL
46. मौदा Mouda- I
एनट पीसीNTPC 500 14:06 10-Dec-13 22:45 13-Dec-13 B F P protection operated 47. VSTPS-11 एनट पीसीNTPC 500 1:19 11-Dec-13 14:31 14-Dec-13 Coal shortage 48. Kawas1A एनट पीसीNTPC 164 21:27 14-Dec-13 14:28 24-Dec-13 Less requisi tion
49. वीएसट पीएस VSTPS-8
एनट पीसीNTPC 500 11:00 17-Dec-13 23:22 20-Dec-13 BTL
50. गांधार Gandhar-2
एनट पीसीNTPC 219 13:03 16-Dec-13 Ready Ready Less requisition
51. MOUDA-I एनट पीसीNTPC 500 16:30 18-Dec-13 5:11 21-Dec-13 Turbine generator area fire 52. टॅ स
TAPS - 4 एनट पीसीNTPC 540 20:05 21-Dec-13 7:17 27-Dec-13 Reverse power protection
53. कावास Kawas 2A
एनट पीसीNTPC 164 20:18 23-Dec-13 Ready Ready Less requisition
54. कावास Kawas 2B
एनट पीसीNTPC 164 0:15 25-Dec-13 Ready Ready Less requisition
55. गांधार Gandhar-3
एनट पीसीNTPC 144 20:37 28-Dec-13 Ready Ready Less requisition Note: Units out for more than 72 hrs are only included.
-
प म े ऽय भार ूेषण कि, मु बई ूणाली ूचालन-ISO-I
संल नकAnnex-2.7 पावर िसःटम ऑपरेशन कारपोरेशन िलिमटेड
(पावरिमड क एक पूण ःवािम व वाली कंपनी)
प म े ऽय भार ूेषण के ि,मु बई Power System Operation Corporation Ltd. (A wholly owned subsidiary company of POWERGRID)
Western Regional Load DespatchCentre,Mumbai
िनयो जत युिनट आऊटेज का दस बर2013 का वःता रत यौरा Details of planned unit outages during the month of Dec.2013
अन ुबमांक Sl.No
यिुनट Unit
सघंटक Constituent/IPP
मता मेगावॉटCap.MW
सo From
समय दनांक
स o From
समय दनांक
कारण Reason
Time Date Time Date
1. पल ParlI-3
मारा वउकंिल MSPGCL
210 23:51 13-Feb-13 अनपुल ध Still out
अनपुल ध Still out
AOH
2. चंिपुर Chandrapur-5
मारा वउकंिल MSPGCL
500 1:01 14-Jul-13 अनपुल ध Still out
अनपुल ध Still out
AOH
3. कोरबा पवू Korba-(E)-5
छरा वउकंिल CSPGCL
120 11:02 7-Sep-13 22:05 5-Dec-13 AOH
4. कोरबा प म Korba(W)- 3
छरा वउकंिल CSPGCL
210 19:48 21-Dec-13 अनपुल ध Still out
अनपुल ध Still out
AOH
5. टॅ स TAPS-2
एनपीसीएल NPCL
160 20:42 24-Nov-13 9:41 26-Dec-13 Maintenance work
6. केएसट पीएस KSTPS-1
एनट पीसीNTPC 210 23:46 5-Dec-13 3:36 29-Dec-13 AOH
-
Annex- 3.1
(MW) sao From tk To1 gau}ivainaila GUVNL
1 WTPS 3 210 28.01.2014 26.02.2014 AOH2 SUGEN 10 382.5 07.02.2014 13.02.2014 R & M works3 EPGL 2 500 11.02.2014 28.02.2014 Boiler & Turbine annual inspection
2NIL
3 Craiva]kMila CSPGCL
map`iva]kMila MPPGCL
ReasonS. No. Unit No.
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING JANUARY 2014 AND FEBRUARY 2014
Capacity Outage as per Annual Maintenance Plan
3.1DSPM-II
II250 12.02.14 17.02.14 SHUT DOWN FOR PLANNED MAINENANCE OF
CRH BALANCING LEAK OF LINE3.2 Korba West-IV 4 210 20.01.14 12.02.14 AOH
4
NIL
5 koMd``Iya xao~ Central Sector5.1 KAWAS GT2B 106 08.01.14 07.03.14 R & M WORK
maraiva]kMila MSPGCL
-
Date Time Date Time1 220 220 kV D/C Bhopal - Ashta Line 20-Jan-14 8:00 21-Jan-14 18:00 cont. Stringing of Bhopal -Bhopal
(MPPTCL) 400 kv D/C LineMPPTCL BDTCL C
2 220 220 kV D/C Bhopal - Biragarh Line 20-Jan-14 8:00 21-Jan-14 18:00 cont. Stringing of Bhopal -Bhopal (MPPTCL) 400 kv D/C Line
MPPTCL BDTCL C
3 220 M/C Waluj-Chitegaon & Waluje - Jalna line on same tower
20-Jan-14 7:00 20-Jan-14 18.00 Daily Crossing work of 400kv M/C Aurangabad - Aurangabad
MSETCL WRTS-I C
4 400 400 KV S/C Bhusawal to Aurangabad 20-Jan-14 8:00 21-Jan-14 18:00 cont. Stringing of Dhule-Aurangabd 765 kv S/C Line
MSETCL BDTCL C
5 400 400 KV S/C Bhusawal to BABLEASWAR 20-Jan-14 8:00 21-Jan-14 18:00 cont. Stringing of Dhule-Aurangabd 765 kv S/C Line
MSETCL BDTCL C
6 400 400KV D/C DHULE SARDAR SAROVAR 20-Jan-14 8:00 21-Jan-14 18:00 cont. Stringing of Dhule-Dhule (MSETCL) 400 kv D/C Line
PGCIL BDTCL C
7 400 Khedamara (Bhilai)-Raita 21-Jan-14 8:00 21-Jan-14 18.00 Daily Crossing work of upcoming 765 KV S/C Raigarh-Raipur
CSPTCL WRTS-I C
8 400 Jetpur Amreli-1 21-Jan-14 8:00 21-Jan-14 18:00 Daily PMM GETCO GETCO9 400 400KV Seoni -Bhilai Ckt 21-Jan-14 9.00 21-Jan-14 18.00 daily For maintenance work MPPTCL EHT- M& I
10 220 Badod - Kota Ckt 21-Jan-14 9.00 21-Jan-14 18.00 daily For maintenance work MPPTCL EHT -M&I11 220KV KAWAS -HALDERVA 2 21-Jan-14 8:00 21-Jan-14 18:00 Daily PLCC Checking NTPC NTPC
12 400KV Korba- Lanco 21-Jan-14 9:00 22-Jan-14 0.79 cont. Annual PM & testing. Testing of LBB, M-I & M-II relays
NTPC NTPC
1300/132 KVindhyachal ICT-3 21-Jan-14 9:00 24-Jan-14 19:00 Cotn. ICT Overhauling and oil filtration NTPC NTPC
14 765kV Sasan-Satna Line -1 21-Jan-14 9:00 25-Jan-14 18:00
cont. Equipment Connections.Circuit Breaker and Satna Line-1 Reactor Testing.Jumper Installations & Connections.Isolator Allignment.
PGCIL Reliance
C
15 400 D/C Aurangabad-Pune & 132kv S/C Padegaon - Gangapur
21-Jan-14 7:00 21-Jan-14 18.00 Daily Crossing work of 400kv M/C Aurangabad - Aurangabad
RelianceMSETCL
WRTS-I C
16 400 Akola-Aurangabad # 2 21-Jan-14 7:00 22-Jan-14 18.00 Conti. charging of new aurangabad s/s and erection of ERS
WRTS-I WRTS-I C
17 400 Bhilai-Bhatapara 21-Jan-14 8:00 21-Jan-14 18.00 Daily Crossing work of upcoming 765 KV S/C Raigarh-Raipur
WRTS-I WRTS-I C
18 400 IEPL-Wardha (Mouda-Wardha # 1)
21-Jan-14 8:00 22-Jan-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R
19 400 Bus-1 at Raipur 21-Jan-14 8:00 21-Jan-14 18:00 Daily For Bus spliting work at Raipur WRTS-I WRTS-I C
20 132 132KV DCSS Mahavir-Gharghoda 22-Jan-14 8:00 23-Jan-14 18:00 Conti.Crossing over stringing work of 765KV D/C Jharsuguda-Dharamjaygarh(Korba) T.L
CSPTCL/Mahavir WRTS-I C
21 400 Varsana Hadala 22-Jan-14 8:00 22-Jan-14 18:00 Daily PMM GETCO GETCO
22 400 Raipur-KSK-DB Power-Raigarh 22-Jan-14 7:00 23-Jan-14 18.00 Conti. Crossing work of 765kv D/C Raipur-Raigarh line
KSK/DBPL/ WRTS-
IWRTS-I C
23 220 Badod - Modak Ckt 22-Jan-14 9.00 22-Jan-14 18.00 daily For maintenance work MPPTCL EHT -M&I24 220 Damoh(PGCIL) - Damoh I / C - I 22-Jan-14 9.00 22-Jan-14 18.00 daily For maintenance work MPPTCL EHT -M&I25 220 BINA(PGCIL)-Shivpuri Ckt 22-Jan-14 9.00 22-Jan-14 17.00 daily For maintenance work MPPTCL EHT -M&I
To Basis Reason System Agency Type
Annexure-3.2-AOutage Planning of Transmission elements during the month of January -2014
SN KV Line From
-
Outage Planning of Transmission elements during the month of January -201426 220KV KAWAS -HALDERVA 1 22-Jan-14 8:00 22-Jan-14 18:00 Daily PLCC Checking NTPC NTPC27 400 Bus-2 at Raipur 22-Jan-14 8:00 22-Jan-14 18:00 Daily For Bus spliting work at Raipur WRTS-I WRTS-I C28 220 220KV Morbi-Bhimasar Line 23-Jan-14 8:00 24-Jan-14 18:00 Daily PMM & Earthing work GETCO GETCO29 400 Vadinar-Hadala -1 23-Jan-14 8:00 23-Jan-14 18:00 Daily PMM GETCO GETCO30 400 Chorania- Asoj 1 23-Jan-14 8:00 23-Jan-14 18:00 Daily PMM GETCO GETCO31 400 Chorania-Amreli line 23-Jan-14 8:00 23-Jan-14 18:00 Daily PMM GETCO GETCO32 220 BINA(PGCIL)-Shivpuri Ckt 23-Jan-14 9.00 23-Jan-14 17.00 daily For maintenance work MPPTCL EHT -M&I33 220 Pune- Talegoan 23-Jan-14 8:00 23-Jan-14 18:00 Daily AMP Work MSETCL WRTS-I R
34 765 Sipat 765KV Bus Sectionalizer-1 ( Bay-16) 23-Jan-14 0.38 23-Jan-14 0.79 Daily Annual Preventive maintenance job NTPC NTPC
35 400 Mouda-Wardha # 2 23-Jan-14 8:00 23-Jan-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R
36 400 Mouda-Wardha # 2 23-Jan-14 8:00 23-Jan-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R37 400 Chorania- Asoj 1 24-Jan-14 8:00 24-Jan-14 18:00 Daily PMM GETCO GETCO38 400 Kosamba-Asoj 24-Jan-14 8:00 24-Jan-14 18:00 Daily PMM GETCO GETCO
39 220 220 kV Bhopal - Bina Line 24-Jan-14 8:00 25-Jan-14 18:00 cont. Stringing of Bhopal -Jabalpur 765 kv S/C Line
MPPTCL BDTCL C
40 220 220 kV Bhopal - Vidisha Line 24-Jan-14 8:00 25-Jan-14 18:00 cont. Stringing of Bhopal -Jabalpur 765 kv S/C Line
MPPTCL BDTCL C
41 400 400 KV D/c Bhusawal to walunj 24-Jan-14 8:00 25-Jan-14 18:00 cont. Stringing of Dhule-Aurangabd 765 kv S/C Line
MSETCL BDTCL C
42 400KV Korba Bus sectionalizer-2( bus 2-4) 24-Jan-14 9:00 25-Jan-14 0.79 cont. Annual Preventive maintenance and testing.
NTPC NTPC
43 765 Sipat 765KV Bus Sectionalizer-2 ( Bay-17) 24-Jan-14 9:00 24-Jan-14 19:00 Daily Annual Preventive maintenance job NTPC NTPC
44 400 Raipur-Sipat 1 & 2 24-Jan-14 8:00 24-Jan-14 18.00 Daily Crossing work of upcoming 765 KV S/C Raigarh-Raipur
WRTS-I WRTS-I C
45 400 IEPL-Wardha (Mouda-Wardha # 1)
24-Jan-14 8:00 24-Jan-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R
46 400 D/C Akola-Aurangabad # 1& 2 with 400KV Bus-1 at Akola 24-Jan-14 7:00 25-Jan-14 18.00 Conti.
Shifting of line to new M/C A'bad-A'bad line by PGCIL & Shifting of existing Bus-I Earth switch at Akola S/S by APTCL
WRTS-I/APTCL
/MSETCLWRTS-I C
47 400 Ukai-Kosamba 3 25-Jan-14 8:00 25-Jan-14 18:00 Daily PMM GETCO GETCO48 400 Mouda-Wardha # 2 25-Jan-14 8:00 25-Jan-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R
-
Outage Planning of Transmission elements during the month of January -2014
49 400 400KV Katni - Damoh Ckt 27-Jan-14 9.00 27-Jan-14 18.00 daily For maintenance work MPPTCL EHT- M& I
50 132 132kV Astha - Arniyankalan SC line of MPPTCL 27-Jan-14 8:00 28-Jan-14 18:00 cont. Stringing of Bhopal -Indore 765 kv S/C Line
MPPTCL BDTCL C
51 220 KV 220 KV Haldrwa Line # 1* 27-Jan-14 8:00 28-Feb-14 18:00
cont. Replacement of existing solid state line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
52 400KV Vindhyachal -Satna-4 Line Shunt Reactor 27-Jan-14 9:00 27-Jan-14 19:00 Daily AMP NTPC NTPC
53 765kV Main Bus-1B at SASANBay 16 - Jack Bus 27-Jan-14 9:00 10-Feb-14 18:00
cont. Equipment Connections.Circuit Breaker and CT Testing.Jumper Installations & Connections.Isolator Allignment.
PGCIL Reliance
C
54 765 765 kV Satna - Bina Ckt I 27-Jan-14 8:00 28-Jan-14 18:00 cont. Stringing of Jabalpur-Bina 765 kv S/C Line
PGCIL JTCL C
55 400 Mouda-Wardha # 2 27-Jan-14 8:00 27-Jan-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R56 220 SEONI - CHHINDWARA CKT I 28-Jan-14 9.00 28-Jan-14 18.00 daily For maintenance work MPPTCL EHT -M&I
57 132 132 kV Berasia - Vidisha Line 28-Jan-14 8:00 29-Jan-14 18:00 cont. Stringing of Bhopal -Jabalpur 765 kv S/C Line
MPPTCL BDTCL C
58 132 132 kV Bhopal - Berasia Line 28-Jan-14 8:00 29-Jan-14 18:00 cont. Stringing of Bhopal -Jabalpur 765 kv S/C Line
MPPTCL BDTCL C
59 220 220 KV Sakri Dondaicha line 28-Jan-14 8:00 29-Jan-14 18:00 cont. Stringing of Dhule-Vadodara 765 kv S MSETCL BDTCL C60 400 KV Vindhyachal - Mahan line 28-Jan-14 9:00 29-Jan-14 19:00 cont. Replacement of R, Y & B-Ph CT NTPC NTPC
61 400 400KV Sipat-Pathadi(LANCO) line 28-Jan-14 9:00 29-Jan-14 19:00 cont. Annual Preventive maintenance job NTPC NTPC
62 400 Mouda-IEPL(Mouda-Wardha # 1)
28-Jan-14 8:00 28-Jan-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R
63 220 KV 220 KV Haldrwa Line # 2** 29-Jan-14 8:00 30-Jan-14 18:00cont. Replacement of existing solid state
line protection relays with Numerical relays and Annual maintenance
NTPC NTPC
64 400KV Korba- Mahan 29-Jan-14 9:00 30-Jan-14 0.79 cont. Annual PM & testing. Testing of LBB, M-I & M-II relays
NTPC NTPC
65 400 Mouda-Wardha # 2 29-Jan-14 8:00 29-Jan-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R
66 400 Korba-Bhatapara 29-Jan-14 8:00 8-Feb-14 18:00 Conti. Diversion of line for Lafarge Railway track.
WRTS-I Lafarge C
67 400 Chorania- Kasor 30-Jan-14 8:00 30-Jan-14 18:00 Daily PMM GETCO GETCO68 220 SEONI - CHHINDWARA CKT II 30-Jan-14 9.00 30-Jan-14 18.00 daily For maintenance work MPPTCL EHT -M&I
69 400 Mouda-IEPL(Mouda-Wardha # 1)
30-Jan-14 8:00 30-Jan-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R
70 400 Chorania- Kasor 31-Jan-14 8:00 31-Jan-14 18:00 Daily PMM GETCO GETCO
71 220 220 kV chalisgaon Bhusawal 31-Jan-14 8:00 1-Feb-14 18:00 cont. Stringing of Dhule-Aurangabd 765 kv S/C Line
MSETCL BDTCL C
72 765 Sipat 765KV / 400KV ICT-1 31-Jan-14 9:00 31-Jan-14 19:00 Daily Protection scheme modification NTPC NTPC
73 400 400 kV D/C Satna - Bina 3&4 31-Jan-14 8:00 1-Feb-14 18:00 cont. Stringing of Jabalpur-Bina 765 kv S/C Line
PGCIL JTCL C
-
Date Time Date Time1 400 400 KV D/C BABLESWAR TO BHUSAWAL (U/C) 1-Feb-14 8:00 2-Feb-14 18:00 Continous Stringing of Dhule-Aurangabad 765
kv S/C LineMSETCL BDTCL C
2 400 Mouda-Wardha # 2 1-Feb-14 8:00 1-Feb-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R
3 400 Bhilai-Koradi 1-Feb-14 8.00 28-Feb-14 18.00 Daily For Online PID, Line in service with A/R in non-auto mode. WRTS-I WRTS-I For IO
4 400 D/C Korba-Birsingpur 1-Feb-14 8.00 28-Feb-14 18.00 Daily For Online PID, Line in service with A/R in non-auto mode. WRTS-I WRTS-I For IO
5 400 Korba-Bhilai # 2 1-Feb-14 8.00 28-Feb-14 18.00 Daily For Online PID, Line in service with A/R in non-auto mode. WRTS-I WRTS-I For IO
6 220 Korba-Budhipadar # 3 1-Feb-14 8.00 28-Feb-14 18.00 Daily For Online PID, Line in service with A/R in non-auto mode. WRTS-I WRTS-I For IO
7 400 Akola-Wardha # 1& 2 1-Feb-14 8.00 28-Feb-14 18.00 Daily For Online PID, Line in service with A/R in non-auto mode. WRTS-I WRTS-I For IO
8 400 Boisar-Padghe 1-Feb-14 8.00 28-Feb-14 18.00 Daily For OPGW installation, Line in service with A/R in non-auto mode. WRTS-I WRTS-I For IO
9 400 Raipur-Raigarh # 1 & Raipur-KSK-DBPL-Raigarh 1-Feb-14 8.00 28-Feb-14 18.00 DailyFor OPGW installation, Line in service with A/R in non-auto mode. WRTS-I WRTS-I C
10 400 Korba-Bhilai # 2 1-Feb-14 8:00 1-Feb-14 18:00 Daily Crossing works of 765KV D/c Raipur-Champa WRTS-I WRTS-I C
Basis Reason System Agency Type
Annexure-3.2-BOutage Planning of Transmission elements during the month of FEBRUARY-2014
SN KV Line From To
11 400 IEPL-Wardha (Mouda-Wardha # 1) 2-Feb-14 8:00 2-Feb-14 18:00 Daily Insulator replacement WRTS-I WRTS-I R
12 400 S/C Raita (Korba) -Bhilai 3-Feb-14 8:00 3-Feb-14 18:00 Daily Crossing works of 765KV D/c Raipur-Champa CSPTCL WRTS-I C
13 220 Omkareshwar-Khandwa Ckt 3-Feb-14 9.00 3-Feb-14 16.00 daily For maintenance work MPPTCL EHT -M&I14 400 New Koyna-Koyna Stg-4-1 3-Feb-14 8.30 3-Feb-14 17.30 Daily Q.M.work MSETCL MSETCL
15 132 132 KV Nandoorbar Dondaicha line 3-Feb-14 8:00 4-Feb-14 18:00 Continous Stringing of Dhule-Vadodara 765 kv S/C Line
MSETCL BDTCL C
16 400 Mundra -Limbdi-1 3-Feb-14 8:00 3-Feb-14 18:00 Daily Suspension Insulator replcement and PGCIL CGPL
17 400 Wardha-Parli # 1& 2 3-Feb-14 8:00 4-Feb-14 18:00 Conti. Crossing work of upcoming 765 KV D/C Raipur-Wardha line WRTS-I WRTS-I C
18 765 Bus-1 at Solapur 3-Feb-14 8:00 4-Feb-14 18:00 Daily Fixing/Modification in lighting fixures. WRTS-I WRTS-I R
19 220 D/C Raigarh- Raigarh 1& 2 4-Feb-14 8:00 5-Feb-14 18:00 Conti.Crossing work of upcoming 765 KV S/C Raigarh-Champa (04/0-5/0) CSPTCL WRTS-I C
20 400 Rajgarh-Ssp Ckt-I 4-Feb-14 9.00 4-Feb-14 18.00 daily For maintenance work MPPTCL EHT- M& I21 220 Damoh(PGCIL ) - Sagar Ckt 4-Feb-14 9.00 4-Feb-14 18.00 daily For maintenance work MPPTCL EHT -M&I22 220 Itarsi(PGCIL)-Hoshangabad Ckt 4-Feb-14 9.00 4-Feb-14 17.00 daily For maintenance work MPPTCL EHT -M&I23 400KV 400 KV JH-Navsari Line # 1 4-Feb-14 8:00 5-Feb-14 18:00 Continuous Annual Bay Maintenance NTPC NTPC
24 400 Sipat 400KV Bay -10 (IBT-3 main bay) 4-Feb-14 9:00 4-Feb-14 19:00 Daily Annual Preventive maintenance job NTPC NTPC
25 400 ndra -Limbdi-2 4-Feb-14 8:00 4-Feb-14 18:00 Daily Suspension Insulator replcement and PGCIL CGPL
26 400 400 kV D/C Satna - Bina 1&2 4-Feb-14 8:00 5-Feb-14 18:00 Continous Stringing of Jabalpur-Bina 765 kv S/C Line
PGCIL JTCL C
-
Outage Planning of Transmission elements during the month of FEBRUARY-2014
27 765 Seoni-Bilaspur # 1 4-Feb-14 8:00 4-Feb-14 18:00 Daily 765KV Ranchi bay extension work at Bilaspur WRTS-1 WRTS-1 C
28 220 Morbi - Bhimasar 4-Feb-14 8:00 4-Feb-14 18:00 Daily PMM work GETCO
29 400 D/C Khedamara (Bhilai)-Raita 5-Feb-14 8:00 5-Feb-14 18:00 Daily Crossing works of 765KV D/c Raipur-Champa CSPTCL WRTS-I C
30 400 Sipat 400KV Bay -11 (IBT-2 tie bay) 5-Feb-14 9:00 5-Feb-14 0.79 Daily Annual Preventive maintenance job NTPC NTPC
31 400 Chorania - Vadavi-1 5-Feb-14 8:00 5-Feb-14 18:00 Daily PMM & Tan Delta testing WRTGPL GETCO32 765 Seoni-Bina line with LR 5-Feb-14 8:00 5-Feb-14 18:00 Daily AMP Work WRTS-2 WRTS-1 R
33 765 Bus-2 at Solapur 5-Feb-14 8:00 6-Feb-14 18:00 Daily Fixing/Modification in lighting fixures. WRTS-I WRTS-I R
34 220 Navsari - Nasik - 1 5-Feb-14 9:00 7-Feb-14 18:00 Continuous PMM & Isolator replcing work GETCO35 400 APL - Hadala 6-Feb-14 8:00 6-Feb-14 18:00 Daily PMM GETCO GETCO36 400 Seoni -Sarni Ckt 6-Feb-14 9.00 7-Feb-14 17.00 daily For maintenance work MPPTCL EHT- M& I37 220 Seoni(PGCIL ) - Chhindwara CKT I 6-Feb-14 9.00 6-Feb-14 18.00 daily For maintenance work MPPTCL EHT -M&I
38 132 132 kV D/C Shahpura LILO Line 6-Feb-14 8:00 7-Feb-14 18:00 Continous Stringing of Bhopal -Jabalpur 765 kv S/C Line
MPPTCL BDTCL
39 400 Jejuri-Koyna stg IV 6-Feb-14 9.00 6-Feb-14 17.00 Daily Q.M.work. MSETCL MSETCL40 400 Akola-Nandgaonpeth 6-Feb-14 9.00 6-Feb-14 17.00 Daily Quaterly Maintainance Work MSETCL MSETCL41 400KV 400 KV JH-Navsari Line # 2 6-Feb-14 8:00 7-Feb-14 18:00 Continuous Annual Bay Maintenance NTPC NTPC
42 400KV Korba-Bhatapara 6-Feb-14 9:00 7-Feb-14 19:00 Cont. Testing of LBB, auto re-close, M-I & M-II relays NTPC NTPC
43 400 Parli-Solapur # 1 6-Feb-14 9:00 6-Feb-14 15:00 Daily AMP work at Parli S/S Reliance WRTS-I R43 400 Parli Solapur # 1 6 Feb 14 9:00 6 Feb 14 15:00 Daily AMP work at Parli S/S. Reliance WRTS I R44 220 Haldarva - Jhanor - 2 (NTPC) 6-Feb-14 9:00 6-Feb-14 18:00 Daily PMM work GETCO
45 400 D/C Akola-Wardha 1 & 2 7-Feb-14 8:00 7-Feb-14 18:00 DailyCrossing works of 400 KV Quard D/C Amravati – Akola – II APTCL Transmission Line
APTCL WRTS-I C
46 400 Rajgarh-Ssp Ckt-II 7-Feb-14 9.00 7-Feb-14 16.00 daily For maintenance work MPPTCL EHT- M& I47 220 Malanpur-Auriya Ckt 7-Feb-14 9.00 8-Feb-14 17.00 daily For maintenance work MPPTCL EHT -M&I48 220 Chhegoan-Khandwa Ckt -II 7-Feb-14 9.00 7-Feb-14 16.00 daily For maintenance work MPPTCL EHT -M&I
49 220 220kV Sukhisewaniya Ashta DC line of MPPTCL 7-Feb-14 8:00 8-Feb-14 18:00 Continous Stringing of Bhopal -Indore 765 kv S/C Line
MPPTCL BDTCL C
50 132 132kV Bairagarh - Kurawar SC line of MPPTCL 7-Feb-14 8:00 8-Feb-14 18:00 Continous Stringing of Bhopal -Indore 765 kv S/C Line
MPPTCL BDTCL C
51 220 Wardha (PG)-Wardha 7-Feb-14 8:00 7-Feb-14 18:00 Daily AMP Work MSETCL WRTS-I R52 400 Bhusawal-Koradi 7-Feb-14 9.00 7-Feb-14 17.00 Daily Q.M.work. MSETCL MSETCL53 400 Sipat 400KV Bay -12 (IBT-2 main bay) 7-Feb-14 9:00 7-Feb-14 19:00 Daily Annual Preventive maintenance job NTPC NTPC54 400 Parli-Solapur # 2 7-Feb-14 9:00 7-Feb-14 15:00 Daily AMP work at Parli S/S. Reliance WRTS-I R55 400 Chorania - Vadavi-2 7-Feb-14 8:00 7-Feb-14 18:00 Daily PMM & Tan Delta testing WRTGPL GETCO56 220 Navsari - Dastan- 1 7-Feb-14 8:00 7-Feb-14 18:00 Daily PMM work GETCO57 220 Mapusa-Thivim # 1 8-Feb-14 8:00 8-Feb-14 18:00 Daily AMP Work GOA WRTS-I R58 400 400 Kv Main BUS -1At Nagda s/s 8-Feb-14 8.00 9-Feb-14 17.00 daily For maintenance work MPPTCL EHT -M&I59 400 Sipat 400KV Bay -14 (IBT-2 main bay) 8-Feb-14 9:00 8-Feb-14 19:00 Daily Annual Preventive maintenance job NTPC NTPC
60 765 Seoni-Bilaspur # 2 8-Feb-14 8:00 8-Feb-14 18:00 Daily 765KV Ranchi bay extension work at Bilaspur WRTS-1 WRTS-1 C
61 220 Navsari - Dastan- 2 8-Feb-14 8:00 8-Feb-14 18:00 Daily PMM work GETCO
-
Outage Planning of Transmission elements during the month of FEBRUARY-2014
62 400 D/C Korba-Khedamara (Bhilai) 10-Feb-14 8:00 10-Feb-14 18:00 Daily Crossing works of 765KV D/c Raipur-Champa CSPTCL WRTS-I C
63 220 Chhegoan-Khandwa Ckt -I 10-Feb-14 9.00 10-Feb-14 16.00 daily For maintenance work MPPTCL EHT -M&I
64 400 D/C Wardha-Warora line 10-Feb-14 8:00 11-Feb-14 18:00 Conti. Crossing work of upcoming 765 KV D/C Raipur-Wardha line MSETCL WRTS-I C
65 400 New Koyna-Koyna Stg-4-2 10-Feb-14 8.30 10-Feb-14 17.30 Daily Q.M.work MSETCL MSETCL
66 132 132 kV Dhule Dondaicha line 10-Feb-14 8:00 11-Feb-14 18:00 Cont. Stringing of Dhule-Vadodara 765 kv S/C Line
MSETCL BDTCL C
67 00/132 K Vindhyachal ICT-1 10-Feb-14 9:00 14-Feb-14 19:00 Cont. ICT Overhauling NTPC NTPC68 400 KV Vindhyachal - Jabalpur-3 Line Shunt Reactor 10-Feb-14 9:00 14-Feb-14 19:00 Cont. Reactor Overhauling NTPC NTPC69 400 Mundra-Bhachau-1 10-Feb-14 8:00 10-Feb-14 18:00 Daily Suspension Insulator replcement and PGCIL CGPL
70 400 Raipur-Raigarh # 4 10-Feb-14 8:00 16-Feb-14 18:00 Cont Lilo 400KV Raipur-Raigarh # 4 at KSK end. WRTS-I KSK C
71 400 Bus-2 at Bhadrawati 10-Feb-14 8:00 10-Feb-14 18:00 Daily AMP Work WRTS-I WRTS-I R
72 400 Akola-Aurangabad # 2 10-Feb-14 8:00 14-Feb-14 18:00 Conti.
Replacement of HCB Line Isolator, 3 nos of CTs , Wave traps and IPS tube for upgradation at MSETCL Waluj
WRTS-I /MSETCL WRTS-I C
73 400 KSK-DB Power 10-Feb-14 8:00 13-Feb-14 18:00 Cont Lilo 400KV Raipur-Raigarh # 4 at KSK end.WRTS-
I/DB/KSK KSK C
74 220 I'pore-Kawas-1 10-Feb-14 8:00 10-Feb-14 18:00 Daily PMM work GETCO75 400 Jetpur - Amreli - 1 11-Feb-14 8:00 12-Feb-14 18:00 Daily PMM GETCO GETCO76 400 Hadala - Vadinar-2 11-Feb-14 8:00 11-Feb-14 18:00 Daily PMM GETCO GETCO77 400 Nagda-Rajgarh Ckt-I 11-Feb-14 9.00 11-Feb-14 18.00 daily For maintenance work MPPTCL EHT- M& I78 220 Mehgaon-Auriya Ckt 11-Feb-14 9.00 11-Feb-14 17.00 daily For maintenance work MPPTCL EHT -M&I79 220 Seoni(PGCIL ) - Chhindwara CKT II 11-Feb-14 9.00 11-Feb-14 18.00 daily For maintenance work MPPTCL EHT -M&I
80 765 Sipat 765KV Bay -13 (Bharari-2 main bay) 11-Feb-14 9:00 11-Feb-14 19:00 Daily Annual Preventive maintenance job NTPC NTPC
81 765kV Main Bus-1B at SASANBay 13 - Jack Bus 11-Feb-14 9:00 21-Feb-14 18:00 ContioniousJumper Installations & Connections.Isolator Allignment.
PGCIL RelianceR
82 400 Mundra-Bhachau-2 11-Feb-14 8:00 10-Feb-14 18:00 Daily Suspension Insulator replcement and PGCIL CGPL83 220 I'pore-Kawas-2 11-Feb-14 8:00 11-Feb-14 18:00 Daily PMM work GETCO84 220 Navsari - Nasik - 2 11-Feb-14 9:00 11-Feb-14 18:00 Daily PMM work GETCO85 400 SSP - Rajgarh - 1 11-Feb-14 8:00 12-Feb-14 18:00 Daily Basis PMM Work GETCO86 400 Nagda-Rajgarh Ckt-II 12-Feb-14 9.00 12-Feb-14 18.00 daily For maintenance work MPPTCL EHT- M& I87 220 Damoh(PGCIL) - Tikamgarh Ckt 12-Feb-14 9.00 12-Feb-14 18.00 daily For maintenance work MPPTCL EHT -M&I
88 132 132 kV S/C Vidisha - Raisen Line 12-Feb-14 8:00 13-Feb-14 18:00 Continous Stringing of Bhopal -Jabalpur 765 kv S/C Line
MPPTCL BDTCL
89 400 Karad-Solapur (PGCIL) 12-Feb-14 9.00 12-Feb-14 17.00 Daily Q.M.work. MSETCL MSETC