  • 7/30/2019 Agreement N0 10

    1/3

    Agreement N0: -ECTDB/12-13 Dated

    This agreement made the day of 2012

    between Sri Bimal Raj, Contractor, B-302 Gugral Apartment Mackniar

    Road , Bareilly , (hereinafter referred to as the contractor) of the one part

    and the U.P. Power Transmission Corporation Ltd. Lucknow

    (hereinafter called employer) of the other part.

    WHEREAS the Employer is about to erect and maintain theAnnual Maintenance and Repair at 220K.V.S/S Budaun (hereinafter

    called the work) mentioned, enumerated or referred to in certain General

    Conditions, Specifications, Schedules Drawings, Form of Tender

    Covering Letter and Schedule of prices which for the purpose of

    identification have been signed by Sri Bimal Raj on behalf of the

    Contractor (the Contractor) and Sri Rajeev Sachan, Executive Engineer,

    Electy. Civil Trans. Division, Rampur Bagh, Bareilly (the Engineer of the

    Employer) on behalf of the Employer and all of which shall form part of

    this contract as though separately set out therein and are included in theexpression (Contract) wherever herein used.

    AND WHEREAS the corporation has accepted the tender of the

    contractor for the provisions and execution of the said work of the sum of

    Rs. 92,970.97 (Rs. Ninety Two Thousand Nine Hundred Seventy and

    Paisa Ninety Seven only) upon the terms and subject to the condition

    hereinafter mentioned,

    Contd.2

  • 7/30/2019 Agreement N0 10

    2/3

    -2-

    NOW PRESENT WITNESS and the parties hereto hereby agree

    and declare as follow: that is to say, in consideration of the payments to be

    made to the Contractor by the U.P. Power Transmission Corporation Ltd.

    as hereinafter mentioned the Contractor shall duly provide the plan for

    said works and things in the contract mentioned or described or which are

    implied there from or therein respectively or may be reasonably necessaryfor the completion of the said works within and at the time and in the

    manner and subject to the terms, conditions and stipulations mentioned in

    the said contract.

    AND in consideration of the due provisions, erection execution and

    construction and Completion of the said works and the maintenance

    there of, as aforesaid, the U.P. Power Transmission Corporation Ltd. Will

    pay to the Contractor The said sum of Rs. 92,970.97 (Rs. Ninety Two

    Thousand Nine Hundred Seventy and Paisa Ninety Seven only) or such

    other sums as may become payable to the contractor under the provision

    of this contract, such payment to be made at such time and in such manneras is provided by the contract.

    Contd------3

  • 7/30/2019 Agreement N0 10

    3/3

    -3-

    IN WITNESS WHEREOF the parties here to have signed this deed

    hereunder of the dates respectively mentioned against the signatures of

    each.

    Signed Signed

    Rajeev Sachan Bimal Raj

    Executive Engineer B-302 Gugral Apartment

    Electy. Civil Trans. Division Mackniar Road

    Rampur Bagh , Bareilly Bareilly,

    In the presence of :

    1. Vipin Kumar

    Divisional Accountant

    2. Kunwar Singh Bisht

    ssOffice Assistant-II