agriculture & natural resources
TRANSCRIPT
D
MAJOR ACCOMPLISHMENTS OF
House 69, Road 16, Block-A, BananiDhaka - 1213, Bangladesh
+88 02 5503 5214-6+88 02 5503 5217
CONTACT US
Country Projects:
� Institutional Strengthening and Project Management Consultants under SAIWRPMP-AF (ADB Loan No. 3302 (SF) & GON Grant No. 0441 (EF); (Jul’17 – Jul ‘22).
� Detailed Design, Construction Supervision and Project Management Support for Coastal Embankment Improvement Project, Phase – I (CEIP-I); (Jan’15 – Dec’21).
� Detail Feasibility Study PRA & FS and Detail Design (DD) under Small Scale Water Resources Development Project (Phase-2) Package SD-4; (May’19 - May’22).
� EIA Study under Southwest Area Integrated Water Resources Planning and Management Project under SAIWRPMP, (ADB Loan No. 2200BAN(SF) and GoN Grant No.0036-BAN) (Apr’15 – Jul’15).
� Financial and Institutional Strengthening of Water Management Organizations (WMGs/ WMAs) and practice for Sustainable O&M under SAIWRPMP; (ADB Loan No.2200BAN(SF) and GoN Grant No.0036-BAN); (Sept 2014 – Jun 2015).
� Technical Feasibility Studies and Detail Design for Coastal Embankment Improvement Programme (CEIP) under ECRRP, BWDB; (Aug 2010 – Sept 2013)
� Detailed Design, Social and Environmental Studies for Construction of Urir Char - Noakhali Cross-Dam Project (UCNCP) in the District of Noakhali, BWDB/WB; (Sep 2013 - Jun 2014).
� Feasibility Study of Additional Sub Project and Institutional Strengthening and Project Management Supporting Water Management Groups with Integrated Water Resources Management under SAIWRPMP, BWDB/ADB; (Aug 2012 – Jul 2014).
� Preparation of Feasibility Study of Additional Sub-Projects and supporting WMO’s with IWRM under SAIWRPMP (ADB Loan No. 2200-BAN(SF) GoN Grant No 0036 BAN (Single Source Contract), (Mar 2012 – Jun 2012).
� Feasibility Study of Capital Dredging and Sustainable River Management in Bangladesh; BWDB/GOB; (Sep 2011 - Aug 2013)
� Consultancy Services for Feasibility Studies and Detailed Design (FSDD) of Sub-projects under Participatory Small Scale Water Resources Sector Project (PSSWRSP), LGED/ADB; (Jan 2010 – Jun 2016).
� Feasibility Studies and Detailed Design (FSDD) of Subprojects underSmall-Scale Water Resources Development Project (SSWRDP) in Greater Mymensingh, Sylhet and Faridpur Areas (Package No.: FSDD Package-8); LGED/JICA (Nov 2010 – Apr 2014).
� Institutional Improvement of BWDB (Contract Package No. BWDB: S-5) under Water Management Improvement Project (WMIP), (IDA Credit No.: 4359); (July 2010 – ongoing).
� Improved Water Management in BWDB Schemes (Contract Pkg. No. BWDB/S-1) under Water Management Improvement Project (WMIP), (IDA Credit No. 4359-BD), BWDB/WB; (Jan 2009 – Dec 2015)
� Feasibility Study of Pilot Program of Land Reclamation from Bay of Bengal by Engineering and Biological Interventions, BWDB/GoB; (Mar 2007 – Apr 2009).
� Southwest Area Integrated Water Resources Planning and Management Project (ADB Funded, ADB Loan No. 2200-BAN(SF) (Jan 2007 – Jun 2014).
� Estuary Development Program (EDP), BWDB/GoB (Mar 2007-Jul 2011).
� Flood Damage Rehabilitation Project-Design and Construction Supervision Consultants: Part D: Water Resources, BWDB/ADB; (Jan 2006 – Jun 2007).
� District Water Resource Assessment, LGED/ADB; (May 2004 –Dec 2007)
� Feasibility Study on Second Small Scale Water Resource Development Sector Project (SSWRSDP-2), LGED/ADB; (Apr 2003 – Jun 2007).
� Gorai River Restoration Project BWDB/DGIS/World Bank (Sep 1999 – Mar 2003)
� Second Coastal Embankment Rehabilitation Project, BWDB/World Bank (Jul 1999 – Dec 2000).
� Feasibility Study of Re-Excavation of Priority Rivers, BWDB/GoB; (Jul 1999 – Feb 2000).
� Meghna Estuary Study-II, BWDB/Government of Netherlands (Oct 1998 – Dec 2002).
� Coastal Embankment Rehabilitation Project, BWDB/European Union (Sep 1996 – Jun 1999).
� Meghna Estuary Study, FAP-5B Socio Economic Study, BWDB/Government of Netherlands (Nov 1996 – Feb 1999)
� Meghna Estuary Study, FAP-5B, BWDB/Government of Netherlands/DANIDA (Nov 1995 – Sep 1998)
AGRICULTURE & NATURAL RESOURCES
DevConsultants Limited
1-2-3-4
Stat
us a
s De
c’20
20
Country Projects:
� Technical Support Unit and Related Services under Bangladesh Municipal Water Supply and Sanitation Project (BMWSSP) (Package No. SD-14); DPHE/WB; (Oct’20-Mar’ 23).
� Rapid Assessment for Establishing It & GIS Based Smart Solid Waste & Faecal Sludge Management Systems in 53 district level Paurashavas & 8 City Corporations; DPHE/ Bill & Melinda Gates Foundation, U.S.A; (Jun’20 – Feb’21).
� Design Monitoring and Supervision Consulting Service of DPHE Component, Cox’s Bazar Under Emergency Assistance Project, DPHE/ADB; (Mar’20 - Feb’22).
� Engineering Design and Construction Supervision of Project for Establishment of Sewerage System in Chattogram Metropolitan; Capacity – 100 MLD (Phase-1) Package No. PESSCM-1/S1); CWASA; (Nov’19 -Oct’24).
� Monitoring and Supervision of Water Supply and Sanitation Schemes including Update of Design, EIA and SIA under Emergency Multi Sector Rohinga Crisis Response Project; DPHE/WB; (Oct’19-Sep’22).
� City Wide Inclusive Sanitation Technical Assistance Hub in South Asia; Bill & Melinda Gates Foundation; (Jun’19 - Jun’22).
� Design, Management and Supervision (DMS): Dhaka Water Supply Network Improvement Project (DWSNIP), Loan No. 3397 BAN; DWASA/ADB; (Mar’18 - Jan’22).
� Project Development Facility (PDF) Consultants (Package No. DWSNIP/PDF/03.5), (i.e. Rayer Bazar Sewerage project), under (DWSNIP); DWASA/ADB; (Feb’19 - Jan’20).
� Feasibility Studies and Preparation of Conceptual Designs & Bidding Documents (i.e. Pagla Sewerage Project); DWASA/WB; (Sep’18 - Sep’19).
� Feasibility Study and Development Project Preparation for Water Supply Facilities for Cox’s Bazar Town; (Dec’17 - Dec’18).
� Utility Modernization Umbrella Consultancy under the Chittagong Water Supply Improvement and Sanitation Project; (Jun’15 - Mar’19).
� Community Mobilization and Development of Action Plan for Rural Non Piped Water Supply Schemes and Community Awareness Building on Sanitation and Hygiene in Bangladesh (East Central Zone-184 Unions); DPHE/WB; (Apr’14 – Apr’17).
� Technical Assistance (TA) for Capacity Building support to Bangladesh Rural Water Supply and Sanitation Project (BRWSSP) – Technical Preparation and Implementation; WB; (Jan’14 - Nov’15).
� Socio-economic Study, Technical Survey and Investigation, Detail Engineering Design and Construction Supervision and Community Mobilization of Rural Piped Water Supply Schemes in Bangladesh, DPHE/WB; (Nov’13 - Jun’17).
� The Development of the National Urban and Rural Water Supply Water Supply and Sanitation Strategy; (Sep’13 – Feb’14).
� Selected Evaluation Studies for 2012, Phase 2 - Thematic Evaluation Study on ADB’s Support for Climate Change Management; ADB (Jul’13 – Aug’13).
� Water Operators Partnership (WOP) between Dhaka WASA and Vitens-Evidus International (VEI); (Oct’12 - Dec’16).
� Preparation of Water Supply Master Plan for Dhaka City, DWASA, (Jan’12 – Dec’12).
� Global Study on the Expansion of Domestic Private Sector Participation in the Water and Sanitation market; (WB); (Oct’11 - Apr’12).
� Developing a National Groundwater Database for Water Supply and Sanitation in Bangladesh ; DPHE/DANIDA (Jan’11 – Mar’12).
� Implementation of Water Safety Plan, WHO-DPHE/AusAID; (Nov‘10 –Jun’11).
� Socio-Economic Study, EIA and Detail Engineering Survey & Investigation and Engineering Design in 148 towns; (Jan’10 - Jun ‘14).
� Review and Revision of the Sector Development Programme (SDP) for the Water and Sanitation Sub-sector in Bangladesh, PSU under the Ministry of LGRDC; (Jan’09 – Mar’11).
� Private Sector Development Support Project (PSDPS) – Environmental and Social Impact Assessment; DFID; (Jul‘08 - May’09).
� Preparation of Master Plan for Pourashavas under Upazila Towns Infrastructure Development Project (Package-03), LGED/GOB; (Apr’08 – Mar’10).
� Developing a National Drinking Water Supply Implementation Guideline; UNICEF; (Feb’08 – Jul’08).
� Preparation of Low Income Communities Water Supply and Sanitation Program (Package DS-7), Dhaka WASA/World Bank; (Apr’06-Dec’07).
� Preparation of Project Implementation Manual (PIM) and Process Action Plan (PAP) for HYSAWA Fund Company; Danida Dhaka; (Mar-May’06).
� Feasibility of Private Sector Participation in the Water and Sanitation Sector in Bangladesh; Royal Netherlands Embassy, Dhaka / DANIDA; (Mar – May’06).
� Design of Water Treatment Plant, Reservoirs, Pipelines and Water Supply Structures under Kachua, Matlab, Chandina and Barura Upazila Water Supply Project, DPHE/GoB; (Jun’2000-Mar’02).
� 18 District Towns Water Supply, Sanitation and Drainage Project (Phase-III), DPHE/Government of Netherlands (GoN); (Jan’96 - Mar’2000).
� Five District Water Supply and Sanitation Project; DPHE/ DANIDA; (Feb’97-Dec’01).
Overseas Projects: � Community Based Water Supply Project, Department of
Public Works of Nepal Government and funded by ADB; (Jan’06 - Dec’10).
� Environmental Protection and Resources Conservation Project, Pakistan; Provincial/ Fed. Govts. of Pakistan; (Dec’95 - Jan’99).
WATER & SAFEGUARDS
Country Projects:
� Design & Supervision Consultancy Services for Urban Infrastructure Improvement Project; LGED/KFAED; (Apr’20 - Sep’22).
� Supervision, Design Review & As-built Drawing Preparation etc. for Improvement of Damaged Roads, Drainage, Footpath and Road Safety of Different Zones; DNCC/GoB; (Nov’19 - Nov’21).
� Feasibility Study of Two Economic Zones: Barisal EZ (Agoiljhora) & Maheshkhali SEZ (Ghatibanga-Sonadia); BEZA/GOB; (Feb’19 - Ongoing)
� Prepare a Detailed Master Plan for “Sonadia Eco-Tourism Park”; BEZA; (Nov’18 - Jun’20).
� Supervision, Design Review & As-built Drawing Preparation for Improvement of Different Damaged Road Infrastructure including Drains and Footpath Construction under Dhaka North City Corporation (Dec’16 – Nov’18).
� Design & Supervision of Construction of Elevated Walkway at Gulistan Area; DSCC/GoB; (May’16 – Oct’17).
� Development of The Economic Zones and Capacity Enhancement of Economic Zone Authority in the People’s Republic of Bangladesh (Apr’15 – Jun’16).
� Transaction Advisory Services for Hi-Tech Parks under Contract Package No. BHTPA-S1, BHTPA/WB, (Sep’14 – Jun’17).
� Supervision of 08 (eight) nos. of Bridges Construction work under Package # BRS-5 of Purbachal New Town Project, RAJUK/GOB, (Jun’14 – Mar’17).
� Regional Development Planning (RDP) under City Region Development Project, Loan No.- 2695-BAN (SF); (Dec’12 - Jun’16).
� Household Interview Survey (HIS) for the Project on Revision and Updating of the Strategic Transport Plan (STP) for Dhaka; DTCA/JICA; (Aug’14 - Nov’14).
� Preparation of Master Plan for Pourashavas under Upazila Towns Infrastructure Development Project (UTIDC), LGED-GoB; (Apr’08 – Mar’10).
� Rural Enterprise Development (RED) of Market Infrastructure Development Porject in Charland Regions (MIDPCR), LGED/GOB; (Feb’10 – Dec’13).
� Socio-Economic Benchmark Survey under UGIIP (Phase-II 11 towns) LGED/ADB; (Feb’07 – Jun’07).
� Greater Faridpur Rural Infrastructure Development Project (RDP-24), LGED/JBIC; (Jul’06 – Jun’07).
� Design, Supervision, Monitoring and Evaluation for Greater Faridpur Rural Infrastructure Development Project (RDP-24), LGED/JBIC (July’06 – Jun’07).
� Design, Supervision, Implementation, Monitoring & Institutional Strengthening for Greater Faridpur Rural Infrastructure Development Project (RDP-24), LGED/JBIC; (Jul’06-Jun’07).
� Socio-Economic Initial Benchmark Surveys under UGIIP (Phase-1 for 22 Towns); LGED/ADB; (Apr’04 – Aug’04).
� Urban Governance and Infrastructure Improvement Project (UGIIP-1) LGED/ADB; (Feb.’04- Jun.’10).
� Emergency Flood Damage Rehabilitation Project (Part E- Municipal Infrastructure); (Jan’05 - Jul’07).
� Management and Supervision Consultancy Services under Bangladesh Municipal Development Fund (BMDF), Phase-I and II, BMDF/ World Bank (Aug’04- Jun’09).
� Design, Supervision and Monitoring Consultancy Services (DSMC) under Post Flood Assistance Recovery Program for Secondary Road Network under Rural Transport Improvement Project (RTIP) of LGED (Sub-Consultant to HIFAB), LGD/World Bank; (Mar’05-Jun’06).
� Technical Audit Services for Rural Roads and Markets Improvement and Maintenance Project, LGED/World Bank; (Apr.’99 – Aug.’01).
� Design, Supervision and monitoring of DUTP Infrastructure Components, Institutional Support and Training, Roads & Highways Department/DCC/BRTA-World Bank; (Feb’99-Sep’05).
� Preparation of a Rural Infrastructure Project-Greater Noakhali District, LGED/World Bank (Apr.’96-Oct.’96).
� Eastern Bangladesh Rural Infrastructure Development Project (EBRIDP), LGED/JBIC; (May.’06-Apr’10).
� Technical Assistance, Detailed Engineering Survey, Design Supervision and Monitoring under Rural Development Project: Greater Noakhali and Chittagong District, LGED/IDB; (Sep.’04-Aug.’08).
� Good Urban Governance in South Asia (GUGSA) Project, TCGI-India/USAID (Aug’04-Mar’07).
� Design, Supervision, Implementation, Monitoring & Institutional Strengthening for Effect Evaluation and Monitoring for Greater Faridpur Rural Infrastructure Development Project (RIDP-24), GED /JICA; (Jul’02 – Jun’06).
INFRASTRUCTURE
Country Projects:
� Construction Supervision Consulting (CSC) Services for PADMA Multipurpose Bridge Project (PMBP), BBA/GOB; (Nov’14 - Dec’23).
� Design Review and Construction Supervision of Multi-Lane Road Tunnel under the River Karnaphuli, Chittagong (Oct’16 - Sep’21).
� Detailed Design and Supervision of Access Road Construction Component of Matarbari Ultra Super Critical Coal-Fired Power Project; RHD/JICA; (Mar’ 16 - Dec’21).
� Construction Supervision Services (Phase-II) for Construction of 3rd & 4th Dual Gauge Railway Track between Dhaka-Tongi section;GoB/LOC; (Jul’19 - Jul’22).
� First Dhaka Elevated Expressway (FDEE) Project; LBCPL, India; (Jan’20 - Nov’21).
� Design & Supervision of the construction of Bridge (60 meter) & Approach Road (Gaynaghat Second Bridge)” under Ashuganj 400 MW CCPP (East) Project; APSC; (Nov’16 - Sep’21).
� Design Review and Enhancement Consultancy (DRC) Services for Improvement of Sylhet-Tamabil-Jaflong Road (N2) to a 4-Lane Highway RHD/AIIB; (Jul’19 - Jun’20).
� Detailed Survey, Investigation, Design and Confirmation Supervision of “the Kanchpur Meghna and Gumti 2nd Bridges Construction and Existing Bridges Rehabilitation Project, BBA/JICA, (Feb’14 - Jan’20).
� Construction Supervision of the Remaining Civil Works of 4-Laning of Dhaka-Chittagong Highway Project , RHD/GOB (Jan’15 – Jun’17).
� Feasibility study of the Bangabandhu Sheikh Mujib International Airport; CAAB/GoB; (Sep’16 - Mar’18).
� Feasibility study for Construction of Fpir Bridges in Southern and Eastern Region of Bangladesh; BBA/GoB; (Aug’17 - Jun’19).
� Study on Road Safety Hazards Including Design of Countermeasures at Intersections on National and Regional Highways of Bangladesh; RHD/GoB. (Jul’18 - Aug’ 19).
� Preparation of Development Plan for Mirsharai Upazila, Chittagong District: Risk Sensitive Land Use Plan: Traffic and Transport Surveys and Studies (Package-4); (Nov’17 – Jun’18).
� Greater Dhaka Sustainable Urban Transport-Package 3: Operational Design and Business Model (ODBM), Project No. 42169-BAN; RHD/ADB; (Jul’13 - Jun’17).
� Feasibility Study for Dhaka-Ashulia Elevated Expressway Project and East-West Elevated Expressway (Middle/Outer Ring Road) Project; BBA/GoB; (Feb’16 - Mar’17).
� Preparation of LAP, RAP & EMP for Multi-Lane Road Tunnel under the River Karnaphuli, Chittagong, Bangladesh (Jun’15 – Sep’16).
� Construction Supervision of Civil Works of 4-Laning of Dhaka-Chittagong Highway Project, RHD/GOB; (Nov ‘10 – Dec’14).
� Household Interview Survey (HIS) for the Project on Revision and Updating of the Strategic Transport Plan (STP) for Dhaka; DTCA/JICA ; (Aug’14 – Nov’14).
� Due Diligence of SAPL’s River Terminal/Depot Project. Haskoning DHV Project No: BD 1866-101-102; FMO; (May’14 – Aug’14).
� Detailed Survey, Investigation, Design and Confirmation Supervision under “the Kanchpur Meghna and Gumti 2nd Bridges Construction and Existing Bridges Rehabilitation Project, BBA/JICA, (Feb’14 – Oct’19).
� Greater Dhaka Sustainable Urban Transport-Package 3: Operational Design and Business Model (ODBM), Project No. 42169-BAN, RHD/ADB; (Jul’13 – Jun’17).
� Conducting Feasibility Study for Multi-Lane Road Tunnel under the River Karnaphuli, Chittagong, Bangladesh; BBA/CDA-CCCC-Arup (Sep’10 – Sep’13).
� Feasibility Study for Bekutia Bridge on Pirojpur-Jhalokati Road over the River Kocha under Jhalokati District , BBA/GoB; (Apr’11 – Oct’13).
� Construction Supervision of Civil Works of 4-Laning of Dhaka-Chittagong Highway Project, RHD/GOB; (Nov ‘10 – Dec’14).
� Eastern Bangladesh Bridge Improvement Project (EBBIP), (JICA L/A No. BD-P60); RHD/JICA, (Mar 2010 - Jun’15).
� Conducting Feasibility Study for Multi-Lane Road Tunnel under the River Karnaphuli, Chittagong, Bangladesh; BBA/CDA-CCCC-Arup (Sep’10 – Sep’13).
� Feasibility Study for Bekutia Bridge on Pirojpur-Jhalokati Road over the River Kocha under Jhalokati District; BBA/GoB; (Apr’11 – Oct’13).
� FS for the Construction of Flyover from Shantinagar to Dhaka-Mawa Road (Jhilmil) via 4th (New) Bridge over Buriganga River (supporting large scale PPP), RAJUK/GoB; (Mar’11- Dec’13).
� Road Network Improvement & Maintenance Project (RNIMP-II), RHD/ADB; (Sep’06-Jun’12).
� Design Review and Finalization of Jatrabari-Gulistan Flyover Project (GOB); (Mar’06 - Jan’12).
� Third Road Rehabilitation and Maintenance Project (RRMP-III) Dhaka-Sylhet Road, RHD/WB; (Jun’99 - Mar’05).
Overseas Projects:
� Basic Configuration Design of Grade Separated Intersection Development at Major Five Junctions in Kathmandu, Dep’nt of Roads, Nepal; (Jan’12 – Dec’12).
� National Highways Development Project – Orissa State of NH-5 (Contract Package OR-VI, VII and VIII), NHA, India; (Jul’01 - May’13).
� Road Maintenance and Development Project – SWRP and PIP, DoR/WB, Nepal; (Sep’05 – Dec’06).
� Study on Sector-wide Road Program and Priority Investment Plan (WB), DoR, Nepal; (Sep’05-Dec’06).
� Feasibility Study and Detail Engineering Design of Uttar Pradesh State Roads Projects, PWD-Uttar Pradesh, India, India/World Bank; (Sep’99-Dec’05).
TRANSPORT
1-2-3-4
Stat
us a
s De
c’20
20
Stat
us a
s De
c’20
20
Stat
us a
s De
c’20
20
1-2-3-4 1-2-3-4