ahs project dust monitoring report sept. 2, 2020 · 9/2/2020 · memorandum geotechnical and...
TRANSCRIPT
Memorandum
GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERS
2269 Massachusetts Avenue
Cambridge, Massachusetts 02140
(617) 868-1420
Page 1 of 1
Date:
September 2, 2020
Recipient: Town of Arlington
HMFH Architects, Inc. Attention:
Ms. Lori Cowles
Sender: William J. Burns, L.S.P.
Project: Arlington High School, Arlington (Project site)
Project No: 6531.9.T18
Subject:
Summary of Dust Monitoring
(June 3 through August 31, 2020)
In order to prevent exposures to the general public, on-site monitoring of dust levels in the
ambient air during construction has been performed by McPhail Associates, LLC. The
environmental monitoring is being performed in accordance with the Release Abatement
Measure (RAM) Plan that was prepared for the project site and submitted to the DEP on
June 2, 2020. The RAM Plan has established levels for dust at which mitigation measures
will be necessary to prevent off-site exposure risks. The action level for dust that has been
established for the project site is 0.15 mg/m3 sustained over a 15-minute duration.
From June 3 through August 21, 2020, the monitoring for airborne dust particulates was
performed utilizing two pod mounted Aeroqual Dust Sentry dust monitors that were
installed along the perimeter of the site. The dust monitors were situated at the eastern
and western portions of the site perimeter located within the work area. A plan showing the
approximate locations of each dust monitor is enclosed with this memorandum.
In general, the results of dust monitoring did not indicate concentrations of airborne dust
particulates in excess of the action level established in the RAM Plan. However, on August
8th and 12th, two isolated exceedances of the action level were recorded which were
considered attributable to equipment working in close proximity to the dust monitor located
along the western perimeter of the project site. Each exceedance was followed by dust
level measurements that were below the above referenced action level. Charts which depict
the results of each 15-minute dust measurement from both Aeroqual Dust Sentry dust
monitors are enclosed with this memorandum.
N:\Working Documents\Jobs\6531 - Arlington High\Dust Monitoring\6531_AHS-Dust Mont. Memo No.1_090120.docx WJB
Lock
elan
dAv
enue
Baile
yRo
ad
Chu
rchi
llAv
enue
S c
h o
u l e
r
C
o u
r t
M a s s a c h u s e t t s A v e n u e
D
D
W W W W W W
WW
W
W
WWW
W
W
W
W
W
W
SSSS
S
G
GG
G
G
G
D
D
D
D
D
D
D
D
D
S
PHASE 1 BLDG FF=76.0
D
CB1GT=78.00INV (OUT)=75.00
AREA DRAIN 3GT=75.50INV.=72.67
SSS
M
T
T
S
M
M
MS
MODULAR BLOCK RETAINING WALL(BIG BLOCK GRAVITY WALL)
PORTION OF EXIST. BUILDING TO REMAIN ANDBE PROTECTED THROUGHOUT PHASE 1
CONSTRUCTION
GC TO VERIFYLOCATION OF
PIPE ANDCONNECT IF LINE
IS LIVE
17' 8" HDPE, S=0.005
150 LF OF 6" HDPES=0.005
C
D D D D D D D D
D
D
D
D
D
D
D D
D
D
DD
DMH AR=76.95
INV (IN-CB1)=72.37INV (IN-CB2)=73.74INV (IN-AD3)=72.37
INV (OUT)=72.37
TEMP. CONNECTIONINV (IN)=65.5
22' 8" HDPE, S=0.20
DMH BR (PH1)=73.00R (PH3)=76.00
INV (IN-DMH X)=70.00INV (OUT)=70.00
DD
AREA DRAIN 1GT=75.85INV.=73.00
AREA DRAIN 2GT=75.85INV.=72.91
48' 8" HDPE, S=0.005
60' 8" HDPE, S=0.005
6' 12" HDPE,S=0.01
G
(2) 8" DIFIRE PROTECTIONCOLD WATER SERVICE
8" x 8" x 4" TEEAND 4" GATEVALVE (DRY TAP)
APPROX.LIMIT OF WORK
LIMITS OF PHASE I BUILDING
SMH-4RIM = 75.8
INV. (SMH-3) = 67.84INV. (IN EX.) = 62.20
INV. (OUT EX.) = 62.1± VIF
GAS LINE PER GASCOMPANY REQS.
WATER CONNECTION(GC PICK UP ALL WATERSERVICES WITHIN THEBUILDING) (SEEPLUMBING PLAN P1.1 )
GAS METER (SEE MEPPLANS BY OTHERS)
RELOCATED 8"CLDI WATER LINE
69 LF OF 6"SDR-35 PVCS = 0.010
GC TO VERIFYWASTE LINEEXITS BLDG INTHIS LOCATION
8" TEE AND GATEVALVE (DRY TAP)
WET TAP WATERCONNECTION (SEE FIREPROTECTION PLAN FP 1.0.1)
(2) 6" DIDOMESTICWATER SERVICE
FDC CONNECTION
SMH-1RIM=75.6INV.(IN) = 69.9INV.(OUT)= 69.8
8" CLDIWATERSERVICE
6" CLDIDOMESTIC 8" CLDI FIRE
PROTECTION
20 LF OF 4" CIS=0.029
4" INV. =69.25
177' 12" HDPES=0.015
4" INV. =70.32
20 LF OF 4"CIS=0.061
20 LF OF 4" CIS=0.021
6" INV. =70.32
SMH-2RIM=75.6INV.(IN) = 69.1INV. (OUT)= 69.0
SMH-3RIM=75.6
INV.(IN) = 68.37INV.(OUT)=68.27
33 LF OF 6"SDR-35 PVC
S = 0.010
43 LF OF 6"SDR-35 PVC
S = 0.010
8" TEE AND GATEVALVES
(TYP.)(DRY TAPS)
LIMITS OF BUILDINGEXPANSION
BUILDING EXPANSIONFOOTINGS PER S2.2D
PHASE 1 BUILDINGFOOTINGS PER S2.2D
BEND W/THRUSTBLOCK
BEND W/THRUSTBLOCK
TEMP. 4" CLDIDOMESTIC SERVICEWATER SERVICE
8" TEE AND GATEVALVE (DRY TAP)
GAS LINECONNECTION PER
GAS COMPANY REQS.
BEND W/THRUSTBLOCK(TYP.)
45° BEND W/THRUSTBLOCK
8" CROSS ANDGATE VALVE
8"x6" REDUCER
8"GATE VALVE
CONNECTIONTO EX. 8"
WATER MAIN
BEND W/THRUSTBLOCK
(TYP.)
GAS METER (SEEPLUMBING PLAN P1.0.1)
TEMPORARY FDC
46' 12" HDPES=0.01
ELEC. MANHOLE (SEEELECTRICAL PHASING SITEPLAN EBP E1.0.1)
TEMP. UTILITY POLE (SEEELECTRICAL PHASING SITEPLAN E1.1) (TYP.)
GAS GATE
GAS LINE PER GASCOMPANY REQS.
TEMP. FDCCONNECTION(SEE PLUMBINGPLAN FP 1.1)
6" INV. = 67.30 TIE INTOEXISTING
DRAIN LINE
4" x 6" PVCWYE
INV.=68.67
73 LF OF 6"SDR-35 PVC
S = 0.010
6" INV. = 67.30
22 LF OF 6" PVC, S= 0.036
E E
BEND W/THRUSTBLOCK
D
D
99.0
'
CM TO DETERMINE IFHYDRANT IS ACTIVE . IF IT ISNOT ACTIVE PROVIDE A NEW6" DI WATER SERVICE VIA TAPAND SLEEVE FROM EXISTING8" MAIN TO THE EX. HYDRANT
75
72
73
74
75
76
75
727374
72
72
72
72
73
73
73
D
D D D D D D
AD-1HDPE AREA DRAINGT=71.50INV.(OUT)= 69.85
AD-2HDPE AREA DRAINGT=71.50INV (IN)=69.10INV (OUT)= 69.10
36 LF OF 6"HDPE S=0.005
INV.=68.90
CONC. PAD FOR NEWGAS METER (SIZE ASREQ'D BY GAS COMPANY)
CB2GT=76.80
INV (OUT)=73.80
10" GEOTHERMALSUPPLY LINE (SEEPLANS BY OTHERS)
(2) 10" GEOTHERMALSUPPLY LINE (SEE
PLANS BY OTHERS)
1
1
1
1
1
1
71
6" x 8"
E
E
EE
E E E E E E E E E E E E E E E
E
E
E
E
E
E
W
W
FP
FP
W
FP FP
COMMUNICATIONS MANHOLE(SEE ELECTRICAL PHASING SITEPLAN EBP E1.0.1)
C
C
C C C C C C CC
CC
C
C
C
E
EE E
E
COMM. STUB
COMM. CONDUIT(SEE ELECTRICALPLANS)
E
E
E
E
E
E
E
E
E
E
E
E
E E E E E E EE
E
C
50
55
60
C
C
C C C C C C CC
CC
C
C
C
E
E
EE
E E
DMH ERIM (PHASE 1)=69.30RIM (PHASE 3)=76.00
INV. (IN)=66.50INV. (OUT)=66.50
RELOCATED CULVERT 203'-48" CLDI, S=0.033
RELOCATED CULVERT221'-36" CLDI, 0.033 160 LF OF 12"
HDPE S=0.01
20 LF OF 12" CI S= 0.023
DMH CR (PHASE 1)=72.00
(4.55' COVER)R (PHASE 3)=76.00
(7.6' COVER)INV.=67.45
PR. ACCESSPOINT 1
RIM=75.00INV.(IN)=59.00
INV. (OUT)=59.00
RELOCATED CULVERT179'-36" CLDI -MJ,S=0.075
PR. ACCESS POINT #3R (PHASE 1)=46.00 (4.7' COVER)
R (PHASE 3)=49.75 (8.45' COVER)INV.(IN)=38.30
INV. (OUT)=38.30
PR. ACCESSPOINT 2R=75.25INV.(IN)=45.50INV. (OUT)=45.50
47 LF OF 12" HDPE, S = 0.24
12" INV. =67.90
12" INV. = 69.05
62 LF OF 12" HDPE,S = 0.015
DMH-12RIM (PHASE 1)=58.00 (3' COVER)RIM (PHASE 3)=62.00 (73' COVER)INV. (IN)=55.00INV. (OUT)=55.00
82 LF OF 12"HDPES = 0.13
DS-1(12' DIA. MH)
R=75.60INV.(IN-EX.)=65.60
INV.(OUT-EX.)=65.60INV. (OUT-PR)=65.60
(V.I.F)
20'-48" CLDI-PUSH ON
20'-48" CLDI-PUSH ON
20'-48" CLDI-PUSH ON
20'-48" CLDI-PUSH ON
20'-48" CLDI-PUSH ON
20'-48" CLDI-PUSH ON
20'-48" CLDI-PUSH ON
8'-48"CLDI-MJ
20'-48" CLDI-MJ20'-48" CLDI-PUSH ON
48" 11.25° CLDI6'-48" CLDI-MJ
48" 22.5° CLDI
36" 22.5° CLDI48" x 36" CLDIREDUCER-MJ
8'-36" CLDI-MJ
36" 22.5° CLDI
12'-36" CLDI-MJ
36" 22.5° CLDI
12'-36" CLDI-MJ
36" 22.5° CLDI
20'-3
6" C
LDI
-MJ
20'-3
6" C
LDI
-MJ
20'-3
6" C
LDI
-MJ
20'-3
6" C
LDI
-MJ
20'-3
6" C
LDI
-MJ
20'-3
6" C
LDI
-MJ
36" 22.5° CLDI
36" 22.5° CLDI12'-3
6" C
LDI -
MJ
36" x 36" x36"CLDI TEE
48" x 48" x36"CLDI TEE
36" 22.5° CLDI
20'-36" CLDI -M
J
20'-36" CLDI -M
J
20'-36" CLDI -M
J
20'-36" CLDI -M
J
20'-36" CLDI -M
J
20'-36" CLDI -M
J
36" 22.50° CLDI
36"X36"X36" CLDI TEE
2.5'-36" CLDI-MJ36" 22.50° CLDI
GC TO COORD. W/ UTILITYCOMPANY ON TEMP.RELOCATION OF GUY WIRE
12'-36" CLDI-MJ
12'-36" CLDI-MJ
12'-36" CLDI-MJ
10'-36" CLDI -MJ
TEMPORARY 6" FIREPROTECTION SERVICE PER
FP DRAWING FP 1.0.1
8"x8"x6" TEE AND6" GATE VALVE
(DRY TAP)
UTIL
ITY
PLAN
A -
PHAS
E 1
C4.0.1A
D
FP
W
SS
SMH
G
DMH
E
LEGEND:
PROPOSED STORM DRAINAGE LINE
PROPOSED WATER LINE
PROPOSED FIRE PROTECTION LINE
PROPOSED SANITARY SEWER LINE
PROPOSED GAS LINE (BY OTHERS)
PROPOSED UNDERGROUND ELECTRIC LINE
PROPOSED SANITARY SEWER MANHOLE
PROPOSED STORM DRAINAGE MANHOLE
PROPOSED CATCH BASIN
PROPOSED HYDRANT
PROPOSED GAS GATE VALVE
PROPOSED WATER GATE VALVE
PROPOSED TAP AND SLEEVE VALVE
CB
APPROX. LOCATION OF ENGINEERED SOIL BARRIER
1 PVMT. TO BE DISTURBED BYCONSTRUCTION. GC TO RETURN TO EX.CONDITIONS AFTER UTILITY WORK ISCOMPLETE
EBP2DRAWING NUMBER
JOBNUMBER
SC
ALE
: AS
SH
OW
ND
RA
WN
BY
:C
HE
CK
ED
BY
:
c COPYRIGHT HMFH ARCHITECTS, INC.
REVISIONS NO. DATE REMARKS BY
Arli
ngto
n H
igh
Sch
ool
Mas
sach
uset
ts A
venu
e, A
rling
ton,
Mas
sach
uset
ts
JPH
/ FA
17211
JPH
/ TM
C
20 A
Str
eet
Fram
ingh
am,
MA
0170
1
T 5
08.8
77.6
688
F 5
08.8
77.8
349
ww
w.s
amio
tes.
com
Sam
iote
s Co
nsul
tant
s In
c.Ci
vil E
ngin
eers
+ L
and
Surv
eyor
s
EB
P#2
EN
AB
LIN
G A
ND
GE
OTH
ER
MA
L W
ELL
FIE
LDB
ID D
OC
UM
EN
TS 0
2-14
-202
0
a bc
e d
KEYPLAN
1 02/28/2020
2 03/12/2020
Approximatelocation ofAeroqual DustSentry Monitor(East)
McPhail Associates LLC
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
6/26/2020 7/1/2020 7/6/2020 7/11/2020 7/16/2020 7/21/2020 7/26/2020 7/31/2020 8/5/2020 8/10/2020 8/15/2020 8/20/2020 8/25/2020 8/30/2020
Arlington High School - Dust Monitoring Report
Aeroqual Dust Sentry Monitor (West) - 06/26/2020 thru 08/31/2020
Concentration PM10 (µg/m³)
0
25
50
75
100
125
150
175
200
225
250
275
300
325
350
375
400
6/3/2020 6/8/2020 6/13/2020 6/18/2020 6/23/2020 6/28/2020 7/3/2020 7/8/2020 7/13/2020 7/18/2020 7/23/2020 7/28/2020 8/2/2020 8/7/2020 8/12/2020 8/17/2020 8/22/2020 8/27/2020
Arlington High School - Dust Monitoring Report
Aeroqual Dust Sentry Monitor (East) - 06/03/2020 thru 08/31/2020
Concentration PM10 (ug/m3)