airport parkway onramp - webcast.ottawa.ca

1
EXIT EXIT EXIT LANDSCAPED AREA LANDSCAPED AREA REFER TO LANDSCAPING PLAN PROPOSED RETIREMENT HOME FF=93.80 BSMT SLAB=90.70 USF=90.40 PROPOSED HOTEL FF=93.20 BSMT SLAB=90.10 USF=89.80 DC EX CONC SIDEWALK EX CONC SIDEWALK EX CONC SIDEWALK EXISTING CL OF DITCH @ 4.40% EXISTING CL OF DITCH @ 3.50% TOP OF SLOPE TOP OF SLOPE HUNT CLUB ROAD AIRPORT PARKWAY ONRAMP 22.25m 2.4m 0.7m 3.2m CENTERLINE OF HUNT CLUB ROAD (CALCULATED BY EDGE OF PAVEMENTS PER ANNEX 1) 22.25m APPROXIMATE LOCATION OF ROW SIAMESE LOCATION RM WM EXIT ENTRANCE ENTRANCE SIAMESE LOCATION RM WM PROPOSED OPAQUE SCREEN 2.0m HIGH BH 1 T/G = 94.42 GWL = 90.46 (March 9, 2017) BH 2 T/G = 94.44 GWL = 90.43 (March 9, 2017) BH 3 T/G = 93.68 GWL = 90.33 (March 9, 2017) BH 4 T/G = 93.51 GWL = 90.51 (April 12, 2017) BH 5 T/G = 93.64 GWL = 90.39 (April 10, 2017) BH 6 T/G = 93.83 GWL = 90.33 (April 11, 2017) BH 7 T/G = 94.59 GWL = 88.59 (April 11, 2017) OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH VC T/G=93.63 FH VB VB CB T/G=93.78 CB T/G=90.64 CB T/G=88.90 CB T/G=88.93 DICB DICB CBMH T/G=92.27 CBMH T/G=92.20 CBMH T/G=91.41 CBMH T/G=89.91 STMH T/G=89.18 STMH T/G=91.86 SAMH200 T/G=92.23 SAMH202 T/G=92.40 TMH T/G=89.47 TMH T/G=89.75 HH GV JUL UP UP UP GW GW GW JUL JUL JUL LS OH OH OH STMH CB T/G=93.27 SAMH T/G=92.50 46.5m-225mmØ AC SAN @ 0.97% 20.2m-225mmØ AC SAN @ 0.05% 17.6m-450mmØ CONC SAN @ 0.51% W.INV=90.78 N.INV=90.33 E.INV=90.33 N.INV=90.24 S.INV=90.32 W.INV=90.22 S.INV=90.15 EX. 600mmØ WATERMAIN EX. 400mmØ WATERMAIN 87.0m-450mmØ CONC SAN SAMH SAMH 82.0m-450mmØ CONC SAN STMH G G G G G G G G G G G G G G G G G G G G G G G G ABND 300mm GAS ABND 300mm GAS 300mm GAS 300mm GAS 300mm GAS EX. 600mmØ WATERMAIN 1800mm STM U/G UTILITIES WIRE E.INV=90.12 OH OH OH OH OH OH OH OH OH OH OH OH 178m-1500mm STM @ 1.40% 450mmØ SAN E.INV=86.44 W.INV=87.08 S.INV=86.40 60.1m-1800mm STM @ 0.50% VB EX. 400mmØ WATERMAIN G G G G G G G G G G G G G G G G G G G G G X X X X X X X X X X X X X X X X X X X X UP SAN INV = 90.60 PROPOSED 150mm Ø PVC DR18 WM PROPOSED 150mm Ø PVC DR18 WM VB VB A T/WM= 91.40 INV.W=88.78 B C VB VB VB PROPOSED TRENCH DRAIN T/G TO MATCH PROPOSED ASPHALT GRADES. SD101 T/G=93.45 INV.SW=92.45 36.4m-250mmØ SUBDRAIN @ 0.50% SD102 T/G=93.28 INV.W=92.27 INV.NE=92.27 SD104 T/G=92.55 INV.NE=91.98 INV.S=91.98 8.6m-250mmØ SUBDRAIN @ 0.50% T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B CONNECT AS PER CITY OF OTTAWA STANDARD S11 INV=89.00 MH103 T/G=92.65 INV.NE=89.61 INV.SE=90.39 INV.W=91.44 4.7m-250mmØ STM @ 1.05% 82.8m-250mmØ STM @ 1.00% PROPOSED 3.0m x 1.8m BOX CULVERT 52.5m LONG MH101 T/G=93.23 54.5m-250mmØ SUBDRAIN @ 1.00% HH SAMH201 T/G=92.57 21.4m - 200mm Ø PVC SAN @ 1.00% 6.9m - 200mmØ SAN @ 1.0% CONNECT AS PER CITY OF OTTAWA STANDARD S11 INV=90.80 SAN INV = 90.88 CONNECT AS PER CITY OF OTTAWA STANDARD S11 INV=90.38 W.INV=90.28 CB T/G=90.14 CONNECT @ 2' O CLOCK WITH VERTICAL RISER AS PER CITY OF OTTAWA STANDARD S11 INV=89.05 STM INV = 92.31 INV=92.19 11.0m - 200mm Ø STM@ 1.00% DRAIN INV = 89.80 D E F AD101 T/G=93.00 AD102 T/G=93.00 AD103 T/G=92.65 AD104 T/G=92.70 SD103 T/G=93.30 INV.N=92.04 INV.SE=92.04 10.6m-250mmØ SUBDRAIN @ 0.54% ALL SERVICES TO BE CAPPED 1.0m FROM FACE OF BUILDING (TYP.) STM INV = 90.10 MH102 T/G=93.23 MH105 T/G=92.67 MH106 T/G=92.81 CB T/G=92.17 BELL MH T/G=92.40 MH104 T/G=92.68 CONNECT AS PER CITY OF OTTAWA STANDARD S11 INV=89.37 2.2m - 200mmØ STM @ 1.0% PROPOSED 3.0m x 1.8m BOX CULVERT 52.5m LONG A A 93.7m-300mmØ SAN B B PROPOSED ICD. SEE 117036-STM1 FOR DETAILS INV.N = 86.70 INV.S=86.79 INV=91.00 90.42 90.42 PROPOSED HOTEL FOUNDATION DRAIN (0.3m) DRAIN INV = 90.40 CONNECT @ 2' O CLOCK WITH VERTICAL RISER AS PER CITY OF OTTAWA STANDARD S11 INV=89.47 16.0m - 200mm FOUNDATION DRAIN @ 1.00% 2.4m - 200mm FOUNDATION DRAIN @ 1.00% PROPOSED RETIREMENT HOME FOUNDATION DRAIN (0.3m) PROPOSED 150mm Ø PVC DR18 WM PROPOSED 150mm Ø PVC DR18 WM FH VB PROPOSED FIRE HYDRANT AND VALVE INSTALLED AS PER CITY OF OTTAWA STANDARD W19 MH107 T/G=92.89 N.INV=90.07 S.INV=90.07 2.8m - 250mm STM @ 1.0% PROPOSED ICD. SEE 117036-STM2 FOR DETAILS 3.0m - 250mm STM @ 1.0% INV=90.44 PROPOSED OGS UNIT SD105 T/G=93.23 INV.NW=92.23 INV.E=92.23 34.3m-250mmØ SUBDRAIN @ 0.55% PAT DOWN R HAWK CR KILL- MINA PIGEON TR LN DEER BA MCCARTHY RD AIRPORT PARKWAY AU BRIDLE PATH DR CAROUSEL WY FARRIERS FOX HAMBLEDON CT HUNTERS MOZART SARAT SOUTHDOWN CT TRAPPER'S RD WYLDE CPR NAY MAC ST MOUNTAIN PIMLICO OGA PL EQUUS CR CR POINT CR HOLLOW CR LN BANK ST THGATE RD PL WYMAN CR WYMAN PL BANKVIEW COBBLER PATTERMEAD CR SPARR TRUSTY WAXWING RICK RD OW WY BA CT PL DR ARDEN CT KENDRON (HWY 31 ) HUNT CLUB ROAD + 90.10 + 89.85 + 89.70 1800 + 91.90 250 250 + 92.15 3000 + 200mmØ STM @ 1.0% 1600 100YR LEVEL=91.70 + 92.67 CSA=4.778m² 520 GENERAL PLAN OF SERVICES PHASE 2 CITY OF OTTAWA HUNT CLUB DEVELOPMENT 117036-00 REV # 5 117036-GP2 MTL GJM MTL GJM GJM M:\2017\117036\CAD\Design\117036_GP.dwg, GP2, Nov 24, 2017 - 11:27am, jmarcuccio PLANA1.DWG - 841mmx594mm PROJECT No. REV DRAWING No. DRAWING NAME LOCATION No. REVISION DATE BY FOR REVIEW ONLY SCALE APPROVED CHECKED DRAWN CHECKED DESIGN Engineers, Planners & Landscape Architects Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario, Canada K2M 1P6 Telephone (613) 254-9643 Facsimile (613) 254-5867 Website www.novatech-eng.com N.T.S. NORTH KEY PLAN 1. ISSUED FOR SITE PLAN APPLICATION MAY 25/17 GJM ELEV: 94.49 SITE BENCHMARK REFERENCED TO LOCAL GEODETIC DATUM 1:300 12 0 1:300 6 9 3 SEWER NOTES: 1. SPECIFICATIONS: ITEM SPEC. No. REFERENCE CATCHBASIN (600x600mm) 705.010 OPSD STORM / SANITARY MANHOLE (1200Ø) 701.010 OPSD CB, FRAME & COVER 400.020 OPSD STORM / SANITARY MH FRAME & COVER 401.010 OPSD SEWER TRENCH - BEDDING (GRANULAR A) COVER (GRANULAR A OR GRANULAR B TYPE I, WITH MAXIMUM PARTICLE SIZE=25mm) STORM SEWER PVC DR 35 SANITARY SEWER PVC DR 35 CATCHBASIN LEAD PVC DR 35 2. INSULATE ALL PIPES (SAN/STM) THAT HAVE LESS THAN 1.5m COVER WITH 50mmX1200mm HI-40 INSULATION. PROVIDE 150mm CLEARANCE BETWEEN PIPE AND INSULATION. 3. SERVICES ARE TO BE CONSTRUCTED TO 1.0m FROM FACE OF BUILDING AT A MINIMUM SLOPE OF 1.0%. 4. PIPE BEDDING, COVER AND BACKFILL ARE TO BE COMPACTED TO AT LEAST 98% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. THE USE OF CLEAR CRUSHED STONE AS A BEDDING LAYER SHALL NOT BE PERMITTED. 5. FLEXIBLE CONNECTIONS ARE REQUIRED FOR CONNECTING PIPES TO MANHOLES (FOR EXAMPLE KOR-N-SEAL, PSX: POSITIVE SEAL AND DURASEAL). THE CONCRETE CRADLE FOR THE PIPE CAN BE ELIMINATED. 6. THE OWNER SHALL REQUIRE THAT THE SITE SERVICING CONTRACTOR PERFORM FIELD TESTS FOR QUALITY CONTROL OF ALL SANITARY SEWERS. LEAKAGE TESTING SHALL BE COMPLETED IN ACCORDANCE WITH OPSS 410.07.16, 410.07.16.04 AND 407.07.24. DYE TESTING IS TO BE COMPLETED ON ALL SANITARY SERVICES TO CONFIRM PROPER CONNECTION TO THE SANITARY SEWER MAIN. THE FIELD TESTS SHALL BE PERFORMED IN THE PRESENCE OF A CERTIFIED PROFESSIONAL ENGINEER WHO SHALL SUBMIT A CERTIFIED COPY OF THE TEST RESULTS. 7. STORM MANHOLES AND CBMHS ARE TO HAVE 300mm SUMPS UNLESS OTHERWISE INDICATED. 8. CONTRACTOR TO TELEVISE (CCTV) ALL PROPOSED SEWERS, 200mmØ OR GREATER PRIOR TO BASE COURSE ASPHALT. UPON COMPLETION OF CONTRACT, THE CONTRACTOR IS RESPONSIBLE TO FLUSH AND CLEAN ALL SEWERS & APPURTENANCES. WATERMAIN NOTES: 1. SPECIFICATIONS: ITEM SPEC. No. REFERENCE WATERMAIN TRENCHING W17 CITY OF OTTAWA THERMAL INSULATION IN SHALLOW TRENCHES W22 CITY OF OTTAWA WATERMAIN CROSSING BELOW SEWER W25 CITY OF OTTAWA WATERMAIN PVC DR 18 2. SUPPLY AND CONSTRUCT ALL WATERMAINS AND APPURTENANCES IN ACCORDANCE WITH THE CITY OF OTTAWA STANDARDS AND SPECIFICATIONS. EXCAVATION, INSTALLATION, BACKFILL AND RESTORATION OF ALL WATERMAINS BY THE CONTRACTOR. CONNECTIONS AND SHUT-OFFS AT THE MAIN AND CHLORINATION OF THE WATER SYSTEM SHALL BE PERFORMED BY CITY OFFICIALS. 3. WATERMAIN SHALL BE MINIMUM 2.4m DEPTH BELOW GRADE UNLESS OTHERWISE INDICATED. 4. PROVIDE MINIMUM 0.25m CLEARANCE BETWEEN OUTSIDE OF PIPES AT ALL CROSSINGS. 5. WATER SERVICE IS TO BE CONSTRUCTED TO WITHIN 1.0m OF FOUNDATION WALL AND CAPPED, UNLESS OTHERWISE INDICATED. 6. WATER DEMAND HAS BEEN CALCULATED AND INCLUDED IN THE "SERVICING AND STORMWATER MANAGEMENT REPORT" PREPARED BY NOVATECH GENERAL NOTES: 1. COORDINATE AND SCHEDULE ALL WORK WITH OTHER TRADES AND CONTRACTORS. 2. DETERMINE THE EXACT LOCATION, SIZE, MATERIAL AND ELEVATION OF ALL EXISTING UTILITIES PRIOR TO COMMENCING CONSTRUCTION. PROTECT AND ASSUME RESPONSIBILITY FOR ALL EXISTING UTILITIES WHETHER OR NOT SHOWN ON THIS DRAWING. 3. OBTAIN ALL NECESSARY PERMITS AND APPROVALS FROM THE CITY OF OTTAWA BEFORE COMMENCING CONSTRUCTION. 4. BEFORE COMMENCING CONSTRUCTION OBTAIN AND PROVIDE PROOF OF COMPREHENSIVE, ALL RISK AND OPERATIONAL LIABILITY INSURANCE FOR $5,000,000.00. INSURANCE POLICY TO NAME OWNERS, ENGINEERS AND ARCHITECTS AS CO-INSURED. 5. RESTORE ALL DISTURBED AREAS ON-SITE AND OFF-SITE, INCLUDING TRENCHES AND SURFACES ON PUBLIC ROAD ALLOWANCES TO EXISTING CONDITIONS OR BETTER TO THE SATISFACTION OF THE CITY OF OTTAWA AND ENGINEER. NOTE: CONTRACTOR TO ADJUST ANY AFFECTED MANHOLE COVERS, WATERMAIN SHUT OFF VALVES OR OTHER MANHOLE COVERS IN AREAS OF CONSTRUCTION TO NEWLY CONSTRUCTED GRADE ELEVATIONS. ANY MANHOLE STRUCTURES NOT ON THIS PLAN WITHIN THE AREA OF CONSTRUCTION ALSO TO BE ADJUSTED AND ENGINEER TO BE NOTIFIED. 6. REMOVE FROM SITE ALL EXCESS EXCAVATED MATERIAL, ORGANIC MATERIAL AND DEBRIS UNLESS OTHERWISE INSTRUCTED BY ENGINEER. EXCAVATE AND REMOVE FROM SITE ANY CONTAMINATED MATERIAL. ALL CONTAMINATED MATERIAL SHALL BE DISPOSED OF AT A LICENSED LANDFILL FACILITY. 7. ALL ELEVATIONS ARE GEODETIC. 8. REFER TO GEOTECHNICAL REPORT (No. PG4091-1, DATED APR 24 2017), PREPARED BY PATERSON GROUP FOR SUBSURFACE CONDITIONS, CONSTRUCTION RECOMMENDATIONS, AND GEOTECHNICAL INSPECTION REQUIREMENTS. THE GEOTECHNICAL CONSULTANT IS TO REVIEW ON-SITE CONDITIONS AFTER EXCAVATION PRIOR TO PLACEMENT OF THE GRANULAR MATERIAL. 9. REFER TO ARCHITECT'S AND LANDSCAPE ARCHITECT'S DRAWINGS FOR BUILDING AND HARDSURFACE AREAS AND DIMENSIONS. 10. REFER TO STORMWATER MANAGEMENT REPORT(R-2017-058) PREPARED BY NOVATECH ENGINEERING CONSULTANTS LTD. 11. SAW CUT AND KEY GRIND ASPHALT AT ALL ROAD CUTS AND ASPHALT TIE IN POINTS AS PER CITY OF OTTAWA STANDARDS (R10). 12. PROVIDE LINE/PARKING PAINTING. 13. CONTRACTOR TO PROVIDE THE CONSULTANT WITH A GENERAL PLAN OF SERVICES INDICATING ALL SERVICING AS-BUILT INFORMATION SHOWN ON THIS PLAN. AS-BUILT INFORMATION MUST INCLUDE: PIPE MATERIAL, SIZES, LENGTHS, SLOPES, I INVERT AND T/G ELEVATIONS, STRUCTURE LOCATIONS, VALVE AND HYDRANT LOCATIONS, T/WM ELEVATIONS AND ANY ALIGNMENT CHANGES, ETC. SITE PAVEMENT STRUCTURE: LIGHT DUTY 50mm HL3 150mm GRAN "A" 300mm GRAN "B" TYPE II HEAVY DUTY 40mm HL3 50mm HL8 150mm GRAN "A" 450mm GRAN "B" TYPE II NOTE: ALL LOCATIONS SHOWN ON PLAN OF STRUCTURES AND UTILITIES ARE APROXIMATE. BEFORE STARTING WORK, DETERMINE THE EXACT LOCATION OF ALL SUCH UTILITIES AND STRUCTURES AND ASSUME ALL LIABILITY FOR DAMAGE TO THEM. PIPE CROSSINGS NO. TOP OF WATERMAIN STORM INV A SANITARY INV CLEARANCE (MIN) 0.50 (W25) B C 89.57 CLEARANCE (ACTUAL) 90.80 0.83 0.50 (W25) 89.55 90.80 0.85 90.38 89.52 0.61 0.50 (W25) D 0.50 (W25) E F 90.85 1.53 0.25 (W25.2) 88.97 90.52 0.60 88.95 0.62 89.07 90.52 0.25 (W25.2) SECTION 'B' - HOTEL WATER STORAGE TANK SCALE: 1:75 LEGEND PROPOSED PROPERTY LINE EXISTING LEGAL ADJACENT LINE EXISTING STANDARD IRON BAR / SIB/ CP EXISTING JOINT USE STREET LIGHT EXISTING STREET LIGHT GV EXISTING GAS VALVE EXISTING GAS MAIN EXISTING OVER HEAD WIRE EXISTING BELL CONDUIT HP/UP EXISTING HYDRO/UTILITY POLE EXISTING GUY WIRE EXISTING TRAFFIC HAND HOLE EXISTING TRAFFIC MANHOLE VC HYD VB 225mmØ EXISITING FLOW DIRECTION OF SEWERS EXISITING SANITARY MANHOLE & SEWER EXISITING STORM MANHOLE & SEWER EXISITING WATERMAIN VALV E CHAMBE VB EXISITING WATERMAIN SHUT-OFF VALVE BOX 400mmØ WM EXISTING WATERMAIN EXISTING HYDRANT C/W LEAD & SHUT OFF VALVE BOX EXISTING TRAFFIC SIGN EXISTING ABANDONED GAS MAIN GW TMH CONTROL POINT 1500mmØ CB EXISITING CATCH BASIN DICB EXISITING DITCH INLET CATCH BASIN JUL LS G G HH B B OH PROPOSED WATERMAIN PROPOSED VALVE BOX VB PROPOSED SANITARY SEWER PROPOSED STORM SEWER PROPOSED STORM TRENCH DRAIN PROPOSED CAP PROPOSED STORM MANHOLE WATERMAIN TABLE STATION SURFACE ELEVATION DESCRIPTION TOP OF WM ELEVATION 1+000 90.25 CONNECT TO EXISTING 400mmØ WM 90° THRUST BLOCK AT CONNECTION 1+012.4 92.93 90.53 PROPOSED VALVE 1+015.5 PROPOSED CROSSING OVER PROP. STORM 93.00 90.52 1+017.1 93.03 89.70 88.02 DUAL 150mm Ø WATERMAIN FROM TEE TO HOTEL CONNECTION TO BUILDING NOTE: THE POSITION OF ALL POLE LINES, CONDUITS, WATERMAINS, SEWERS AND OTHER UNDERGROUND AND OVERGROUND UTILITIES AND STRUCTURES IS NOT NECESSARILY SHOWN ON THE CONTRACT DRAWINGS, AND WHERE SHOWN, THE ACCURACY OF THE POSITION OF SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED. BEFORE STARTING WORK, DETERMINE THE EXACT LOCATION OF ALL SUCH UTILITIES AND STRUCTURES AND ASSUME ALL LIABILITY FOR DAMAGE TO THEM. UNDERGROUND PARKING LIMITS NOTE: WHERE PROPOSED WATERMAIN IS LESS THAN 2.4m BELOW GRADE, INSULATE WATERMAIN PER CITY OF OTTAWA STANDARD W22. D07-12-17-0068 2. REVISED PER CITY COMMENTS SEPT 7/17 GJM PROPOSED FOUNDATION DRAIN STORM ICD TABLE STR. NO MH103 T/G 92.65 IN 90.39 ICD MODEL/SIZE 100-YR HEAD (m) RELEASE RATE (L/s) INVERT 55mm IPEX TEMPEST LMF 14 1.65 2.4 MH107 92.89 90.07 1.63 2.1 55mm IPEX TEMPEST LMF 14 IN TANK 92.04 100YR WL 91.70 3. ADDITION OF STORM ICD TABLE OCT 26/17 GJM 4. ADDITION OF PROPOSED OGS UNIT NOV 15/17 GJM 5. REVISED RETAINING WALL AND WEST PARKING LOT NOV 24/17 GJM

Upload: others

Post on 28-Nov-2021

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AIRPORT PARKWAY ONRAMP - webcast.ottawa.ca

EXIT

EXIT

EX

IT

LAND

SCAPED

AR

EA

LAND

SCAPED

AR

EA

REFER

TO

LAN

DSC

APING

PLAN

PROPOSED RETIREMENT HOME

FF=93.80

BSMT SLAB=90.70

USF=90.40P

RO

PO

SE

D H

OT

EL

FF

=93.2

0

BS

MT

SLA

B=

90.1

0

US

F=

89.8

0

DC

EX CONC SIDEWALK

EX CONC SIDEWALK

EX CONC SIDEWALK

EX

IS

TIN

G C

L O

F D

IT

CH

@

4.40%

E

X

IS

T

IN

G

C

L

O

F

D

IT

C

H

@

3

.5

0

%

TO

P O

F S

LO

PE

TO

P O

F S

LO

PE

HUNT CLUB ROAD

A

IR

P

O

R

T

P

A

R

K

W

A

Y

O

N

R

A

M

P

22.25m

2.4m

0.7m

3.2m

CENTERLINE OF HUNT CLUB ROAD (CALCULATED BY EDGE OF PAVEMENTS PER ANNEX 1)

22.25m

APPROXIMATE LOCATION OF ROW

SIA

ME

SE

LO

CA

TIO

N

RM

WM

EX

IT

ENTR

ANC

E

EN

TR

AN

CE

SIA

ME

SE

LO

CA

TIO

N

RM

WM

PROPOSED

OPAQUE

SCREEN 2.0m

HIGH

BH 1

T/G = 94.42

GWL = 90.46 (March 9, 2017)

BH 2

T/G = 94.44

GWL = 90.43 (March 9, 2017)

BH 3

T/G = 93.68

GWL = 90.33 (March 9, 2017)

BH 4

T/G = 93.51

GWL = 90.51 (April 12, 2017)

BH 5

T/G = 93.64

GWL = 90.39 (April 10, 2017)

BH 6

T/G = 93.83

GWL = 90.33 (April 11, 2017)

BH 7

T/G = 94.59

GWL = 88.59 (April 11, 2017)

OHOH

OHOH

OHOH

OHOH

OHOH

OH

OH OH OH OH OH OH OH OH OH OHOH OH OH OH

OH OH OHOH

OH

OH OH OH OH

VC

T/G=93.63

FH

VB

VB

CB

T/G=93.78

CB

T/G=90.64

CB

T/G=88.90

CB

T/G=88.93

DICB

DICB

CBMH

T/G=92.27

CBMH

T/G=92.20

CBMH

T/G=91.41

CBMH

T/G=89.91

STMH

T/G=89.18

STMH

T/G=91.86

SAMH200

T/G=92.23

SAMH202

T/G=92.40

TMH

T/G=89.47

TMH

T/G=89.75

HH

GV

JUL

UP

UP

UP

GW

GW

GW

JUL

JUL

JUL

LS

OH

OH

OH

STMH

CB

T/G=93.27

SAMH

T/G=92.50

46.5

m-2

25m

AC

SA

N @

0.9

7%

20.2m

-225m

A

C S

AN

@

0.05%

17.6m

-450m

C

ON

C S

AN

@

0.51%

W.INV=90.78

N.INV=90.33

E.INV=90.33

N.INV=90.24

S.INV=90.32

W.INV=90.22

S.INV=90.15

EX. 600mmØ WATERMAIN

EX. 400mmØ WATERMAIN

87.0m-450mmØ CONC SAN

SAMH

SAMH

82.0

m-4

50m

CO

NC

SA

N

STMH

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

ABND 300mm GAS

AB

ND

300m

m G

AS

300mm GAS

300mm GAS

300m

m

G

A

S

EX. 600mmØ WATERMAIN

1

8

0

0

m

m

S

T

M

U

/G

U

T

IL

IT

IE

S

W

IR

E

E.INV=90.12

O

H

O

H

O

H

O

H

O

H

O

H

O

H

O

H

O

H

O

H

O

H

O

H

178m

-1500m

m S

TM

@

1.4

0%

4

5

0

m

m

Ø

S

A

N

E.INV=86.44

W.INV=87.08

S.INV=86.40

6

0

.1

m

-1

8

0

0

m

m

S

T

M

@

0

.5

0

%

VB

E

X

.

4

0

0

m

m

Ø

W

A

T

E

R

M

A

I

N

GG

GG G

GG G

GG

G GG

G

G

G

G

G

G

G

G

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

UP

SA

N IN

V =

90.60

PR

OP

OS

ED

150m

m Ø

P

VC

D

R18 W

M

PR

OP

OS

ED

150m

m Ø

P

VC

D

R18 W

M

VBVB

A

T/W

M=

91.40

INV.W=88.78

B

C

VB

VB

VB

PROPOSED TRENCH DRAIN

T/G TO MATCH PROPOSED

ASPHALT GRADES.

SD101

T/G=93.45

INV.SW=92.45

36.4m-250mmØ SUBDRAIN @ 0.50%

SD102

T/G=93.28

INV.W=92.27

INV.NE=92.27

SD104

T/G=92.55

INV.NE=91.98

INV.S=91.98

8

.

6

m

-

2

5

0

m

m

Ø

S

U

B

D

R

A

I

N

@

0

.

5

0

%

TT

TT

TT

TT

TT

TT T T T T T T T T T

T

T

T

T

T

T

T

T

T

T

T

T

TT

B

B

B

BB

B

B

B

B

B

B

B

B

B

BB

BB

BB

BB

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

CONNECT AS PER CITY OF

OTTAWA STANDARD S11

INV=89.00

MH103

T/G=92.65

INV.NE=89.61

INV.SE=90.39

INV.W=91.44

4.7m

-250m

ST

M @

1.05%

82.8

m-2

50m

ST

M @

1.0

0%

PROPOSED 3.0m x 1.8m BOX

CULVERT 52.5m LONG

MH101

T/G=93.23

54.5m-250mmØ SUBDRAIN @ 1.00%

HH

SAMH201

T/G=92.57

21.4m

- 200m

m Ø

P

VC

S

AN

@

1.00%

6.9m - 200mmØ SAN @ 1.0%

CONNECT AS PER CITY OF

OTTAWA STANDARD S11

INV=90.80

SA

N IN

V =

90.88

CONNECT AS PER CITY OF

OTTAWA STANDARD S11

INV=90.38

W.INV=90.28

CB

T/G=90.14

CONNECT @ 2' O CLOCK WITH

VERTICAL RISER AS PER CITY OF

OTTAWA STANDARD S11

INV=89.05

ST

M IN

V =

92.31

INV=92.19

11.0m

- 200m

m Ø

ST

M@

1.00%

DR

AIN

IN

V =

89.80

D

E

F

AD101

T/G=93.00

AD102

T/G=93.00

AD103

T/G=92.65

AD104

T/G=92.70

SD103

T/G=93.30

INV.N=92.04

INV.SE=92.04

10.6m

-250m

m

ØS

U

B

D

R

A

IN

@

0.54%

ALL SERVICES TO BE

CAPPED 1.0m FROM FACE

OF BUILDING (TYP.)

ST

M IN

V =

90.10

MH102

T/G=93.23

MH105

T/G=92.67

MH106

T/G=92.81

CB

T/G=92.17

BELL MH

T/G=92.40

MH104

T/G=92.68

CONNECT AS PER CITY OF

OTTAWA STANDARD S11

INV=89.37

2.2m - 200mmØ STM @ 1.0%

PROPOSED 3.0m x 1.8m BOX

CULVERT 52.5m LONG

A

A

93.7

m-3

00m

SA

N

B

B

PROPOSED ICD. SEE

117036-STM1 FOR DETAILS

INV.N = 86.70

INV.S=86.79

INV=91.00

90.42

90.42

PROPOSED HOTEL

FOUNDATION DRAIN (0.3m)

DR

AIN

IN

V =

90.40

CONNECT @ 2' O CLOCK

WITH VERTICAL RISER AS

PER CITY OF OTTAWA

STANDARD S11

INV=89.47

16.0m

- 200m

m F

OU

ND

AT

IO

N

DR

AIN

@

1.00%

2.4m - 200mm

FOUNDATION

DRAIN @ 1.00%

PROPOSED RETIREMENT HOME

FOUNDATION DRAIN (0.3m)

PR

OP

OS

ED

150m

m Ø

P

VC

D

R18 W

M

PR

OP

OS

ED

150m

m Ø

P

VC

D

R18 W

M

FH

VB

PROPOSED FIRE HYDRANT AND

VALVE INSTALLED AS PER CITY

OF OTTAWA STANDARD W19

MH107

T/G=92.89

N.INV=90.07

S.INV=90.07

2.8m - 250mm

STM @ 1.0%

PROPOSED ICD. SEE

117036-STM2 FOR DETAILS

3.0m - 250mm

STM @ 1.0%

INV=90.44

PROPOSED

OGS UNIT

SD105

T/G=93.23

INV.NW=92.23

INV.E=92.23

34.3m

-250m

S

UB

DR

AIN

@

0.55%

P

A

T

D

O

W

N

C

A

H

I

L

L

D

R

H

A

W

K

C

R

KIL

L-

MINA

P

I

G

E

O

N

T

R

LN

DE

ER

BA

M

C

C

A

R

T

H

Y

R

D

A

IR

P

O

R

T

P

A

R

K

W

A

Y

A

U

T

U

M

N

W

O

O

D

S

T

B

R

I

D

L

E

P

A

T

H

D

R

C

A

R

O

U

S

E

L

W

Y

F

A

R

R

I

E

R

S

F

O

X

H

A

M

B

L

E

D

O

N

C

T

H

U

N

T

E

R

S

M

O

Z

A

R

T

S

A

R

A

T

S

O

U

T

H

D

O

W

N

C

T

T

R

A

P

P

E

R

'S

R

D

W

Y

L

D

E

W

O

O

D

S

T

C

P

R

F

O

N

T

E

N

A

Y

M

A

C

S

T

M

O

U

N

T

A

I

N

P

I

M

L

I

C

O

O

G

A

P

L

E

Q

U

U

S

C

R

C

R

P

O

I

N

TC

R

H

O

L

L

O

W

C

R

L

N

B

A

N

K

S

T

S

O

U

T

H

G

A

T

E

R

D

P

L

U

P

L

A

N

D

S

D

R

W

Y

M

A

N

C

R

WY

MA

N P

L

B

A

N

K

V

I

E

W

C

O

B

B

L

E

R

P

A

T

T

E

R

M

E

A

D

C

R

S

P

A

R

R

T

R

U

S

T

Y

W

A

X

W

I

N

G

R

I

C

K

R

D

O

W

W

Y

B

A

C

T

P

L

D

R

A

R

D

E

N

C

T

K

E

N

D

R

O

N

(HW

Y 31 )

H

U

N

T

C

L

U

B

R

O

A

D

+90.10

+89.85

+

89.70

1800

+91.90

250

250

+

92.15

3000

+

200mmØ STM @ 1.0%

1600

100YR LEVEL=91.70

+

92.67

CSA=4.778m²

520

GENERAL PLAN OF SERVICES

PHASE 2

CITY OF OTTAWA

HUNT CLUB DEVELOPMENT

117036-00

REV # 5

117036-GP2

MTL

GJM

MTL

GJM

GJM

M:\2

01

7\1

17

03

6\C

AD

\D

esig

n\1

17

03

6_

GP

.d

wg

, G

P2

, N

ov 2

4, 2

01

7 - 1

1:2

7a

m, jm

arcu

ccio

PLANA1.DWG - 841mmx594mm

PROJECT No.

REV

DRAWING No.

DRAWING NAME

LOCATION

No. REVISION DATEBY

FOR REVIEW ONLY

SCALE

APPROVED

CHECKED

DRAWN

CHECKED

DESIGN

Engineers, Planners & Landscape Architects

Suite 200, 240 Michael Cowpland Drive

Ottawa, Ontario, Canada K2M 1P6

Telephone (613) 254-9643

Facsimile (613) 254-5867

Website www.novatech-eng.com

N.T.S.

NORTH KEY PLAN

1. ISSUED FOR SITE PLAN APPLICATION MAY 25/17 GJM

ELEV: 94.49

SITE BENCHMARK

REFERENCED TO LOCAL

GEODETIC DATUM

1:300

120

1:300

6 93

SEWER NOTES:

1. SPECIFICATIONS:

ITEM SPEC. No. REFERENCE

CATCHBASIN (600x600mm) 705.010 OPSD

STORM / SANITARY MANHOLE (1200Ø) 701.010 OPSD

CB, FRAME & COVER 400.020 OPSD

STORM / SANITARY MH FRAME & COVER 401.010 OPSD

SEWER TRENCH - BEDDING (GRANULAR A)

COVER (GRANULAR A OR GRANULAR B TYPE I,

WITH MAXIMUM PARTICLE SIZE=25mm)

STORM SEWER PVC DR 35

SANITARY SEWER PVC DR 35

CATCHBASIN LEAD PVC DR 35

2. INSULATE ALL PIPES (SAN/STM) THAT HAVE LESS THAN 1.5m COVER WITH

50mmX1200mm HI-40 INSULATION. PROVIDE 150mm CLEARANCE BETWEEN PIPE AND

INSULATION.

3. SERVICES ARE TO BE CONSTRUCTED TO 1.0m FROM FACE OF BUILDING AT A

MINIMUM SLOPE OF 1.0%.

4. PIPE BEDDING, COVER AND BACKFILL ARE TO BE COMPACTED TO AT LEAST 98% OF

THE STANDARD PROCTOR MAXIMUM DRY DENSITY. THE USE OF CLEAR CRUSHED

STONE AS A BEDDING LAYER SHALL NOT BE PERMITTED.

5. FLEXIBLE CONNECTIONS ARE REQUIRED FOR CONNECTING PIPES TO MANHOLES

(FOR EXAMPLE KOR-N-SEAL, PSX: POSITIVE SEAL AND DURASEAL). THE CONCRETE

CRADLE FOR THE PIPE CAN BE ELIMINATED.

6. THE OWNER SHALL REQUIRE THAT THE SITE SERVICING CONTRACTOR PERFORM

FIELD TESTS FOR QUALITY CONTROL OF ALL SANITARY SEWERS. LEAKAGE TESTING

SHALL BE COMPLETED IN ACCORDANCE WITH OPSS 410.07.16, 410.07.16.04 AND

407.07.24. DYE TESTING IS TO BE COMPLETED ON ALL SANITARY SERVICES TO

CONFIRM PROPER CONNECTION TO THE SANITARY SEWER MAIN. THE FIELD TESTS

SHALL BE PERFORMED IN THE PRESENCE OF A CERTIFIED PROFESSIONAL

ENGINEER WHO SHALL SUBMIT A CERTIFIED COPY OF THE TEST RESULTS.

7. STORM MANHOLES AND CBMHS ARE TO HAVE 300mm SUMPS UNLESS OTHERWISE

INDICATED.

8. CONTRACTOR TO TELEVISE (CCTV) ALL PROPOSED SEWERS, 200mmØ OR GREATER

PRIOR TO BASE COURSE ASPHALT. UPON COMPLETION OF CONTRACT, THE

CONTRACTOR IS RESPONSIBLE TO FLUSH AND CLEAN ALL SEWERS &

APPURTENANCES.

WATERMAIN NOTES:

1. SPECIFICATIONS:

ITEM SPEC. No. REFERENCE

WATERMAIN TRENCHING W17 CITY OF OTTAWA

THERMAL INSULATION IN SHALLOW TRENCHES W22 CITY OF OTTAWA

WATERMAIN CROSSING BELOW SEWER W25 CITY OF OTTAWA

WATERMAIN PVC DR 18

2. SUPPLY AND CONSTRUCT ALL WATERMAINS AND APPURTENANCES IN ACCORDANCE WITH THE

CITY OF OTTAWA STANDARDS AND SPECIFICATIONS. EXCAVATION, INSTALLATION, BACKFILL

AND RESTORATION OF ALL WATERMAINS BY THE CONTRACTOR. CONNECTIONS AND

SHUT-OFFS AT THE MAIN AND CHLORINATION OF THE WATER SYSTEM SHALL BE PERFORMED

BY CITY OFFICIALS.

3. WATERMAIN SHALL BE MINIMUM 2.4m DEPTH BELOW GRADE UNLESS OTHERWISE INDICATED.

4. PROVIDE MINIMUM 0.25m CLEARANCE BETWEEN OUTSIDE OF PIPES AT ALL CROSSINGS.

5. WATER SERVICE IS TO BE CONSTRUCTED TO WITHIN 1.0m OF FOUNDATION WALL AND CAPPED,

UNLESS OTHERWISE INDICATED.

6. WATER DEMAND HAS BEEN CALCULATED AND INCLUDED IN THE "SERVICING AND STORMWATER

MANAGEMENT REPORT" PREPARED BY NOVATECH

GENERAL NOTES:

1. COORDINATE AND SCHEDULE ALL WORK WITH OTHER TRADES AND CONTRACTORS.

2. DETERMINE THE EXACT LOCATION, SIZE, MATERIAL AND ELEVATION OF ALL EXISTING

UTILITIES PRIOR TO COMMENCING CONSTRUCTION. PROTECT AND ASSUME

RESPONSIBILITY FOR ALL EXISTING UTILITIES WHETHER OR NOT SHOWN ON THIS

DRAWING.

3. OBTAIN ALL NECESSARY PERMITS AND APPROVALS FROM THE CITY OF OTTAWA

BEFORE COMMENCING CONSTRUCTION.

4. BEFORE COMMENCING CONSTRUCTION OBTAIN AND PROVIDE PROOF OF

COMPREHENSIVE, ALL RISK AND OPERATIONAL LIABILITY INSURANCE FOR

$5,000,000.00. INSURANCE POLICY TO NAME OWNERS, ENGINEERS AND ARCHITECTS

AS CO-INSURED.

5. RESTORE ALL DISTURBED AREAS ON-SITE AND OFF-SITE, INCLUDING TRENCHES AND

SURFACES ON PUBLIC ROAD ALLOWANCES TO EXISTING CONDITIONS OR BETTER TO

THE SATISFACTION OF THE CITY OF OTTAWA AND ENGINEER.

NOTE:

CONTRACTOR TO ADJUST

ANY AFFECTED MANHOLE

COVERS, WATERMAIN

SHUT OFF VALVES OR

OTHER MANHOLE COVERS

IN AREAS OF

CONSTRUCTION TO NEWLY

CONSTRUCTED GRADE

ELEVATIONS.

ANY MANHOLE

STRUCTURES NOT ON THIS

PLAN WITHIN THE AREA OF

CONSTRUCTION ALSO TO

BE ADJUSTED AND

ENGINEER TO BE NOTIFIED.

6. REMOVE FROM SITE ALL EXCESS EXCAVATED MATERIAL, ORGANIC MATERIAL AND

DEBRIS UNLESS OTHERWISE INSTRUCTED BY ENGINEER. EXCAVATE AND REMOVE

FROM SITE ANY CONTAMINATED MATERIAL. ALL CONTAMINATED MATERIAL SHALL

BE DISPOSED OF AT A LICENSED LANDFILL FACILITY.

7. ALL ELEVATIONS ARE GEODETIC.

8. REFER TO GEOTECHNICAL REPORT (No. PG4091-1, DATED APR 24 2017), PREPARED BY

PATERSON GROUP FOR SUBSURFACE CONDITIONS, CONSTRUCTION

RECOMMENDATIONS, AND GEOTECHNICAL INSPECTION REQUIREMENTS. THE

GEOTECHNICAL CONSULTANT IS TO REVIEW ON-SITE CONDITIONS AFTER EXCAVATION

PRIOR TO PLACEMENT OF THE GRANULAR MATERIAL.

9. REFER TO ARCHITECT'S AND LANDSCAPE ARCHITECT'S DRAWINGS FOR BUILDING

AND HARDSURFACE AREAS AND DIMENSIONS.

10. REFER TO STORMWATER MANAGEMENT REPORT(R-2017-058) PREPARED BY

NOVATECH ENGINEERING CONSULTANTS LTD.

11. SAW CUT AND KEY GRIND ASPHALT AT ALL ROAD CUTS AND ASPHALT TIE IN POINTS

AS PER CITY OF OTTAWA STANDARDS (R10).

12. PROVIDE LINE/PARKING PAINTING.

13. CONTRACTOR TO PROVIDE THE CONSULTANT WITH A GENERAL PLAN OF SERVICES

INDICATING ALL SERVICING AS-BUILT INFORMATION SHOWN ON THIS PLAN.

AS-BUILT INFORMATION MUST INCLUDE: PIPE MATERIAL, SIZES, LENGTHS, SLOPES, I

INVERT AND T/G ELEVATIONS, STRUCTURE LOCATIONS, VALVE AND HYDRANT

LOCATIONS, T/WM ELEVATIONS AND ANY ALIGNMENT CHANGES, ETC.

SITE

PAVEMENT STRUCTURE:

LIGHT DUTY

50mm HL3

150mm GRAN "A"

300mm GRAN "B" TYPE II

HEAVY DUTY

40mm HL3

50mm HL8

150mm GRAN "A"

450mm GRAN "B" TYPE II

NOTE:

ALL LOCATIONS SHOWN ON

PLAN OF STRUCTURES AND

UTILITIES ARE APROXIMATE.

BEFORE STARTING WORK,

DETERMINE THE EXACT

LOCATION OF ALL SUCH

UTILITIES AND STRUCTURES

AND ASSUME ALL LIABILITY

FOR DAMAGE TO THEM.

PIPE CROSSINGS

NO.

TOP OF

WATERMAIN

STORM

INV

A

SANITARY

INV

CLEARANCE

(MIN)

0.50 (W25)

B

C

89.57

CLEARANCE

(ACTUAL)

90.800.83

0.50 (W25)89.55

90.800.85

90.3889.52 0.61 0.50 (W25)

D0.50 (W25)

E

F

90.85 1.53

0.25 (W25.2)88.97

90.520.60

88.95 0.62

89.07

90.520.25 (W25.2)

SECTION 'B' - HOTEL WATER STORAGE TANK

SCALE: 1:75

LEGEND

PROPOSED PROPERTY LINE

EXISTING LEGAL ADJACENT LINE

EXISTING STANDARD IRON BAR /

SIB/

CP

EXISTING JOINT USE STREET LIGHT

EXISTING STREET LIGHT

GV

EXISTING GAS VALVE

EXISTING GAS MAIN

EXISTING OVER HEAD WIRE

EXISTING BELL CONDUIT

HP/UP

EXISTING HYDRO/UTILITY POLE

EXISTING GUY WIRE

EXISTING TRAFFIC HAND HOLE

EXISTING TRAFFIC MANHOLE

VCHYD

VB

225mmØ

EXISITING FLOW DIRECTION OF SEWERS

EXISITING SANITARY MANHOLE & SEWER

EXISITING STORM MANHOLE & SEWER

EXISITING WATERMAIN VALV E CHAMBER

VB

EXISITING WATERMAIN SHUT-OFF

VALVE BOX

400mmØ WM

EXISTING WATERMAIN

EXISTING HYDRANT C/W LEAD

& SHUT OFF VALVE BOX

EXISTING TRAFFIC SIGN

EXISTING ABANDONED GAS MAIN

GW

TMH

CONTROL POINT

1500mmØ

CB

EXISITING CATCH BASIN DICB

EXISITING DITCH INLET

CATCH BASIN

JUL

LS

G

G

HH

B B

OH

PROPOSED WATERMAIN

PROPOSED VALVE BOX

VB

PROPOSED SANITARY SEWER

PROPOSED STORM SEWER

PROPOSED STORM TRENCH DRAIN

PROPOSED CAP

PROPOSED STORM MANHOLE

WATERMAIN TABLE

STATION

SURFACE

ELEVATION

DESCRIPTION

TOP OF WM

ELEVATION

1+000 90.25

CONNECT TO EXISTING 400mmØ WM

90° THRUST BLOCK AT CONNECTION

1+012.4 92.93 90.53PROPOSED VALVE

1+015.5PROPOSED CROSSING OVER PROP. STORM

93.00 90.52

1+017.1 93.03 89.70

88.02

DUAL 150mm Ø WATERMAIN FROM TEE TO HOTEL

CONNECTION TO BUILDING

NOTE:

THE POSITION OF ALL POLE LINES,

CONDUITS, WATERMAINS, SEWERS

AND OTHER UNDERGROUND AND

OVERGROUND UTILITIES AND

STRUCTURES IS NOT NECESSARILY

SHOWN ON THE CONTRACT

DRAWINGS, AND WHERE SHOWN, THE

ACCURACY OF THE POSITION OF

SUCH UTILITIES AND STRUCTURES IS

NOT GUARANTEED. BEFORE

STARTING WORK, DETERMINE THE

EXACT LOCATION OF ALL SUCH

UTILITIES AND STRUCTURES AND

ASSUME ALL LIABILITY FOR DAMAGE

TO THEM.

UNDERGROUND PARKING LIMITS

NOTE:

WHERE PROPOSED WATERMAIN IS LESS THAN 2.4m BELOW GRADE,

INSULATE WATERMAIN PER CITY OF OTTAWA STANDARD W22.

D07-12-17-0068

2. REVISED PER CITY COMMENTS SEPT 7/17 GJM

PROPOSED FOUNDATION DRAIN

STORM ICD TABLE

STR. NO

MH103

T/G

92.65

IN

90.39

ICD MODEL/SIZE

100-YR HEAD

(m)

RELEASE

RATE (L/s)

INVERT

55mm IPEX TEMPEST LMF 14

1.65 2.4

MH107 92.89

90.07

1.63 2.1

55mm IPEX TEMPEST LMF 14

IN TANK

92.04

100YR WL

91.70

3. ADDITION OF STORM ICD TABLE OCT 26/17 GJM

4. ADDITION OF PROPOSED OGS UNIT NOV 15/17 GJM

5. REVISED RETAINING WALL AND WEST PARKING LOT NOV 24/17 GJM

AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
X