airspace concept workshop case study 1. airspace concept workshop case study phuket / krabi 2
TRANSCRIPT
![Page 1: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/1.jpg)
AIRSPACE CONCEPT WORKSHOP CASE STUDY
1
![Page 2: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/2.jpg)
AIRSPACE CONCEPT WORKSHOP CASE STUDY
Phuket / Krabi
2
![Page 3: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/3.jpg)
PBN Implementation Processes
3
![Page 4: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/4.jpg)
4Airspace Concept Activity Overview
![Page 5: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/5.jpg)
Phuket / Krabi Info
5
![Page 6: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/6.jpg)
Phuket/Krabi
6
![Page 7: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/7.jpg)
Phuket / Krabi Info
7
• Facilities developed independently as traffic developed• Area Controls: Phuket and Krabi both open 24/7• Terminal Approach Radar operational: 24/7• Radar: PHK ASR 70nm / ACC SSR 250nm / PHK piped to Krabi• Phuket: Rwys 09L/R and 27L/R• Krabi: Rwys 09/27• Landing and departing to the west 85% of the time• Phuket Rwys separated by only 400 meters• Phuket/Krabi airports approximately 10nm apart• Traffic mix 88% Phuket / 12% Krabi
![Page 8: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/8.jpg)
Phuket / Krabi Info
8
• More than 95% of operators RNAV/RNP qualified• Holds in ACC activated with little notice from APP• No published holds currently exist in APP airspace• APP vectors most aircraft• Military airspace has not been able to be used• Airspace use is inefficient due to independent operations• ANSP tasked to combine facilities and improve efficiency• ANSP tasked to take advantage of RNAV capabilities
![Page 9: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/9.jpg)
Phuket ILS or LOC RWY 27
9
![Page 10: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/10.jpg)
Fleet Capability
10
Total
RNAV/RNP RNP 10 RNP 4
RNAV1/RN
AV2 RNP .3 RF Leg RNP < .3
DME/DME/
IRU
SBAS/WAAS
GLS/GBAS
Flights at Phuket 330,468 4220 280,035 280,035 300,173
270,398 270,837 240,838 260,718 640 503
Percentage 1% 84% 84% 90% 82% 82% 74% 78% 1% 1%
Total
RNAV/RNP RNP 10 RNP 4
RNAV1/RN
AV2 RNP .3 RF Leg RNP < .3
DME/DME/
IRU
SBAS/WAAS
GLS/GBAS
Flights at Krabi 34,468 422 28,035 28,035 33,173 27,398 29,432 24,653 27,198 57 42
Percentage 1% 84% 84% 91% 82% 83% 74% 82% 1% 1%
![Page 11: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/11.jpg)
Phuket/Krabi
11
![Page 12: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/12.jpg)
Phuket/Krabi
12
MyThai No CZ
![Page 13: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/13.jpg)
Phuket/Krabi
13
![Page 14: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/14.jpg)
Phuket/Krabi
14
![Page 15: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/15.jpg)
Phuket/Krabi
15
![Page 16: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/16.jpg)
Phuket/Krabi
16
![Page 17: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/17.jpg)
Rules of Thumb
17
CDO descent rough starting points:• 3 miles per thousand feet plus 1 mile per 10knots or• 4 miles per thousand feet
CCO climb rough starting points:• Very Slow climber - 5 miles per thousand feet• Medium climber – 3 to 4 miles per thousand feet• Faster climber – 2 miles per thousand feet• Rocket ship - 1 mile per thousand feet
• RNAV Final between 4-5 nm• Curved RNAV? A-RNP - RF prior to FAF?
![Page 18: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/18.jpg)
Phuket/Krabi
18
![Page 19: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/19.jpg)
Phuket/Krabi
19
![Page 20: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/20.jpg)
Phuket/Krabi
✈Team Lead
✈Team Recorder
✈Team Name
20
![Page 21: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/21.jpg)
Phuket/Krabi
✈Safety
✈Capacity
✈Efficiency
✈Environment
✈Access
21
1 - Agree on Operational Requirements
![Page 22: AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2](https://reader038.vdocuments.net/reader038/viewer/2022102515/551b2745550346dd1a8b48ad/html5/thumbnails/22.jpg)
Fini
22