AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
1
1
Contract No. BA/2/L/1476 Hard & Soft Landscape Works and Automatic Irrigation System in Al Bateen Palace for H.H. Sheikh
Hamdan Bin Zayed Al Nahyan
Abu Dhabi Municipality
Arabian Engineering Center
& Al Khatib Cracknell
21.09.1998 30.11.1999
2
Contract No. BA/2/L/1568 For Construction, Completion and Remedying of defects of
Ghantoot Racing and Polo Club Landscape at Abu Dhabi
Abu Dhabi Municipality
- 25.06.1999 31.01.2000
3 Contact No. BA/2/L/1254 For the Supply & Installation of Equipment in the Veterinary
Laboratory at Al Wathba Clinic
Abu Dhabi Municipality
Spectrum Eng. Consultants
03.03.1999 01.10.2001
4 Contract No. 231/2000 External Landscaping
Works for Marfa Hotel Public works Department
The Arab Office for Planning &
Architecture 19.06.2000 06.11.2001
5
Ruwais Housing Complex Expansion Project No.1215, Agreement No. 171215C8 / Package 7.
Construction of Landscaping & Irrigation Branches
ADNOC - 10.07.2001 06.08.2002
6 Supply and Installation of 353 Controllers Abu Dhabi
Municipality - 12.08.2002 20.04.2003
7 Supply and Installation of 240 Controllers Abu Dhabi
Municipality - 10.11.2002 12.05.2003
8
Contract No. BA/2/L/1959 H.H. Sheikh Sultan Bin Zayed Al Nahyan Residential Complex Landscape
Works
Abu Dhabi Municipality
Sam Engineering Consultants
06.04.2002 12.05.2003
9 Construction & Completion of 170 Farms at
Khalifa City "A" Abu Dhabi
Municipality
Jouzy & Partners Consulting Engineers
15.04.2002 27.05.2003
10
Abu Dhabi TRIP Contract No. 980 Umm Al Nar Bridge and Tunnel Interchange Landscaping
Works
Abu Dhabi Municipality
Delew Cather 31.12.2002 31.07.2003
11 Landscaping and Maintenance at Ruwais Housing
Comlex ADNOC ADNOC - 01.05.1999 08.08.2003
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
2
12
Contract No. BA/2/L/1664 Construction, Completion and Maintenance of Al Wathba Park
Abu Dhabi Municipality
Derby Design 16.09.2000 31.08.2003
13
Contract No. BA/2/L/2072 Supply, Installation & Maintenance of Electrical & Mechanical
Playground Equipment at Different Locations in Abu Dhabi
Abu Dhabi Municipality
Pan Emirates
01.09.2002
18.10.2003
14 Renovation and Maintenance of (5) Fountains in
Abu Dhabi Abu Dhabi
Municipality
Arabian Engineering Center
01.04.2002 15.12.2003
15
Contract No. BA/2/L/1606 Furnishing of the Surgery and X-ray Section at the Al Wathba
Veterinary Clinic
Abu Dhabi Municipality
Spectrum Eng. Consultants
30.06.2000 29.02.2004
16
Contract No. BA/2/L/1547 Supply and Installation of Computer Control System for
Irrigation Network at Wadi Al Ryum
Abu Dhabi Municipality
Arabian Engineering Center
10.10.2001 14.04.2004
17
Contract No. BA/2/L/2004 Construction & Maintenance of 3 Nos. of Pumping Stations for
Fodder Farms in Wadi Al Ryum
Abu Dhabi Municipality
Dr. M.H. Ali El Saie Consulting
Engineering 02.03.2002 22.05.2004
18
Contract No. BA/2/L/2222 Supply, Installation & Maintenance of Electrical & Mechanical
Playground Equipment at different locations in Abu Dhabi
Abu Dhabi Municipality
Pan Emirates 01.06.2003 30.05.2004
19
Contract No. 230/2002 Development and Beautification Works at Lulu Island
Public works Department
- 15.08.2002 14.06.2004
20
Contract No. BA/2/L/2151 Completion & Plantation of 240 Farmsat Khalifa City B - Abu
Dhabi
Abu Dhabi Municipality
Sam Engineering Consultants
01.09.2003 03.07.2004
21 Construction & Maintenance of 74 Farms Abu Dhabi
Municipality
Sam Engineering Consultants
01.03.2004 27.08.2004
22 Irrigation Control System at Quoryn Al Aich Public works Department
- 10.05.2004 09.09.2004
23
Contract No. BA/2/L/2105 Construction & Maintenance of 800 Farms at Al Falah Area, Abu
Dhabi
Abu Dhabi Municipality
Sam Engineering Consultants
01.07.2002 30.09.2004
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
3
24
Contract No. BA/2/L/2050 Construction & Maintenance of 649 Farms at Al Rehbah, Abu
Dhabi
Abu Dhabi Municipality
Sam Engineering Consultants
10.11.2001 08.12.2004
25
Contract No.910/1 Irrigation Control System at Abu Dhabi Industrial City - Phase I
Public works Department
Parsons 23.10.2004 11.12.2004
26
Supply & Installation of 20 Tanks 100,000 Gallons at the Western Region
Western Region Municipality
Joozy & Partners 17.11.2003 15.12.2004
27
Replacement of Irrigation System & Lighting at Crown Prince Diwan
Abu Dhabi Municipality
Joozy & Partners 17.11.2003 15.12.2004
28
Landscaping Works at Conference Palace Hotel
(Emirates Palace) - Abu Dhabi, Package 14 A, B & C
Conference Palace Hotel Executive
Committee
Turner 25.07.2004 30.12.2004
29
Contract No. BA/2/L/2637 Replacement of Irrigation System at his Highness The President
Palace at Muzairah
Abu Dhabi Municipality
Sam Engineering Consultants
24.07.2004 19.01.2005
30
Contract No. BA/2/L/2516 Removal, Supply, Installation & Maintenance of Garden Lights at
Mirfa Corniche
Abu Dhabi Municipality
Agriculture Dept.
Dr. M.H. Ali El Saie Consulting
Engineering 15.05.2004 10.03.2005
31 Supply & Installation of 100 Pumps at Bida
Yamrah 8 Abu Dhabi
Municipality
Sam Engineering Consultants
10.01.2004 08.05.2005
32 Supply & Installation of Flow Control Valves at
Taweelah, Rehba & Bahia Abu Dhabi
Municipality
Dr. M.H. Ali El Saie Consulting
Engineering
09.01.2004 09.05.2005
33
Contract No. BA/2/L/2472 Renovation & Maintenance of 8 Fountains inside & outside Abu
Dhabi - Phase 3
Abu Dhabi Municipality
Pan Emirates 13.12.2003 10.05.2005
34
Abu Dhabi TRIP Contract No. 982 Umm Al Nar Bridge and Tunnel Interchange Landscape &
Irrigation Works
Public works Department
Delew Cather 10.03.2004 21.06.2005
35
Plantation Around the Villas at Rehba, Al Shahama, Al Sader, Al Shelilla, Helleeya North,
Helleeya South, Shawmekh and Baniyas - Phase II
Abu Dhabi Municipality
Sam Engineering Consultants
17.07.2004 16.07.2005
36 Contract No. 950 Irrigation, Agricultural
Drainage and Landscaping Works at Abu Dhabi International Airport - Phase I
Abu Dhabi Municipality SPC
Dept. Parsons 24.07.2004 18.07.2005
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
4
37
Contract No. 176/2004 Maintenance Works at Ajban Race Track
Public works Department
- 01.05.2004 28.02.2006
38
Plantation Around the Villas at Rehba, Al Shahama, Al Sader, Al Shelilla, Helleeya North,
Helleeya South, Shawmekh and Baniyas - Phase I
Abu Dhabi Municipality
Sam Engineering Consultants
17.07.2004 26.03.2006
39
Burj Dubai Development - The Residences Hard & Soft Landscaping Works
EMAAR MACE Int'l Ltd. 06.10.2005 31.05.2006
40 Maintenance Works at Mirfa Garden Abu Dhabi
Municipality
Arab Officer for Planning and Architecture
04.06.2005 03.06.2007
41
Contract No. BA/2/L/2872 Natural Beautification, Fountains & Landscaping Works at the area
surrounding Mafraq Hotel - Abu Dhabi
Abu Dhabi Municipality
Sam Engineering Consultants
09.07.2005 03.07.2006
42
Supply, Installation, Operation & Maintenance of Steel Tank (1 M Gallon) & Pumping Stations &
600 Water Line for Al Foah Farm at Al Ain Contract No. 08/2005
Al Foah Dev. Co. - 20.12.2005 15.07.2006
43
Contract No. BA/2/L/2705 Supply & Installation of 4 Nos. R.O. Plants (10,000 GPD) in
Western Region
Abu Dhabi Municipality
Dr.M.S. Al Saie 24.01.2005 23.07.2006
44
Maintenance Works in Gardens & Parks - PROJECT I
Abu Dhabi Municipality
Parsons 17.07.2004 16.07.2006
45 Shade Structures for various Schools in Northern
Emirates Ministry of Public
Works. - 12.05.2006 11.08.2006
46
Contract No. BA/2/L/2874 Supply, Installation & Maintenance of Mehanical & Electrical
Playground Equipment inside & outside Abu Dhabi
Abu Dhabi Municipality
Pan Emirates Consult
24.12.2005 20.08.2006
47 Arabian Ranches – Dubai EMAAR Parsons 01.05.2006 01.09.2006
48
Emirates Hills - Frayland Villas Streetscape Landscaping & Irrigation Works
EMAAR - 01.12.2005 15.09.2006
49
Maintenance Works in Gardens & Parks - PROJECT 2
Abu Dhabi Municipality
- 04.10.2004 03.10.2006
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
5
50 Landscaping & Irrigation Works at Sea Palace
Side Road - Abu Dhabi Abu Dhabi
Municipality Hyder 01.10.2006 22.10.2006
51 Contract No. BA/2/L/2707 Completion &
Maintenance of Two Concrete Tanks at Um al Nar
Abu Dhabi Municipality
Agriculture Dept.
Consulting Engineering Group
30.04.2005 30.09.2006
52
Burj Dubai Development: Old Town Sites A & B Contract No. 3020 Site A,Phase I Contract No.
4070 Landscaping & Irrigation Works
EMAAR MACE Int'l Ltd. 20.12.2005 15.10.2006
53
Contract No. JAP006/C94 The Palm Jumeirah - Concrete Works for Chiller Plant (4000 Sq. Mtr.
Concrete Works)
Nakheel Parsons 20.12.2005 20.10.2006
54
Maintenance Works in Gardens & Parks - PROJECT 3
Abu Dhabi Municipality
Parsons 01.11.2004 31.10.2006
55
Burj Dubai Development: Business Park - Phase I Landscaping & Irrigation Works
EMAAR Shank Land - Cox 08.02.2006 31.10.2006
56 Maintenance Works at Ajban Race Track Public works Department
- 01.05.2004 10.11.2006
57
Contract No. BA/2/L/2270 Landscape, Irrigation System & Lighting for Development Projects at
Waves Breaker - Villas Area
Abu Dhabi Municipality
Sam Engineering Consultants
08.01.2006 15.11.2006
58 Maintenance Works in Gardens & Parks - Project
4 Abu Dhabi
Municipality - 02.01.2005 01.01.2007
59 Irrigation and Landscaping Works at Abu Dhabi -
Golf Course
Tourism Development & Investment Co.
- 28.10.2006 17.01.2007
60
Construction of New Car Park with Shades including Asphalt Works at Abu Dhabi
Intercontinental Hotel Refurbishment Project
National Corporation for
Tourism and Hotels Turner 09.07.2006 10.02.2007
61
Shade Structure Works for Seven Schools at Ajman – Contract No.
MB24/190202051015/156/2006
Ministry of Public Works
- 12.08.2006 11.02.2007
62
Shade Structure Works for Six Schools at Dubai – Contract No. MB19020205105/155/2006
Ministry of Public Works
- 12.08.2006 11.02.2007
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
6
63
Shade Structure Works for Two Schools at Al Quwain – Contract No.
MB190202051015/157/2006
Ministry of Public Works
-
12.08.2006
11.02.2007
64
Soft Landscape and Irrigation Works of Shahil Accommodation /Replacement for ADMA-OPCO
on Das Island
ADNOC - 24.03.2006 18.02.2007
65 New Corniche Road East Landscaping & Irrigation
Works Contract No. 2015-2016 Abu Dhabi
Municipality Delew Cather 18.03.2004 19.04.2007
66
Burj Dubai Development - The Residences - Phase II Hard & soft Landscaping Works
EMAAR MACE Int'l Ltd. 11.07.2006 31.05.2007
67
Landscaping & Irrigation Works at Shoreline Apartment
Nakheel - 11.03.2006 10.06.2007
68 Construction and Completion of The Armenian
Embassy in Abu Dhabi
The Armenian Embassy in Abu
Dhabi
Spectrum Engineering Consultant
01.05.2006 30.07.2007
69 Contract No.952 Landscape, Agricultural & Irrigation Works at Abu Dhabi Int'l Airport -
Phase II
Abu Dhabi Municipality
Agriculture Dept.
Parsons 10.09.2005 30.12.2007
70
Contract No. PJ 9167/2 Construction of New Community Facilities & Improvements to Existing
Facilities - Zone 2
Dubai Municipality Gulf Engineering
Consultant 28.10.2006 30.12.2007
71
Contract No. PJ 9167/3 Construction of New Community Facilities & Improvements to Existing
Facilities - Zone 3
Dubai Municipality Gulf Engineering
Consultant 28.10.2006 30.12.2007
72
Contract No. PJ 9167/4 Construction of New Community Facilities & Improvements to Existing
Facilities - Zone 4
Dubai Municipality Gulf Engineering
Consultant 28.10.2006 30.12.2007
73 Contract No. 910/2 - Agricultural & Irrigation Works at Abu Dhabi Industrial City - Phase II
Abu Dhabi Municipality
Agriculture Dept.
Hyder 20.05.2007 14.03.2008
74
Contract No. 017/2007 - Various Landscaping & Irrigation Works for Armed Forces
G.H.Q. Armed Forces Directorate of Military Works
- 01.04.2007 31.03.2008
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
7
75
Completion of Central Control Irrigation System for Water Distribution for locals farms at
Mouazaz, Al Jarf & Al Nahda
Abu Dhabi Municipality
SAM Engg. 01.05.2007 30.04.2008
76 Contract No.N026-040-13 – Palm Deira –
Promenade at Deira Island Front Nakheel - 15.01.2008 30.03.2009
77
Contract No. AE/A/493/2007, Various work for Armed Forces
G.H.Q. Armed Forces Directorate of Military Works
- 20.02.2008 19.08.2008
78
Contract No. PJ-9163, Construction, Completion and Maintenance of Mirdif Park
Dubai Municipality - 01.05.2007 31.12.2008
79
TenderL35/2007,Devl of Waves Breaker Area in Abu Dhabi (Landscaping & Agric. Works-Lighting
Network-Irrigation Network, Hardscaping(Interlocks pavers II)
Abu Dhabi Municipality &
Agriculture
SAM Engineering Consultant
18.03.2008 17.01.2009
80 Kempinski Hotel & Residences at the Palm
Jumeirah – Phase II
Emerald Palace Group
Management FZ-LLC
- 28.09.2009 28.12.2010
81 Contract No.A219999/2008/C/004 – 400MM External Infrastructure Trunk Sewer - Al Raha
Garden ALDAR Properties GHD 09.01.2009 30.06.2009
82
Contract No. 350 - Rehabilitation of Water Tanks and Irrigation Network at Western Region -
Ghayathy City - Phase 1
Abu Dhabi Municipality
KEO 07.04.2007 31.07.2009
83
Green Reconstruction of Abu Dhabi Golf & Equestrian Club
ALDAR Properties - 01.06.2009 15.10.2009
84
Contract No. A219999/2007/C/001 - Landscaping Works for Parks, Gardens & planting adjacent to
roads, boundary walls for the Residential Compounds of Al Raha Gardens I & II, Abu Dhabi
ALDAR Properties GHD Global PTY
Ltd.
07.04.2007
30.10.2009
85
Contract No.SSC-08-02004-000000029 - Irrigation works at Interchange 4 & 5, for the Al
Raha Beach Development
ALDAR Properties Cansult Maunsell 26.04.2009 01.11.2009
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
8
86
Cont. No.147/2008 - Maint, Rehabilitation & Additional Works for the Roads and Brigdes of Emirate, Main Land – North, Farms in Al Idlah
Abu Dhabi Municipality
- 04.08.2009 04.11.2009
87 Saadiyat Island Expressway Early Landscape
Works – Project # C40
Tourism Development & Investment Co.
Parsons Engr. 13.06.2009 12.11.2009
88
Landscaping Works for Parks, Gardens & planting adjacent to roads, boundary walls for the
Residential Compounds of Al Raha Gardens III, Abu Dhabi
ALDAR Properties GHD Global PTY
Ltd. 30.09.2008 30.11.2009
89
Soft Landscaping and Irrigation Works for 5 nos. of Operative Village at Yas Island
ALDAR Properties Whitby Bird 25.06.2008 30.11.2009
90 Soft Landscaping and Irrigation Works for Links
Golf Course at Yas Island ALDAR Properties Whitby Bird 25.06.2008 30.11.2009
91
Contract No.A219999/2008/C/005 – 1200MM External Infrastructure Sewerage Trunk Service –
Al Raha Garden
ALDAR Properties GHD Global PTY
Ltd 08.11.2008 30.11.2009
92 Reactivation of Abu Dhabi Corniche Beach
Improvement Works – Phase I
M/s. UPC – Urban Planning Council
M/s. Hyder Consulting Middle
East Limited 02.06.2009 31.12.2009
93
Const of Iraqi Embassy Building, Ambassador Residence, Servant's Accom, Utility Blocks and
Boundary Walls
Iraqi Embassy DEWAN 29.04.2008 30.01.2010
94
Ref. No. S439001/2008/T/001 Infrastructure, Soft Landscape and Irrigation Works, Yas Island
Development Zone – P Central Park / F1 Car Park
ALDAR Properties HALCROW 06.11.2008 30.01.2010
95
Hotels H3 & H4 (Crown Plaza Stay Bridge) Contt#A430852/2007/c/007/sub/0021
ALDAR Properties Kannfinche 05.12.2008 31.01.2010
96 Development & Landscape for the Garden & Entrance of Ministry of Presidential Affairs
Ministry of Presidential Affairs
- 17.12.2009 17.02.2010
97
Abu Dhabi International Shooting Club External Landscape & Irrigation Planting System – Built
For Wake Board Facilities and Landscape Upgrade – Design for Paint Ball Area including
Old Wake Facilities
Private Property Management
ATKINS 24.12.2008 31.03.2010
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
9
98
Landscaping and Maintenance at Ruwais Housing Complex ADNOC Agreement No.1740301
ADNOC 07.08.2003 30.06.2010
99
Additional Car Parks @ Emirates Palace
Emirates Palace
KEO
05.06.2010
30.07.2010
100
Nareel Island Development External Roads and
Fence
ALDAR Properties
Parsons Engineering
06.05.2010
30.08.2010
101
Al Ain Equestrian Club – Steel Water Tank
Musanada - 24.10.2009 23.10.2010
102 Ph. 1A Welcome Pavilion Water Cascades MEP
Works Al Dar – Besix - 03.02.2010 30.10.2010
103 Kempinski Residences – Palm Jumeirah
Landscaping Works KEMPINSKI LMS Intl 05.08.2009 30.10.2010
104
MW/D/25/2010 - Supply & Installation of Two Water Tanks in Al Ain
Crown Prince Court - 13.04.2010 14.11.2010
105 Contract No. 4100 – Irrigation and Landscape
Works at the Interchange on Abu Dhabi – Dubai Road
Abu Dhabi Municipality
Dorsch Holding GmBH
11.07.2010 15.12.2010
106 Landscaping Beautification Works to the Area
Located at West 2/19, Abu Dhabi Abu Dhabi
Municipality Dorsch Holding
GmBH 15.08.2010 11.09.2010
107 Al Gurm Villas Irrigation and Landscaping Works AL Dar Properties Dar Al Handasah 31.08.2010 15.01.2011
108 Annual Maintenance Contract for Landscaping and Irrigation system maintenance for Marina
Office Park
National Investment Corporation
- 01.03.2010 28.02.2011
109
Contract No. 488 – Subsoil Drainage for Ghantoot Polo Club
Abu Dhabi Municipality
Dorsch Holding GmbH
11.04.2010 30.04.2011
110
Cont. #MW-OU-059-2009 Const. of Concrete Boundary Wall, Observation Towers, Road Works
and Other Works at Falag Hazza Camp – Al Ain
GHD - 07.03.2010 30.04.2011
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
10
111
Contract No. GC-26 Al Jawaher Temporary utility Works
TDIC - 07.12.2010 07.05.2011
112 New Pump Station at Rawdat Al Reef Crown Prince Court - 3.01.2010 30.04.2011
113
T-FM-42-2010 Supply, Installation , Testing and Commissioning and Operating of (23) Traveller Irrigation Systems in Ghantoot Racing and Polo
Club
Abu Dhabi General Services PJSC
trading as MUSANADA
15.01.2011
15.06.2011
114
AC7143 – Al Raha Beach Development Southside IC6 Extension – Complete Works –
Removal/Relocation of Palm Trees
Balfour Beatty LLC Parsons
Engineering 15.08.2011 31.09.2011
115 Civil & Landscaping Works at Al Bateen Palace Crown Prince Court Dorsch Holding
GmbH 06.06.2011 30.10.2011
116
Contract No. 469 – Landscape & Irrigation Works for the VIP Entrance of H.H. Sheikh Zayed Bin
Sultan Al Nahyan Mosque
Abu Dhabi Municipality
Dorsch Holding GmBH
20.03.2011 17.09.2011
117 Supply & Installation of Tensile Fabric for Private
Villa Island Shield Cont. Co. - 01.08.2011 30.09.2011
118 Construction, Completion of Football Pitch
Facilities Building, Emirates Palace, Abu Dhabi Emirates Palace,
Abu Dhabi - 21.09.2011 30.09.2011
119 Landscape and Irrigation Maintenance Works at
H.H. Sheikh Hamdan Al Nakheel Palace – Abu Dhabi
The Private Office of H.H. Sheikh
Hamdan Al Nakheel Bin Zayed
- 01.10.2010 01.10.2011
120 Construction of Beach Restaurant & Grill – Phase
1 Kempinski Residences – Palm Jumeirah
Sunny Beach Properties LTD, Abu Dhabi, UAE
- 15.05.2011 30.09.2011
121 Renovation of Pump Sets & Controller and
Related Works at Al Maha Farm Elite Agro LLC
Al Salaam KLhalil N. Khoury
09.06.2011 31.12.2011
122 Supply & Installation of New Pipeline & Electrical
Lines to CPI’s and Related Works Elite Agro LLC
Al Salaam KLhalil N. Khoury
09.06.2011 30.11.2011
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
11
123 Supply & Installation of One MIG Water Tank in
Al Maha Farm Elite Agro LLC
Al Salaam KLhalil N. Khoury
15.08.2011 30.11.2011
124 Gen. Maint. for Aljeel KG in Al Shamkha –
Building no. C1142 MUSANADA - 26.07.2011 30.11.2011
125 Gen. Maint. for Al Maha School in Al Falah –
Building no. C1143 MUSANADA - 26.07.2011 30.11.2011
126 Gen. Maint for Capital School in Al Shamkha –
Building no. C11139 MUSANADA - 26.07.2011 30.11.2011
127 Gen. Maint. for Al Janeen School in Al Shamkha –
Building no. C1142 MUSANADA - 26.07.2011 30.11.2011
128 Gen. Maint. for Al Taleeaa School in Al Shamkha
– Building no. C1144 MUSANADA - 26.07.2011 30.11.2011
129
Gen. Maint. for Gurun Yafour School in Al Falah – Building no. C1133
MUSANADA - 26.07.2011 30.11.2011
130 Gen. Maint. for Al Tawan School in Al Shamkha –
Building no. C1124 MUSANADA - 26.07.2011 30.11.2011
131 Gen. Maint. for Al Hisn Secondary Shool in Al
Shamkha – Building no. C1114 MUSANADA - 26.07.2011 30.11.2011
132 Gen. Maint. for Mariam Bint Imran School –
Baniyas – Buildning no. C1134 MUSANADA - 03.08.2011 30.11.2011
133 Gen. Maint. for Al Bidaya School Al Shamkha –
Building no. C1433 MUSANADA - 02.08.2011 30.11.2011
134 Gen. Maint. for Al Mo’ Tasem School – Baniyas –
Building no. C1117 MUSANADA - 26.07.2011 30.10.2011
135 Gen. Maint. for Al Norr School – Baniyas –
Building no. C1121 MUSANADA - 03.08.2011 30.11.2011
136 Gen. Maint. for Al Mafraq High School – Baniyas
– Building no. C1116 MUSANADA - 26.07.2011 30.11.2011
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
12
137 Restoration & Maintenance Works of Existing
Buildings at Al Maha Farm Elite Agro LLC
Al Salaam KLhalil N. Khoury
13.08.2011 30.11.2011
138
Contract # MW-Gs-180-2008 – Construction of Headquarter Bldg. Stores & Different Works for H.Q. of Logistic & Transforming Arm at Maleeha
GHQ Armed Forces - `
15.01.2010 30.11.2011
139 Contract No. 1004 – Landscaping Works at Raha
– Yas Tunnel Road Entrance Abu Dhabi
Municipality Parsons
Engineering 11.07.2010 31.12.2011
140
Khalifa City District Cooling – Installation of 4 Tanks in Khalifa City
Drake & scull Int’l - 01.08.2011
31.12.2011
141
CW/630/2007 – const. of 2 pumping stations each with 60 MIGD capacity in loc. no. 5 & loc.
no. 7 complete with surge protection system and associated MEP works
DEWA
Al - Diar
15.06.2008
15.12.2011
142 Contract C2010/3- Irrigation and Landscaping Works for H.H. Crown Prince Court, Abu Dhabi
Crown Prince Court Dorsch Holding
GmbH 15.01.2011
31.12.2011
143
Contract No. MW-AF-043-2009 - Construction of 7 nos. Ammunition Stores and
Modification Works for Fence at Safran Air Base
UAE Armed Forces - 25.09.2010 30.11.2011
144
Abu Dhabi Corniche Landscaping Services
(Maintenance)
John Buck International
Properties Hyder 15.11.2009 31.12.2011
145 Contract No. P042-C45 Electrically Operated
Sliding Gates TDIC - 01.05.2011 31.12.2011
146
Contract No. MW/D/27/2010, Supply and Installation of 1 Water Tank with 1 Million Gallon
capacity along with Installation of an Irrigation Network at Farms of Mehier – Al Ain
Private Dept. of H.H. Sheik Fatima
Bint Mubarak - 07.11.2010 30.11.2011
147
Contract No. MW/D/26/2010, Supply and Installation of 1 Water Tank with 1 Million Gallon
capacity along with Installation of an Irrigation Network at Al Maqam – Al Ain
Private Dept. of H.H. Sheik Fatima
Bint Mubarak - 07.11.2010 29.02.2012
148 Saadiyat Island Beach Resort Landscape &
Irrigation Works TDIC
Parsons Engineering
16.01.2010 29.02.2012
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
13
149 Main Irrigation Line from Mafraq WWTP to Al
Faya along Abu Dhabi Al Ain – Road Contract No. 956
Abu Dhabi Municipality
Parsons Engineering
01.05.2010
21.02.2012
150
Landscaping & Irrigation System Maintenance for Marina Office Park – Abu Dhabi
National Investment Corporation
-
01.03.2011
29.02.2012
151
CONTRACT NO.SC-09-2048-0000011 – Al Raha Beach Development/Infrastructure – Irrigation
Network at Eastern Precinct
ALDAR Properties - 19.02.2009 29.02.2012
152
CW/146A/2010 – Design, Supply, Installation, Testing and Commissioning of Chlorine Dioxide
Dosing System at Mushrif Reservoir Phases 1 to 6
DEWA - 09.01.2011 09.02.2012
153 Contract No. P001-C47 Saadiyat Expressway
Permanent Landscape Works TDIC
Parsons Engineering
11.02.2010
29.02.2012
154
Agreement No. 1741118 – Supply & Lay of a High Density Polyethylene (HDPE) Pipeline from a
Supplementary High Rise Pumping Station (SHRPS) to H.H. the Presi.Palace Plant Yard at
Ruwais Housing Complex
ADNOC - 14.07.2011 29.02.2012
155 The Landmark Tower Project, Abu Dhabi
Al Habtoor & CCIC Joint Venture
- 30.10.2011 31.01.2012
156 Proposed Arzanah Development, Sector W-57,
Abu Dhabi-UAE-Rihan Heights (Phase 1A-Plot H)
MUBADALA Capital and Real Estate LLC
- 08.11.2011 31.01.2012
157 Landscaping & Irrigation Works of the Burj
Khalifa Boulevard Centre Media EMAAR Properties - 09.11.2011 08.01.2012
158
Contract No. CW/0146A/2010 – Design, Supply, Installation, Testing & Commissioning of
Chlorine Dioxide Dosing System at Mushrif Reserviors Phases 1 to 6 including Al Chlorination Lines, Interconnection with Existing Chlorination Lines, All Associated Earthworks, Civil, Electrical and Drainage Works, Automation System and
Safety Equipment
DEWA - 09.01.2011 31.01.2012
159 Contract no. 151/1 Removal of Weeds and
Pruning of Trees in Abu Dhabi Island Abu Dhabi
Municipality Parsons
Engineering 02.09.2010 30.04.2012
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
14
160 Construction Works of irrigation Main Lines at Khalifa Bin Zayed Town B – Contract No. 481
Abu Dhabi Municipality
Dorsch Holding GmbH
28.04.2010 31.03.2012
161 Al Dhabeya Maritime Residential Complex Crown Prince Court Dorsch Holding
GmbH 22.05.2010 28.04.2012
162
Maintenance and irrigation Services of Landscaped Areas at ADNOC premises in Abu
Dhabi, Sas Al Nakhil and Al Shawamekh – Agreement No. 1720736
ADNOC - 01.11.2008 03.05.2012
163 Contract No. 6W/2010-4MIG & 2x1MIG RCC
Water Tanks & Pumping Station in Central Area FEWA Dr. M. H. Ali El-Saie 01.06.2011 31.03.2012
164 Contract No. CMW – 11051 – C002
Construction of Stores at Al Maryal Camp Camp No. (220802)
GHQ Armed Forces - 01.11.2011 31.03.2012
165 Modification to Boundary Wall For H.H. the
Crown Prince Diwan at W-35, Abu Dhabi – UAE H.H. The Crown
Prince Diwan
Architectural & Engineering Consultant
20.01.2012 20.05.2012
166 Maintenance of Landscape Works, Sport Field
and Irrigation Network Private Property
Management - 10.07.2011 30.08.2012
167 CMW-11098-C002 GHQ Armed Forces -
17.07.2012
31.10.2012
168 Cont. CNIA/05/04/2010/51/06 - Maint. & Renov.
For CNIA Camps in Zone 1 (Abu Dhabi and various location)
Ministry of Defence
- 18.04.2010 30.11.2012
169 Yas Island Development – Modification of Potable Water Network for Gateway Park
Al Dar Properties PSJC
- 23.04.2012 31.10.2012
170 Contract no. 151/2 Removal of Weeds and
Pruning of Trees in Abu Dhabi Island Abu Dhabi
Municipality Parsons
Engineering 02.09.2010 31.12.2012
171 Oman Botanic Gardens, Phase IV BAM International - 01.12.2011 31.12.2012
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
15
172
Contract No. A199999/2011/C/025 – Geo-textile Fabric under Gravel Mulch at Al Gurm Berm Area
(Al Gurm Development)
Al Dar Properties PSJC
- 26.12.2011 26.12.2012
173 New Management Building and New Auditorium
Building at Buhasa – Soft Landscaping & Irrigation Works
Abu Dhabi Gas Industries Ltd.
(GASCO) AECOM 01.05.2012 31.12.2012
174 Contract No. M46/2012 – Landscaping &
Irrigation Works at Falj Al Mua ‘ala Palace, Ajman Crown Prince Court - 19.10.2012 20.01.2013
175
Tender No. EPD-CT-12020 Design, Supply & Installation of Dense Planting Screen at Khaleej Al Arabi Service Station – Abu
Dhabi
ADNOC - 30.01.2013 15.02.2013
176 Maintenance of Emirates Palace Football Pitch Emirates Palace
Hotel - 15.01.2012 28.02.2013
177 C410 – Development & Const. Works for
irrigation Network & Pumping Station in Farm Areas (Dhaharat, Al Tayeb, Al Wafiya, Al Wathba
Abu Dhabi Municipality
Dorsch Holding GmbH
01.06.2010 11.03.2013
178
Refurbishment Job – Contract No. CW/0771/2009 – Replacement of Valves and
Header Pipes with Associated Fittings for Najma Pumping Station Phase 1 & Phase 2
Dubai Electricity & Water Authority
(DEWA) - 02.03.2011 31.03.2013
179 Millenium Hotel, Sulaimani, Kurdistan Region -
Iraq Faruk Holding Company Ltd.
- 02.02.2012 31.03.2013
180 Landscape Complementary of Faruk Medixal
Center ( FMC) Faruk Holding Company Ltd.
- 19.07.2012 19.12.2012
181 Contract No. 15W/2010(2) – 3x2MIG RCC Water
Tanks & Pumping Station in Rak Area
Federal Electricity & Water Authority
(FEWA)
Dr. M. H. Ali El-Saie 01.06.2011 30.04.2013
182 Supply and Installation of Water Features Al Dar Properties
PSJC - 01.09.2012 31.03.2013
183 4EW/2011 – Construction of New Water Well
Fields at Surrah - UAE
Federal Electricity & Water Authority
(FEWA)
- 13.02.2012 30.04.2013
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
16
184 Maintenance Works for Soft Landscape and
Irrigation System – Zayed Sports City – Phase 1A
MUBADLA Capital and Real Estate LLC
- 02.01.2012 30.06.2013
185 Construction Works for Al Raha Gardens
Attached Housing Project – Contract No. ARG-00-C-NET-C-00
Sorouh Real Estate Const. Gen.
Contracting House Ltd.
25.12.2012 25.06.2013
186 Supply & Installation of Landscaping Works –
Habshan 5 Industrial Facilities, Habshan
Abu Dhabi Gas Industries Ltd.
(GASCO) - 10.11.2011 31.08.2013
187
Supplying Agriculture Equipment
UAE University
-
01.09.2010
01.10.2013
188 Elixier II Mirfa – Landscaping & Irrigation Works ADNOC
LindeIndustrial Gases Co. Ltd.
- 28.09.2011 27.09.2013
189
GS/RFP-0212-Landscape Works for the
Surrounding Areas of Al Bahr Tower Sector -25, Plot 70 & 71
Abu Dhabi Investment Council
- 15.12.2012 15.09.2013
190 Bab Al Bahar – A Luxury Collection Hotel on Plot
No. 44, Al Nakheel Area in Ajman - UAE H.H. Crown Prince
of Ajman
Badri & Bensouda Architectural Engineering
04.03.2012 30.09.2013
191 Contract No: 2012/97 – Irrigation & Landscape
Works for H.H. Prince Crown (VIP Entrance)
Crown Prince Court Dorsch Holding
GmbH 19.06.2013 15.11.2013
192
Removal of Existing Services Within Basement Extension For the First Gulf Bank Office Bldg, Plot
C 110, Sector 48, Al Qurm Area, Abu Dhabi
First Gulf Bank M/s. Architectural
& Engr. Cons. 04.07.2013 03.11.2013
193
Contract No.PGD-O&M-309-Operation & Maint. Of Landscape, Forests and Irrig. Infrastructure at
Ghayathi, Ghayathi (A,B,C), Markaz/Hezam Ghayathi, Mashtal Ghayathi, Qasr saleh Al
Mazari, Gurnama (1,2) Bida Rashed and Shamal Gharb Ghayadhi
Municipality of Western Region -
WRM KEO Int’l 15.02.2007
31.12.2013
194 Sea Palace - The Governess House & Boudary
Wall Crown Prince Court
Dorsch Holding GmbH
01.10.2012
31.12.2013
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
17
195 Recreational Park & Landscaping Works &
Plantation of Trees Along Main Road, Al Ajban Tawazun Holding
Co. LLC - 05.12.2012
31.12.2013
196 GC-43Saadiyat Beach Public Realm Streetscape –
Landscape Works
Tourism Development & Investment Co.
Parsons Engineering
03.03.2013
31.12.2013
197 Al Maryah Island Public Realm & Promenade MUBADALA -
08.05.2013
31.12.2013
198
Lusail Underground Car Park Project- Phase 2B
Lusail Real Estate Development Co.
(LREDC)
ACE 10.10.2013 31.03.2014
199 Contract No. E19/2 Landscaping & irrigation
Works for Public Park E19/2 Crown Prince Court
Dorsch Holding GmbH
04.10.2012
16.02.2014
200 Contract no. 467/1 Removal of Weeds and
Pruning of Trees in Abu Dhabi Island Abu Dhabi
Municipality Dorsch Holding
GmbH 02.09.2010 01.04.2014
201 Contract no. 467/4 Removal of Weeds and
Pruning of Trees in Abu Dhabi Island Abu Dhabi
Municipality Dorsch Holding
GmbH 02.09.2010 01.04.2014
202
Landscape works at Ambulatory Healthcare Center At Al Shamkha & Al Bahya(Site 108 A &
B), Abu Dhabi
SEHA - 01.02.2013 30.04.2014
203
Mussafah Water Transmission Scheme, Mussafah to Abu Dhabi ( Lot M) – Landscaping
Works
AYDINER Const. – Abu Dhabi
Khatib & Alami 27.01.2014 20.04.2014
204 Infrastructure Works including all MEP Works & Playground Foundation – Baghdad-Iraq Adjacent
to Green Zone
Al Zawraa Park for Games &
Commercial Agencies Ltd. Liability Co.
- 13.03.2013 31.05.2014
205 Contract No. 2013/58 – External Miscellaneous
Works for Crown Prince Court Crown Prince Court
Dorsch Holding GmbH
01.09.2013 31.05.2014
206 6W2011-Network Rehabilitation at Khuzam Rak
Area
Federal Electricity & Water Authority
(FEWA)
Dr. M. H. Ali El-Saie 27.09.2011 31.07.2014
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
18
207
Contract No. PD/CA/FM/SB/R530/Gen/13/51 – Blanket Agreement for Supply of Potable Drinking Water to Schools in Al Ain City
MUSANADA - 04.04.2013 03.07.2014
208 Agreement No. 1741257 – Renovation of the Children and Families Park in Ruwais Housing
Complex – Ruwais UAE ADNOC - 14.09.2013 12.07.2014
209 Contract No. 21W/2012 – Water Distribution
Networks in UAQ Areas
Federal Electricity & Water Authority
(FEWA)
Dr. M. H. Ali El-Saie 22.08.2012 31.07.2014
210 25W/2012 – 5MIG RCC Water Tank at Hiniya
WDC - Fujairah
Federal Electricity & Water Authority
(FEWA)
- 06.10.2012 12.07.2014
211 18W/2012 – Rehabilitation of Distribution
Netwrok at Rams - RAK
Federal Electricity & Water Authority
(FEWA)
Dr. M. H. Ali El-Saie 05.05.2012 31.07.2014
212 Contract no. 1W/2011/
Transmission/Distribution Pipeline System in Al Jurf and Pumps at A. Zawra - Ajman
Federal Electricity & Water Authority
(FEWA)
Dr. M. H. Ali El-Saie 01.09.2011 30.09.2014
213 Church Compound for Armenian Community of
Abu Dhabi
Armenian Community of Abu
Dhabi
Kojakian Engineering Consultants
01.05.2012
29.11.2014
214 Tender No. 14EW/2013 – Design, Supply &
Const. of RCC Brine Reject & Outfall Structure at Ghallilah, Ras Al Khaimah, UAE
Federal Electricity & Water Authority
(FEWA)
- 15.02.2014 30.11.2014
215 Landscape Works for New York University
Tourism Development & Inv. Co. (TDIC)
- 01.05.2014 31.10.2014
216 Modification in the Gate Building for H.H. the Crown Prince Diwan at W-35, Abu Dhabi, UAE
Crown Prince Court
M/s. Architectural & Engineering
Consultants
01.04..2014 31.11.2014
217
CW/200B/2011 – Supply, Installation, Testing & Commissioning of Fibre Cement/Glass
Reinforced Expoxy Water Transmission Pipelines and Associated Works at Various Locations in the
Emirate of Dubai
Dubai Electricity & Water Authority
(DEWA)
NJS Consultants Co. Ltd.
06.12.2011 31.12.2014
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
19
218
Supply & Installation of Yas Mall Main Const. Works Ph. 2 Zone E Yas Island Devl. - Contract
No. A430601/2010/C/063
Al Dar Properties PSJC
AECOM 01.10.2012
31.12.2014
219
Contract No. RFX 2131200064 – Supply, Installation, Testing & Commissioning of Glass
Reinforced Epoxy Water Transmission Pipelines and Associated Works at Various Locations in the
Emirate of Dubai Including 600mm Dia Transmission Pipeline along Outer Bypass Road
to Al Khawaneej Road in Wadi Al Mardi and Interconnection Between the Two Existing
900mm Dia Pipeline by 600mm Dia Pipeline in Al Khawaneej Area
Dubai Electricity & Water Authority
(DEWA) - 09.12.2012 31.12.2014
220
Replacing the Control System of the Irrigation Network inside Abu Dhabi from the Manual System to an Automated System, Phase II,
Contract No. 908/3A, Abu Dhabi, UAE
Abu Dhabi Municipality
Dorsch Holding GmbH
01.10.2013 31.12.2014
221
Contract No.PGD-O&M-404-Operation & Maint. For Irrig. Reservoirs with Transmission Pipeline,
Landscape, Irrig. Infrastructure & Forests - Al Khatim Area 1
Abu Dhabi Municipality
Dorsch Holding GmbH
15.02.2007 31.12.2014
222
Contract No.PGD-O&M-406-Operation & Maint. For Irrig. Reservoirs with Transmission Pipeline,
Landscape, Irrig. Infrastructure & Forests - Al Khatim Area 3
Abu Dhabi Municipality
Dorsch Holding GmbH
25.02.2007 31.12.2014
223
Contract No.PGD-O&M-103 - Operation & Maint. Of Landscape, Irrigation Storm Water and
Associated Infrastructure Abu Dhabi Quadrant 3 & Surrounding Islands
Abu Dhabi Municipality
Dorsch Holding GmbH
07.10.2007 03.01.2015
224
CONTRACT NO. 208 - Operation & Maintenance for Landscape, Irrigation, and Landscape
Facilities for Al Bahya & Al Rahbah Gardens
Abu Dhabi Municipality
Parsons Engineering
13.04.2009 03.01.2015
225 FP- 5020000006 - Dubai Endurance Table
Engineer’s Office of HH Sheikh
Mohammed Bin Rashid Al Maktoum
- 19.01.2015 24.01.2015
226 FP- 2053000007 – Construction of Gym, Pool, Staff Accommodation, and Stable at Lehbab,
Dubai
Engineer’s Office of HH Sheikh
- 17.01.2015 31.01.2015
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
20
Mohammed Bin Rashid Al Maktoum
227
Develop 20 Playgrounds in Abu Dhabi Mainland – Phase 1C – Contract No. 393, Abu Dhabi, U.A.E.
Abu Dhabi Municipality
KEO International 15.12.2013 10.04.2015
228
Contract No. 2014/51 – Civil Works of the Fountain in the Private Entrance of the Bldg. of
Crown Prince Court
Crown Prince Court - 11.09.2014 15.04.2015
229
Contract No. D-8604, Replacement of GRP Water Pipelines & Construction of New Connection in Madinat Zayed – Western Region, Abu Dhabi
Abu Dhabi Distribution
Company (ADDC) Ital Consult 27.03.2012 26.04.2015
230 FP- 2023000012 – Landscaping and Irrigation
Works Infront of Main Villa at Habab Coservation- Dubai
Engineer’s Office of HH Sheikh
Mohammed Bin Rashid Al Maktoum
- 18.01.2015 15.04.2015
231 Landscaping for Marina Office Park
National Investment Corporation
- 01.04.2012 01.03.2015
232 20W/2012-DN600 Transmission Pipeline from
Shouka to Huwailat Junction and Pumping Station at Shouka RAK
Federal Electricity & Water Authority
(FEWA)
- 10.05.2013 31.05.2015
233
Commercial Bldg. For M/s. Inheritors of Late Abdulsalam Hamad Abdulrahman Rashed Al Mubarak, Located Sector E-25, Plot no. C-13
ADCP ARKAN 15.11.2014
11.06.2015
234
Landscaping & Irrigation Maintenance Services at Ruwais Housing Complex Agreement No.
1740716
ADNOC -
01.07.2010
30.06.2015
235
Contract (12) – for the Operation, Water Management, Development, Maintenance And
Repair of Irrigation Water Supply and Distribution System in Al Ain Region
Al Ain Municipality DMJM
International 01.07.2010 30.06.2015
236 C1004/1, Upgrading of VVIP Approach Road Yas
Island Abu Dhabi
Municipality Parson Int’l Ltd. 16.01.2014 30.07.2015
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
21
237
Contract 10/2012 - Construction and execution of a network for irrigation and improving the
main entrance for the eastern sector
Al Ain Municipality Dorsch Holding
GmbH 01.04.2013 31.08.2015
238 Contract No. CPC-14014-M1 – Periodic Maintenance Works for Different Areas
Crown Prince Court - 01.05.2014 30.08.2015
239
Contract No. CPC-14024-M1 – Maintenance Palms in Falaj Mualla & Al Ain
Crown Prince Court - 01.05.2014 30.08.2015
240 Contract No. CPC-14048-MI Crown Prince Court - 01.11.2014 30.10.2015
241 Contract No. DPDP-6009/CS-OT-10 Design and
Build of Plant Nursery Facility
Meraas Development LLC
- 02.09.2014 30.10.2015
242
Supply, Installation, Testing & Commissioning ( SITC) of Pump Motor Units & Associated
Switchgear with SCADA Integration including one Panel Mounted Work Station in Najma Pumping
Station
Dubai Electricity & Water Authority
(DEWA) - 10.02.2013 31.12.2015
243 Four Seasons Hotel – Abu Dhabi
Contract No. CC0044 Al Futtaim Carillion
LLC AECOM 01.03.2014 31.01.2016
244 Church Compound for Armenian Community of
Abu Dhabi – School
Armenian Community of Abu
Dhabi
Kojakian Engineering Consultants
01.06.2015 31.03.2016
245 Palm Jumeirah – Azure Residence Building
(Contract DMS135862) Nakheel
Ms. Dal Al Handasha
20.11.2014 30.04.2016
246 Construction of 20 Playgrounds in Abu Dhabi
Main Land-Phase 1 – Contract No. 393-A Abu Dhabi
Municipality KEO International 03.08.2014 30.04.2016
247 Construction of 20 Children Playgrounds in Abu Dhabi Main Land-Phase 1 – Contract No. 393-B
Abu Dhabi Municipality
KEO International 03.08.2014 30.04.2016
248
CPC-15054-M1 Periodic Maintenance Work for Different Areas
Crown Prince Court - 01.05.2015 30.04.2016
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
22
249 Landscaping, Swimming Pools & Water Features
Package Works ( 3700) – Kempenski Hotel Sunrise Properties
Ltd LINX 13.07.2014 30.06.2016
250 Legoland Main Contract Package 3 – Adventure,
Miniland and Factory LL Dubai Theme
Park LLC - 27.07.2015 26.06.2016
251
Design, Supply, & Installation of Promenade Hard Landscaping Works Below Bridge 4, Al Maryah
Island
Al Sowah Square Properties LLC
- 27.01.2016 30.06.2016
252
Engineering, Design Development, Supply and Installation of the LEGOLAND Package 3 Miniland
Dome Works, Dubai
LL Dubai Theme Park LLC
- 15.03.2015 31.08.2016
253
Arabian Ranches 2 Development PA06 Palma - Landscape Package 07
Emaar Properties PJSC
Parsons Int’l Ltd. 12.11.2015 31.08.2016
254
Contract No. 73/2014 Landscaping Maintenance for Crown Prince Court Buildings and the Villa of
Strategic Affairs, Abu Dhabi
Crown Prince Court - 21.10.2015 20.10.2016
255
Infrastructure Works for Package 8 and Package 2A – Contract No. DMS – 140563, Jumeirah Park
Development, Dubai
Nakheel - 25.06.2015 24.11.2016
256 Madinat Jumeirah Phase 4 – External Timber,
Aluminium & Tensile Structure at Madinat Jumeirah, Dubai
Mirage Leisure and Development Inc.
- 02.05.2015 30.11.2016
257
DPDP-LE-4003/CW-MC-04 The Royal Theatre at Bollywood Park
Bollywood Parks LLC
Kling Consult 27.03.2014 29.09.2016
258
Contract No. 1/154 – Removal of Weeds and Pruning of Trees in Mainland, Abu Dhabi
Abu Dhabi Municipality
Parsons Int’l Ltd. 10.11.2014 31.12.2016
259 Contract No. 1/153 – Removal of Weeds and
Pruning of Trees in North, Abu Dhabi
Abu Dhabi Municipality
Parsons Int’l Ltd. 10.11.2014 31.12.2016
260
Mitigation Measures of Water Logging Problems in Al Sameeh & Al Shahama Areas
Environment Agency
Parsons Int’l Ltd. 11.07.2013 30.11.2016
261
Upgrading the Engineering Natural Beautification Value Outside the Island of Abu Dhabi, Second
Phase, Project No. 407/1
Abu Dhabi Municipality
Dorsch Holding GmbH
01.10.2013 31.01.2017
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
23
262 Reem Development Phase 1 Mira 3 & 4 –
Landscape Package 3 & 4
Emaar Properties PJSC
Parsons Int’l Ltd. 08.12.2015 28.02.2017
263
Legoland Main Contract Package 2 – Lego City, Create, Kingdom and Back of House
Besix/Orascom J.V. - 26.08.2015 31.03.2017
264
AKOYA Golf Clubhouse – Hard & Soft Landscaping Works, Swimming Pool and Water
Feature Package
DAMAC Crescent Properties LLC
- 15.06.2016 11.03.2017
265
Construction of Landscaping in Villages 4 and 5 at the Al Falah Community Development, Abu
Dhabi
ALDAR Properties PJSC
Hyder Consulting 08.12.2015 07.04.2017
266
Operations & Maintenance of Parks, Landscape, Recreational Facilities & their related
Infrastructure of Asset s for Delma Island, Western Region, Emirate of Abu Dhabi
Western Region Municipality
- 01.01.2014 31.03.2017
267
DPDP-LE-4005/CW-MC-03 – The Construction of the Area Development Works for Legoland and
Ride Installation of Castle Coaster
LL Dubai Theme Park LLC
Kling Consult 14.06.2015 01.06.2017
268
DPDP-LE-4003.4005.4007.4008/MC-INF-01 In-Parks Primary Infrastructure works for
LEGOLAND Dubai Park, Bollywood Park, Hotel 1 and River walk on Dubai Parks
Dubai Parks & Resorts PJSC
- 11.05.2014 01.06.2017
269
DPDP-LE-4001/CW-INF-01 In-Parks Primary Infrastructure works for Motiongate
Motiongate LLC - 11.05.2014 01.06.2017
270
Contract No. DPDP-6009/CW-MC-12 The Complete Construction and Commissioning of
the Community Facility Buildings (Civil Defense, Ambulance Post and data Center)
Dubai Parks & Resorts PJSC
- 24.06.2015 01.06.2017
271 Contract No.DPDP-LE-4005/CW-MC-05 Ride
Specialist Installation Contractor
LL Dubai Theme Park LLC
- 02.08.2015 01.06.2017
272 Contract No.DPDP-LE-4001/CW-MC-07 Ride
Specialist Installation Contractor Motiongate LLC - 02.08.2015
01.06.2017
273 Contract No.DPDP-LE-4003/CW-MC-11 Ride
Specialist Installation Contractor Bollywood Parks
LLC - 02.08.2015 01.06.2017
274
DPDP – 4003 – Bollywood Park Construction of the Area Development Works for
Bollywood Park
Bollywood Parks LLC
- 30.08.2015 01.06.2017
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
24
275
Contract: PRFD/O&M/C4100/1 - Formula 1 Preparation Works of Landscape and Local
Irrigation Assets for Yas Island - Zone 2
Abu Dhabi Municipality
Parsons Int’l Ltd. 08.10.2013 30.06.2017
276
Contract No. 9/467 – Removal of Weeds and Pruning of Trees in Abu Dhabi Island South, Abu
Dhabi
Abu Dhabi Municipality
Dorsch Holding GmbH
10.11.2014 30.06.2017
277
Contract: PRFD/O&M/121/1R – Operation and Maintenance of Parks and Water Features at
Area along Abu Dhabi – Dubai Highway
Abu Dhabi Municipality
Parsons Int’l Ltd. 31.12.2014 30.06.2017
278
Contract: PRFD/O&M/112R – Operation and Maintenance of Landscape and Pocket Park
Assets on Abu Dhabi Island
Abu Dhabi Municipality
Parsons Int’l Ltd. 31.12.2014 30.06.2017
279
Contract: PRFD/O&M/111R – Operation and Maintenance of Landscape and Pocket Park
Assets on Abu Dhabi Island
Abu Dhabi Municipality
Parsons Int’l Ltd. 31.12.2014 30.06.2017
280
Operation & Maintenance of the Seeds of Beautification Plants and the Local Irrigation
Networks at Khalifa City – Contract No.1R/113
Abu Dhabi Municipality
Dorsch Holding GmbH
31.12.2014 30.06.2017
281
Operation & Maintenance of Beautification Plants and Irrigation Networks at the Area of Abu
Dhabi – Al Ain Road from Mussafah Bridge Intersection to Al Nahda Area – Contract No.
1R/112
Abu Dhabi Municipality
Dorsch Holding GmbH
31.12.2014 30.06.2017
282 Contract No. 67W/2014 – 1MIG RCC Water Tank
at Gizemri – Fujairah
Federal Electricity & Water Authority
- 16.08.2015 31.08.2017
283
CW/200A/2011 – Supply, Installation, Testing and Commissioning of Fiber Cement/Glass
Reinforced Epoxy Water Transmission Pipeline and Associated Works at Various Location in the
Emirate of Dubai
Dubai Electricity & Water Authority
(DEWA)
NJS Consultants Co. Ltd.
06.12.2011 31.10.2017
284 Site Wide Irrigation Control Al Dar Properties
PSJC
M/s Maunsell (AECOM)
Consultancy Services
06.10.2011 30.09.2017
285 River Parks RD&E Project – Hard Landscaping
Works KIER Dubai LLC - 01.03.2016 30.09.2017
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
25
286 LOUVRE Museum –Abu Dhabi Tourism Dev. & Investment Co.
( TDIC) - 06.10.2014 25.10.2017
287 Contract No. 79/2016 – Landscaping
Maintenance for CPC & OSA’s Building Crown Prince Court - 21.10.2016 20.10.2017
288
DPDP-4001/CW-MC-08 - Construction of the Area Development Works for Motiongate Park
Motiongate LLC - 30.08.2015 31.01.2017
289
Contract No. 52/2014 – Outsourcing Work of Operation, Development & Maintenance of Public Parks and Landscapes in Al Ain and
Eastern Region of the Emirates – Contract (12) for the Operation, Water Management, Devl. ,
Maintenance & Repair of Irrigation Water Supply and Distribution City in Al Ain Region, Al Ain UAE
Al Ain Municipality - 01.07.2015 31.12.2017
290
CW/200D/2011 – Supply, Installation, Testing
and Commissioning of Fiber Cement/Glass Reinforced Epoxy Water Transmission Pipelines
and Associated Works at Various Locations in the Emirate of Dubai
Dubai Electricity & Water Authority
(DEWA)
NJS Consultants Co. Ltd.
06.12.2011 30.04.2017
291
Renovation of the Garden and the Infrastructure in the Main Desert, Sixth Phase, Infrastructure,
Project No. 209/5 at Abu Dhabi Main Land
Abu Dhabi Municipality
Dorsch Holding GmbH
01.10.2013 31.12.2017
292 FP-1006000004 – Irrigation Upgradation Works
at Taweelah
Engineer’s Office
of HH Sheikh Mohammed Bin
Rashid Al Maktoum
- 04.11.2015 30.11.2017
293 Motiongate Dreamworks – Ride Specialist
Installation Motiongate LLC - 20.09.2015 31.12.2017
294
DPDP-4005-Legoland Design, Manufacture, Supply, Installation, Commissioning & Final
Acceptance Testing of Legoland Show Sets & Scenic (Package 9C)
LL Dubai Theme Park LLC
- 30.12.2015 31.12.2017
AL RYUM GROUP – PROJECTS COMPLETED S.
NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE
COMPLETION DATE
26
295 Design & Build of LEGOLAND Water Park
LL Dubai Theme
Park LLC
- 01.07.2015 28.02.2018
296 C02- Louvre Abu Dhabi External Works
Tourism Dev. & Investment Co. (
TDIC)
TURNER 10.01.2017 31.12.2017
297
Reinstatement of Affected Soft Landscape Assets Due to the Poor Maintenance of Previous
Contractor (Contract Area 103S)
Abu Dhabi Municipality
- 01.10.2017 31.12.2017
298 Landscaping and Irrigation Maintenance for
Marina Office Park Marina Facilities
Management - 01.03.2015 28.02.2018
299
Landscaping and Irrigation System Maintenance
for Marina Royal Complex
Marina Facilities
Management
- 07.01.2015 28.02.2018