AL RYUM GROUP – PROJECTS COMPLETED S. NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE COMPLETION DATE 1 1 Contract No. BA/2/L/1476 Hard & Soft Landscape Works and Automatic Irrigation System in Al Bateen Palace for H.H. Sheikh Hamdan Bin Zayed Al Nahyan Abu Dhabi Municipality Arabian Engineering Center & Al Khatib Cracknell 21.09.1998 30.11.1999 2 Contract No. BA/2/L/1568 For Construction, Completion and Remedying of defects of Ghantoot Racing and Polo Club Landscape at Abu Dhabi Abu Dhabi Municipality - 25.06.1999 31.01.2000 3 Contact No. BA/2/L/1254 For the Supply & Installation of Equipment in the Veterinary Laboratory at Al Wathba Clinic Abu Dhabi Municipality Spectrum Eng. Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works Department The Arab Office for Planning & Architecture 19.06.2000 06.11.2001 5 Ruwais Housing Complex Expansion Project No.1215, Agreement No. 171215C8 / Package 7. Construction of Landscaping & Irrigation Branches ADNOC - 10.07.2001 06.08.2002 6 Supply and Installation of 353 Controllers Abu Dhabi Municipality - 12.08.2002 20.04.2003 7 Supply and Installation of 240 Controllers Abu Dhabi Municipality - 10.11.2002 12.05.2003 8 Contract No. BA/2/L/1959 H.H. Sheikh Sultan Bin Zayed Al Nahyan Residential Complex Landscape Works Abu Dhabi Municipality Sam Engineering Consultants 06.04.2002 12.05.2003 9 Construction & Completion of 170 Farms at Khalifa City "A" Abu Dhabi Municipality Jouzy & Partners Consulting Engineers 15.04.2002 27.05.2003 10 Abu Dhabi TRIP Contract No. 980 Umm Al Nar Bridge and Tunnel Interchange Landscaping Works Abu Dhabi Municipality Delew Cather 31.12.2002 31.07.2003 11 Landscaping and Maintenance at Ruwais Housing Comlex ADNOC ADNOC - 01.05.1999 08.08.2003

Upload: doduong

Post on 27-May-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

1

1

Contract No. BA/2/L/1476 Hard & Soft Landscape Works and Automatic Irrigation System in Al Bateen Palace for H.H. Sheikh

Hamdan Bin Zayed Al Nahyan

Abu Dhabi Municipality

Arabian Engineering Center

& Al Khatib Cracknell

21.09.1998 30.11.1999

2

Contract No. BA/2/L/1568 For Construction, Completion and Remedying of defects of

Ghantoot Racing and Polo Club Landscape at Abu Dhabi

Abu Dhabi Municipality

- 25.06.1999 31.01.2000

3 Contact No. BA/2/L/1254 For the Supply & Installation of Equipment in the Veterinary

Laboratory at Al Wathba Clinic

Abu Dhabi Municipality

Spectrum Eng. Consultants

03.03.1999 01.10.2001

4 Contract No. 231/2000 External Landscaping

Works for Marfa Hotel Public works Department

The Arab Office for Planning &

Architecture 19.06.2000 06.11.2001

5

Ruwais Housing Complex Expansion Project No.1215, Agreement No. 171215C8 / Package 7.

Construction of Landscaping & Irrigation Branches

ADNOC - 10.07.2001 06.08.2002

6 Supply and Installation of 353 Controllers Abu Dhabi

Municipality - 12.08.2002 20.04.2003

7 Supply and Installation of 240 Controllers Abu Dhabi

Municipality - 10.11.2002 12.05.2003

8

Contract No. BA/2/L/1959 H.H. Sheikh Sultan Bin Zayed Al Nahyan Residential Complex Landscape

Works

Abu Dhabi Municipality

Sam Engineering Consultants

06.04.2002 12.05.2003

9 Construction & Completion of 170 Farms at

Khalifa City "A" Abu Dhabi

Municipality

Jouzy & Partners Consulting Engineers

15.04.2002 27.05.2003

10

Abu Dhabi TRIP Contract No. 980 Umm Al Nar Bridge and Tunnel Interchange Landscaping

Works

Abu Dhabi Municipality

Delew Cather 31.12.2002 31.07.2003

11 Landscaping and Maintenance at Ruwais Housing

Comlex ADNOC ADNOC - 01.05.1999 08.08.2003

Page 2: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

2

12

Contract No. BA/2/L/1664 Construction, Completion and Maintenance of Al Wathba Park

Abu Dhabi Municipality

Derby Design 16.09.2000 31.08.2003

13

Contract No. BA/2/L/2072 Supply, Installation & Maintenance of Electrical & Mechanical

Playground Equipment at Different Locations in Abu Dhabi

Abu Dhabi Municipality

Pan Emirates

01.09.2002

18.10.2003

14 Renovation and Maintenance of (5) Fountains in

Abu Dhabi Abu Dhabi

Municipality

Arabian Engineering Center

01.04.2002 15.12.2003

15

Contract No. BA/2/L/1606 Furnishing of the Surgery and X-ray Section at the Al Wathba

Veterinary Clinic

Abu Dhabi Municipality

Spectrum Eng. Consultants

30.06.2000 29.02.2004

16

Contract No. BA/2/L/1547 Supply and Installation of Computer Control System for

Irrigation Network at Wadi Al Ryum

Abu Dhabi Municipality

Arabian Engineering Center

10.10.2001 14.04.2004

17

Contract No. BA/2/L/2004 Construction & Maintenance of 3 Nos. of Pumping Stations for

Fodder Farms in Wadi Al Ryum

Abu Dhabi Municipality

Dr. M.H. Ali El Saie Consulting

Engineering 02.03.2002 22.05.2004

18

Contract No. BA/2/L/2222 Supply, Installation & Maintenance of Electrical & Mechanical

Playground Equipment at different locations in Abu Dhabi

Abu Dhabi Municipality

Pan Emirates 01.06.2003 30.05.2004

19

Contract No. 230/2002 Development and Beautification Works at Lulu Island

Public works Department

- 15.08.2002 14.06.2004

20

Contract No. BA/2/L/2151 Completion & Plantation of 240 Farmsat Khalifa City B - Abu

Dhabi

Abu Dhabi Municipality

Sam Engineering Consultants

01.09.2003 03.07.2004

21 Construction & Maintenance of 74 Farms Abu Dhabi

Municipality

Sam Engineering Consultants

01.03.2004 27.08.2004

22 Irrigation Control System at Quoryn Al Aich Public works Department

- 10.05.2004 09.09.2004

23

Contract No. BA/2/L/2105 Construction & Maintenance of 800 Farms at Al Falah Area, Abu

Dhabi

Abu Dhabi Municipality

Sam Engineering Consultants

01.07.2002 30.09.2004

Page 3: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

3

24

Contract No. BA/2/L/2050 Construction & Maintenance of 649 Farms at Al Rehbah, Abu

Dhabi

Abu Dhabi Municipality

Sam Engineering Consultants

10.11.2001 08.12.2004

25

Contract No.910/1 Irrigation Control System at Abu Dhabi Industrial City - Phase I

Public works Department

Parsons 23.10.2004 11.12.2004

26

Supply & Installation of 20 Tanks 100,000 Gallons at the Western Region

Western Region Municipality

Joozy & Partners 17.11.2003 15.12.2004

27

Replacement of Irrigation System & Lighting at Crown Prince Diwan

Abu Dhabi Municipality

Joozy & Partners 17.11.2003 15.12.2004

28

Landscaping Works at Conference Palace Hotel

(Emirates Palace) - Abu Dhabi, Package 14 A, B & C

Conference Palace Hotel Executive

Committee

Turner 25.07.2004 30.12.2004

29

Contract No. BA/2/L/2637 Replacement of Irrigation System at his Highness The President

Palace at Muzairah

Abu Dhabi Municipality

Sam Engineering Consultants

24.07.2004 19.01.2005

30

Contract No. BA/2/L/2516 Removal, Supply, Installation & Maintenance of Garden Lights at

Mirfa Corniche

Abu Dhabi Municipality

Agriculture Dept.

Dr. M.H. Ali El Saie Consulting

Engineering 15.05.2004 10.03.2005

31 Supply & Installation of 100 Pumps at Bida

Yamrah 8 Abu Dhabi

Municipality

Sam Engineering Consultants

10.01.2004 08.05.2005

32 Supply & Installation of Flow Control Valves at

Taweelah, Rehba & Bahia Abu Dhabi

Municipality

Dr. M.H. Ali El Saie Consulting

Engineering

09.01.2004 09.05.2005

33

Contract No. BA/2/L/2472 Renovation & Maintenance of 8 Fountains inside & outside Abu

Dhabi - Phase 3

Abu Dhabi Municipality

Pan Emirates 13.12.2003 10.05.2005

34

Abu Dhabi TRIP Contract No. 982 Umm Al Nar Bridge and Tunnel Interchange Landscape &

Irrigation Works

Public works Department

Delew Cather 10.03.2004 21.06.2005

35

Plantation Around the Villas at Rehba, Al Shahama, Al Sader, Al Shelilla, Helleeya North,

Helleeya South, Shawmekh and Baniyas - Phase II

Abu Dhabi Municipality

Sam Engineering Consultants

17.07.2004 16.07.2005

36 Contract No. 950 Irrigation, Agricultural

Drainage and Landscaping Works at Abu Dhabi International Airport - Phase I

Abu Dhabi Municipality SPC

Dept. Parsons 24.07.2004 18.07.2005

Page 4: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

4

37

Contract No. 176/2004 Maintenance Works at Ajban Race Track

Public works Department

- 01.05.2004 28.02.2006

38

Plantation Around the Villas at Rehba, Al Shahama, Al Sader, Al Shelilla, Helleeya North,

Helleeya South, Shawmekh and Baniyas - Phase I

Abu Dhabi Municipality

Sam Engineering Consultants

17.07.2004 26.03.2006

39

Burj Dubai Development - The Residences Hard & Soft Landscaping Works

EMAAR MACE Int'l Ltd. 06.10.2005 31.05.2006

40 Maintenance Works at Mirfa Garden Abu Dhabi

Municipality

Arab Officer for Planning and Architecture

04.06.2005 03.06.2007

41

Contract No. BA/2/L/2872 Natural Beautification, Fountains & Landscaping Works at the area

surrounding Mafraq Hotel - Abu Dhabi

Abu Dhabi Municipality

Sam Engineering Consultants

09.07.2005 03.07.2006

42

Supply, Installation, Operation & Maintenance of Steel Tank (1 M Gallon) & Pumping Stations &

600 Water Line for Al Foah Farm at Al Ain Contract No. 08/2005

Al Foah Dev. Co. - 20.12.2005 15.07.2006

43

Contract No. BA/2/L/2705 Supply & Installation of 4 Nos. R.O. Plants (10,000 GPD) in

Western Region

Abu Dhabi Municipality

Dr.M.S. Al Saie 24.01.2005 23.07.2006

44

Maintenance Works in Gardens & Parks - PROJECT I

Abu Dhabi Municipality

Parsons 17.07.2004 16.07.2006

45 Shade Structures for various Schools in Northern

Emirates Ministry of Public

Works. - 12.05.2006 11.08.2006

46

Contract No. BA/2/L/2874 Supply, Installation & Maintenance of Mehanical & Electrical

Playground Equipment inside & outside Abu Dhabi

Abu Dhabi Municipality

Pan Emirates Consult

24.12.2005 20.08.2006

47 Arabian Ranches – Dubai EMAAR Parsons 01.05.2006 01.09.2006

48

Emirates Hills - Frayland Villas Streetscape Landscaping & Irrigation Works

EMAAR - 01.12.2005 15.09.2006

49

Maintenance Works in Gardens & Parks - PROJECT 2

Abu Dhabi Municipality

- 04.10.2004 03.10.2006

Page 5: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

5

50 Landscaping & Irrigation Works at Sea Palace

Side Road - Abu Dhabi Abu Dhabi

Municipality Hyder 01.10.2006 22.10.2006

51 Contract No. BA/2/L/2707 Completion &

Maintenance of Two Concrete Tanks at Um al Nar

Abu Dhabi Municipality

Agriculture Dept.

Consulting Engineering Group

30.04.2005 30.09.2006

52

Burj Dubai Development: Old Town Sites A & B Contract No. 3020 Site A,Phase I Contract No.

4070 Landscaping & Irrigation Works

EMAAR MACE Int'l Ltd. 20.12.2005 15.10.2006

53

Contract No. JAP006/C94 The Palm Jumeirah - Concrete Works for Chiller Plant (4000 Sq. Mtr.

Concrete Works)

Nakheel Parsons 20.12.2005 20.10.2006

54

Maintenance Works in Gardens & Parks - PROJECT 3

Abu Dhabi Municipality

Parsons 01.11.2004 31.10.2006

55

Burj Dubai Development: Business Park - Phase I Landscaping & Irrigation Works

EMAAR Shank Land - Cox 08.02.2006 31.10.2006

56 Maintenance Works at Ajban Race Track Public works Department

- 01.05.2004 10.11.2006

57

Contract No. BA/2/L/2270 Landscape, Irrigation System & Lighting for Development Projects at

Waves Breaker - Villas Area

Abu Dhabi Municipality

Sam Engineering Consultants

08.01.2006 15.11.2006

58 Maintenance Works in Gardens & Parks - Project

4 Abu Dhabi

Municipality - 02.01.2005 01.01.2007

59 Irrigation and Landscaping Works at Abu Dhabi -

Golf Course

Tourism Development & Investment Co.

- 28.10.2006 17.01.2007

60

Construction of New Car Park with Shades including Asphalt Works at Abu Dhabi

Intercontinental Hotel Refurbishment Project

National Corporation for

Tourism and Hotels Turner 09.07.2006 10.02.2007

61

Shade Structure Works for Seven Schools at Ajman – Contract No.

MB24/190202051015/156/2006

Ministry of Public Works

- 12.08.2006 11.02.2007

62

Shade Structure Works for Six Schools at Dubai – Contract No. MB19020205105/155/2006

Ministry of Public Works

- 12.08.2006 11.02.2007

Page 6: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

6

63

Shade Structure Works for Two Schools at Al Quwain – Contract No.

MB190202051015/157/2006

Ministry of Public Works

-

12.08.2006

11.02.2007

64

Soft Landscape and Irrigation Works of Shahil Accommodation /Replacement for ADMA-OPCO

on Das Island

ADNOC - 24.03.2006 18.02.2007

65 New Corniche Road East Landscaping & Irrigation

Works Contract No. 2015-2016 Abu Dhabi

Municipality Delew Cather 18.03.2004 19.04.2007

66

Burj Dubai Development - The Residences - Phase II Hard & soft Landscaping Works

EMAAR MACE Int'l Ltd. 11.07.2006 31.05.2007

67

Landscaping & Irrigation Works at Shoreline Apartment

Nakheel - 11.03.2006 10.06.2007

68 Construction and Completion of The Armenian

Embassy in Abu Dhabi

The Armenian Embassy in Abu

Dhabi

Spectrum Engineering Consultant

01.05.2006 30.07.2007

69 Contract No.952 Landscape, Agricultural & Irrigation Works at Abu Dhabi Int'l Airport -

Phase II

Abu Dhabi Municipality

Agriculture Dept.

Parsons 10.09.2005 30.12.2007

70

Contract No. PJ 9167/2 Construction of New Community Facilities & Improvements to Existing

Facilities - Zone 2

Dubai Municipality Gulf Engineering

Consultant 28.10.2006 30.12.2007

71

Contract No. PJ 9167/3 Construction of New Community Facilities & Improvements to Existing

Facilities - Zone 3

Dubai Municipality Gulf Engineering

Consultant 28.10.2006 30.12.2007

72

Contract No. PJ 9167/4 Construction of New Community Facilities & Improvements to Existing

Facilities - Zone 4

Dubai Municipality Gulf Engineering

Consultant 28.10.2006 30.12.2007

73 Contract No. 910/2 - Agricultural & Irrigation Works at Abu Dhabi Industrial City - Phase II

Abu Dhabi Municipality

Agriculture Dept.

Hyder 20.05.2007 14.03.2008

74

Contract No. 017/2007 - Various Landscaping & Irrigation Works for Armed Forces

G.H.Q. Armed Forces Directorate of Military Works

- 01.04.2007 31.03.2008

Page 7: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

7

75

Completion of Central Control Irrigation System for Water Distribution for locals farms at

Mouazaz, Al Jarf & Al Nahda

Abu Dhabi Municipality

SAM Engg. 01.05.2007 30.04.2008

76 Contract No.N026-040-13 – Palm Deira –

Promenade at Deira Island Front Nakheel - 15.01.2008 30.03.2009

77

Contract No. AE/A/493/2007, Various work for Armed Forces

G.H.Q. Armed Forces Directorate of Military Works

- 20.02.2008 19.08.2008

78

Contract No. PJ-9163, Construction, Completion and Maintenance of Mirdif Park

Dubai Municipality - 01.05.2007 31.12.2008

79

TenderL35/2007,Devl of Waves Breaker Area in Abu Dhabi (Landscaping & Agric. Works-Lighting

Network-Irrigation Network, Hardscaping(Interlocks pavers II)

Abu Dhabi Municipality &

Agriculture

SAM Engineering Consultant

18.03.2008 17.01.2009

80 Kempinski Hotel & Residences at the Palm

Jumeirah – Phase II

Emerald Palace Group

Management FZ-LLC

- 28.09.2009 28.12.2010

81 Contract No.A219999/2008/C/004 – 400MM External Infrastructure Trunk Sewer - Al Raha

Garden ALDAR Properties GHD 09.01.2009 30.06.2009

82

Contract No. 350 - Rehabilitation of Water Tanks and Irrigation Network at Western Region -

Ghayathy City - Phase 1

Abu Dhabi Municipality

KEO 07.04.2007 31.07.2009

83

Green Reconstruction of Abu Dhabi Golf & Equestrian Club

ALDAR Properties - 01.06.2009 15.10.2009

84

Contract No. A219999/2007/C/001 - Landscaping Works for Parks, Gardens & planting adjacent to

roads, boundary walls for the Residential Compounds of Al Raha Gardens I & II, Abu Dhabi

ALDAR Properties GHD Global PTY

Ltd.

07.04.2007

30.10.2009

85

Contract No.SSC-08-02004-000000029 - Irrigation works at Interchange 4 & 5, for the Al

Raha Beach Development

ALDAR Properties Cansult Maunsell 26.04.2009 01.11.2009

Page 8: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

8

86

Cont. No.147/2008 - Maint, Rehabilitation & Additional Works for the Roads and Brigdes of Emirate, Main Land – North, Farms in Al Idlah

Abu Dhabi Municipality

- 04.08.2009 04.11.2009

87 Saadiyat Island Expressway Early Landscape

Works – Project # C40

Tourism Development & Investment Co.

Parsons Engr. 13.06.2009 12.11.2009

88

Landscaping Works for Parks, Gardens & planting adjacent to roads, boundary walls for the

Residential Compounds of Al Raha Gardens III, Abu Dhabi

ALDAR Properties GHD Global PTY

Ltd. 30.09.2008 30.11.2009

89

Soft Landscaping and Irrigation Works for 5 nos. of Operative Village at Yas Island

ALDAR Properties Whitby Bird 25.06.2008 30.11.2009

90 Soft Landscaping and Irrigation Works for Links

Golf Course at Yas Island ALDAR Properties Whitby Bird 25.06.2008 30.11.2009

91

Contract No.A219999/2008/C/005 – 1200MM External Infrastructure Sewerage Trunk Service –

Al Raha Garden

ALDAR Properties GHD Global PTY

Ltd 08.11.2008 30.11.2009

92 Reactivation of Abu Dhabi Corniche Beach

Improvement Works – Phase I

M/s. UPC – Urban Planning Council

M/s. Hyder Consulting Middle

East Limited 02.06.2009 31.12.2009

93

Const of Iraqi Embassy Building, Ambassador Residence, Servant's Accom, Utility Blocks and

Boundary Walls

Iraqi Embassy DEWAN 29.04.2008 30.01.2010

94

Ref. No. S439001/2008/T/001 Infrastructure, Soft Landscape and Irrigation Works, Yas Island

Development Zone – P Central Park / F1 Car Park

ALDAR Properties HALCROW 06.11.2008 30.01.2010

95

Hotels H3 & H4 (Crown Plaza Stay Bridge) Contt#A430852/2007/c/007/sub/0021

ALDAR Properties Kannfinche 05.12.2008 31.01.2010

96 Development & Landscape for the Garden & Entrance of Ministry of Presidential Affairs

Ministry of Presidential Affairs

- 17.12.2009 17.02.2010

97

Abu Dhabi International Shooting Club External Landscape & Irrigation Planting System – Built

For Wake Board Facilities and Landscape Upgrade – Design for Paint Ball Area including

Old Wake Facilities

Private Property Management

ATKINS 24.12.2008 31.03.2010

Page 9: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

9

98

Landscaping and Maintenance at Ruwais Housing Complex ADNOC Agreement No.1740301

ADNOC 07.08.2003 30.06.2010

99

Additional Car Parks @ Emirates Palace

Emirates Palace

KEO

05.06.2010

30.07.2010

100

Nareel Island Development External Roads and

Fence

ALDAR Properties

Parsons Engineering

06.05.2010

30.08.2010

101

Al Ain Equestrian Club – Steel Water Tank

Musanada - 24.10.2009 23.10.2010

102 Ph. 1A Welcome Pavilion Water Cascades MEP

Works Al Dar – Besix - 03.02.2010 30.10.2010

103 Kempinski Residences – Palm Jumeirah

Landscaping Works KEMPINSKI LMS Intl 05.08.2009 30.10.2010

104

MW/D/25/2010 - Supply & Installation of Two Water Tanks in Al Ain

Crown Prince Court - 13.04.2010 14.11.2010

105 Contract No. 4100 – Irrigation and Landscape

Works at the Interchange on Abu Dhabi – Dubai Road

Abu Dhabi Municipality

Dorsch Holding GmBH

11.07.2010 15.12.2010

106 Landscaping Beautification Works to the Area

Located at West 2/19, Abu Dhabi Abu Dhabi

Municipality Dorsch Holding

GmBH 15.08.2010 11.09.2010

107 Al Gurm Villas Irrigation and Landscaping Works AL Dar Properties Dar Al Handasah 31.08.2010 15.01.2011

108 Annual Maintenance Contract for Landscaping and Irrigation system maintenance for Marina

Office Park

National Investment Corporation

- 01.03.2010 28.02.2011

109

Contract No. 488 – Subsoil Drainage for Ghantoot Polo Club

Abu Dhabi Municipality

Dorsch Holding GmbH

11.04.2010 30.04.2011

110

Cont. #MW-OU-059-2009 Const. of Concrete Boundary Wall, Observation Towers, Road Works

and Other Works at Falag Hazza Camp – Al Ain

GHD - 07.03.2010 30.04.2011

Page 10: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

10

111

Contract No. GC-26 Al Jawaher Temporary utility Works

TDIC - 07.12.2010 07.05.2011

112 New Pump Station at Rawdat Al Reef Crown Prince Court - 3.01.2010 30.04.2011

113

T-FM-42-2010 Supply, Installation , Testing and Commissioning and Operating of (23) Traveller Irrigation Systems in Ghantoot Racing and Polo

Club

Abu Dhabi General Services PJSC

trading as MUSANADA

15.01.2011

15.06.2011

114

AC7143 – Al Raha Beach Development Southside IC6 Extension – Complete Works –

Removal/Relocation of Palm Trees

Balfour Beatty LLC Parsons

Engineering 15.08.2011 31.09.2011

115 Civil & Landscaping Works at Al Bateen Palace Crown Prince Court Dorsch Holding

GmbH 06.06.2011 30.10.2011

116

Contract No. 469 – Landscape & Irrigation Works for the VIP Entrance of H.H. Sheikh Zayed Bin

Sultan Al Nahyan Mosque

Abu Dhabi Municipality

Dorsch Holding GmBH

20.03.2011 17.09.2011

117 Supply & Installation of Tensile Fabric for Private

Villa Island Shield Cont. Co. - 01.08.2011 30.09.2011

118 Construction, Completion of Football Pitch

Facilities Building, Emirates Palace, Abu Dhabi Emirates Palace,

Abu Dhabi - 21.09.2011 30.09.2011

119 Landscape and Irrigation Maintenance Works at

H.H. Sheikh Hamdan Al Nakheel Palace – Abu Dhabi

The Private Office of H.H. Sheikh

Hamdan Al Nakheel Bin Zayed

- 01.10.2010 01.10.2011

120 Construction of Beach Restaurant & Grill – Phase

1 Kempinski Residences – Palm Jumeirah

Sunny Beach Properties LTD, Abu Dhabi, UAE

- 15.05.2011 30.09.2011

121 Renovation of Pump Sets & Controller and

Related Works at Al Maha Farm Elite Agro LLC

Al Salaam KLhalil N. Khoury

09.06.2011 31.12.2011

122 Supply & Installation of New Pipeline & Electrical

Lines to CPI’s and Related Works Elite Agro LLC

Al Salaam KLhalil N. Khoury

09.06.2011 30.11.2011

Page 11: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

11

123 Supply & Installation of One MIG Water Tank in

Al Maha Farm Elite Agro LLC

Al Salaam KLhalil N. Khoury

15.08.2011 30.11.2011

124 Gen. Maint. for Aljeel KG in Al Shamkha –

Building no. C1142 MUSANADA - 26.07.2011 30.11.2011

125 Gen. Maint. for Al Maha School in Al Falah –

Building no. C1143 MUSANADA - 26.07.2011 30.11.2011

126 Gen. Maint for Capital School in Al Shamkha –

Building no. C11139 MUSANADA - 26.07.2011 30.11.2011

127 Gen. Maint. for Al Janeen School in Al Shamkha –

Building no. C1142 MUSANADA - 26.07.2011 30.11.2011

128 Gen. Maint. for Al Taleeaa School in Al Shamkha

– Building no. C1144 MUSANADA - 26.07.2011 30.11.2011

129

Gen. Maint. for Gurun Yafour School in Al Falah – Building no. C1133

MUSANADA - 26.07.2011 30.11.2011

130 Gen. Maint. for Al Tawan School in Al Shamkha –

Building no. C1124 MUSANADA - 26.07.2011 30.11.2011

131 Gen. Maint. for Al Hisn Secondary Shool in Al

Shamkha – Building no. C1114 MUSANADA - 26.07.2011 30.11.2011

132 Gen. Maint. for Mariam Bint Imran School –

Baniyas – Buildning no. C1134 MUSANADA - 03.08.2011 30.11.2011

133 Gen. Maint. for Al Bidaya School Al Shamkha –

Building no. C1433 MUSANADA - 02.08.2011 30.11.2011

134 Gen. Maint. for Al Mo’ Tasem School – Baniyas –

Building no. C1117 MUSANADA - 26.07.2011 30.10.2011

135 Gen. Maint. for Al Norr School – Baniyas –

Building no. C1121 MUSANADA - 03.08.2011 30.11.2011

136 Gen. Maint. for Al Mafraq High School – Baniyas

– Building no. C1116 MUSANADA - 26.07.2011 30.11.2011

Page 12: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

12

137 Restoration & Maintenance Works of Existing

Buildings at Al Maha Farm Elite Agro LLC

Al Salaam KLhalil N. Khoury

13.08.2011 30.11.2011

138

Contract # MW-Gs-180-2008 – Construction of Headquarter Bldg. Stores & Different Works for H.Q. of Logistic & Transforming Arm at Maleeha

GHQ Armed Forces - `

15.01.2010 30.11.2011

139 Contract No. 1004 – Landscaping Works at Raha

– Yas Tunnel Road Entrance Abu Dhabi

Municipality Parsons

Engineering 11.07.2010 31.12.2011

140

Khalifa City District Cooling – Installation of 4 Tanks in Khalifa City

Drake & scull Int’l - 01.08.2011

31.12.2011

141

CW/630/2007 – const. of 2 pumping stations each with 60 MIGD capacity in loc. no. 5 & loc.

no. 7 complete with surge protection system and associated MEP works

DEWA

Al - Diar

15.06.2008

15.12.2011

142 Contract C2010/3- Irrigation and Landscaping Works for H.H. Crown Prince Court, Abu Dhabi

Crown Prince Court Dorsch Holding

GmbH 15.01.2011

31.12.2011

143

Contract No. MW-AF-043-2009 - Construction of 7 nos. Ammunition Stores and

Modification Works for Fence at Safran Air Base

UAE Armed Forces - 25.09.2010 30.11.2011

144

Abu Dhabi Corniche Landscaping Services

(Maintenance)

John Buck International

Properties Hyder 15.11.2009 31.12.2011

145 Contract No. P042-C45 Electrically Operated

Sliding Gates TDIC - 01.05.2011 31.12.2011

146

Contract No. MW/D/27/2010, Supply and Installation of 1 Water Tank with 1 Million Gallon

capacity along with Installation of an Irrigation Network at Farms of Mehier – Al Ain

Private Dept. of H.H. Sheik Fatima

Bint Mubarak - 07.11.2010 30.11.2011

147

Contract No. MW/D/26/2010, Supply and Installation of 1 Water Tank with 1 Million Gallon

capacity along with Installation of an Irrigation Network at Al Maqam – Al Ain

Private Dept. of H.H. Sheik Fatima

Bint Mubarak - 07.11.2010 29.02.2012

148 Saadiyat Island Beach Resort Landscape &

Irrigation Works TDIC

Parsons Engineering

16.01.2010 29.02.2012

Page 13: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

13

149 Main Irrigation Line from Mafraq WWTP to Al

Faya along Abu Dhabi Al Ain – Road Contract No. 956

Abu Dhabi Municipality

Parsons Engineering

01.05.2010

21.02.2012

150

Landscaping & Irrigation System Maintenance for Marina Office Park – Abu Dhabi

National Investment Corporation

-

01.03.2011

29.02.2012

151

CONTRACT NO.SC-09-2048-0000011 – Al Raha Beach Development/Infrastructure – Irrigation

Network at Eastern Precinct

ALDAR Properties - 19.02.2009 29.02.2012

152

CW/146A/2010 – Design, Supply, Installation, Testing and Commissioning of Chlorine Dioxide

Dosing System at Mushrif Reservoir Phases 1 to 6

DEWA - 09.01.2011 09.02.2012

153 Contract No. P001-C47 Saadiyat Expressway

Permanent Landscape Works TDIC

Parsons Engineering

11.02.2010

29.02.2012

154

Agreement No. 1741118 – Supply & Lay of a High Density Polyethylene (HDPE) Pipeline from a

Supplementary High Rise Pumping Station (SHRPS) to H.H. the Presi.Palace Plant Yard at

Ruwais Housing Complex

ADNOC - 14.07.2011 29.02.2012

155 The Landmark Tower Project, Abu Dhabi

Al Habtoor & CCIC Joint Venture

- 30.10.2011 31.01.2012

156 Proposed Arzanah Development, Sector W-57,

Abu Dhabi-UAE-Rihan Heights (Phase 1A-Plot H)

MUBADALA Capital and Real Estate LLC

- 08.11.2011 31.01.2012

157 Landscaping & Irrigation Works of the Burj

Khalifa Boulevard Centre Media EMAAR Properties - 09.11.2011 08.01.2012

158

Contract No. CW/0146A/2010 – Design, Supply, Installation, Testing & Commissioning of

Chlorine Dioxide Dosing System at Mushrif Reserviors Phases 1 to 6 including Al Chlorination Lines, Interconnection with Existing Chlorination Lines, All Associated Earthworks, Civil, Electrical and Drainage Works, Automation System and

Safety Equipment

DEWA - 09.01.2011 31.01.2012

159 Contract no. 151/1 Removal of Weeds and

Pruning of Trees in Abu Dhabi Island Abu Dhabi

Municipality Parsons

Engineering 02.09.2010 30.04.2012

Page 14: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

14

160 Construction Works of irrigation Main Lines at Khalifa Bin Zayed Town B – Contract No. 481

Abu Dhabi Municipality

Dorsch Holding GmbH

28.04.2010 31.03.2012

161 Al Dhabeya Maritime Residential Complex Crown Prince Court Dorsch Holding

GmbH 22.05.2010 28.04.2012

162

Maintenance and irrigation Services of Landscaped Areas at ADNOC premises in Abu

Dhabi, Sas Al Nakhil and Al Shawamekh – Agreement No. 1720736

ADNOC - 01.11.2008 03.05.2012

163 Contract No. 6W/2010-4MIG & 2x1MIG RCC

Water Tanks & Pumping Station in Central Area FEWA Dr. M. H. Ali El-Saie 01.06.2011 31.03.2012

164 Contract No. CMW – 11051 – C002

Construction of Stores at Al Maryal Camp Camp No. (220802)

GHQ Armed Forces - 01.11.2011 31.03.2012

165 Modification to Boundary Wall For H.H. the

Crown Prince Diwan at W-35, Abu Dhabi – UAE H.H. The Crown

Prince Diwan

Architectural & Engineering Consultant

20.01.2012 20.05.2012

166 Maintenance of Landscape Works, Sport Field

and Irrigation Network Private Property

Management - 10.07.2011 30.08.2012

167 CMW-11098-C002 GHQ Armed Forces -

17.07.2012

31.10.2012

168 Cont. CNIA/05/04/2010/51/06 - Maint. & Renov.

For CNIA Camps in Zone 1 (Abu Dhabi and various location)

Ministry of Defence

- 18.04.2010 30.11.2012

169 Yas Island Development – Modification of Potable Water Network for Gateway Park

Al Dar Properties PSJC

- 23.04.2012 31.10.2012

170 Contract no. 151/2 Removal of Weeds and

Pruning of Trees in Abu Dhabi Island Abu Dhabi

Municipality Parsons

Engineering 02.09.2010 31.12.2012

171 Oman Botanic Gardens, Phase IV BAM International - 01.12.2011 31.12.2012

Page 15: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

15

172

Contract No. A199999/2011/C/025 – Geo-textile Fabric under Gravel Mulch at Al Gurm Berm Area

(Al Gurm Development)

Al Dar Properties PSJC

- 26.12.2011 26.12.2012

173 New Management Building and New Auditorium

Building at Buhasa – Soft Landscaping & Irrigation Works

Abu Dhabi Gas Industries Ltd.

(GASCO) AECOM 01.05.2012 31.12.2012

174 Contract No. M46/2012 – Landscaping &

Irrigation Works at Falj Al Mua ‘ala Palace, Ajman Crown Prince Court - 19.10.2012 20.01.2013

175

Tender No. EPD-CT-12020 Design, Supply & Installation of Dense Planting Screen at Khaleej Al Arabi Service Station – Abu

Dhabi

ADNOC - 30.01.2013 15.02.2013

176 Maintenance of Emirates Palace Football Pitch Emirates Palace

Hotel - 15.01.2012 28.02.2013

177 C410 – Development & Const. Works for

irrigation Network & Pumping Station in Farm Areas (Dhaharat, Al Tayeb, Al Wafiya, Al Wathba

Abu Dhabi Municipality

Dorsch Holding GmbH

01.06.2010 11.03.2013

178

Refurbishment Job – Contract No. CW/0771/2009 – Replacement of Valves and

Header Pipes with Associated Fittings for Najma Pumping Station Phase 1 & Phase 2

Dubai Electricity & Water Authority

(DEWA) - 02.03.2011 31.03.2013

179 Millenium Hotel, Sulaimani, Kurdistan Region -

Iraq Faruk Holding Company Ltd.

- 02.02.2012 31.03.2013

180 Landscape Complementary of Faruk Medixal

Center ( FMC) Faruk Holding Company Ltd.

- 19.07.2012 19.12.2012

181 Contract No. 15W/2010(2) – 3x2MIG RCC Water

Tanks & Pumping Station in Rak Area

Federal Electricity & Water Authority

(FEWA)

Dr. M. H. Ali El-Saie 01.06.2011 30.04.2013

182 Supply and Installation of Water Features Al Dar Properties

PSJC - 01.09.2012 31.03.2013

183 4EW/2011 – Construction of New Water Well

Fields at Surrah - UAE

Federal Electricity & Water Authority

(FEWA)

- 13.02.2012 30.04.2013

Page 16: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

16

184 Maintenance Works for Soft Landscape and

Irrigation System – Zayed Sports City – Phase 1A

MUBADLA Capital and Real Estate LLC

- 02.01.2012 30.06.2013

185 Construction Works for Al Raha Gardens

Attached Housing Project – Contract No. ARG-00-C-NET-C-00

Sorouh Real Estate Const. Gen.

Contracting House Ltd.

25.12.2012 25.06.2013

186 Supply & Installation of Landscaping Works –

Habshan 5 Industrial Facilities, Habshan

Abu Dhabi Gas Industries Ltd.

(GASCO) - 10.11.2011 31.08.2013

187

Supplying Agriculture Equipment

UAE University

-

01.09.2010

01.10.2013

188 Elixier II Mirfa – Landscaping & Irrigation Works ADNOC

LindeIndustrial Gases Co. Ltd.

- 28.09.2011 27.09.2013

189

GS/RFP-0212-Landscape Works for the

Surrounding Areas of Al Bahr Tower Sector -25, Plot 70 & 71

Abu Dhabi Investment Council

- 15.12.2012 15.09.2013

190 Bab Al Bahar – A Luxury Collection Hotel on Plot

No. 44, Al Nakheel Area in Ajman - UAE H.H. Crown Prince

of Ajman

Badri & Bensouda Architectural Engineering

04.03.2012 30.09.2013

191 Contract No: 2012/97 – Irrigation & Landscape

Works for H.H. Prince Crown (VIP Entrance)

Crown Prince Court Dorsch Holding

GmbH 19.06.2013 15.11.2013

192

Removal of Existing Services Within Basement Extension For the First Gulf Bank Office Bldg, Plot

C 110, Sector 48, Al Qurm Area, Abu Dhabi

First Gulf Bank M/s. Architectural

& Engr. Cons. 04.07.2013 03.11.2013

193

Contract No.PGD-O&M-309-Operation & Maint. Of Landscape, Forests and Irrig. Infrastructure at

Ghayathi, Ghayathi (A,B,C), Markaz/Hezam Ghayathi, Mashtal Ghayathi, Qasr saleh Al

Mazari, Gurnama (1,2) Bida Rashed and Shamal Gharb Ghayadhi

Municipality of Western Region -

WRM KEO Int’l 15.02.2007

31.12.2013

194 Sea Palace - The Governess House & Boudary

Wall Crown Prince Court

Dorsch Holding GmbH

01.10.2012

31.12.2013

Page 17: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

17

195 Recreational Park & Landscaping Works &

Plantation of Trees Along Main Road, Al Ajban Tawazun Holding

Co. LLC - 05.12.2012

31.12.2013

196 GC-43Saadiyat Beach Public Realm Streetscape –

Landscape Works

Tourism Development & Investment Co.

Parsons Engineering

03.03.2013

31.12.2013

197 Al Maryah Island Public Realm & Promenade MUBADALA -

08.05.2013

31.12.2013

198

Lusail Underground Car Park Project- Phase 2B

Lusail Real Estate Development Co.

(LREDC)

ACE 10.10.2013 31.03.2014

199 Contract No. E19/2 Landscaping & irrigation

Works for Public Park E19/2 Crown Prince Court

Dorsch Holding GmbH

04.10.2012

16.02.2014

200 Contract no. 467/1 Removal of Weeds and

Pruning of Trees in Abu Dhabi Island Abu Dhabi

Municipality Dorsch Holding

GmbH 02.09.2010 01.04.2014

201 Contract no. 467/4 Removal of Weeds and

Pruning of Trees in Abu Dhabi Island Abu Dhabi

Municipality Dorsch Holding

GmbH 02.09.2010 01.04.2014

202

Landscape works at Ambulatory Healthcare Center At Al Shamkha & Al Bahya(Site 108 A &

B), Abu Dhabi

SEHA - 01.02.2013 30.04.2014

203

Mussafah Water Transmission Scheme, Mussafah to Abu Dhabi ( Lot M) – Landscaping

Works

AYDINER Const. – Abu Dhabi

Khatib & Alami 27.01.2014 20.04.2014

204 Infrastructure Works including all MEP Works & Playground Foundation – Baghdad-Iraq Adjacent

to Green Zone

Al Zawraa Park for Games &

Commercial Agencies Ltd. Liability Co.

- 13.03.2013 31.05.2014

205 Contract No. 2013/58 – External Miscellaneous

Works for Crown Prince Court Crown Prince Court

Dorsch Holding GmbH

01.09.2013 31.05.2014

206 6W2011-Network Rehabilitation at Khuzam Rak

Area

Federal Electricity & Water Authority

(FEWA)

Dr. M. H. Ali El-Saie 27.09.2011 31.07.2014

Page 18: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

18

207

Contract No. PD/CA/FM/SB/R530/Gen/13/51 – Blanket Agreement for Supply of Potable Drinking Water to Schools in Al Ain City

MUSANADA - 04.04.2013 03.07.2014

208 Agreement No. 1741257 – Renovation of the Children and Families Park in Ruwais Housing

Complex – Ruwais UAE ADNOC - 14.09.2013 12.07.2014

209 Contract No. 21W/2012 – Water Distribution

Networks in UAQ Areas

Federal Electricity & Water Authority

(FEWA)

Dr. M. H. Ali El-Saie 22.08.2012 31.07.2014

210 25W/2012 – 5MIG RCC Water Tank at Hiniya

WDC - Fujairah

Federal Electricity & Water Authority

(FEWA)

- 06.10.2012 12.07.2014

211 18W/2012 – Rehabilitation of Distribution

Netwrok at Rams - RAK

Federal Electricity & Water Authority

(FEWA)

Dr. M. H. Ali El-Saie 05.05.2012 31.07.2014

212 Contract no. 1W/2011/

Transmission/Distribution Pipeline System in Al Jurf and Pumps at A. Zawra - Ajman

Federal Electricity & Water Authority

(FEWA)

Dr. M. H. Ali El-Saie 01.09.2011 30.09.2014

213 Church Compound for Armenian Community of

Abu Dhabi

Armenian Community of Abu

Dhabi

Kojakian Engineering Consultants

01.05.2012

29.11.2014

214 Tender No. 14EW/2013 – Design, Supply &

Const. of RCC Brine Reject & Outfall Structure at Ghallilah, Ras Al Khaimah, UAE

Federal Electricity & Water Authority

(FEWA)

- 15.02.2014 30.11.2014

215 Landscape Works for New York University

Tourism Development & Inv. Co. (TDIC)

- 01.05.2014 31.10.2014

216 Modification in the Gate Building for H.H. the Crown Prince Diwan at W-35, Abu Dhabi, UAE

Crown Prince Court

M/s. Architectural & Engineering

Consultants

01.04..2014 31.11.2014

217

CW/200B/2011 – Supply, Installation, Testing & Commissioning of Fibre Cement/Glass

Reinforced Expoxy Water Transmission Pipelines and Associated Works at Various Locations in the

Emirate of Dubai

Dubai Electricity & Water Authority

(DEWA)

NJS Consultants Co. Ltd.

06.12.2011 31.12.2014

Page 19: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

19

218

Supply & Installation of Yas Mall Main Const. Works Ph. 2 Zone E Yas Island Devl. - Contract

No. A430601/2010/C/063

Al Dar Properties PSJC

AECOM 01.10.2012

31.12.2014

219

Contract No. RFX 2131200064 – Supply, Installation, Testing & Commissioning of Glass

Reinforced Epoxy Water Transmission Pipelines and Associated Works at Various Locations in the

Emirate of Dubai Including 600mm Dia Transmission Pipeline along Outer Bypass Road

to Al Khawaneej Road in Wadi Al Mardi and Interconnection Between the Two Existing

900mm Dia Pipeline by 600mm Dia Pipeline in Al Khawaneej Area

Dubai Electricity & Water Authority

(DEWA) - 09.12.2012 31.12.2014

220

Replacing the Control System of the Irrigation Network inside Abu Dhabi from the Manual System to an Automated System, Phase II,

Contract No. 908/3A, Abu Dhabi, UAE

Abu Dhabi Municipality

Dorsch Holding GmbH

01.10.2013 31.12.2014

221

Contract No.PGD-O&M-404-Operation & Maint. For Irrig. Reservoirs with Transmission Pipeline,

Landscape, Irrig. Infrastructure & Forests - Al Khatim Area 1

Abu Dhabi Municipality

Dorsch Holding GmbH

15.02.2007 31.12.2014

222

Contract No.PGD-O&M-406-Operation & Maint. For Irrig. Reservoirs with Transmission Pipeline,

Landscape, Irrig. Infrastructure & Forests - Al Khatim Area 3

Abu Dhabi Municipality

Dorsch Holding GmbH

25.02.2007 31.12.2014

223

Contract No.PGD-O&M-103 - Operation & Maint. Of Landscape, Irrigation Storm Water and

Associated Infrastructure Abu Dhabi Quadrant 3 & Surrounding Islands

Abu Dhabi Municipality

Dorsch Holding GmbH

07.10.2007 03.01.2015

224

CONTRACT NO. 208 - Operation & Maintenance for Landscape, Irrigation, and Landscape

Facilities for Al Bahya & Al Rahbah Gardens

Abu Dhabi Municipality

Parsons Engineering

13.04.2009 03.01.2015

225 FP- 5020000006 - Dubai Endurance Table

Engineer’s Office of HH Sheikh

Mohammed Bin Rashid Al Maktoum

- 19.01.2015 24.01.2015

226 FP- 2053000007 – Construction of Gym, Pool, Staff Accommodation, and Stable at Lehbab,

Dubai

Engineer’s Office of HH Sheikh

- 17.01.2015 31.01.2015

Page 20: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

20

Mohammed Bin Rashid Al Maktoum

227

Develop 20 Playgrounds in Abu Dhabi Mainland – Phase 1C – Contract No. 393, Abu Dhabi, U.A.E.

Abu Dhabi Municipality

KEO International 15.12.2013 10.04.2015

228

Contract No. 2014/51 – Civil Works of the Fountain in the Private Entrance of the Bldg. of

Crown Prince Court

Crown Prince Court - 11.09.2014 15.04.2015

229

Contract No. D-8604, Replacement of GRP Water Pipelines & Construction of New Connection in Madinat Zayed – Western Region, Abu Dhabi

Abu Dhabi Distribution

Company (ADDC) Ital Consult 27.03.2012 26.04.2015

230 FP- 2023000012 – Landscaping and Irrigation

Works Infront of Main Villa at Habab Coservation- Dubai

Engineer’s Office of HH Sheikh

Mohammed Bin Rashid Al Maktoum

- 18.01.2015 15.04.2015

231 Landscaping for Marina Office Park

National Investment Corporation

- 01.04.2012 01.03.2015

232 20W/2012-DN600 Transmission Pipeline from

Shouka to Huwailat Junction and Pumping Station at Shouka RAK

Federal Electricity & Water Authority

(FEWA)

- 10.05.2013 31.05.2015

233

Commercial Bldg. For M/s. Inheritors of Late Abdulsalam Hamad Abdulrahman Rashed Al Mubarak, Located Sector E-25, Plot no. C-13

ADCP ARKAN 15.11.2014

11.06.2015

234

Landscaping & Irrigation Maintenance Services at Ruwais Housing Complex Agreement No.

1740716

ADNOC -

01.07.2010

30.06.2015

235

Contract (12) – for the Operation, Water Management, Development, Maintenance And

Repair of Irrigation Water Supply and Distribution System in Al Ain Region

Al Ain Municipality DMJM

International 01.07.2010 30.06.2015

236 C1004/1, Upgrading of VVIP Approach Road Yas

Island Abu Dhabi

Municipality Parson Int’l Ltd. 16.01.2014 30.07.2015

Page 21: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

21

237

Contract 10/2012 - Construction and execution of a network for irrigation and improving the

main entrance for the eastern sector

Al Ain Municipality Dorsch Holding

GmbH 01.04.2013 31.08.2015

238 Contract No. CPC-14014-M1 – Periodic Maintenance Works for Different Areas

Crown Prince Court - 01.05.2014 30.08.2015

239

Contract No. CPC-14024-M1 – Maintenance Palms in Falaj Mualla & Al Ain

Crown Prince Court - 01.05.2014 30.08.2015

240 Contract No. CPC-14048-MI Crown Prince Court - 01.11.2014 30.10.2015

241 Contract No. DPDP-6009/CS-OT-10 Design and

Build of Plant Nursery Facility

Meraas Development LLC

- 02.09.2014 30.10.2015

242

Supply, Installation, Testing & Commissioning ( SITC) of Pump Motor Units & Associated

Switchgear with SCADA Integration including one Panel Mounted Work Station in Najma Pumping

Station

Dubai Electricity & Water Authority

(DEWA) - 10.02.2013 31.12.2015

243 Four Seasons Hotel – Abu Dhabi

Contract No. CC0044 Al Futtaim Carillion

LLC AECOM 01.03.2014 31.01.2016

244 Church Compound for Armenian Community of

Abu Dhabi – School

Armenian Community of Abu

Dhabi

Kojakian Engineering Consultants

01.06.2015 31.03.2016

245 Palm Jumeirah – Azure Residence Building

(Contract DMS135862) Nakheel

Ms. Dal Al Handasha

20.11.2014 30.04.2016

246 Construction of 20 Playgrounds in Abu Dhabi

Main Land-Phase 1 – Contract No. 393-A Abu Dhabi

Municipality KEO International 03.08.2014 30.04.2016

247 Construction of 20 Children Playgrounds in Abu Dhabi Main Land-Phase 1 – Contract No. 393-B

Abu Dhabi Municipality

KEO International 03.08.2014 30.04.2016

248

CPC-15054-M1 Periodic Maintenance Work for Different Areas

Crown Prince Court - 01.05.2015 30.04.2016

Page 22: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

22

249 Landscaping, Swimming Pools & Water Features

Package Works ( 3700) – Kempenski Hotel Sunrise Properties

Ltd LINX 13.07.2014 30.06.2016

250 Legoland Main Contract Package 3 – Adventure,

Miniland and Factory LL Dubai Theme

Park LLC - 27.07.2015 26.06.2016

251

Design, Supply, & Installation of Promenade Hard Landscaping Works Below Bridge 4, Al Maryah

Island

Al Sowah Square Properties LLC

- 27.01.2016 30.06.2016

252

Engineering, Design Development, Supply and Installation of the LEGOLAND Package 3 Miniland

Dome Works, Dubai

LL Dubai Theme Park LLC

- 15.03.2015 31.08.2016

253

Arabian Ranches 2 Development PA06 Palma - Landscape Package 07

Emaar Properties PJSC

Parsons Int’l Ltd. 12.11.2015 31.08.2016

254

Contract No. 73/2014 Landscaping Maintenance for Crown Prince Court Buildings and the Villa of

Strategic Affairs, Abu Dhabi

Crown Prince Court - 21.10.2015 20.10.2016

255

Infrastructure Works for Package 8 and Package 2A – Contract No. DMS – 140563, Jumeirah Park

Development, Dubai

Nakheel - 25.06.2015 24.11.2016

256 Madinat Jumeirah Phase 4 – External Timber,

Aluminium & Tensile Structure at Madinat Jumeirah, Dubai

Mirage Leisure and Development Inc.

- 02.05.2015 30.11.2016

257

DPDP-LE-4003/CW-MC-04 The Royal Theatre at Bollywood Park

Bollywood Parks LLC

Kling Consult 27.03.2014 29.09.2016

258

Contract No. 1/154 – Removal of Weeds and Pruning of Trees in Mainland, Abu Dhabi

Abu Dhabi Municipality

Parsons Int’l Ltd. 10.11.2014 31.12.2016

259 Contract No. 1/153 – Removal of Weeds and

Pruning of Trees in North, Abu Dhabi

Abu Dhabi Municipality

Parsons Int’l Ltd. 10.11.2014 31.12.2016

260

Mitigation Measures of Water Logging Problems in Al Sameeh & Al Shahama Areas

Environment Agency

Parsons Int’l Ltd. 11.07.2013 30.11.2016

261

Upgrading the Engineering Natural Beautification Value Outside the Island of Abu Dhabi, Second

Phase, Project No. 407/1

Abu Dhabi Municipality

Dorsch Holding GmbH

01.10.2013 31.01.2017

Page 23: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

23

262 Reem Development Phase 1 Mira 3 & 4 –

Landscape Package 3 & 4

Emaar Properties PJSC

Parsons Int’l Ltd. 08.12.2015 28.02.2017

263

Legoland Main Contract Package 2 – Lego City, Create, Kingdom and Back of House

Besix/Orascom J.V. - 26.08.2015 31.03.2017

264

AKOYA Golf Clubhouse – Hard & Soft Landscaping Works, Swimming Pool and Water

Feature Package

DAMAC Crescent Properties LLC

- 15.06.2016 11.03.2017

265

Construction of Landscaping in Villages 4 and 5 at the Al Falah Community Development, Abu

Dhabi

ALDAR Properties PJSC

Hyder Consulting 08.12.2015 07.04.2017

266

Operations & Maintenance of Parks, Landscape, Recreational Facilities & their related

Infrastructure of Asset s for Delma Island, Western Region, Emirate of Abu Dhabi

Western Region Municipality

- 01.01.2014 31.03.2017

267

DPDP-LE-4005/CW-MC-03 – The Construction of the Area Development Works for Legoland and

Ride Installation of Castle Coaster

LL Dubai Theme Park LLC

Kling Consult 14.06.2015 01.06.2017

268

DPDP-LE-4003.4005.4007.4008/MC-INF-01 In-Parks Primary Infrastructure works for

LEGOLAND Dubai Park, Bollywood Park, Hotel 1 and River walk on Dubai Parks

Dubai Parks & Resorts PJSC

- 11.05.2014 01.06.2017

269

DPDP-LE-4001/CW-INF-01 In-Parks Primary Infrastructure works for Motiongate

Motiongate LLC - 11.05.2014 01.06.2017

270

Contract No. DPDP-6009/CW-MC-12 The Complete Construction and Commissioning of

the Community Facility Buildings (Civil Defense, Ambulance Post and data Center)

Dubai Parks & Resorts PJSC

- 24.06.2015 01.06.2017

271 Contract No.DPDP-LE-4005/CW-MC-05 Ride

Specialist Installation Contractor

LL Dubai Theme Park LLC

- 02.08.2015 01.06.2017

272 Contract No.DPDP-LE-4001/CW-MC-07 Ride

Specialist Installation Contractor Motiongate LLC - 02.08.2015

01.06.2017

273 Contract No.DPDP-LE-4003/CW-MC-11 Ride

Specialist Installation Contractor Bollywood Parks

LLC - 02.08.2015 01.06.2017

274

DPDP – 4003 – Bollywood Park Construction of the Area Development Works for

Bollywood Park

Bollywood Parks LLC

- 30.08.2015 01.06.2017

Page 24: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

24

275

Contract: PRFD/O&M/C4100/1 - Formula 1 Preparation Works of Landscape and Local

Irrigation Assets for Yas Island - Zone 2

Abu Dhabi Municipality

Parsons Int’l Ltd. 08.10.2013 30.06.2017

276

Contract No. 9/467 – Removal of Weeds and Pruning of Trees in Abu Dhabi Island South, Abu

Dhabi

Abu Dhabi Municipality

Dorsch Holding GmbH

10.11.2014 30.06.2017

277

Contract: PRFD/O&M/121/1R – Operation and Maintenance of Parks and Water Features at

Area along Abu Dhabi – Dubai Highway

Abu Dhabi Municipality

Parsons Int’l Ltd. 31.12.2014 30.06.2017

278

Contract: PRFD/O&M/112R – Operation and Maintenance of Landscape and Pocket Park

Assets on Abu Dhabi Island

Abu Dhabi Municipality

Parsons Int’l Ltd. 31.12.2014 30.06.2017

279

Contract: PRFD/O&M/111R – Operation and Maintenance of Landscape and Pocket Park

Assets on Abu Dhabi Island

Abu Dhabi Municipality

Parsons Int’l Ltd. 31.12.2014 30.06.2017

280

Operation & Maintenance of the Seeds of Beautification Plants and the Local Irrigation

Networks at Khalifa City – Contract No.1R/113

Abu Dhabi Municipality

Dorsch Holding GmbH

31.12.2014 30.06.2017

281

Operation & Maintenance of Beautification Plants and Irrigation Networks at the Area of Abu

Dhabi – Al Ain Road from Mussafah Bridge Intersection to Al Nahda Area – Contract No.

1R/112

Abu Dhabi Municipality

Dorsch Holding GmbH

31.12.2014 30.06.2017

282 Contract No. 67W/2014 – 1MIG RCC Water Tank

at Gizemri – Fujairah

Federal Electricity & Water Authority

- 16.08.2015 31.08.2017

283

CW/200A/2011 – Supply, Installation, Testing and Commissioning of Fiber Cement/Glass

Reinforced Epoxy Water Transmission Pipeline and Associated Works at Various Location in the

Emirate of Dubai

Dubai Electricity & Water Authority

(DEWA)

NJS Consultants Co. Ltd.

06.12.2011 31.10.2017

284 Site Wide Irrigation Control Al Dar Properties

PSJC

M/s Maunsell (AECOM)

Consultancy Services

06.10.2011 30.09.2017

285 River Parks RD&E Project – Hard Landscaping

Works KIER Dubai LLC - 01.03.2016 30.09.2017

Page 25: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

25

286 LOUVRE Museum –Abu Dhabi Tourism Dev. & Investment Co.

( TDIC) - 06.10.2014 25.10.2017

287 Contract No. 79/2016 – Landscaping

Maintenance for CPC & OSA’s Building Crown Prince Court - 21.10.2016 20.10.2017

288

DPDP-4001/CW-MC-08 - Construction of the Area Development Works for Motiongate Park

Motiongate LLC - 30.08.2015 31.01.2017

289

Contract No. 52/2014 – Outsourcing Work of Operation, Development & Maintenance of Public Parks and Landscapes in Al Ain and

Eastern Region of the Emirates – Contract (12) for the Operation, Water Management, Devl. ,

Maintenance & Repair of Irrigation Water Supply and Distribution City in Al Ain Region, Al Ain UAE

Al Ain Municipality - 01.07.2015 31.12.2017

290

CW/200D/2011 – Supply, Installation, Testing

and Commissioning of Fiber Cement/Glass Reinforced Epoxy Water Transmission Pipelines

and Associated Works at Various Locations in the Emirate of Dubai

Dubai Electricity & Water Authority

(DEWA)

NJS Consultants Co. Ltd.

06.12.2011 30.04.2017

291

Renovation of the Garden and the Infrastructure in the Main Desert, Sixth Phase, Infrastructure,

Project No. 209/5 at Abu Dhabi Main Land

Abu Dhabi Municipality

Dorsch Holding GmbH

01.10.2013 31.12.2017

292 FP-1006000004 – Irrigation Upgradation Works

at Taweelah

Engineer’s Office

of HH Sheikh Mohammed Bin

Rashid Al Maktoum

- 04.11.2015 30.11.2017

293 Motiongate Dreamworks – Ride Specialist

Installation Motiongate LLC - 20.09.2015 31.12.2017

294

DPDP-4005-Legoland Design, Manufacture, Supply, Installation, Commissioning & Final

Acceptance Testing of Legoland Show Sets & Scenic (Package 9C)

LL Dubai Theme Park LLC

- 30.12.2015 31.12.2017

Page 26: AL RYUM GROUP PROJECTS COMPLETED Completed - without value...Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel Public works ... Contract

AL RYUM GROUP – PROJECTS COMPLETED S.

NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE

COMPLETION DATE

26

295 Design & Build of LEGOLAND Water Park

LL Dubai Theme

Park LLC

- 01.07.2015 28.02.2018

296 C02- Louvre Abu Dhabi External Works

Tourism Dev. & Investment Co. (

TDIC)

TURNER 10.01.2017 31.12.2017

297

Reinstatement of Affected Soft Landscape Assets Due to the Poor Maintenance of Previous

Contractor (Contract Area 103S)

Abu Dhabi Municipality

- 01.10.2017 31.12.2017

298 Landscaping and Irrigation Maintenance for

Marina Office Park Marina Facilities

Management - 01.03.2015 28.02.2018

299

Landscaping and Irrigation System Maintenance

for Marina Royal Complex

Marina Facilities

Management