Sustainable Construction and the PrivateSustainable Construction and the Private
House BuilderHouse Builder
Reasons against / Reasons for
Carvill Overview of Recent Schees
Carvill !ew Schees
Carvill "uture Schees
-
8/10/2019 Alan Little Revised
3/23
Reasons against Sustainable constructionReasons against Sustainable constructionRenewable #echnologies / Sustainable ethods increase costs
#radesen and Site Staff are resistant change
Currently Sellers ar$et % deand for hoes outstri&s su&&ly
#o date Sustainability is not a &riority with ost &urchasers
'overnent initiatives do not a&&ly to &rivate develo&er
Lac$ of &ublic awareness of sustainability (badges)
*co%Hoes a&&lications involve considerable tie and cost
-
8/10/2019 Alan Little Revised
4/23
Reasons for Sustainable constructionReasons for Sustainable constructionRising fuel and energy &rices
+ncreasing &ublic awareness of 'lobal waring / 'reen issues
'overnent forcing change through legislation / ta, syste
Changing &ersonal lifestyles and faily units
-oral duty toward sustainability for individuals and businesses
+ncreasing deand for sustainable hoes
Better to decide to change before being forced to
-
8/10/2019 Alan Little Revised
5/23
.ecision to change was ade
years ago and is being
driven by -anaging .irector
GROUP
THE
CARVILL
-
8/10/2019 Alan Little Revised
6/23
Recent ScheesRecent Schees
0 Residential develo&ents have been constructed
to *co Hoes
standards 123 units4
*co Hoes Logo on Sales Brochures
'ood and new 5ery 'ood ratings being obtained
-
8/10/2019 Alan Little Revised
7/23
Energy
Parkmount 58 units
Picture missing
-
8/10/2019 Alan Little Revised
8/23
Energy
Transport
Halcombe Square 60 units
Picture missing
-
8/10/2019 Alan Little Revised
9/23
-
8/10/2019 Alan Little Revised
10/23
Energy
Transport
Pollution
Materials
Rosss !ill 165 units
Picture missing
-
8/10/2019 Alan Little Revised
11/23
Energy
Transport
Pollution
Materials
Water use
"oo#lan$ !ews %& units
Picture missing
-
8/10/2019 Alan Little Revised
12/23
Energy
Transport
Pollution
Materials
Water use
Land use and Ecology
'unmore 136 units
Picture missing
-
8/10/2019 Alan Little Revised
13/23
Energy
Transport
Pollution
Materials
Water use
Land use and Ecology
Health and Well being
(l$ )akers Court *+0 units
Picture missing
-
8/10/2019 Alan Little Revised
14/23
New Schemes
WOODBROOK
Phase 1
! acres
"#$ units
% year construction
Phase & '$$ units(
Picture missing
-
8/10/2019 Alan Little Revised
15/23
Woodbrook the next stage? Very Good Eco Home rating
Urban design !anned to enco"rage sense o# comm"nity and maintain site
eco!ogy
$arge area o# green sace% cyc!e aths and ri&er 'a!k
Roads mode!!ed to red"ce &ehic!e seed
(ncororate rene'ab!e techno!ogies
(ns"!ate to higher standard than B"i!ding Reg"!ations)
*ro&ide One +ear ,rans!ink ,ra&e! *ass #ree er "nit
Red"ce carbon emissions
-
8/10/2019 Alan Little Revised
16/23
Renewable #echnologiesRenewable #echnologies
'round source heat &u&s lac$ of &lot s&ace
6ind &ower location / sall scale / &lanning &erission / &aybac$
Photovoltaic &anels orientation / cost / &aybac$
Solar hot water heating orientation / redesign of &lubing syste
6ood &ellet boilers storage of fuel / bagged fuel cost
+ncor&orate as standard or as &urchaser e,tra7
!o 'rants available to &rivate develo&ers
-
8/10/2019 Alan Little Revised
17/23
#he Solution Bioass "uelled#he Solution Bioass "uelled
.istrict Heating Syste.istrict Heating Syste
One large boiler roo ore efficient than individual boilers
All units benefit fro the technology though reduced energy costs
'ood reduction in CO8 eissions
-ar$eting &otential largest housing schee in Britain
#echnology can be re%created on a&artent schees
Su&&ort local businesses with fuel su&&ly contracts
-
8/10/2019 Alan Little Revised
18/23
#he Syste#he Syste
#hree 933 $6 bioass boilers
:933 tonnes of wood chi& &er annu 1:93 hectares willow4
; tonne fuel store on site %
-
8/10/2019 Alan Little Revised
19/23
Low Carbon benefitLow Carbon benefit
:>33 ft8 three storey town house
Highly insulated with 23? efficient gas cobination boiler
#*R :;@0 .*R :;@>; CO8 *issions 8@89 t/year
Highly insulated with Bioass district heating
#*R :;@0 .*R @>8 CO8 *issions 3@9; t/year
A ;3? reduction in CO8 eissions
-
8/10/2019 Alan Little Revised
20/23
)uture Schemes
-(RO..O
1! acres
$$$ units
1% year construction
Picture missing
-
8/10/2019 Alan Little Revised
21/23
-irocco #"t"re !i&ing
B"i!d to /.ode #or -"stainab!e Homes0 1 /Green G"ide0
2im #or 3ero .arbon -cheme
Enco"rage city centre !i&ing
(mro&e edestrian access to city and entire ri&er 'a!k'ay
Red"ced carark ro&ision on site 1 incororate high 4"a!ity .ar .!"b
.onsider 5odern 5ethods o# .onstr"ction
(ncororate recyc!ed b"i!ding rod"cts and techno!ogies
(n&estigate rain 'ater har&esting
-
8/10/2019 Alan Little Revised
22/23
Picture missing
-
8/10/2019 Alan Little Revised
23/23
#han$%you Alan LittleGROUP
THE
CARVILL
Picture missing