Page 1: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

1

Alberta’s approach to

managing long-term liability Prepared by Alberta Energy

Joint IEA-GCCSI Workshop April 21, 2015

Page 2: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

2

Overview

• Alberta’s CCS development program

• Alberta’s approach to long term liability

management

• Post Closure Stewardship Fund

• Lesson’s learned

Page 3: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

3

Alberta’s CCS Development Program

• CCS Funding Program

– Enable development of commercial-scale CCS

• CCS Policy and Regulatory Development

– Reduce regulatory barriers. Ensure comprehensive

& transparent regulatory framework.

– Build public confidence

• Engagement & Knowledge Sharing

– Contribute to Global Effort

– Learn from others

Page 4: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

4

Alberta’s CCS Funding Program

• Objective is to sequester 2.76 Mt CO2 annually, with projects starting to come on line in 2015

• CAD$1.3 billion allocated to two commercial-scale projects:

– Alberta Carbon Trunk Line

– Quest Project

• Reduce oil sands emissions

• Knowledge sharing

Page 5: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

5

The Quest Project

• Partners: Shell Canada,

Chevron, Marathon.

• 1.08 Mt/year into deep

saline formation.

• Funding ($1.3 Billion):

– $745 Million – Alberta

– $120 Million – Canada

– $485 Million – Quest Partners

• Commercial Operation: 2015

Page 6: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

6

The Alberta Carbon Trunk Line

• Partners: Enhance Energy,

NWRP.

• 1.68 Mt/year via CO2-EOR.

• Capacity of 14 Mt/year

• Funding ($1.2 Billion):

– $495.0 Million – Alberta

– $63.3 Million – Canada

– $640 Million – ACTL Partners

• Commercial Operation: 2017

Page 7: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

7

Long term liability

• Issue for today’s discussion:

– long-term liability for sequestered CO2 is a key

regulatory issue facing CCS proponents and

Governments

• Alberta’s Path:

– Alberta will assume long-term liability once a closure

certificate is issued.

Page 8: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

8

CCS Legislation

CCS Statutes Amendment Act, 2010

• Pore space ownership

• Tenure agreements

• Long-term liability

• Established the Post Closure

Stewardship Fund (PSCF)

Page 9: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

9

CCS Legislation

CCS Statutes Amendment Act, 2010

• Upon issue of closure certificate, the Crown:

– Becomes owner of

captured CO2 site

– Assumes obligations of

the lessee

– Indemnfies lessee against

tort damages

Page 10: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

Regulatory Framework Assessment

10

• 18-month review of Alberta’s framework

– Assessed regulatory system:

• Applications, Approvals

and Regulatory Framework

• Risk Assessment, Monitoring,

and Technical Requirements

• Public Consultation and Notification,

Surface Access and Public Safety

• Site Closure and Long Term Liability

– 71 recommendations to consider toward closing

regulatory gaps or enhancing current requirements

Page 11: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

Site Selection

& Permitting

Injection Period

Closure Period

Post Closure

11

CCS Project Timeline

CCS Operator Government of Alberta

Responsible for CO2 storage site

Managing Long Term Liability

Page 12: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

12

Site Selection and Permitting

• Carbon Sequestration Tenure Regulation

– Evaluation Permit 5 year, non-renewable

– Carbon Sequestration Lease 15 year, renewable

• Require MMV and Closure plans – (renewed every 3 years)

• Site selection

– Adequate storage volume capacity,

injectivity, suitable containment

• 1000m minimum depth

• Various approvals through Regulator

Site Selection

& Permitting

Page 13: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

13

Site Selection and Permitting

• RFA Recommendations

– Risk Assessments • Should form the basis of Closure and MMV plans

– Closure plans criteria • Project overview, storage performance criteria for site closure (as

per MMV submission), storage performance evidence, operating

plan updates, proposed closure activities.

– MMV • Use of best available technologies to monitor each

domain of review

• Risk based, site specific

• Shallow groundwater monitoring plans

Site Selection

& Permitting

Page 14: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

• Ongoing updates to MMV, Closure plans.

• Reporting and data

• Payments into the Post Closure Stewardship

Fund (PCSF)

0 5 10 15 20 25 30 35 40 45 50 55 60 65…………………………

PCSF

Fund

Size

Time (years)

CCS operator

pays into PCSF

Government monitors and

maintains site.

PCSF Rate Reviewed

14

Injection Phase

Injection Period

Page 15: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

15

Closure

• Closure Period

– Ongoing monitoring

– Abandonment and reclamation

• Closure Point

– Issuance of a Closure Certificate

once all closure requirements are fulfilled

– Point when long-term liability for

sequestered C02 transfers

to the Crown

Closure

Page 16: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

16

Closure

• RFA Recommendations

– Minimum closure period of 10 years.

– Closure criteria: • Conformance

• Containment

• Predictable CO2 behaviour

• Decreasing risk profile

• Decommissioning and surface reclamation complete

– Closure certificate application • Include a final closure report

and MMV report (evidence and data)

Closure

Page 17: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

17

Post-Closure

• Ongoing maintenance and monitoring

• Post Closure Stewardship Fund

– Uses: • Monitoring of injected CO2

• Fulfilling obligations assumed when closure certificate issued

• Suspension, abandonment, remediation and reclamation of

orphaned facilities (not capture or pipelines)

• Work to Date:

– CCS RFA

– PCSF Working Group Post

Closure

Page 18: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

18

Post Closure Stewardship Fund

• RFA Recommendations

– Elements to consider when determining the rate • Risk-based and probability-weighted basis

• Project specific

• Not increase due to withdrawals from the PCSF, or risks associated

with other projects

• Be reviewed every three years

– Funds should be pooled amongst all PCSF payees

Page 19: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

19

PCSF Working Group

• Members from government agencies, NGOs,

academia and industry

• Goals of the Working Group:

– Assist in development of robust procurement process

for Fund rate consultant

– Review consultant progress over the duration of the

contract

– Provide detailed principles that can be used to set the

Fund rate

Page 20: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

Methodology

• Statistical model

– Commissioned DNV GL to produce a replicable,

defensible and quantitative methodology.

– Risk based, probability weighted,

and project specific • Statistical Model (Monte Carlo Simulation)

– Inputs include • Monitoring, measurement and verification

• Risk events

• Interest and Inflation rate

• Orphan levy

• Admin Cost

20

Results

Main results

Total costTotal cost Unit P95 P99 Expected cost Expected + std. Dev.

MMV and Risk event cost CAD 2,365,167 2,589,327 1,507,070 2,185,386

RateRate elements Unit P95 P99 Expected cost Expected + std. Dev.

MMV and Risk event rate CAD/Tonne 0.190 0.208 0.121 0.176

Admin rate CAD/Tonne 0.010 0.010 0.010 0.010

Orphan levy rate CAD/Tonne 0.010 0.010 0.010 0.010

Total rate CAD/Tonne 0.210 0.228 0.141 0.196

80.0 %

82.0 %

84.0 %

86.0 %

88.0 %

90.0 %

92.0 %

94.0 %

96.0 %

98.0 %

100.0 %

0 2,000,000 4,000,000 6,000,000 8,000,000 10,000,000

Cu

mu

lati

ve p

rob

ab

ilit

y

CAD

MMV & Risk event cost

0.000

0.050

0.100

0.150

0.200

0.250

P95 P99 Expectedcost

Expected +std. Dev.

Rate buildup

MMV and Risk eventrate

Admin rate

Orphan levy rate

Page 21: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

21

Lessons learned

• Collaboration has been key

– Global experts

– RFA has provided a future look

– Project Proponents

• Approach allows for refinement

– Learn by doing

– Roles and responsibilities

– PCSF - Ability to review

Site Selection

& Permitting

Injection Period

Closure Period

Post Closure

Page 22: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

22

Knowledge Sharing

• Knowledge sharing reports focus on:

– Capture, transport and storage;

– Regulatory Approvals; and

– Costs and Revenues.

• What would valuable be for you?

• Alberta’s first knowledge sharing reports are

publically available at:

http://www.energy.alberta.ca/Initiatives/1438.asp

Page 23: Alberta’s approach to · 1 Alberta’s approach to managing long-term liability Prepared by Alberta Energy Joint IEA-GCCSI Workshop April 21, 2015

23

Thank you