alessander kormann - ahkbrasilien.com.br · alessander kormann . ... design principle of fundão...

33
Tecnologias para o monitoramento de rejeitos experiência da Fugro no desastre de Bento Rodrigues e desenvolvimentos recentes Alessander Kormann

Upload: vanthuan

Post on 25-Aug-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

Tecnologias para o monitoramento de rejeitos – experiência da Fugro no

desastre de Bento Rodrigues e desenvolvimentos recentes

Alessander Kormann

Page 2: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

2 www.fugro.com

Samarco Project - Locations

Source: www.samarco.com/rompimento-de-fundao/

Page 3: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

3 www.fugro.com

Samarco Structures – Germano Mine Complex

Germano Mine

complex before

Fundão dam

failure

Page 4: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

4 www.fugro.com

Setup of Fundão Dam System, early 2015

Page 5: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

5 www.fugro.com

Overview of Germano Complex after Dam Failure, 2016

Sela Dike

Tulipa Dike

Baia 3 Dike

Germano

Main Dam

Selinha Dike

Germano

Buttress

Auxiliary Dike

Page 6: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

6 www.fugro.com

Design Principle of Fundão Dam System

A) Initial design of

Fundao-dam system

with separation of course

grained sands and fine

grained suspensions

(slimes)

B) Planned layout

of Fundao-dam system

following upstream

method of construction.

Drainage system within

sandy tailings

Source: Fundao Tailings dam Review Panel

Page 7: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

7 www.fugro.com

Fundão Drainage System, 2008

Page 8: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

8 www.fugro.com

Source: Fundao Tailings

dam Review Panel

Redesign of Drainage with Blanket Drain, 2009

Installation of

1st Blanket Drain for

drainage of tailings

above an elevation

of 826m

Secondary drainage

galleries not working

properly, detected

2010

Page 9: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

9 www.fugro.com

Construction of Setback Crest, 2012

Source: Fundao Tailings dam Review Panel

In 2012 it becames evident

that secondary drainage

gallery at left abutment is

out of function.

A setback crest was con-

structed and a second

blanket drain installed at

Plateau elevation 865

Installation of piezometers

in 2014 showing increasing

saturation of the dam, even

above elevation 865

Page 10: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

10 www.fugro.com

Fundão Dam: Principle Stress Situation

Pore water pressure [u]

Load [Mean Total Stress]

Source: Fundao Tailings dam Review Panel

Page 11: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

11 www.fugro.com

Fundão Dam: Process of Failure at Left Abutment

σefective = σtotal - u

u ≥ σtotal → σefective = 0

Page 12: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

12 www.fugro.com

Principle Stress States, Drained & Undrained

UNSTABLE

STABLE

STEADY STATE

SHEAR STRENGTH

(σ1+σ3)/2 [Mean stress]

CONCEPT OF THE COLLAPSE SURFACE

(σ1-σ

3)/

2 [S

he

ar

str

ess]

5

4

3

2

1

STRESS PATHS INHERENT FROM AN INITIALLY STABLE CONDITION

(σ1+σ3)/2 [Mean stress]

(σ1-σ

3)/

2 [S

he

ar

str

ess]

Adapted from: MARTIN & Mc ROBERTS, 2012

STRESS

PATH

BEHAVIOUR ON

STRESS

ANALYSIS

METHOD

1-2-3 Contractive USA

1-4 Contractive ESA

1-4 Dilative ESA

1-5 Dilative USA

Page 13: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

13 www.fugro.com

Technologies for Site Characterization and Monitoring of Tailings

• Geotechnical Investigation (Active):

‒ Drilling (rotary and SPT)

‒ CPT

‒ Vane Tests

‒ Seismic CPT

• Geophysical Survey:

‒ GPR

‒ Electrical Resistivity

‒ Magnetometry

• Geotechnical Instrumentation (Passive):

‒ Casagrande Piezometer

‒ VW Piezometer

‒ Water Level Indicator

‒ Inclinometer

• Laboratory:

‒ Earthworks control

‒ Index tests

‒ Advanced tests

Page 14: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

14 www.fugro.com

Cone Penetration Testing (CPT)

signal cable

connection piece

for rod

water proof casing

O-rings

calibrated steel rod

with strain gauges

Inclinometer

Friction sleeve

As = 150 cm²

calibrated steel rod

with strain gauges

O-rings

Cone

Ac = 10 cm²

Penetration of the CPT

cone (hydraulic) into the

ground with a constant

speed of 2 cm/sec

Simultaneous and

continues measurement

of the total penetration

resistance, which is

divided in cone

resistance (qc) and local

sleeve friction (fs)

Additional parameters

can be measured with

added tools

Page 15: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

15 www.fugro.com

CPT – Lithologic Interpretation

Page 16: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

16 www.fugro.com

Seismic CPT

t = t0

t = t1

t = t2

Δs

Calculation shear wave velocity

t2 – t1 = Δt vs = Δs / Δt

Page 17: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

17 www.fugro.com

Degradation of Shear Modulus with Increasing Strain

G0 gemessen mit SCPT

Page 18: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

18 www.fugro.com

Germano: Main Dike and Germano Buttress – Performed Investigations

Service

Before

Fundão

Breach

After

Fundão

Breach

Drilling (m) 759.28 1476.52

Water level

indicator

(unit)

4 6

VW

piezometer 0 16

Casagrande

piezometer

(unit)

11 35

Inclinometer

(unit) 0 3

CPT (m) 362.94 134.91

Page 19: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

19 www.fugro.com

Cava de Germano – Performed Investigations/Measurements

Page 20: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

20 www.fugro.com

Case Study: Tailing Characterization for Re-mining

CPT based Technology

Deliveres geotechnical data

XRF technology - provides metal concentrations

High resolution – real time

3D modelingof resources for remining

Old tailing for remining / resource estimation

Page 21: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

www.fugro.com 21

Typical XRF-CPT profile

at Tailing1

CPT-XRF: How it Works

> 1% Cu Target Horizon

Page 22: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

www.fugro.com 22

3D Resource Estimation

Metal Distribution within Tailing Body

Metal bearing zone

> 1% Copper

Page 23: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

www.fugro.com © Fugro 2013

GeODin

O GeODin foi desenvolvido inicialmente por geólogos e hidrogeólogos para organizar

dados de campos e permitir seu compartilhamento. Atualmente, a Fugro usa o GeODin

em escala global, como ferramenta padrão de gerenciamento de dados.

Page 24: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

www.fugro.com © Fugro 2013

Estrutura

Gerenciamento de documentos

Sistema GeODin

Dados dinâmicos Estações meteorológicas

Pontos de controle de rede

Poços

Sondagens

Pontos de monitoramento

Monitoramento

Dados estáticos

GIS

Gerenciamento correto

Servidor do portal

Page 25: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

www.fugro.com © Fugro 2013

Monitoramento hidrogeológico com interface WebGis

Túnel Itália - Áustria

Page 26: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

www.fugro.com © Fugro 2013

Aquisição de Dados e Integridade

Coleta e exame dos dados: como estão organizados (estrutura), relações entre

conjuntos de dados & realidade física (topologia), origem (metadata).

Page 27: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

www.fugro.com © Fugro 2013

Dados Dinâmicos, Análise & Estatísticas

Page 28: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

www.fugro.com © Fugro 2013

Rotinas Automatizadas para Relatórios

Page 29: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

www.fugro.com © Fugro 2013

Município de Berlin, Alemanha

Gestão de dados regional (130.000 furos de sondagem, 8.000 poços de

monitoramento, piezômetros, qualidade da água subterrânea).

Page 30: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

www.fugro.com © Fugro 2013

Base de dados aberta

Dados dinâmicos

Sistema de alerta

Gerenciamento de Barragens, Alemanha

Oito barragens e reservatórios (463 milhões de metros cúbicos). Maior sistema

fluvial integrado do país.

Page 31: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

www.fugro.com © Fugro 2013

Companhia Siderúrgica do Atlântico, Brasil

Gestão de dados do

subsolo e de

geomonitoramento

Page 32: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

www.fugro.com © Fugro 2013 32 www.fugro.com

Considerações Finais

• Importância de abordagens integradas de investigação e

monitoramento de estruturas de disposição de rejeitos.

• Informações integradas: geográficas, geológicas,

meteorológicas, hidrogeológicas, geotécnicas, estruturais

(monitoramento).

• Evolução tecnológica: aumento da segurança na cadeia

produtiva da mineração.

Page 33: Alessander Kormann - ahkbrasilien.com.br · Alessander Kormann . ... Design Principle of Fundão Dam System A) ... that secondary drainage gallery at left abutment is

Obrigado!