  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    1/64

    ALEXANDRIAAUTHORITYPORT

    ALEXANDRIA PORT AUTHORITY

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    2/64

    Location Of Alexandria Port

    Main International Trade Route

    Alexandria Port

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    3/64

    Alexandria port is one of the oldest ports in the world (5000 yearsold ). Alexander the great built a bridge between the coast andpharos island creating two ports: the Eastern port used for militarypurposes and the Western port used for commercial purposes which

    is the current location of Alexandria port .

    Ancient Alexandria Port

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    4/64

    Alexandria and Eldekhiela ports in the new era

    Alexandria portElDekhiela port

    Cruise terminal

    Shipyard

    Radar tower

    Alexandria Container

    TerminalGrain terminal

    Oil terminal

    Live stock terminal

    coal terminal

    Liquid bulk terminal

    Container terminal

    Petrochemicalsterminal

    Grain terminal

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    5/64

    General Data for Alexandria and El-Dekheila ports

    Item Alexandria El Dekhiela

    Water surface area km2 6.8 2.74

    Land surface area km2 1.6 3.5

    Total number of berths 67 14

    Total berths length/Meter 10600 4400m

    Depth/Meter 8.5 - 14 10 - 20

    Hinter land m21650000 m2

    Including managementbuildings & warehouses

    3500000 m

    2

    Includingmanagementbuildings &outer area

    Terminals 20 6

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    6/64

    The main gate

    The bridgeLandscape

    ParkingBerths

    Cruise terminal

    Gift shops

    Fountain The toursticstreet

    The Tourist train station

    to

    The cruise terminal

    and tourist area

    Total Area is 70,000 m2

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    7/64

    Tourist st.

    Gifts shops

    Main gates

    The berths

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    8/64

    Cruise Terminal

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    9/64

    Cruise Terminal

    Total surface area = 8725 m2

    107 shops , 5 restaurants& 3 cafes

    Total invested area = 6370 m2

    In addition to the open area = 2400 m2

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    10/64

    The Terminalfrom inside

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    11/64

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    12/64

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    13/64

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    14/64

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    15/64

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    16/64

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    17/64

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    18/64

    Tourist Train station

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    19/64

    InfrastructureReorganization ofthe port gates Roads

    Buildings yards berthsEnvironment

    protection

    Cargo Terminals-Total area is 300,000 m2. 20 terminals

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    20/64

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    21/64

    Road:Total length of main and back roads is 150 km

    Main road

    After

    development

    Before

    development

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    22/64

    Before

    development

    After

    development

    Back roads

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    23/64

    Berths

    Beforedevelopment

    After

    development

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    24/64

    yardsTotal area 360000 m2

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    25/64

    Port MuseumAs Alexandria is one of the oldest ports, we established the port museum

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    26/64

    (40) 1

    The new buildingfor business offices , banks , shipping agentsetc.

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    27/64

    Applying security and safety systems

    ISPS code : In May 2004 an assessment forAlexandria port was done, the port security plan wasready and started in June 2004 .

    CSI and Mega-ports systems : Alexandria portauthority started negotiations with USA customs toapply CSI and Mega-ports systems in the port

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    28/64

    A DVC systemwith 264 fixed and mobile cameras isbeing installed to monitor all the port areas including the

    water surface, the anchorage area and the port entrance.

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    29/64

    Data center

    Operations planning

    Operations control

    Observation

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    30/64

    One stop shop

    Decreasing Required

    Permits

    Submit One set ofdocuments

    Logistic centers

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    31/64

    electronic centers-sub

    Facilitate Inspectionprocedures with

    customs and GOIEC

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    32/64

    radar tower , VTMIS and AIS systems

    Control Vessels

    Direct the Ingress and EgressOf Vessels

    Locating Vessels

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    33/64

    Weighing bridges

    Calculate overweightfor the roads fees

    Calculate overweight

    for customs

    (12 in Alexandria 8 in ElDekhiela)

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    34/64

    Automated gates

    Reducing traffic congestionin the port

    Admission trucks onlyWhen it is time for loading

    Forbid the Egress ofUnreleased Cargo

    Directing trucks to yards byRouting Ticket

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    35/64

    Port control system 264 videocameras

    Water surface control

    Land surface control

    Network and infrastructure control

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    36/64

    AfterBeforeDepartment

    SignaturesProceduresSignaturesprocedures

    -12838customs1

    --1720Imports2

    --1211Exports3

    --1616Lab.4

    --610Certificates oforigins dep.

    5

    5 hours2 daysTime

    Procedures and total no. of signatures

    before/ after applying IT systems

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    37/64

    Container

    managementsystem

    General cargo

    managementsystem

    Portmanagement

    system

    Massages

    Automated

    gates

    SPARCSSPS

    Smart portsolution

    Stevedoringcontainers

    Passengers

    Applications

    General cargo

    stevedoringsystem

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    38/64

    The Great InvestmentProjects In Alexandria Port

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    39/64

    Establishing Multi purpose Terminal ( ContainersGeneral

    cargo ) in Alexandria port with a length of 2140 m. and a depth

    of 14 m. and a back area of 375 thousand m2.

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    40/64

    Operating andmanaging the Cruise

    terminal

    Operating andmanaging Tourist

    train station

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    41/64

    Developing the old area of Alexandria port (El Gona) by

    Establishing an International Marina that will has a capacity to

    receive 500 yacht (an integrated touristic project which will

    include a commercial center and 5 stars Hotel).

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    42/64

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    43/64

    Establishing a new terminal ( green Terminal) on berth

    65 , 66 with a length of 284 m. and a depth of 10m. by

    developing the current fridge with a capacity of 6000 tons,

    and establishing new 2 fridges on 7500 m. The project will

    include a shipping line between Alexandria and EU Ports.

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    44/64

    Warehouses Central Refrigerator

    A detailed feasibility study includes the way of transfering

    the warehouses of berths 65, 66 to refrigerators and the way

    of developing the existing refrigerators , and time plan forthat.

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    45/64

    Investment Projects inAlexandria and El-Dekhiela ports

    withLand Lord System

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    46/64

    1- Executed Projects in

    El-Dekhiela port

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    47/64

    1- Petrochemical Production Handling Terminal

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    48/64

    2- International cont. terminal in El Dekhiela port

    Area 180 thousand m2

    Capacity 220 thousandTEU/year

    Length of the berth 300 m.

    Depth of the berth 12 m.

    RoRo berth with a depth of 10 m.

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    49/64

    3- New Silos with a capacity of 260 thousandtons (Added to the old silos which had a

    capacity of 800 thousand tons).

    Silos of productivity 260.000 tons

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    50/64

    2- Investment Projects which

    are under construction inEl-Dekhiela port

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    51/64

    New Facilities for producing and Handling petrochemical Materials

    1- First phase: Establishing a factory for producing Polystyrene

    2- Second phase : Establishing a factory for producing styrene and

    developing facilities for importing and exporting

    Current Investment Projects in El-Dekhiela Port

    Developing the grain area by constructing grains silos with total area100.000 m2

    Current working on Silos of productivity 390.000 tons

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    52/64

    The Future Investment Projects In El-Dekhiela Port

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    53/64

    COKE

    CLINKER

    BULK CEMENT

    CONVEYOR BELT

    1- Establishing and operating the coal and dry bulk terminal on the area

    beside berth 90/2 for exporting ( coal clinker cement fertilizers

    etc.(

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    54/64

    2- The extension of thebreak-water

    2

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    55/64

    3- To connect the port with the high way by

    Establishing high bridge

    3

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    56/64

    4- Developing and

    extension of the

    grain terminal witha length of 600m.

    (B.O.T. contract).

    4

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    57/64

    5- Establishing new berth (no.

    100) with a length of 1000

    m. and an area of 280

    thousand m2.

    5

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    58/64

    6- The Integrated

    project to construct

    Multi Purpose

    Terminal with alength of 700 m. and

    an area of 262

    thousand m2

    ( B.O.T. contract) .

    6

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    59/64

    Throughput

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    60/64

    Statement 2005 2006 2007

    Total no. ofcruises

    103 141 155

    Passengers 111.971 154.685 193.634

    Tourists traffic

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    61/64

    Year 2005 2006 2007

    Total 4849 5004 5288

    Total no. of shipsfor Alexandria and Dekhiela Ports

    Total no. of Ships

    Total no. of Ships

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)

    62/64

    Total Weight for Cargoes

    Year 2005 2006 2007

    Weight of cargoes 37.170.116 41.269.616 42.615.961

  • 8/2/2019 Alexandria Port Authority Djibouti 2008 (2)