allomax limited introduction july 2010 ppt

27
Allomax Update Subsea / ROV Subsea / ROV Asset Evaluation Recruitment Changes www.allomax.com www.sysmax.com

Upload: chrissim

Post on 09-Jul-2015

189 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Allomax Limited Introduction July 2010 Ppt

Allomax Update

Subsea / ROVSubsea / ROV

Asset Evaluation

Recruitment Changes

www.allomax.com www.sysmax.com

Page 2: Allomax Limited Introduction July 2010 Ppt

Staff

Recruitment

ROV Operations

Asset EvaluationRecruitment

Agency Services

Well Engineering

Operations

SubseaPersonnel

Evaluation

Risk Management

Competence Assurance

Page 3: Allomax Limited Introduction July 2010 Ppt

ALLOMAX ASSOCIATES

Page 4: Allomax Limited Introduction July 2010 Ppt

Well Engineering Well Engineering

Subsea / ROV Operations

Management Consulting

Page 5: Allomax Limited Introduction July 2010 Ppt

Personnel Provision• We provide highly experienced personnel globally

– Drilling– Completions– Subsea– Management Consulting

• Support Network for Consultants• Support Network for Consultants– Social Network– Allomax Answers (knowledge network)– Online Job Notice Board

• Internationally experienced

Page 6: Allomax Limited Introduction July 2010 Ppt

Why Allomax?•Provide ‘quality over quantity’

• Innovative, fast & efficient

•Focussed market awareness

•Originality, objectivity, enthusiasm & trust

•Premium service delivering ‘value for money’

• PEOPLE TECHNOLOGY• PEOPLE

• Skills base

• Track record

• Experience in the industry

TECHNOLOGY

• Social Networking site

• Knowledge Bank

• Job Notice Board

• CANDIDATE QUALIFICATION

• CV Screening

• Casmax competency profiling

• Interviews

Page 7: Allomax Limited Introduction July 2010 Ppt

Allomax Answers

• Post questions to peers

• Find answers to • Find answers to challenges

• Get expert advice from the network

Page 8: Allomax Limited Introduction July 2010 Ppt

Search Consulting Opportunities

• Search our latest vacancies

• Get paid for posting opportunities

Page 9: Allomax Limited Introduction July 2010 Ppt

Network with Colleagues

• Find past and present colleagues

• Stay in touch

Page 10: Allomax Limited Introduction July 2010 Ppt

Social Networking & Allomax Answers

•Find past & present colleagues

•Search our Consulting opportunities

•Post questions to peers

•Find answers to challenges

•Get paid for posting opportunities

•Stay in touch with colleagues

•Get expert advice from the network

Page 11: Allomax Limited Introduction July 2010 Ppt

Our Client base

Page 12: Allomax Limited Introduction July 2010 Ppt

Our Client base

Page 13: Allomax Limited Introduction July 2010 Ppt

SYSMAX

Page 14: Allomax Limited Introduction July 2010 Ppt

Track Record Over 250 projects Indicative Examples

• ERD vs Subsea vs MMFP� Harding (BP), Claymore (Talisman), Tilapia (Ranger Congo), Zhoa Dong

(Apache China), Espoire (Ranger Cote d’Ivoire)

• Conceptual Field Design Optimisation� Jasmine (ConocoPhillips), Shiehallion & Foinavon (BP)

• Well design / planning optimisation� Tartan, Auk, Burghley, Gyda, South Angsi (Malaysia) (Talisman)� Tartan, Auk, Burghley, Gyda, South Angsi (Malaysia) (Talisman)� Erskine workover (Total)� Nini (Dong – Denmark)

• Potential major incident (confidential)� Shut in production for riser replacement or not?� Commence relief well or not?� Deepwater Xmas tree deployment (Total Dalian Angola)

• Risk Based Well cost estimation – custom build Tullow Oil, • >100 field acquisitions

Page 15: Allomax Limited Introduction July 2010 Ppt

Asset Evaluation Team• Peter McAteer – BSc C.Eng C.Dir FIMMM MIoD – Project Management

� 25 year experienced specialist in conceptual field design and asset evaluationsupervising multi-disciplinary teams unlocking reserves for many oilcompanies.

• Tom Mackay – BSc Geol. SPE - Subsurface

� Ex Managing Director and Senior VP of Stratic Energy Corporation -Increased market cap. of company over period 2002-2007 from approx. $10million to approx. $220 million.Increased market cap. of company over period 2002-2007 from approx. $10million to approx. $220 million.

• Paul Barron – Bsc C.Eng MIMM Eur. Ing - Facilities Engineering� Paul has over 30 years experience, specialising in new field developments

and project management internationally.• Jon Ford – Bsc Geol & Geophys - Geoscience

� 30 years of subsurface evaluation and interpretation experienceinternationally.

• Steven Turner – Financial

� Led and executed investments / divestments in over 30 energy assets andlicences totalling more than $1.1bn. Raised over $2.1bn in new debt includingproject debt, tax based structures and public market bonds.

Page 16: Allomax Limited Introduction July 2010 Ppt

Sysmax Risk Management

• Reduce waste (non productive time / cost / incidents)

• Communicate risk and likely costs to managementmanagement

• Evaluate options and choose the best

• Integrate wells, facilities and reservoir risk to achieve optimal development

Page 17: Allomax Limited Introduction July 2010 Ppt

Risk Management Toolbox

Risk Management

Risked Well Cost Estimation

Risk Based Option Analysis

Optimise asset performance

www.sysmax.com

Page 18: Allomax Limited Introduction July 2010 Ppt

Casmax

• Competence Assurance System� Develop people to meet objectives

Page 19: Allomax Limited Introduction July 2010 Ppt

Track Record > 1200 Personnel

Wells, Subsea & Facilities Engineering available

Page 20: Allomax Limited Introduction July 2010 Ppt

How Is Casmax Used?

• By the individual?�To drive own career

• By the Asset?�To provide assurance / succession planning

• By Discipline• By Discipline�Right people / right place / right time�Succession planning

• By Company�Demonstrates commitment to people�Link to career ladder / grades

Page 21: Allomax Limited Introduction July 2010 Ppt

A Simple Process

Database Architecture

Set-up

Range StatementAmendment or Creation

Set up Job Profiles

CandidateSelf AssessmentPersonal Profile

Training / Development /

PromotionSupervisorAssessment

Self Assessment

DevelopmentAction Setting

Initiation

Cyclic

Customise

Personal ProfileAmendment

Page 22: Allomax Limited Introduction July 2010 Ppt

Benefits

• Corporate improvement

• Assess, Assure, Develop & Deploy people better

�Focus training and development�Focus training and development

�Demonstrate the experience / skills / knowledge required

�Help retain and motivate people

�Increase efficiency and HS&E

Page 23: Allomax Limited Introduction July 2010 Ppt

ALLOMAX SUBSEA

Page 24: Allomax Limited Introduction July 2010 Ppt

Allomax Subsea

• Personnel Provision

• ROV Vehicle Supply

– Operations Management

– Specialist Tooling– Specialist Tooling

Page 25: Allomax Limited Introduction July 2010 Ppt

Allomax Subsea

• Personnel Provision– Operations Management

– Able to call on 60 years ROV industry knowledge

– Single point senior project manager

– Senior PM supported by qualified ROV project Engineers– Senior PM supported by qualified ROV project Engineers

– Experienced ROV offshore staff

• ROV Vehicle Supply– Specific ROV systems for Drill support

– Large rental tooling pool

– Specific drill support tooling

– Tooling designed for our ROV systems

Page 26: Allomax Limited Introduction July 2010 Ppt

Allomax Subsea• ROV System’s

– TSV 1 125 HP dual manip ROV

– Capable of 300KG payload

– Konsberg MS900 digital sonar

– Fibre optic multiplexing

– TMS 200 Mt tether– TMS 200 Mt tether

– Triton 12 100 HP dual manip ROV

– Capable of 200KG payload

– Konsberg MS1000 digital sonar

– Fibre optic multiplexing c/w survey expansion mux

– TMS 500Mt neutrally buoyant tether

Page 27: Allomax Limited Introduction July 2010 Ppt

Thank you!!

Allomax - Integrity with Efficiency…Allomax - Integrity with Efficiency…