altairstrickland presentation fccu revamp constructability issues · 2017-08-03 · presentation...

29
AltairStrickland Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010

Upload: others

Post on 26-Jul-2020

15 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

AltairStrickland Presentation

FCCU Revamp Constructability Issues

1

League City, TexasApril 12-16, 2010

Page 2: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

AltairStrickland

• LaPorte, TX, (Houston, TX area)• Founded 1976

N U i• Non-Union• Principal areas of focus:

Project Management and ExecutionProject controlsProject controlsComplex mechanical scopesHeavy riggingSubcontractor management and coordination

FCC and Coker TAR’s and revamps

Constructability optimizationExecution driven engineering

2

Value creation

Page 3: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

Door Sheet Equipment Installations

3

Page 4: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #1p y

Air Grid Installation

Complete Scope Included:• Installation of Regenerator lower cone section• Replacement of Regenerator air grid• Replacement of Regenerator air grid• Replacement of feed section on riser• Replaced reactor trickle valves• Flue gas line repairs• Knife gate valve repairs• Extensive refractory work• Miscellaneous maintenance work scope

4

Page 5: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #1p y

Cone with Air Grid Trunk Installation

5

Page 6: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #1

Air Grid Installation

p y

6

Page 7: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #2p y

Regenerator Cyclone InstallationComplete Scope Included:• Removal and replacement of the first stage regenerator, primary and secondary cyclones. (6 each)

l d l f l i (2 h)• Removal and replacement of external risers (2 each)• Removal and replacement of regenerated catalyst slide valves (2 each)• Removal and replacement of regenerated catalyst standpipes (2 each) and wye sections (2 each)y ( )• Removal and replacement of the rough cut cyclones (4 each) complete with overhead vapor lines and crossovers. (3 Sisters)• Removal and replacements of second-stage regenerator withdrawal wells (2

h) l t ith h d li d leach) complete with overhead lines and nozzles.• Installation of Erosion-resistant refractory on reactor first stage cyclone inlets.• Coke anchors added to the reactor cyclones.

7

y• Removal and replacement of reactor first stage cyclone dip legs and dustbowls complete with trickle valves.• Installation of two new 36” man ways on the reactor.

Page 8: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #2p y

Regenerator Cyclone Installation

8

Page 9: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #2p y

Regenerator Cyclone Installation

9

Page 10: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #2p y

Regenerator Cyclone Installation

10

Page 11: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #2p y

Regenerator Cyclone Installation

11

Page 12: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #2p y

Regenerator Cyclone Installation

12

Page 13: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #2p y

Regenerator Cyclone Installation

13

Page 14: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #2p y

Regenerator Cyclone Installation

Ensuring Welder

Modeling for fit up pre job

14

Welder Access

fit up pre job

Page 15: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

Crane Installations - Considerations

15

Page 16: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #3p y

Crane Installation

Complete Scope Included:• New regenerator shell, new regenerator head and cyclones• New combustorNew combustor• New stripper• New cat hopper• Removal and installation of fin fan coolers

Ti i f bb• Tie ins for new scrubber• All new lines under combustor• This FCCU Revamp involved the replacement of near 80% of the equipment in the structure• Major structure modifications during pre down and turnaround schedule

16

Page 17: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #3p y

Crane Installation

17

Page 18: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #3p y

Crane Installation

18

Page 19: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #4p y

Crane Consideration Example

Complete Scope Included:• Transportation and Installation of new reactor• New air grid• New air grid• Replacement of refractory in all regenerator dust bowls (discovery work)• New main air blower• New support structure for reactor

19

Page 20: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #4p y

Crane Considerations for Reactor Installation

20

Page 21: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

Major Equipment Installation

21

Page 22: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #5p y

Major Equipment Installation

Complete Scope Included:• New head and cyclones in regeneratory g• Installation of new reactor• Tie ins to FCC for new scrubber• Flue gas cooler work• Major structure work• Major structure work

22

Page 23: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #5p y

Major Equipment Installation

23

Page 24: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #5p y

Major Equipment Installation

24

Page 25: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #5p y

Major Equipment Installation

25

Page 26: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #5p y

Major Equipment Installation

26

Page 27: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #5p y

Major Equipment Installation

27

Page 28: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

FCCU Revamp Case Study #5p y

Major Equipment Installation

28

Page 29: AltairStrickland Presentation FCCU Revamp Constructability Issues · 2017-08-03 · Presentation FCCU Revamp Constructability Issues 1 League City, Texas April 12-16, 2010. AltairStrickland

AltairStrickland 1605 S. BattlegroundLa Porte, TX 77571Whitney Strickland

[email protected]

29