Page 1 of 6 American River Watershed Common Features, Water Resources Development Act of 2016, American River Contract 2 Frequently Asked Questions Project Partners The American River Watershed Common Features (ARCF) 2016 Project is a collaborative effort by the U.S. Army Corps of Engineers (USACE), Central Valley Flood Protection Board, California Department of Water Resources, and the Sacramento Area Flood Control Agency. The project will modernize Sacramento’s aging flood control infrastructure while reducing the flood risk to more than 530,000 people and $62 billion in damageable property in the greater Sacramento region. SEIS/SEIR Public Review Period (June 4, 2021 – July 19, 2021) This is an opportunity to learn about the American River Contract 2 bank protection project and submit comments. The 45-day public review period for the draft SEIS/SEIR will begin on June 4, 2021 and end on July 19, 2021. Responses to comments will be published in the Final SEIS/EIR. A virtual public meeting will be held on June 29, 2021 from 4:30 p.m. to 5:30 p.m. to present details of the project and to receive comments. Instructions to access the virtual meeting, sign up to receive email notices, and view the draft document are available at: www.sacleveeupgrades.com Comments can be submitted at the public meeting or anytime during the comment period by email or mail at the following addresses: Email U.S. Postal Service [email protected] U.S. Army Corps of Engineers, Public Affairs Office 1325 J Street Sacramento, California 95814

Upload: others

Post on 13-Nov-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: American River Watershed Common Features, Water …

Page 1 of 6

American River Watershed Common Features, Water Resources Development Act of 2016, American River Contract 2

Frequently Asked Questions

Project Partners The American River Watershed Common Features (ARCF) 2016 Project is a collaborative effort by the U.S. Army Corps of Engineers (USACE), Central Valley Flood Protection Board, California Department of Water Resources, and the Sacramento Area Flood Control Agency. The project will modernize Sacramento’s aging flood control infrastructure while reducing the flood risk to more than 530,000 people and $62 billion in damageable property in the greater Sacramento region. SEIS/SEIR Public Review Period (June 4, 2021 – July 19, 2021) This is an opportunity to learn about the American River Contract 2 bank protection project and submit comments. The 45-day public review period for the draft SEIS/SEIR will begin on June 4, 2021 and end on July 19, 2021. Responses to comments will be published in the Final SEIS/EIR. A virtual public meeting will be held on June 29, 2021 from 4:30 p.m. to 5:30 p.m. to present details of the project and to receive comments. Instructions to access the virtual meeting, sign up to receive email notices, and view the draft document are available at: www.sacleveeupgrades.com Comments can be submitted at the public meeting or anytime during the comment period by email or mail at the following addresses: Email U.S. Postal Service

[email protected] U.S. Army Corps of Engineers, Public Affairs Office 1325 J Street Sacramento, California 95814

Page 2: American River Watershed Common Features, Water …

Page 2 of 6

Project Area The bank protection improvements would occur along the right bank of the American River from just upstream of the Howe Avenue bridge to the downstream end of the Campus Commons Golf Course. Proposed Project Description & Justification With the 2017 completion of a new auxiliary spillway at Folsom Reservoir and levee improvements that address seepage and stability along the Lower American River, the ability to manage large flood events has greatly improved. More water can be safely released from Folsom Reservoir earlier in a major storm event to create additional flood storage space for anticipated peak inflows into the reservoir. These improvements were designed to allow flood releases into the American River of up to 160,000 cubic feet per second (cfs). The ARCF GRR focused on identifying areas associated with the erosion impacts from the higher and longer releases from Folsom Dam. The proposed bank protection work would armor the river bank to reduce and prevent erosion which, if left unaddressed, could cause levee failure. Proposed Action The Proposed Action consist of the following:

1. Installation of approximately 7,800 linear feet of erosion protection and on-site habitat mitigation features along two levee segments (Sites 2-2 and 2-3) of the Lower American River.

2. Creation of three off-site riparian habitat restoration sites (Arden Pond, Rossmoor East and Rossmoor West).

3. Temporary establishment and use of staging areas, stockpile sites, and haul routes.

4. Reconstruction of the Campus Commons Golf Course.

Page 3: American River Watershed Common Features, Water …

Page 3 of 6

Anticipated Construction Timeline

Pre-construction (November 2021 - May 2022) Woody vegetation clearing and pruning, including elderberry shrub transplanting within construction footprints and site preparation and planting activities at mitigation sites. Bank Protection Construction (Summer 2022 - Fall 2022) Install waterside erosion rock riprap protection measures and backfill with soil for revegetation. Post-Construction Planting (Begin as early as Fall/Winter 2022) Install a mixture of native vegetation along the waterside edge and within mitigation sites in the Parkway.

Frequently Asked Questions 1. A GRR FEIS/FEIR was adopted in 2016, why is there a need for a Supplemental EIS/EIR? The SEIS/SEIR analyzes details specific to construction, staging areas, haul routes, and construction of off-site mitigation that were not analyzed in the GRR FEIS/FEIR. Further, it addresses the proposal to construct 7,800 linear feet of bank erosion protection improvements along the Lower American River right bank from just upstream of the Howe Avenue bridge to the downstream end of the Campus Commons Golf Course. 2. How are stakeholder concerns being addressed? Project impacts are presented in the draft SEIS/SEIR. Stakeholders and members of the public are invited to review the document and provide comments during the 45-day public review period. A presentation of project details will be made at the June 29, 2021public meeting. Comments will be considered and addressed in the final SEIS/SEIR. Project partners have reached out to interested parties and various stakeholders via the Lower American River Task Force, Lower American River Bank Protection Working Group, as well as public presentations made to the Sacramento County American River Parkway Advisory Committee and Recreation and Parks Commission. 3. When reviewing a NEPA/CEQA document what type of comments are appropriate?

The basic purpose of an environmental document is to help inform decision makers and the public about the potential significant environmental impacts of a project and identify ways that those impacts can be avoided or reduced. Effective comments are substantive in nature and should address specific impacts and concerns related to the Project. 4. Why is the Project necessary? The Sacramento metropolitan area is one of the most at-risk areas for flooding in the United States due to its location at the confluence and within the floodplain of two major rivers, the Sacramento and American Rivers. Both of these rivers have large watersheds with very high potential runoff, which in the past has overwhelmed the existing flood management system that was designed and built many decades ago before modern construction methods were employed.

Page 4: American River Watershed Common Features, Water …

Page 4 of 6

Sections of the American River are confined by levees and the energy of the water flow tends to erode river banks and levees over time. Channel erosion could have detrimental effects on the levees by undercutting the foundation materials beneath the levees. The erosion of the river bank may also increase under-seepage through the foundation soil and reduce the overall stability of the levee. Significant erosion can lead to failure of the levee and presents an unacceptable level of risk to public safety. 5. Once work is completed at these erosion sites, would additional bank protection work be

required? The work at Sites 2-2 and 2-3 is one component of a comprehensive plan to improve the levees along the Lower American River, as outlined in the 2016 GRR FEIS/FEIR. Additional erosion protection measures would be required along other portions of the American River. Overall, the GRR anticipated that up to 11 miles of erosion protection work would be constructed to complement already completed levee seepage and stability improvements along the American River. The Project partners are working to develop subsequent phases of design and construction to address the additional erosion protection measures required along the Lower American River. The draft SEIS/SEIR analyzes the immediate work being conducted at Sites 2-2 and 2-3 and the associated mitigation sites. Future bank protection work would be addressed in future supplemental environmental compliance documents. 6. How would mitigation for impacts to biological resources be addressed in the American River

Parkway? Generally speaking, the amount of erosion work called for along the Lower American River as part of the ARCF 2016 Project necessitates a significant amount of appropriate mitigation. Unavoidable adverse effects would be mitigated through a combination of on-site and off-site actions. The proposed mitigation measures include compensatory mitigation for salmonids, Yellow-billed Cuckoo and Valley Elderberry Longhorn Beetle, which generally would be accomplished by transplanting elderberry shrubs and creating riparian woodland habitat onsite and offsite within the American River Parkway to compensate for the loss of vegetation from construction of erosion protection features. Further, to the extent feasible, elderberry shrubs would be avoided and/or protected in place by establishing and maintaining work buffers. 7. How will tree and shrub removal be addressed for the project? In order to construct the bank protection measures, trees and shrubs located in the project footprint would be removed prior to the start of construction. Vegetation removal work typically occurs between November 1 and April 30, prior to bird nesting season. The majority of the vegetation affected by project activities are located on lands owned by the County of Sacramento or under the jurisdiction of the State Lands Commission. The project sponsors are working directly with these respective agencies, including Sacramento County Regional Parks, to facilitate removal of the vegetation necessary to accommodate the project and implement appropriate mitigation measures, which would include on-site and off-site mitigation.

8. What on-site and off-site mitigation is under review? To compensate for unavoidable impacts, the Project intends to improve the overall long-term on-site resource conditions, where feasible, through design opportunities. On-site mitigation has been integrated into the design of the bank protection features and includes placement of soil over the erosion protection,

Page 5: American River Watershed Common Features, Water …

Page 5 of 6

establishment of planting benches, and the restoration of disturbed areas through comprehensive revegetation efforts (see Figures 2-10 and 2-15). The off-site mitigation areas identified in this SEIS/SEIR are Rossmoor East, Rossmoor West, and Arden Pond. These sites are in addition to the Glenn Hall Park mitigation site and the Rio Americano East and West mitigation sites described in the Supplemental Environmental Assessment/ Supplemental Environmental Impact Report for American River Contract 1. Other sites are also being pursued in anticipation of projected impacts under full implementation of the ARCF 2016 bank protection program. The Rossmoor East and West mitigation sites (see Figures 2-22 and 2-23), would be used for transplanting elderberry shrubs and planting riparian habitat. The primary components of the Arden Pond Mitigation Site (see Figures 2-20, 2-21) includes a bass pond (up to 9.5 acres) with a minimum 6 feet depth for continued recreational fishing and an adjacent side channel that not only replenishes water in the bass pond but also provides shallow flow areas and periodically inundated floodplain habitat for rearing juvenile salmonids that consists of riparian woodlands plantings and instream-woody material (up to 30.1 acres) 9. How would neighbors living adjacent to the work areas be impacted by Project traffic?

Haul routes for materials and equipment would utilize Interstate 80 (I-80) to the north or U.S. Highway 50 (U.S. 50) to the south. As depicted on attached Figure 2-25, haul trucks would travel using various routes to access the Howe Avenue and Campus Commons construction sites and staging areas (Sites 2-2, 2-3).

The neighborhoods situated adjacent to the work sites, along the haul routes, ingress and egress points, and staging areas would be notified in advance of scheduled construction activity and any potential road closures and detours.

10. Would the Jedediah Smith Memorial Trail, commonly referred to as the American River Bike Trail, and equestrian trails be impacted?

Haul trucks and other construction equipment would need to use or cross portions of recreational trails located within the American River Parkway to move materials to the construction and mitigation sites. In areas where construction equipment is required to only cross an existing trail, flaggers would be present to direct traffic. Where larger portions of a trail is impacted or required for construction access, the trail would be temporarily rerouted a short distance away from the construction area. Any required detours would be developed in consultation with the City of Sacramento Bicycle and Pedestrian Coordinator and signage would be posted at the affected locations a minimum of 14-days in advance.

11. During what time period would work occur?

Between November 2021 – March 2022, site preparation would begin with trimming and/or removal of woody vegetation and relocation of elderberry shrubs located within the construction footprint. In spring 2022, site mobilization activity would begin, and include building temporary access roads, preparing staging areas, rerouting pedestrian and bicycle trails, and installing signage for traffic and alternate transportation routes. Bank protection construction would begin in late Spring 2022 and continue through Fall 2022.

Page 6: American River Watershed Common Features, Water …

Page 6 of 6

12. What are the daily work hours? Construction hours would comply with the City of Sacramento’s noise ordinance and would be Monday through Saturday from 7:00 a.m. to 6:00 p.m. No work or hauling would take place on holidays without permission given by the City of Sacramento.

13. How would the construction affect the Sacramento County Parks’ Campus Commons Golf

Course?

It is anticipated that the golf course would be closed to the public for approximately two years, beginning November 2021. Extensive bank protection measures would be constructed along the river bank of the Campus Commons Golf Course and the property would be used as a staging area to support construction. Restoration of the golf course would begin in spring 2023 and the course could reopen in November 2023. 14. How can I stay informed? USACE is planning to host an online meeting on June 29, 2021 at 4:30 p.m. to discuss the SEIS/SEIR and obtain public feedback.

Instructions on how to participate in the online meeting can be found at www.sacleveeupgrades.com. Stakeholders can also obtain a copy of the draft document from the site and sign up to receive future project-related email updates.

Residents can also contact the USACE Public Affairs Office directly at:

Phone: (916) 557-5100 E-mail: [email protected] Facebook: www.facebook.com/sacramentodistrict Twitter: www.twitter.com/usacesacramento

Page 7: American River Watershed Common Features, Water …

2:1

EXISTING GRADE

800 CFS

3,900 CFS2,660 CFS

12" BEDDING MATERIAL

24" SOIL-FILLED ROCK SLOPE PROTECTION

EXCAVATED CHANNEL BED MATERIAL, FILTER MATERIAL, OR SOIL FILL

2:1

1.5:1

1.5:1

12" TOP SOIL

RIPARIANSEED MIX

WILLOWCONTAINERS

LONGITUDINAL LAUNCHABLEROCK TOE PROTECTION

H: 1'=10' V: 1"=5'TYPICAL PLANTING SECTION (STATION 516+50 TO 519+50 AND 524+50 TO 528+20)

WILLOWCUTTINGS

RIPARIAN BENCH EXISTINGVEGETATION

LONGITUDINAL LAUNCHABLEROCK TOE PROTECTION

DESIGNGRADE

800 CFS

3,900 CFS2,660 CFS

EXISTING GRADE

2:1

1.5:1

1.5:1 TOPSOIL

SCALE: 1"=10'TYPICAL PLANTING SECTION (STATION 519+50 TO 524+50)

ARCF 2016 American River Contract 2

Figure 2-10Cross Section of Planting Plan for Benches at Site 2-2

SOURCE: USACE, 2020

D16

0092

.08

- A

mer

ican

Riv

er W

ater

shed

Con

trac

t 1

Env

ironm

enta

l\05

Gra

phi

cs-G

IS-M

odel

ing\

Illus

trat

or

WILLOWCUTTINGS

RIPARIAN BENCH EXISTINGVEGETATION

LONGITUDINAL LAUNCHABLEROCK TOE PROTECTION

DESIGNGRADE

800 CFS

3,900 CFS2,660 CFS

EXISTING GRADE

2:1

1.5:1

1.5:1 TOPSOIL

SOLI

CIT

ATIO

N N

O.:

DES

IGN

ED B

Y:

DES

CR

IPTI

ON

1

A

MAR

KSI

ZE:

SUBM

ITTE

D B

Y:

DAT

E

CO

NTR

ACT

NO

.:C

HEC

KED

BY:

DR

AWN

BY:

ISSU

E D

ATE:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

®US Army Corpsof Engineers

SPEC

NO

:

DES

IGN

FIL

E N

O:

65%

PR

OJE

CT

SAC

RAM

ENTO

CO

UN

TY, C

ALIF

OR

NIA

AMER

ICAN

RIV

ER C

OM

MO

N F

EATU

RES

(AR

CF)

ERO

SIO

N --

LO

WER

AM

ERIC

AN R

IVER

SIT

E 2-

2 &

2-3,

CO

NTR

ACT

2no

rthw

est h

ydra

ulic

con

sulta

nts

2600

Cap

itol A

venu

e, S

uite

140

Sacr

amen

to, C

alifo

rnia

958

16(9

16) 3

71-7

400

ww

w.n

hcw

eb.c

om

SAC

RAM

ENTO

DIS

TRIC

T13

25 'J

' STR

EET

SAC

RAM

ENTO

, CAL

IFO

RN

IA 9

5814

NO

VEM

BER

202

0

XXXX

XXXX

XXX

XXXX

XXXX

XXX

2286

1-04

-064

5AN

SI-D

SCALE: 1"=10'TYPICAL PLANTING SECTION (STATION 519+50 TO 524+50)

NOTES:

1. VEGETATION IS SHOWN AT MATURE FORM.

2. APPROXIMATE WATER SURFACE ELEVATIONSASSOCIATED WITH TARGET FLOWS SHOWN FORREFERENCE.

L-303

TYPI

CAL

SEC

TIO

NS

- SIT

E 2-

2

S. M

CC

OM

AS

S. M

CC

OM

AS

M. R

AAD

B. W

ARD

MAN

2:1

EXISTING GRADE

800 CFS

3,900 CFS2,660 CFS

12" BEDDING MATERIAL

24" SOIL-FILLED ROCK SLOPE PROTECTION

EXCAVATED CHANNEL BED MATERIAL, FILTER MATERIAL, OR SOIL FILL

2:1

1.5:1

1.5:1

12" TOP SOIL

RIPARIANSEED MIX

WILLOWCONTAINERS

LONGITUDINAL LAUNCHABLEROCK TOE PROTECTION

SOLI

CIT

ATIO

N N

O.:

DES

IGN

ED B

Y:

DES

CR

IPTI

ON

1

A

MAR

KSI

ZE:

SUBM

ITTE

D B

Y:

DAT

E

CO

NTR

ACT

NO

.:C

HEC

KED

BY:

DR

AWN

BY:

ISSU

E D

ATE:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

®US Army Corpsof Engineers

SPEC

NO

:

DES

IGN

FIL

E N

O:

65%

PR

OJE

CT

SAC

RAM

ENTO

CO

UN

TY, C

ALIF

OR

NIA

AMER

ICAN

RIV

ER C

OM

MO

N F

EATU

RES

(AR

CF)

ERO

SIO

N --

LO

WER

AM

ERIC

AN R

IVER

SIT

E 2-

2 &

2-3,

CO

NTR

ACT

2no

rthw

est h

ydra

ulic

con

sulta

nts

2600

Cap

itol A

venu

e, S

uite

140

Sacr

amen

to, C

alifo

rnia

958

16(9

16) 3

71-7

400

ww

w.n

hcw

eb.c

om

SAC

RAM

ENTO

DIS

TRIC

T13

25 'J

' STR

EET

SAC

RAM

ENTO

, CAL

IFO

RN

IA 9

5814

NO

VEM

BER

202

0

XXXX

XXXX

XXX

XXXX

XXXX

XXX

2286

1-04

-064

5AN

SI-D

H: 1'=10' V: 1"=5'TYPICAL PLANTING SECTION (STATION 516+50 TO 519+50 AND 524+50 TO 528+20)

NOTES:

1. VEGETATION IS SHOWN AT MATURE FORM.

2. APPROXIMATE WATER SURFACE ELEVATIONSASSOCIATED WITH TARGET FLOWS SHOWN FORREFERENCE.

L-303

TYPI

CAL

SEC

TIO

NS

- SIT

E 2-

2

S. M

CC

OM

AS

S. M

CC

OM

AS

M. R

AAD

B. W

ARD

MAN

Page 8: American River Watershed Common Features, Water …

NOTES:

1. VEGETATION IS SHOWN ATMATURE FORM.

2. APPROXIMATE WATERSURFACE ELEVATIONSASSOCIATED WITH TARGETFLOWS SHOWN FORREFERENCE.

ARCF 2016 American River Contract 2

Figure 2-15Typical Cross Section of Planting Plan on Cobble/Soil Mix Section at Site 2-3

SOURCE: USACE, 2020

D16

0092

.08

- A

mer

ican

Riv

er W

ater

shed

Con

trac

t 1

Env

ironm

enta

l\05

Gra

phi

cs-G

IS-M

odel

ing\

Illus

trat

or

1040645L-SC0023.dwg

TYPICAL PLANTING SECTION WITH COBBLE / SOIL MIX (STA 1+80 TO 5+30 AND 63+50 TO 66+25)1" = 5'

TYPICAL PLANTING SECTION WITH LARGE WOODY MATERIAL BETWEEN BURIED ROCK TIE-BACKS (STA 5+30 TO 63+50)1" = 5'

1

2

SOLI

CIT

ATIO

N N

O.:

DES

IGN

ED B

Y:

DES

CR

IPTI

ON

1

A

MAR

KSI

ZE:

SUBM

ITTE

D B

Y:

DAT

E

CO

NTR

ACT

NO

.:C

HEC

KED

BY:

DR

AWN

BY:

ISSU

E D

ATE:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

®US Army Corpsof Engineers

SPEC

NO

:

DES

IGN

FIL

E N

O:

65%

PR

OJE

CT

SAC

RAM

ENTO

CO

UN

TY, C

ALIF

OR

NIA

AMER

ICAN

RIV

ER C

OM

MO

N F

EATU

RES

(AR

CF)

ERO

SIO

N --

LO

WER

AM

ERIC

AN R

IVER

SIT

E 2-

2 &

2-3,

CO

NTR

ACT

2no

rthw

est h

ydra

ulic

con

sulta

nts

2600

Cap

itol A

venu

e, S

uite

140

Sacr

amen

to, C

alifo

rnia

958

16(9

16) 3

71-7

400

ww

w.n

hcw

eb.c

om

SAC

RAM

ENTO

DIS

TRIC

T13

25 'J

' STR

EET

SAC

RAM

ENTO

, CAL

IFO

RN

IA 9

5814

NO

VEM

BER

202

0

XXXX

XXXX

XXX

XXXX

XXXX

XXX

2286

1-04

-064

5AN

SI-D

L-301

TYPI

CAL

SEC

TIO

NS

- SIT

E 2-

3

S. M

CC

OM

AS

S. M

CC

OM

AS

M. R

AAD

B. W

ARD

MAN

Page 9: American River Watershed Common Features, Water …

 

 

Woo

dbrid

geWay

Woodcliff Way

Way W arrenton

Ri v e r w

o o d W

a y Dr

River Edge Way River Trails Cir

American Rive

r A m b a

s s a d o

r D r

Georg e t o w n D r

E ll i s o n D r

T a r s h e s D r

D a n b u r y W a y

F a r n s

w o r t h

W a y

Starrlyn

R e d B r o ok W a y

H o ll y d a l e W a y

R u g b y C t

River Vista Way

R o s e H i ll C t

Conservaton Easement (20.54 ac)Temporary Work Area Easement (3.55 ac)Temporary Utility Easement (0.21 ac)Staging Area (0.89 ac)Permanent Access rouN 0 500 e (0.94 ac)t

Path:

U:\G

IS\GI

S\Pr

ojects

\16xx

xx\D

1600

92_0

8_SA

FCA_

Bank

Prote

ction

\03_M

XDs_

Proje

cts\P

D_Co

ntrac

t2\Fig

2-22_

VELB

_Site

_Ros

smoo

rWes

t.mxd

, epim

entel

2/17

/2021

Feet

SOURCE: DigitalGlobe, 2018; NHC, 2020; USACE, 2021; ESA, 2021 ARCF 2016 American River Contract 2

Figure 2-22Rossmoor West Mitigation Site

Page 10: American River Watershed Common Features, Water …

16

Rossmoor Dr

Ambassador D

r

Stanley Ave

Rossmoor Dr

Path:

U:\G

IS\GI

S\Pr

ojects

\16xx

xx\D

1600

92_0

8_SA

FCA_

Bank

Prote

ction

\03_M

XDs_

Proje

cts\P

D_Co

ntrac

t2\Fig

2-23_

VELB

_Site

_Ros

smoo

rEas

t.mxd

,  epim

entel

  2/17

/2021

SOURCE: DigitalGlobe, 2018; NHC, 2020; USACE, 2021; ESA, 2021

N 0 500Feet

Conservaton Easement (6.07 ac)Temporary Work Area Easement (0.86 ac)Staging Area (0.13 ac)Permanent Access route (1.04 ac)River Mile

Figure 2-23Rossmoor East Mitigation Site

ARCF 2016 American River Contract 2

American River

Page 11: American River Watershed Common Features, Water …

American River

Arden Way

Ingress/Egress point

Ingress/Egress point

Bass PondDredging

Fill Area / Berm

East Mitigation Site

West Mitigation Site

Inlet forBass Pond

Inlet for ShallowSide Channel

Shallo

w Side Channel

Berm

RM 12

Kean

e Dr

American River Dr

Mccla

ren D

r

American Rive

r Bike

Trail

Sand Bar Cir

Harri

ngto

n Way

King

sford

Dr

Shelato Way

Ivanhoe Way

Los Rios Dr

Brick

well W

ay

Shelley Way

Gary Way

Thist

lewoo

d Way

Meredith Way

Beard Way

Marimoore Way

Path:

U:\G

IS\GI

S\Pr

ojects

\16xx

xx\D

1600

92_0

8_SA

FCA_

Bank

Prote

ction

\03_M

XDs_

Proje

cts\P

D_Co

ntrac

t2\Fig

2-20_

Arde

nPon

d_Wo

rk_Ar

eas.m

xd,  e

pimen

tel  4

/12/20

21

SOURCE: USDA, 2018; NHC, 2021; HDR, 2021; ESA 2021 ARCF 2016 American River Contract 2

Haul RouteProject Areas

Mitigation SiteTemporary Work Area EasementCross-section shown on Figure 2-21Shallow Side ChannelGrading LineContour LineRiver Mile

Figure 2-20Arden Pond Mitigation Site

N 0 600Feet

Page 12: American River Watershed Common Features, Water …

RIVER BERM BERMSHALLOW WATERSIDE CHANNEL BASS POND

American River Common Features Contract 2

Figure 2-21Typical Cross Section at Arden Pond Mitigation Site

SOURCE: HDR, 2021

D16

0092

.16

- A

mer

ican

Riv

er W

ater

shed

Com

mon

Fea

ture

s C

ontr

act

2\05

Gra

phi

cs-G

IS-M

odel

ing\

Illus

trat

or

Not to scale

Page 13: American River Watershed Common Features, Water …

Howe

Ave

65th

St

Exposition Blvd

Arden Way

J St

H St

Folsom Blvd

Elvas Ave

45th

St

0

Amer ican R iver

50

Site 2-3

Folsom Blvd59th

St

Broadway

La Riviera Dr

Elvas Ave

Carlson

Dr

Sandburg Dr

J St

Fair O

aks Bl

vd

University Ave

Fair Oaks Blvd

Munro

e St

Howe

Ave

Hurley Way

Howe

Ave

Arden Way

Alta Arden Expy

Cottage Way

Etha

n Way

CollegeTown Dr

57th

St58

th St

Messina Dr

H St

M St

Rode

o Way

54th

St

American River Dr

Unive

rsity

Ave

Munro

e St

Northrop Ave

SacramentoState

University

Cal Expo

State

Univ

ersity

Dr

Ingress/Egress point

160

80

Egress for somehaul trucks

Ingress/Egress point

E. A.

Fairb

airn

Site 2-2

RM 4

RM 5

RM 6

RM 7 RM 8

Path:

U:\G

IS\G

IS\Pr

ojects

\16xx

xx\D

1600

92_0

8_SA

FCA_

Bank

Prote

ction

\03_M

XDs_

Proje

cts\PD

_Con

tract2

\Fig2

-25_H

aulR

outes

_Site

s2-2_

2-3.m

xd,  e

pimen

tel  3

/25/20

21

SOURCE: USDA, 2018; NHC, 2021; ESA, 2021

Subreach 2Project Work Areas

Erosion Protection SIteTemporary Work Area EasementStaging Area

Proposed Haul RoutesHaul RoutesRiver Mile

0 2,000Feet

ARCF 2016 American River Contract 2

Figure 2-25Haul Routes

N

8