‘Mid Term Evaluation of the Scheme
on Modernisation of Prisons’ in
Rajasthan
2009-Delhi-0056
Ministry of Home Affairs, Government of India
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 2 of 33
Table of Contents
1 INTRODUCTION ...................................................................................................................................................... 3
2 PRISONS VISITED .................................................................................................................................................. 3
2.1 CENTRAL PRISON, BIKANER ............................................................................................................................... 4
2.2 CENTRAL PRISON, BHARATPUR ......................................................................................................................... 7
2.3 DISTRICT PRISON, DAUSA ................................................................................................................................ 10
2.4 SUB JAIL, BANDIKUI .......................................................................................................................................... 12
3 UTILIZATION OF FUNDS .................................................................................................................................... 15
4 SUMMARY .............................................................................................................................................................. 17
4.1 CURRENT SCENARIO OF PRISONS .................................................................................................................... 17
4.1.1 Shortage of staff ..................................................................................................................................... 18
4.2 IMPLEMENTATION OF THE SCHEME ................................................................................................................... 18
4.2.1 Security arrangements during the implementation of works ............................................................ 18
4.2.2 Maintenance of the assets created ...................................................................................................... 18
4.3 BUDGETING AND TRACKING OF EXPENDITURE ................................................................................................. 18
4.4 QUALITY CONTROL ........................................................................................................................................... 18
4.5 PERFORMANCE OF THE STATE ......................................................................................................................... 19
4.6 SUGGESTIONS .................................................................................................................................................. 23
5 ANNEXURE ............................................................................................................................................................ 25
Disclaimer, Limitations of Use, Intended Audience:
This report is solely for the use of Ministry of Home Affairs, Government of India and should not be used, circulated, quoted or
otherwise referred to for any other purpose, nor included or referred to in whole or in part in any document without our prior written
consent. The nature and content of any advice provided necessarily reflects the specific scope and limitations of our engagement,
the amount and accuracy of information provided to us by the Ministry of Home Affairs, GoI and the respective departments of the
State governments and the timescale within which the advice was required. Specific suggestions are provided for the purposes of
this engagement and we disclaim any responsibility for the use of our suggestions for a different purpose or in a different context.
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 3 of 33
1 Introduction
According to the constitution of India, prisons are a subject of the State governments. Most of the prisons are old and
some of them were built during the British rule. Government of India has taken an initiative to modernize prisons in
India by providing adequate infrastructure, basic amenities and improving other facilities. ‘Modernisation of Prisons
Scheme’ was implemented between 2002-03 and 2006-07. This scheme was extended till 31 March 2009 by the
Central government to complete the pending works under Phase I. Ernst & Young has been appointed as consultant
by the Ministry of Home Affairs, Government of India, to evaluate the implementation of this scheme by various
State governments.
The scheme consists of four components:
Construction of new jails
Expansion and renovation of existing jails
Construction of staff quarters
Sanitation and water supply.
2 Prisons visited
As part of the assessment Ministry of Home Affairs (MHA), GoI identified Rajasthan as a pilot state and the
consultant team visited the state on the suggestion from MHA to study the implementation of the scheme for
allocations done in Phase I.
In Rajasthan, the team visited the following prisons;
1. Central Prison, Bikaner
2. Central Prison, Bharatpur
3. District Prison, Dausa
4. Sub Jail, Bandikui.
The prisons were identified in discussion with the officials from the State namely IG Prisons and DG Prisons based on
the utilization of funds and works implemented under the four components of the scheme.
Following is the list of officials met during the visit.
S.
No
Name of the Official & Designation Date
1 Mr. Purohit, IG Prisons, Rajasthan 4th
May 2009
2 Mr. M B Purohit, DG Prisons, Rajasthan 4th
May 2009
3 Mr. Niyazi, Superintendent, Central Prison, Bikaner 5th
May 2009
4 Mr. Vishesh Joshi, Superintendent, Central Prison, Bharatpur 6th
May 2009
5 Mr. Ashok Verma, Deputy Superintendent, District Prison, Dausa 4th
May 2009
6 Mr. Kailash Meena, Assistant Jailor, Sub Jail, Bandikui 6th
May 2009
7 Mr. Ghanshyam Dutt Sharma, AE, RSRDCCL, Jaipur 4th
May 2009
8 Mr. Tara Chand Gupta, Resident Engineer, Unit – I, RSRDCCL, Bikaner 6th
May 2009
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 4 of 33
2.1 Central Prison, Bikaner
The Central prison is located approximately 15 km from the Bikaner city. Construction of the prison was started in the
month of October, 2004 and was completed in the month of March, 2006. The prison became operational on 30th
September 2006.
Capacity of the prison 1000
Number of barracks 46 (Male) (Capacity of each barrack: 20 prisoners)
2 (Female) (Capacity of each barrack: 20 prisoners)
Number of cells 40
Present strength 739 (as on 5th
May 2009)
Lock-up details:
Prisoners As on 01-04-09 As on 01-04-08 As on 01-04-07 As on 01-04-06
Convicts 501 518 382 299
Under trailers 218 215 145 141
Detainees 3 0 1 0
Pak / Other 10 0 4 10
SI 7 10 5 5
Total 739 743 537 455
Children 1 1 0 0
Working staff to
sanctioned staff ratio 93/177
Staff to inmate ratio 1:8
Staff position as on 30 April 2009:
S. No Staff Category Sanctioned Working Vacant
1 Superintendent 1 1 0
2 Deputy Superintendent 1 0 1
3 Medical Officer 1 1 0
4 Jailors 3 2 1
5 Deputy Jailors 3 1 2
6 Assistant Jailors 3 2 1
7 Chief Head Warders 1 0 1
8 Head Warders 14 12 2
9 Warders 125 56 69
10 Male Nurse, Grade II 3 0 3
11 Steno 1 0 1
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 5 of 33
S. No Staff Category Sanctioned Working Vacant
12 Typists 1 1 0
13 Office Assistants 1 1 0
14 UDC 2 2 0
15 LDC 4 4 0
16 Driver 1 1 0
17 Assistant Grade 4 2 2 0
18 Cook 1 0 1
19 Naai 1 1 0
20 Assistant Machine man 1 1 0
21 Sweeper 2 2 0
22 Assistant Factory Instructor 1 0 1
23 Dyer 1 0 1
24 Carpenter 1 1 0
25 Tailor 1 1 0
26 Gardener 1 1 0
Total 177 93 84
The above table suggests that there are 84 vacant positions in the prison. Maximum numbers of vacant positions are
at the Warder level. It was informed that the recruitment is due with the State government.
S. No Key Performance Indicators Standard as per Model Prison Manual, BPRD Presently
1 Space 3.71 sq.m/prisoner (Sleeping barracks) NA
8.92 sq.m/prisoner (Cells) NA
5.58 sq.m/prisoner (Hospitals) NA
2 Toilets (Men) 1:6 (Day) 1:4
1:10 (Night) 1:9
3 Toilets (Women) 1:6 (Day) 1:2
1:10 (Night) 1:5
4 Bathrooms (Men) 1:10 1:8
5 Bathrooms (Women) 1:10 1:3
6 Water Supply 135 litres/prisoner 70 - 100
7 Hospital (No of beds) 5% i.e. up to 50 beds 10
8 Doctor to inmate ratio 1:728
Observations and information gathered in discussion with the Prison officials during the prison visit:
The prison was clean and had provisions for ventilation and lighting.
There is shortage of water inside the prison resulting in waterborne diseases. Other minor ailments include
orthopedic and dental problems in old prisoners. Few incidents of skin diseases were observed inside the
prison.
Mining dust from the surrounding industries to be one of the reasons for dust pollution in the area.
Sewerage is open type within the jail compound and the waste water is currently being utilized for vegetable
cultivation.
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 6 of 33
2.1.1 Works undertaken in the prison with this scheme
Construction of Jail Complex
Total cost Rs 2000.00 Lakhs (Rs 20 Crores)
Total Plinth Area 1,85,000 SFT approximately.
Cost of construction Rs 1081/SFT approximately. (It includes establishment charges to
RSRDCC Limited, approach road, security walls, live wire fencing, water
tank, etc.)
Observations on the construction:
Provisions for ventilation and lighting available inside the prison
Polished Kota stone used for flooring within the barracks and tiles for kitchen, toilets, administrative and
other buildings.
The prison compound has workshops, library and auditorium hall for correctional purposes.
External security wall of 18 feet height with additional 3 feet of live wire fencing and internal enclosure wall
of 15 feet height were made with bricks and stone.
RCC was not used for external wall as in the case of prisons in Andhra Pradesh.
Construction of 34 staff quarters
Total cost Rs 200.00 Lakhs
Total Plinth Area 29,000 SFT approx.
Cost of construction Rs 690/SFT approximately. (It includes establishment charges to RSRDCC
Limited and building services such as water supply, electricity, etc.)
Construction of 42 warder’s quarters
Total cost Rs 192.60 Lakhs
Total Plinth Area 27,300 SFT approx.
Cost of construction Rs 700/SFT approximately. (It includes establishment charges to RSRDCC
Limited and building services such as water supply, electricity, etc.)
Observations on the construction:
Tiles were used for flooring in staff quarters, toilets and kitchen.
Polished Kota was used for warder’s quarters.
Impetus was given for ventilation and lighting.
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 7 of 33
The residents mentioned that the quality and standard of living has improved with the provision of these
quarters.
2.1.2 The following additional requirements in the prison came up in discussion with the Prison officials
Separation blocks
Parking facilities
Crèche for children
Two additional bore wells
Mini sewerage treatment plant
Visitors waiting hall with separate toilet facilities for men and women
Additional quarters for Deputy Superintendent, technical staff and female nurse.
2.2 Central Prison, Bharatpur
This prison was previously a district prison which was converted and upgraded to a central prison in the year 2001.
Capacity of the prison 800 (Male) + 25 (Female)
Present strength of prisoners 763 (as on 6 May 2009)
Number of barracks 20 (Old) + 4 (New)
Number of cells 50
Lock-up details:
Prisoners As on 31-3-09 As on 31-3-08 As on 31-3-07 As on 31-3-06
Convicts (Male) 546 687 682 439
Under trailers (Male) 195 164 143 120
Under trailers (Female) 22 19 18 17
Total 763 870 843 576
Children 5 4 1 5
Working staff to
sanctioned staff ratio 99/140
Staff to inmate ratio 1:8
Staff position:
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 8 of 33
S. No Staff category Sanctioned Cadre strength Vacancies
1 Superintendent 1 1 0
2 Medical Officer 1 1 0
3 Jailor 3 3 0
4 Deputy Jailor 2 0 2
5 Assistant Jailor 1 1 0
6 UDC 2 1 1
7 LDC 4 4 0
8 Typist 1 1 0
9 Assistant Typist 1 1 0
10 Grade II Male Nurse 1 1 0
11 Driver 1 1 0
12 Chief Head Warder 1 1 0
13 Head Warder 13 10 3
14 Warders 102 68 34
15 Class 4 personnel 1 1 0
16 Naai 1 1 0
17 Launderer 1 1 0
18 Cleaning personnel 1 1 0
19 Teacher 1 0 1
20 Gardner 1 1 0
Total 140 99 41
S.
No
Key Performance
Indicators
Standard as per Model Prison
Manual, BPRD
Previously Presently
1 Space 3.71 sq.m/prisoner (Sleeping barracks) NA NA
8.92 sq.m/prisoner (Cells) NA NA
5.58 sq.m/prisoner (Hospitals) NA NA
2 Toilets (Men) 1:6 (Day) 1:7 1:6
1:10 (Night) 1:11 1:10
3 Toilets (Women) 1:6 (Day) 1:7 1:4
1:10 (Night) 1:20 1:20
4 Bathrooms (Men) 1:10 NA 1:25
5 Bathrooms (Women) 1:10 NA 1:10
4 Water Supply 135 litres/prisoner <70 <70
5 Hospital (No of beds) 5% i.e. up to 40 beds 8 8
6 Doctor to inmate ratio 1:763
Observations and information gathered in discussion with Prison officials during the prison visit:
Most of the buildings were old. Instead of repairing these old structures, they should be replaced with new
buildings.
Newly constructed factory sheds and stores currently being used as material dumps.
No proper provision for ventilation and lighting even in the newly constructed barracks.
Health problems prevalent in the prison including skin diseases, waterborne diseases, gastric troubles,
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 9 of 33
malaria, depression, etc.
Water supply is through bore well and water had mineral and fluorine content.
The hospital inside the prison is currently not operational. It was informed that the hospital needs further
improvement in order to make it functional such as furniture, equipment, etc. Further, there is no provision
of female doctor and female nurse for women prisoners.
Separate kitchen built for women was currently not being utilized.
2.2.1 Works undertaken in the prison with this scheme
Works were implemented by PWD of the State.
S. No Item Cost (Lakhs) Completion date
1 RCC roof and repair works at Gole Garh (Barrack No. 1 to 9) 48.90 2006
2 Construction of three factory sheds 65.70 July 2005
3 Repairs to Hospital & Guest House 4.27 June 2005 & April 2005
4 Electrical works 5.17 Completed
5 Extension of interview room 4.52 May 2005
6 Rewiring at prisoner’s barracks 3.91 July 2005
7 Construction of four additional barracks 59.23 March 2006
8 Increase of compound wall height for barracks 11 to 17 4.81 December 2007
9 General repair works 2.38 2006
10 Repair of old quarters 2.08 January 2005
11 Boundary wall for Superintendent Quarter 3.25 December 2004
12 Separate kitchen in female ward 3.00 2005
13 Construction of staff quarters 122.78 January 2009
14 Two warder blocks 26.33 Completed
15 Renovation of water supply line 1.77 2005
16 Construction of septic tank 5.58 2006-07
17 Construction of water tank and water supply line 10.92 Jul 2006
18 Construction of bathrooms & toilets in prisoner’s barracks 9.48 December 2006
19 Meditation hall 13.42 March 2008
2.2.2 The following additional requirements in the prison came up in discussion with the Prison officials
Furniture and equipment for the hospital
31 additional quarters for Superintendent, Deputy Superintendent, Doctor, Jailors, medical staff, factory
manager, store keeper and warders.
Internal roads and compound wall for newly built staff quarters
Additional sump for water storage, urinals and washbasins, etc
Crèche for children
Acoustic facilities for Interview room
Additional room for clerical staff
RCC roof for kitchen shed located behind the main kitchen
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 10 of 33
2.3 District Prison, Dausa
This is a B class district prison operational from the new premises since 18th
May 2006. It was previously a sub jail
located in Dausa town.
Capacity of the prison 200
Number of barracks 7 (Males) + 1 (Females)
Number of cells 5
Present strength of prisoners 80 (as on 4th
May 2009)
Lock-up details:
Date As on 31-03-09 As on 31-12-08 As on 31-12-07 As on 31-12-06
Prisoners 81 69 98 70 (Including one female)
Working staff to
sanctioned staff ratio 12/15
Staff to inmate ratio 1:7
Staff position:
S. No Staff category Sanctioned Cadre strength Vacancies
1 Deputy Superintendent 1 1 0
2 Jailor 1 0 1
3 Assistant Jailor 1 1 0
4 Head Warder 1 1 0
5 Warders 10 8 2
6 UDC 1 1 0
Total 15 12 3
S.
No
Key Performance
Indicators
Standard as per Model Prison
Manual, BPRD
Before
implementation
After implementation
1 Space 3.71 sq.m/prisoner (Sleeping
barracks)
NA NA
8.92 sq.m/prisoner (Cells) NA NA
5.58 sq.m/prisoner (Hospital) NA NA
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 11 of 33
2 Toilets (Men) 1:6 (Day) 1:10-15 1:2
1:10 (Night) 1:15-30 1:7
3 Bathrooms 1:10 Nil Nil
4 Water Supply 135 litres/prisoner 100-135 100-135
5 Hospital (No of beds) 5% i.e. up to 10 beds NA -
6 Doctor to inmate ratio Visiting doctor once in a
week
Observations and information gathered from Prison officials during the prison visit:
Prison was not being maintained properly.
Only 50% of the jail being utilized presently.
Most of the newly constructed toilets were found to be blocked and in a state of neglect.
No drainage and sewerage facility within and outside the prison compound.
Electric mains were kept outside in the open with out proper roof/cover.
Cracks were observed in the main security wall.
It was informed that the occurrence of Skin diseases is very common in the prison. Other health problems
include TB, dental problems, etc.
No compound wall at the rear end of the prison.
Visitor’s hall had a tin roof and has no toilet facility.
2.3.1 Works undertaken in the prison with this scheme
Construction of Jail complex
Total Cost Rs 311 Lakhs
Total Plinth Area 31215 SFT
Cost of construction Rs 1000/SFT approximately. (Includes outer security wall, inner
segregation walls, etc and establishment charges to RSRDCC Limited)
Based on the discussion with Prison officials the following areas of improvements were noted:
Drainage within and outside the jail complex need to be improved.
Electrical fittings, plumbing work and waste water pipes need fixing and improvement.
Electrical mains to be shifted to the main building.
Periodic maintenance and optimum utilization of existing assets to be done.
Construction of staff quarters
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 12 of 33
No of quarters 5 (Five)
2.3.2 The following additional requirements in the prison came up in discussion with the Prison officials
At least two additional quarters for male nurse and UDC
Recruitment of Women warders
Compound wall at the rear side of the prison
2.4 Sub Jail, Bandikui
Capacity of the jail 100 (No women)
Number of barracks 2
Number of cells 2
Lock-up details:
Prisoners As on 6-5-09 As on 31-12-08 As on 31-12-07
Convicts 1 0 0
Under trailers 49 51 69
Detainees 0 0 0
Pak / Other 2 0 0
SI 0 0 0
Total 52 51 69
Working staff to
sanctioned staff ratio 6/9
Staff to inmate ratio 1:9
Staff position as on 6-05-2009:
S. No Staff category Sanctioned
strength
Working strength Vacant
1 Assistant Jailor 1 1 0
2 Head warder 1 1 0
3 Warder 7 4 3
Total 9 6 3
S.
No
Key Performance
Indicators
Standard as per Model
Prison Manual, BPRD
Previously at the
old sub jail
Presently at the district jail
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 13 of 33
S.
No
Key Performance
Indicators
Standard as per Model
Prison Manual, BPRD
Previously at the
old sub jail
Presently at the district jail
1 Space 3.71 sq.m/prisoner
(Sleeping barracks)
< 3.71 ~ 3.71
8.92 sq.m/prisoner (Cells) < 8.92 ~ 8.92
5.58 sq.m/prisoner
(Hospital)
< 5.58 ~ 5.58
2 Toilets 1:6 (Day) 1:10 1:6
1:10 (Night) 1:20 1:10
3 Bathrooms 1:10 NA 1:10
4 Water Supply 135 litres/prisoner <100 100-135
5 Hospital (No of
beds)
5% i.e. up to 5 beds NA NA
6 Doctor to inmate
ratio
Visiting doctor once in a week and
male nurse weekly twice from District
Hospital
2.4.1 Works undertaken in the prison with this scheme
Construction of Sub Jail Complex
Cost of construction Rs 1128/SFT approximately. (Including high security wall/perimeter, inner
segregation wall, boundary wall and establishment charges to RSRDCC
Limited)
Based on the discussion with Prison officials the following areas of improvements were noted:
Appropriate drainage system with in and outside the jail complex
Staircase to the administrative building to be built
Open pits for waste water to be covered
It was observed that the roof of the administrative building was damp and leaking. Access to the roof of the
administrative building to be provided.
Construction of 5 staff quarters
Cost of construction Rs 600/SFT approximately. (including establishment charges to RSRDCC
Ltd)
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 14 of 33
2.4.2 Based on the discussion with Prison officials the following areas of improvements were noted
High mast central lighting
Correctional measures such as library, games, etc.
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 15 of 33
3 Utilization of funds
Table below shows the funds utilization up to 31-03-2009. Utilization certificate for the first quarter of 2009 is due for
submission.
Funds sanctioned, released and utilization up to 31-03-2009:
S. No Year Central
Share (INR
Crore)
State
Share (INR
Crore)
Total
(INR Crore)
Amount spent up to
31 December 2008
(INR Crore)
1 2002-03 9.7725 3.2575 13.03 13.03
2 2003-04 9.7725 3.2575 13.03 13.0261
3 2004-05 9.7725 3.2575 13.03 13.0864
4 2005-06 9.7553 3.2575 13.0128 11.2924
5 2006-07 9.7672 2.5839 13.0247 10.0548
Total 48.84 15.6139 65.1275 60.4897
Ongoing projects for which sanction was accorded and works are under various stages of implementation are given
below. Utilization certificates for the same are due for submission.
With in this scheme, the state has made a provision of Rs 67.36 Lakhs for IT and Security Systems up-gradation of
S. No Name of the work Amount sanctioned
(INR Crore)
1 District Prison, Karoli
Construction of new District Jail Building
3.11
2 Central Prison, Jodhpur
Construction of Staff quarters
1.8251
3 Sub Prison, Rajgarh (Churu)
Construction of Staff quarters
0.077
4 District Jail, Alwar
Construction of Staff quarters
1.1477
5 District Jail, Sirohi
Construction of Staff quarters
0.1696
6 Sub Jail, Kotra (Udaipur)
Construction of Staff quarters
0.1155
7 Sub Jail, Mavli ( daipur)
Construction of Staff quarters
0.077
8 Sub Jail, Neem-ka-thana
Construction of Staff quarters
0.1925
Total 6.7144
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 16 of 33
which Rs 31.44 Lakhs were spent in acquiring Biometric Access Control System (BAMS) and jammers. Also, Rs 62.08
Lakhs was set aside for buildings under correctional programmes in this scheme, which include meditation halls,
crèche and nursery. So far Rs. 48.18 Lakhs have been utilized.
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 17 of 33
4 Summary
Modernisation of Prisons scheme is being monitored by the Inspector General Prisons, Director General Prisons,
Accounts Manager and other senior staff along with Superintendents of the respective prisons.
Rajasthan State Road Development & Construction Corporation Limited (RSRDCC Ltd) and Public Works
Department (PWD) are the implementing agencies for this scheme. Quality control during execution is monitored by
the officials of the prisons department, RSRDCC LTD/PWD and state vigilance cell.
Provisions for ventilation and sanitation inside the new central prison in Bikaner.
It was observed that sanitation and water supply facilities were improved in Bharatpur prison with the
implementation of this scheme.
Assets created under this scheme were not being properly maintained in district jail at Dausa. As a result,
some of the toilets were blocked.
Assets created at District Prison, Dausa and Central Prison, Bharatpur were found to be underutilized. In
Dausa, only 50% of the jail being utilized. Also, in Bharatpur, factory sheds constructed under this scheme
are presently being used as a material dump.
Cracks are visible over the outer perimeter wall in the district jail at Dausa and the sub jail at Bandikui.
Central prison at Bharatpur needs further improvements as the existing buildings were very old. Some of the
buildings are in a dilapidated stage and need replacement with new buildings.
The new prisons were provided with toilet to prisoner ratio of 1:10 during night time and 1:6 during day time.
Ratio of bathrooms to prisoners is 1:10
Fund flow during the implementation of this scheme was from the Centre to the State Treasury department
and then to the Project Development (PD) Account of the implementing agency i.e. RSRDCC Ltd/PWD. PD
A/c would be a non interest bearing account. Time taken for the fund flow is about six months to one year
from the state government to the implementing agencies and it was more in case of PWD.
4.1 Current scenario of prisons
Presently, there are eight central prisons, three reformatories (two for women and one for juvenile), 25 district jails,
59 sub jails and 10 open camps in Rajasthan.
S. No Type Number of Jails Authorized capacity Population
% Over-crowding
1 Central Jails 8 8,118 8,153 0.43%
2 Reformatories 3 440 262 Nil
3 District Jails 25 4,929 4,045 Nil
4 Sub Jails 59 3,611 2,409 Nil
5 Open Camps 10 529 482 Nil
17,627 15,351 Nil
As on date overcrowding is in only some of the central jails.
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 18 of 33
4.1.1 Shortage of staff
Overall shortage of staff was found to be 30-35%. Shortage is higher in case of central prisons. It is as high as 47% for Bikaner and
29% for Bharatpur. Sub jail at Bandikui has a shortage of 33%. Staff recruitment is pending with the State government and in order
to cope with the shortage, it is planning to hire 200 ex-military men on contract basis. It was informed that recruitment of 244 home
guards is also under persuasion by the State government.
4.2 Implementation of the scheme
The scheme is being implemented by the Rajasthan State Road Development & Construction Corporation Limited
(RSRDCC) and PWD. Implementation of the scheme took place in four stages i.e. designs, estimates, selection of
contractors and execution of works.
Designs were either prepared by RSRDCC or PWD. These designs were finalized after consultations with the Prisons
department. Estimates were either prepared by RSRDCC or PWD depending on the works allotted to them.
Contractors were selected at the state level by calling open tenders depending upon the lowest bid. In the tendering
process, the provision for negotiations is up to 5-10% and re-tendering happened in case the negotiations fail.
4.2.1 Security arrangements during the implementation of works
Security arrangements during the implementation of works include deployment of more number of guards and extra
vigil during the working hours. Also, in some cases prisoners were shifted to other jails. During the renovation work of
Bharatpur, prisoners were transferred to prisons at Ajmer, Kota and Jaipur.
4.2.2 Maintenance of the assets created
Maintenance of the assets created under this scheme is through the grants of the State government. The contractor
is responsible for any repair and maintenance (component wise) for the first year from the date of completion of
works and thereafter by the State through its annual maintenance grant. Annual maintenance grants from the State
government is usually a small amount and not sufficient to carry out the repair works. Any minor repairs will be
taken-up by the Prison Superintendent with the approval of the DG Prisons.
4.3 Budgeting and tracking of expenditure
Budgeting and tracking of funds along with the expenditure incurred for works is carried at the state level by the
office of the IG Prisons, RSRDCC and PWD. If there is any change/revision to the estimates, the same is conveyed to
the office of the IG Prisons and their approval is taken by RSRDCC/PWD. For any works/minor changes requested by
the Prison Superintendent during the implementation, approval is taken from the DG Prisons and RSRDCC/PWD.
4.4 Quality Control
Quality control during the course of implementation of this scheme is undertaken by the Quality Control
Departments of the RSRDCC/PWD and Vigilance Cell of the State Government. Also, office of the Inspector General
Prisons monitors the works progress every month. Superintendents of the respective prisons give feedback to the DG
prisons on the progress of the work. Also, monthly review of works progress takes place at the head office during the
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 19 of 33
work’s meetings.
4.5 Performance of the State
Following graphs show the performance of the prisons visited before and after implementation of the scheme in Rajasthan.
Prisoners per toilet during day time and night time in various prisons in Rajasthan
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 20 of 33
Prisoners per bathroom in various prisons in Rajasthan
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 21 of 33
Vacancies in various prisons in Rajasthan
The table below indicates the implementation of the scheme in different categories of jails under the four
components: (Please refer Annexure for detail information on scoring)
Type of jail Parameter Degree of
implementation Degree of
responsiveness Score
Central Jail, Bikaner
Construction of new jails 73 80 74.40
Staff quarters 65 75 67.00
Sanitation & water supply 66.67 75 68.34
Total score 69.91
Central Jail, Bharatpur
Expansion & renovation of
existing jails
64
75 66.20
Staff quarters 66.67 70 67.34
Sanitation & water supply 61.67 70 63.34
Total score 65.62
District Jail, Dausa
Construction of new jails 61 70 62.80
Staff quarters 65 65 65.00
Sanitation & water supply 65 70 66.00
Total score 64.60
Sub Jail, Bandikui
Construction of new jails 63.33 70 64.66
Staff quarters 63.33 65 63.66
Sanitation & water supply 66.67 70 67.34
Total score 65.22
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 22 of 33
Parameter wise performance Score
Construction of new jails 67.29
Expansion & renovation of existing jails 66.20
Staff quarters 65.75
Sanitation & water supply 66.25
Overall 66.37
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 23 of 33
4.6 Suggestions
Project
Management &
Operational
Aspects
Area Suggestions
Fund flow & quality Mechanism to be designed to monitor fund flow from the treasury
department to the implementing agency.
Option of releasing fund directly to the implementing agency can be
weighed or a special agency can be formed for implementing the scheme.
Conference of DGs (Prisons) should be held at regular intervals on the
lines of the DGs (Police) conference.
An Independent Agency to monitor quality of construction and utilization
of funds for prison modernization.
Staff All vacant staff positions should be reassessed according to requirements
Requirement for resident doctors, nurses and correctional staff in these
jails.
Recruitment of staff including medical, correctional and clerical.
Infrastructure Appropriate assessment to be done by the State before taking up repair
works in old prisons. Reconstruction of jails may sometime prove to be
more economical option.
Additional barracks are needed to replace the old and dilapidated ones in
Bharatpur.
Additional toilets and bathrooms to replace some of the existing old
toilets, which are beyond repair in Bharatpur. Presently, toilet to inmate
ratio in women enclosure is 1:20 (night) and ratio of bathroom to prisoner
for men is 1:25 in Bharatpur.
Quarters for Superintendent, officers, staff and other support staff such as
UDC, LDC, etc depending up on their grade and designation.
Drainage facilities, lighting, electrical fittings, plumbing, etc in the newly
constructed jail buildings and staff quarters need improvement.
Provisions of garage, safety grills, compound wall, etc are needed in the
newly built staff quarters.
Hospitals in the prisons need attention with provision of necessary
equipment, labs, ambulance, etc.
Funding and monitoring mechanism to be created for appropriate
utilization and maintenance of the assets created under the Scheme.
Alternative sources of energy such as solar energy should be used in the
prisons.
Waste water recycling and solid waste management system to reuse
treated water and convert solid waste into manure for agricultural uses in
the jail.
Improvement of personnel hygiene with regular supply of bathing soap,
detergent, toothpaste, oil, etc and adequate supply of shaving kits and
blades to jail barbers.
Vehicles to the prisons at Bharatpur, Dausa and Bandikui.
Technological improvements to the prisons such as CCTVs, video
conferencing facilities, communication equipment, etc
Improvement of diet to the prisoner’s especially pregnant women and
women with children on consultation with a dietician.
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 24 of 33
Training Training to staff in correctional measures and physical fitness
Involving NGOs and other non-profit organizations for educating the
prisoners
Vocational courses such as weaving, tailoring, plumbing, electrification,
etc are needed for the inmates.
Adequate rehabilitative schemes with the help of NGOs should be
introduced for the convicts who are released from the prisons after
undergoing imprisonment for five years or more.
Increase in daily wages to the convict prisoners and provision for utilizing
the services of under trail prisoners as well.
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 25 of 33
5 Annexure
Assessment of Prisons
Type of Prison Central Prison
Location Bikaner
1 Construction of New Jails
SL Parameters Evaluation Max
Score Marking scheme Comments
1.1 Mechanisms for Planning, Estimation and Monitoring 7 10
Establishment of a PMU In place
1.2 Quality of construction of barracks 8 10
Civil works Electrical works Ventilation Flooring Finishing
RCC framed structure with standard electrical fittings and flooring with mosaic/kota stone.
1.3
Quality of construction of Common areas bathrooms/toilets, kitchen, stores, visiting rooms etc. 8 10
Civil works Electrical works Ventilation Flooring Finishing
RCC framed structure with standard electrical fittings and flooring with tiles.
1.4 Cost effectiveness of construction. 8 10
Per square foot cost. Delays? Rs 1081
1.5
Level to which overcrowding has been addressed. (benefits, living conditions) 8 10
Ratio of barrack capacity to inmate strength Ratio of no of toilets to inmate strength
Toilet to prisoner ratio with in the permitted standard of 1:6 during day time and 1:10 during night time.
1.6
Level of Utilization of facilities, Responsiveness and adequacy of Maintenance requirements 7 10
Extent of Utilization of new construction Responsiveness of Authorities to maintenance Adequacy/Quality of maintenance
Maintenance provisions need improvements
1.7 Adequacy of facilities for women inmates at the prison 7 10
Availability of separate kitchen Crèche Facilities for pregnant women Crèche not available
1.8 Adequacy of Medical/Hospital facilities at the prison 7 10
Availability of hospital Availability of full time Staff Medical Staff to inmate ratio No of beds available Availability of ambulance
No female nurse and separate facilities for women in hospital. Number of required beds are 50 as against 10 provided now.
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 26 of 33
1.9 Adequacy of Staff at the prison 5 10
Staff to inmate ratio Vacancies to be filled
1:8. Shortage of staff. 84 vacant posts.
1.10 Adequacy of necessary facilities/items at the prison 8 10
Vehicles Furniture Kitchen items Recreational items Library
The prison has library, auditorium, games, etc
73
2 Construction of Staff Quarters
SL Parameters Evaluation Max
Score Marking scheme Comments
2.1 Mechanisms for Planning, Estimation and Monitoring 7 10
Establishment of a PMU In place
2.2 Overall Quality of construction of the quarters 7 10
Civil works Electrical works Ventilation Flooring Finishing
RCC framed structure with standard electrical fittings and flooring with mosaic/kota stone for warder’s quarters and tiles for officer’s quarters.
2.3 Cost effectiveness of construction. 7 10
Per square foot cost. Delays? Rs 700
2.4 User experience in terms of quality of living 7 10 User feedback Satisfied
2.5 Responsiveness and adequacy of Maintenance requirements 5 10
Responsiveness of Authorities to maintenance Adequacy/Quality of maintenance
Maintenance provisions need improvement
2.6
Adequacy of number of quarters allotted as per the scheme 6 10
No of quarters to Staff ratio Requirements for quarters
Shortage of staff quarters for Dy Superintendent, technical staff, nurse, etc
39 60 65/100
3 Sanitation & Water Supply in Prison
SL Parameters Evaluation Max
Score Marking scheme Comments
3.1 Quality of water supply system 6 10 135 LPCD Less than 100LPCD
3.2 Cost effectiveness of construction. 7 10
3.3 Cleanliness of barracks & bathrooms/toilets 7 10
Hygiene conditions. Cleanliness Properly maintained
3.4
Adequacy of number of toilets to the actual number of prisoners 8 10
Toilet to inmate ratio
With in the standard of 1:10 during night time and 1:6 during day time
3.5 Adequacy of septic tank/sewerage system 6 10
Septic tank condition Sewerage?
Open sewerage. Need improvement.
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 27 of 33
3.6 Health conditions at the prison 6 10
Frequency of diseases Segregation of sick inmates
Need improvement, especially women nursing staff and facilities for women
40 60 66.67/100
Assessment of Prisons
Type of Prison Central Prison
Location Bharatpur
1 Repair/Renovation of Existing Jails
SL Parameters Evaluation Max
Score Marking scheme Comments
1.1 Mechanisms for Planning, Estimation and Monitoring 7 10
Establishment of a PMU In place
1.2 Quality of construction of barracks 6 10
Civil works Electrical works Ventilation Flooring Finishing
Need further improvement
1.3
Quality of construction of Common areas bathrooms/toilets, kitchen, stores, visiting rooms etc. 6 10
Civil works Electrical works Ventilation Flooring Finishing
Need further improvements to replace dilapidated structures especially toilets, kitchen sheds, etc
1.4 Cost effectiveness of construction. 7 10
Per square foot cost. Delays?
1.5
Level to which overcrowding has been addressed. (benefits, living conditions) 7 10
Ratio of barrack capacity to inmate strength Ratio of no of toilets to inmate strength
Need improvements to replace old ones
1.6
Level of Utilization of facilities, Responsiveness and adequacy of Maintenance requirements 6 10
Extent of Utilization of new construction. Responsiveness of Authorities to maintenance. Adequacy/Quality of maintenance
Maintenance provisions need improvement
1.7 Adequacy of facilities for women inmates at the prison 6 10
Availability of separate kitchen Crèche Facilities for pregnant women
Need further improvements and crèche
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 28 of 33
1.8 Adequacy of Medical/Hospital facilities at the prison 6 10
Availability of hospital Availability of full time Staff Medical Staff to inmate ratio No of beds available Availability of ambulance
Need improvements such as equipment and furniture
1.9 Adequacy of Staff at the prison 6 10
Staff to inmate ratio Vacancies to be filled Staff shortage of 41.
1.10 Adequacy of necessary facilities/items at the prison 7 10
Vehicles Furniture Kitchen items Recreational items Library
Need vehicle, furniture, etc
64
2 Construction of Staff Quarters
SL Parameters Evaluation Max
Score Marking scheme Comments
2.1 Mechanisms for Planning, Estimation and Monitoring 7 10
Establishment of a PMU In place
2.2 Overall Quality of construction of the quarters 7 10
Civil works Electrical works Ventilation Flooring Finishing
RCC framed structure with standard electrical fittings. Flooring is with mosaic.
2.3 Cost effectiveness of construction. 7 10
Per square foot cost. Delays?
2.4 User experience in terms of quality of living 7 10 User feedback Satisfied
2.5 Responsiveness and adequacy of Maintenance requirements 6 10
Responsiveness of Authorities to maintenance Adequacy/Quality of maintenance
Maintenance provisions need improvement
2.6
Adequacy of number of quarters allotted as per the scheme 6 10
No of quarters to Staff ratio Requirements for quarters
Additional 31 staff quarters are needed. Some of the existing quarters are in a dilapidated stage.
40 60 66.67
3 Sanitation & Water Supply in Prison
SL Parameters Evaluation Max
Score Marking scheme Comments
3.1 Quality of water supply system 5 10 135 LPCD Less than 70 LPCD
3.2 Cost effectiveness of construction. 6 10
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 29 of 33
3.3 Cleanliness of barracks & bathrooms/toilets 6 10
Hygiene conditions. Cleanliness Need improvements
3.4
Adequacy of number of toilets to the actual number of prisoners 7 10
Toilet to inmate ratio No of toilets not in order
Only one toilet during night time for women i.e. 1:20 ratio and bathrooms for men 1:25 as against 1:10
3.5 Adequacy of septic tank/sewerage system 6 10
Septic tank condition Sewerage? Need improvements
3.6 Health conditions at the prison 7 10
Frequency of diseases Segregation of sick inmates Need improvements
37 61.67
Assessment of Prisons
Type of Prison District Prison
Location Dausa
1 Construction of New Jails
SL Parameters Evaluation Max
Score Marking scheme Comments
1.1 Mechanisms for Planning, Estimation and Monitoring 7 10
Establishment of a PMU In place
1.2 Quality of construction of barracks 7 10
Civil works Electrical works Ventilation Flooring Finishing
RCC framed structure with standard electrical fittings and flooring with mosaic/kota stone.
1.3
Quality of construction of Common areas bathrooms/toilets, kitchen, stores, visiting rooms etc. 6 10
Civil works Electrical works Ventilation Flooring Finishing
RCC framed structure with standard electrical fittings and flooring with tiles.
1.4 Cost effectiveness of construction. 7 10
Per square foot cost. Delays? Rs 1000
1.5
Level to which overcrowding has been addressed. (benefits, living conditions) 8 10
Ratio of barrack capacity to inmate strength Ratio of no of toilets to inmate strength Only 53% utilization
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 30 of 33
1.6
Level of Utilization of facilities, Responsiveness and adequacy of Maintenance requirements 5 10
Extent of Utilization of new construction Responsiveness of Authorities to maintenance Adequacy/Quality of maintenance Only 53% utilization
1.7 Adequacy of facilities for women inmates at the prison 4 10
Availability of separate kitchen Crèche Facilities for pregnant women
No crèche in the prison and no facilities for pregnant women.
1.8 Adequacy of Medical/Hospital facilities at the prison 5 10
Availability of hospital Availability of full time Staff Medical Staff to inmate ratio No of beds available Availability of ambulance
No separate facilities and no women medical staff.
1.9 Adequacy of Staff at the prison 7 10
Staff to inmate ratio Vacancies to be filled
Need more staff for full utilization of the prison.
1.10 Adequacy of necessary facilities/items at the prison 5 10
Vehicles Furniture Kitchen items Recreational items Library
Need vehicle, equipment, library, etc
61
2 Construction of Staff Quarters
SL Parameters Evaluation Max
Score Marking scheme Comments
2.1 Mechanisms for Planning, Estimation and Monitoring 7 10
Establishment of a PMU In place
2.2 Overall Quality of construction of the quarters 6 10
Civil works Electrical works Ventilation Flooring Finishing
RCC framed structure with standard electrical fittings and flooring with mosaic/kota stone.
2.3 Cost effectiveness of construction. 7 10
Per square foot cost. Delays?
2.4 User experience in terms of quality of living 6 10 User feedback Not satisfied.
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 31 of 33
2.5 Responsiveness and adequacy of Maintenance requirements 5 10
Responsiveness of Authorities to maintenance Adequacy/Quality of maintenance
Maintenance provisions need improvement.
2.6
Adequacy of number of quarters allotted as per the scheme 8 10
No of quarters to Staff ratio Requirements for quarters
No shortage of staff quarters
39 65/100
3 Sanitation & Water Supply in Prison
SL Parameters Evaluation Max
Score Marking scheme Comments
3.1 Quality of water supply system 7 10 135 LPCD 100-135 LPCD
3.2 Cost effectiveness of construction. 7 10
3.3 Cleanliness of barracks & bathrooms/toilets 5 10
Hygiene conditions. Cleanliness Need improvements
3.4
Adequacy of number of toilets to the actual number of prisoners 7 10
Toilet to inmate ratio No of toilets not in order
With in the standard of 1:6 during day time and 1:10 during night time
3.5 Adequacy of septic tank/sewerage system 6 10
Septic tank condition Sewerage?
Open sewerage. Need improvement.
3.6 Health conditions at the prison 7 10
Frequency of diseases Segregation of sick inmates
Need improved medical facilities
39 65/100
Assessment of Prisons Type of Prison Sub Prison
Location Bandikui
1 Construction of New Jails
SL Parameters Evaluation Max
Score Marking scheme Comments
1.1 Mechanisms for Planning, Estimation and Monitoring 7 10
Establishment of a PMU In place
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 32 of 33
1.2 Quality of construction of barracks 7 10
Civil works Electrical works Ventilation Flooring Finishing
RCC framed structure with standard electrical fittings and flooring with mosaic/kota stone.
1.3
Quality of construction of Common areas bathrooms/toilets, kitchen, stores, visiting rooms etc. 7 10
Civil works Electrical works Ventilation Flooring Finishing
RCC framed structure with standard electrical fittings and flooring with tiles.
1.4 Cost effectiveness of construction. 7 10
Per square foot cost. Delays? Rs 1128
1.5
Level to which overcrowding has been addressed. (benefits, living conditions) 8 10
Ratio of barrack capacity to inmate strength Ratio of no of toilets to inmate strength
No overcrowding. Toilet to staff ratio with in the standard of 1:10 during night and 1:6 during day hours
1.6
Level of Utilization of facilities, Responsiveness and adequacy of Maintenance requirements 6 10
Extent of Utilization of new construction Responsiveness of Authorities to maintenance Adequacy/Quality of maintenance
Maintenance provisions need improvement
1.7 Adequacy of facilities for women inmates at the prison 0 NA
Availability of separate kitchen Crèche Facilities for pregnant women Not available
1.8 Adequacy of Medical/Hospital facilities at the prison 5 10
Availability of hospital Availability of full time Staff Medical Staff to inmate ratio No of beds available Availability of ambulance
Beds not available. Only visiting staff and no permanent doctor.
1.9 Adequacy of Staff at the prison 5 10
Staff to inmate ratio Vacancies to be filled Shortage of staff
1.10 Adequacy of necessary facilities/items at the prison 5 10
Vehicles Furniture Kitchen items Recreational items Library
Need furniture, equipment, vehicle, etc
57 63.33/100
2 Construction of Staff Quarters
SL Parameters Evaluation Max
Score Marking scheme Comments
2.1 Mechanisms for Planning, Estimation and Monitoring 7 10
Establishment of a PMU In place
MMiidd TTeerrmm EEvvaalluuaattiioonn ooff tthhee SScchheemmee oonn MMooddeerrnniizzaattiioonn ooff PPrriissoonnss –– RRaajjaasstthhaann
Private and Confidential Page 33 of 33
2.2 Overall Quality of construction of the quarters 7 10
Civil works Electrical works Ventilation Flooring Finishing
RCC framed structure with standard electrical fittings and flooring with mosaic/kota stone.
2.3 Cost effectiveness of construction. 6 10
Per square foot cost. Delays? Rs 600
2.4 User experience in terms of quality of living 7 10 User feedback
Satisfied, but need improvements.
2.5 Responsiveness and adequacy of Maintenance requirements 5 10
Responsiveness of Authorities to maintenance Adequacy/Quality of maintenance
Maintenance provisions need improvement.
2.6
Adequacy of number of quarters allotted as per the scheme 6 10
No of quarters to Staff ratio Requirements for quarters
Requirement for three additional staff
38 63.33/100
3 Sanitation & water supply in Prison
SL Parameters Evaluation Max
Score Marking scheme Comments
3.1 Quality of water supply system 7 10 135 LPCD 100-135 LPCD
3.2 Cost effectiveness of construction. 7 10
3.3 Cleanliness of barracks & bathrooms/toilets 7 10
Hygiene conditions. Cleanliness Need improvements
3.4
Adequacy of number of toilets to the actual number of prisoners 7 10
Toilet to inmate ratio No of toilets not in order
With in the standard of 1:10 during night time and 1:6 during day time
3.5 Adequacy of septic tank/sewerage system 5 10
Septic tank condition Sewerage?
Need improvements to sewerage and drainage
3.6 Health conditions at the prison 7 10
Frequency of diseases Segregation of sick inmates
Need improved facilities such as beds, furniture and equipment.
40 66.67/100