Ⅰ. Introduction of Samcheok Green Power

Project Name : Samcheok Green Power Unit 1,2

Location : East Coast of Korea

Construction for the Samcheok Green Power

호산항

작진항

Area : about 2.6million m2 (Land 1.6million m2 + Sea 1million

Before construction

Under construction

Capacity : 2,000MW (1,000MW × 2units)

Fuel : Coal (Subbituminous Coal & Biomass co-firing)

Generation Quantity : 15,768 GWh/year (at 90% availability)

Major Equipment

- Main Equipment

(The World`s First Supercritical CFBC Boiler & Turbine 2:1

Configuration)

Boiler

: Supercritical, CFBC

: Manufacturer - Foster Wheeler

Turbine Generator

: Tandem Compound, Reheat,

Condensing Turbine

: Manufacturer – Toshiba

- B.O.P : Mech. 20 Package + I&C 13 Package

Gen. 1,000MW

CFBC Boiler

500MW

CFBC Boiler

500MW

Construction for the Samcheok Green Power

Aerial View of Samcheok Green Power

Unit1 Boiler

Coal Shed

Unit1 Turbine

Control Room with Stack

Coal Unloading Dock

Biomass Equip.

SNG Equip.

3rd Fuel Unloading Dock

Small Hydro Power Equip.

Unit2 Boiler

Unit2 Turbine

Construction Milestones

2009. 8 Planning

2011. 1 Start site grading

2012. 5 Constuction Permit

2012. 6 Excavation

2013. 8 Start pressure part installation

2014. 6 Power receiving

2015. 1 Initial firing

2015.12 Unit 1 COD (43 months from excavation)

2016. 6 Unit 2 COD (49 months from excavation)

Ⅱ. Samcheok CFBC Boiler

Samcheok Green Power Conditions

Samcheok CFBC Boiler

Outlet Steam Condition

- Flow ton/h 1,572 / 1,296

- Pressure bar 255.5 / 52.8

- Temperature deg.C 603 / 603

Fuel Range

Design Range

HHV (af) Kcal/kg 4,250 Min. 3,750

Moisture (af) % 33.5 Min. 43

Ash (ad) % 4.5 1.21~17

Sulfur (ad) % 0.1 Max 1.0

Configuration of Boiler

Samcheok CFBC Boiler

Benson type

Vertical tube furnace

8 Cyclones per boiler

INTREX Heat Exchanger

- 4ea S/H and 4ea R/H

Regenerative air pre-

heater

8 Coal silos and 1 Bio-

mass silo

Cyclone Arrangement

Samcheok CFBC Boiler

Steam Cooled type

Compact type

Refractory

8 Cyclones per boiler

Economizer system

Evaporator system

Superheater system

Reheater system

Steam system

Comparison Table

Plant Condition & Fuel Comparison

Division PC Power Plant

(Example) (500MW)

Lagisza Power Plant

(460MW)

Samcheok Green Power

(500MW)

Steam

Condition

<@BMCR>

Flow (SH/RH)

Pr.(SH/RH)

Temp.(SH/RH)

1,605/1,281 t/h

255/53.78 bar

569/596 ℃

1,300/1,102 t/h

275/55 bar

560/580 ℃

1,572/1,296 t/h

255.5/52.8 bar

603/603 ℃

Environment

Condition

Sox

Nox

Dust

40 ppm

50 ppm

15 ppm

69.9 ppm

97.3 ppm

30 [mg/Nm3]

50 ppm

50 ppm

15 ppm

Design Coal

Analysis

Heating Value

Total Moisture

Ash

Sulfur

6,080

kcal/kg(HHV)

10 %(AF)

15 %(AD)

0.72 %(AR)

5,015

kcal/kg(HHV)

12 %(AF)

26.1 %(AD)

1.2 %(AF)

4,250 kcal/kg(HHV)

33.5 %(AF)

4.5 %(AD)

0.1 %(AF)

Biomass

Analysis

Heating Value

Total Moisture

Ash

N/A

2268.6

kcal/kg(LHV)

45 %

1.3 %

3773.04

kcal/kg(LHV)

5~15 %

0.7~16.2 %

Plant Configuration (2:1) : Overcome the 500MW capacity limitation

World’s 1st 2:1 combined Once Through SC CFB power plant

1,000MW Toshiba 48 inch LSB Turbine

CFBC Boiler 500MW

Generator 1,000MW

CFBC Boiler

500MW

CFBC Boiler 500MW

Generator 1,000MW

CFBC Boiler

500MW

Unit 1 Unit 2

Environmental Equipment - Reduction of Foot Print

Past Power Plant

SCR

Wet FGD

PC Boiler Stack Gypsum

Samcheok Green Power

FGD removed

CFBC Boiler

E.P

Stack

SOx : 40ppm NOx : 50ppm Dust : 15ppm

SOx : 50ppm NOx : 50ppm Dust : 15ppm

<Eco. Outlet> SOx : 1,000 ppm NOx : 180 ppm

<Eco. Outlet> SOx : 50 ppm NOx : 175 ppm

E.P

SCR

Ⅲ. Eco-Friendly Power Plant

Coal Stock Yard Ash Pond Stack

Not In My Back Yard

NIMBY

Control Room Office Restaurant Viewing Deck

Eco-Friendly Multi Complex Office Using Stack

New Concept

3 No Power Plant

No Outdoor Coal Stock Yard

No Discharge

No Ash Pond

• No Visible Coal Storage • Ash Recycling • Waste Water RECYCLE

Plant Site with Non-visible Coal Storage

Samcheok Green Power

A.B.C(Air-supported B.C.) & Underground Conveyer

Coal is transferred by air slides

Outdoor Conveyer

Existing Power Plant

Complex spider web of conveyors

Non-efficient land use

Plant Site with Non-visible Coal Storage

Environmentally Unfriendly Disposal of Ash Waste

No Ash Pond

Existing Power Plant

No Ash Pond

Ash handling system

100% recycling

- Using bottom ash for light aggregate, fly ash for cement

- Remaining ash will be used for mine back fill

- No need for an ash pond

Fly Ash Bottom Ash

Cement Material

ESP

CFBC Boiler Stack

Producing light aggregate -> selling as a construction material

Mine Back fill

Abandoned Mine

Abandoned Mine Backfill by Ash

Water Supply : A New Idea

Samcheok

Choice 1. Recirculation of retention basin discharge

Choice 2. Seawater desalination

Water supply

Water pond Underground Channel

Plant

Sea

Desalination

Facility

Storage

Tank Plant

Existing

Expensive, Impact on environment and civil issues

New Dam Construction

Intake from new dam or existing dam

Existing Plant Samcheok

Dam

Dumped into the sea

Treated Water

Waste Water

Discharge

: about 900 tons/day

Retention Desalination Rain water

Treated Water

Waste Water

Water & Waste Water Treatment : No Waste Water Discharge

Zero discharge by closed loop system of

water & waste water treatment system

Ⅳ. Clean Energy Production

1. SNG

KOSPO operates a number of CCPP

Hard to introduce LNG directly

Coal gasification as an alternative fuel

Coal gasification using low grade coal

Keep in LNG storage tank &

use for CCPP alternative fuel

SNG

2. Small Hydro-power

Using discharge

Capacity : 5,500 kW (1,375kW x 4

Units)

Type : Kaplan

Ⅴ. Status of Construction Work

1. Status of Construction Work

Air Photograph of Samcheok Green Power (`2013. 7)

Air Photograph of Samcheok Green Power (Sep. 2013)

Sea Water Disch.

#1,2 BLR

EP

Switch yard

Stack and Control BLDG.

Construction Office

3rd Fuel Unloading Dock

Carrying Spot

Carrying Spot

Construction Photographs

1. Status of Construction Work

Construction Photographs

1. Status of Construction Work

Construction Photographs

1. Status of Construction Work

Samcheok |Multi-stage Ground Elevation

Existing Plant |Flat Ground Elevation

Reduce earthwork volume 700 million m3

[Save $83 million]

150m

[Save $42 million]

60m

90m

Site Formation : Reduction of earthwork volume with a multi-stage site grading plan

Samcheok [Both Side Access : 1 Pier Required]

Existing [One Side Access : 2 Piers

Required]

Unloading Dock : Both Side Access

Length of Jetty : 1,4OO m

Length of Jetty : 900 m