PROPOSED DESIGN, CONSTRUCTION AND COMPLETION

OF 548 UNITS GOVERNMENT APARTMENTS AT

PARCEL 17 RM4 PRECINCT 17, PUTRAJAYA

PROGRESS REPORT ON 28 JUNE 2009 – 31.26 Actual / 31.34 Target

Surau 1 Storey

LAYOUT PLAN

Block E

Block D

Block C

Block B

Dewan 2 Storey

Car Park 1

Car Park 3

Car Park 2

Block A

IBS: IBS: PROJECT COMPONENTSPROJECT COMPONENTSIBS: IBS: PROJECT COMPONENTSPROJECT COMPONENTS

Page 4

C 19 122

B 19 122

BLOCKS STOREYSUNITS

D 18 115E 16 74

TOTAL 548

Others: Car Parks 3 nos.(660 parking bays)

Substations 3 nos. Landscape Infrastructures

BLOCK A

BLOCK E

BLOCK D

BLOCK C

BLOCK B

DEWANSURAU

PERSPECTIVE

NA 18 115

IBS: IBS: CONSTRUCTION ELEMENTSCONSTRUCTION ELEMENTSIBS: IBS: CONSTRUCTION ELEMENTSCONSTRUCTION ELEMENTS

Page 5

PRECASTAPARTMENTS• 2nd Floor to 17th Floor• Structural precast walls• Precast hollowcore slab• Non-structural precast wall panels• Precast staircases• Blockwork infill wall

CAST-IN-SITUAMENITIES AND M&E ROOMS• Ground and first floor• Cast-in situ 250mm thk rc shear

wall • Blockwork infill• 2nd Floor• Cast-in situ slab

Precast

Cast-in Situ

IBS: IBS: TYPICAL FLOOR LAYOUTTYPICAL FLOOR LAYOUTIBS: IBS: TYPICAL FLOOR LAYOUTTYPICAL FLOOR LAYOUT

Page 6

Page 7

(Cont’d)IBS: IBS: TYPICAL UNITTYPICAL UNITIBS: IBS: TYPICAL UNITTYPICAL UNIT

Unit Size -9.0m X 14.4m (1,200 sqf) 3 Bedrooms• Master Bedroom (4.2m x 5.4m) 1 Living room (4.2m x 9.0m)1 Kitchen (4.2m X 3.5m)1 Store (1.3m x 1.5m)2 BathroomsDry Yard

Page 8

IBS: IBS: CASTING SECTION (Hollow Core Panel)CASTING SECTION (Hollow Core Panel)IBS: IBS: CASTING SECTION (Hollow Core Panel)CASTING SECTION (Hollow Core Panel)

Page 9

IBS: IBS: CASTING SECTION (Other Precast Panel)CASTING SECTION (Other Precast Panel)IBS: IBS: CASTING SECTION (Other Precast Panel)CASTING SECTION (Other Precast Panel)

Page 10

(Cont’d)IBS: IBS: CASTING SECTION (Quality Assurance and Control)CASTING SECTION (Quality Assurance and Control)IBS: IBS: CASTING SECTION (Quality Assurance and Control)CASTING SECTION (Quality Assurance and Control)

Page 11

(Cont’d)IBS: IBS: DELIVERY SECTION DELIVERY SECTION IBS: IBS: DELIVERY SECTION DELIVERY SECTION

Page 12

(Cont’d)IBS: IBS: INSTALLATION SECTIONINSTALLATION SECTIONIBS: IBS: INSTALLATION SECTIONINSTALLATION SECTION

Page 13

(Cont’d)IBS: IBS: Construction of Joints and SupportConstruction of Joints and SupportIBS: IBS: Construction of Joints and SupportConstruction of Joints and Support

Overall progress on 28 June 2009

Block E on 28 June 2009

(Cont’d)IBS: IBS: Progress PhotosProgress PhotosIBS: IBS: Progress PhotosProgress Photos

(Cont’d)IBS: IBS: Progress PhotosProgress PhotosIBS: IBS: Progress PhotosProgress Photos

Block D on 28 June 2009

Block C on 28 June 2009

(Cont’d)IBS: IBS: Progress PhotosProgress PhotosIBS: IBS: Progress PhotosProgress Photos

Block B on 28 June 2009

Block A on 28 June 2009

(Cont’d)IBS: IBS: Progress PhotosProgress PhotosIBS: IBS: Progress PhotosProgress Photos

Page 18

(Cont’d)IBS: IBS: MOCK-UP UNITMOCK-UP UNITIBS: IBS: MOCK-UP UNITMOCK-UP UNIT