PROGRESS REPORT ON 28 JUNE 2009 – 31.26 Actual / 31.34 Target
Surau 1 Storey
LAYOUT PLAN
Block E
Block D
Block C
Block B
Dewan 2 Storey
Car Park 1
Car Park 3
Car Park 2
Block A
IBS: IBS: PROJECT COMPONENTSPROJECT COMPONENTSIBS: IBS: PROJECT COMPONENTSPROJECT COMPONENTS
Page 4
C 19 122
B 19 122
BLOCKS STOREYSUNITS
D 18 115E 16 74
TOTAL 548
Others: Car Parks 3 nos.(660 parking bays)
Substations 3 nos. Landscape Infrastructures
BLOCK A
BLOCK E
BLOCK D
BLOCK C
BLOCK B
DEWANSURAU
PERSPECTIVE
NA 18 115
IBS: IBS: CONSTRUCTION ELEMENTSCONSTRUCTION ELEMENTSIBS: IBS: CONSTRUCTION ELEMENTSCONSTRUCTION ELEMENTS
Page 5
PRECASTAPARTMENTS• 2nd Floor to 17th Floor• Structural precast walls• Precast hollowcore slab• Non-structural precast wall panels• Precast staircases• Blockwork infill wall
CAST-IN-SITUAMENITIES AND M&E ROOMS• Ground and first floor• Cast-in situ 250mm thk rc shear
wall • Blockwork infill• 2nd Floor• Cast-in situ slab
Precast
Cast-in Situ
IBS: IBS: TYPICAL FLOOR LAYOUTTYPICAL FLOOR LAYOUTIBS: IBS: TYPICAL FLOOR LAYOUTTYPICAL FLOOR LAYOUT
Page 6
Page 7
(Cont’d)IBS: IBS: TYPICAL UNITTYPICAL UNITIBS: IBS: TYPICAL UNITTYPICAL UNIT
Unit Size -9.0m X 14.4m (1,200 sqf) 3 Bedrooms• Master Bedroom (4.2m x 5.4m) 1 Living room (4.2m x 9.0m)1 Kitchen (4.2m X 3.5m)1 Store (1.3m x 1.5m)2 BathroomsDry Yard
Page 8
IBS: IBS: CASTING SECTION (Hollow Core Panel)CASTING SECTION (Hollow Core Panel)IBS: IBS: CASTING SECTION (Hollow Core Panel)CASTING SECTION (Hollow Core Panel)
Page 9
IBS: IBS: CASTING SECTION (Other Precast Panel)CASTING SECTION (Other Precast Panel)IBS: IBS: CASTING SECTION (Other Precast Panel)CASTING SECTION (Other Precast Panel)
Page 10
(Cont’d)IBS: IBS: CASTING SECTION (Quality Assurance and Control)CASTING SECTION (Quality Assurance and Control)IBS: IBS: CASTING SECTION (Quality Assurance and Control)CASTING SECTION (Quality Assurance and Control)
Page 11
(Cont’d)IBS: IBS: DELIVERY SECTION DELIVERY SECTION IBS: IBS: DELIVERY SECTION DELIVERY SECTION
Page 12
(Cont’d)IBS: IBS: INSTALLATION SECTIONINSTALLATION SECTIONIBS: IBS: INSTALLATION SECTIONINSTALLATION SECTION
Page 13
(Cont’d)IBS: IBS: Construction of Joints and SupportConstruction of Joints and SupportIBS: IBS: Construction of Joints and SupportConstruction of Joints and Support
Overall progress on 28 June 2009
Block E on 28 June 2009
(Cont’d)IBS: IBS: Progress PhotosProgress PhotosIBS: IBS: Progress PhotosProgress Photos
(Cont’d)IBS: IBS: Progress PhotosProgress PhotosIBS: IBS: Progress PhotosProgress Photos
Block D on 28 June 2009
Block C on 28 June 2009
(Cont’d)IBS: IBS: Progress PhotosProgress PhotosIBS: IBS: Progress PhotosProgress Photos
Block B on 28 June 2009
Block A on 28 June 2009
(Cont’d)IBS: IBS: Progress PhotosProgress PhotosIBS: IBS: Progress PhotosProgress Photos
Page 18
(Cont’d)IBS: IBS: MOCK-UP UNITMOCK-UP UNITIBS: IBS: MOCK-UP UNITMOCK-UP UNIT