47th apec energy working group meeting
Post on 11-Jan-2016
54 Views
Preview:
DESCRIPTION
TRANSCRIPT
Report on Progress of APEC Low-Carbon Report on Progress of APEC Low-Carbon
Model Town Task force Model Town Task force
47th APEC Energy Working Group Meeting47th APEC Energy Working Group Meeting
May 2014May 2014
Shobu NagataniShobu NagataniAgency for Natural Resources and Agency for Natural Resources and
EnergyEnergyMETI, JapanMETI, Japan
Agenda Item 8b
1.1. APEC LCMT Task Force MeetingAPEC LCMT Task Force Meeting
2.2. Overview of the APEC Low Carbon Model Overview of the APEC Low Carbon Model
TownTown (LCMT) Project(LCMT) Project
3.3. Summary of the LCMT Phase 3 ProjectSummary of the LCMT Phase 3 Project
4.4. Progress of the LCMT Phase 4 ProjectProgress of the LCMT Phase 4 Project
5.5. Plan of Actions for 2014Plan of Actions for 2014
CONTENTSCONTENTS
2
3
1 APEC LCMT Task Force Meeting (1) 1 APEC LCMT Task Force Meeting (1)
Role of the LCMT Task Force
Develop the Concept of the Low-Carbon Town in APEC Region
Conduct Feasibility Study on selected case town
Share best practices for making low-carbon communities a
reality
9th APEC Energy Ministers’ Meeting (Fukui, Japan - 19 June, 2010)
4
1 APEC LCMT Task Force Meeting1 APEC LCMT Task Force Meeting (2) (2)
Attended: 13 Economies, Lead Shepherd, EGNRET
representative, APEC Secretariat and the APERC
Reported: Summary of APEC LCMT Phase 3 project,
Work plan of Feasibility Study for San Borja
Discussed: Progress and future plan of APEC LCT Indicator
Agreed:Plan of Action for Phase 4 project
7th APEC LCMT Task Force Meeting
(Kunming, China - 19 May 2014)
2 Overview of the APEC Low Carbon Model Town 2 Overview of the APEC Low Carbon Model Town ProjectProject
9th APEC ENERGY M INISTERIAL MEETING
June 2010 in Fukui, Japan
ENERGY WORKING GROUP
LCMT TASK FORCE
[Concept] [Policy Recommendations][F/S Report]
( I ) (Ⅱ) (Ⅲ)
5
Outcomesof LCMT Project
6
28 December 2012 Final Approval of BMC and SOM of LCMT Phase 3 project
April 2013 The suitable consultant was identified through the APEC project tender process for LCMT Phase 3 project
3-1 Summary of the LCMT Phase 3 Project - Feasibility Study - 3-1 Summary of the LCMT Phase 3 Project - Feasibility Study -
April 2013 Feasibility Study by selected consultant was started
November 2013 Progress Report was presented to LCMT Task Force members and EWG members at EWG 46
2014 Final Report on the Feasibility Study was published
Study Group A & LCMT Task ForceSite visits on low-carbon development projects in July in the USA and
Peru• To hear and visit low-carbon town cases in advanced and developing APEC
economies
• To hear existing activities on low-carbon town indicators
3-2 Summary of the LCMT Phase 3 Project - Concept (Refinement) -3-2 Summary of the LCMT Phase 3 Project - Concept (Refinement) -
7
Task Force Japan
Prepare preliminary draft
Study inclusion of indicators
“The Concept of the Low Carbon Town in APEC Region”
will be tailored for Redevelopment of existing
sites
The Refined Concept was distributed and endorsed by EWG
members
Recommendation on regulatory schemes, technical matters, etc.
Study Group B Conduct Peer Review
8
“Policy Review Report” is now distributed to EWG members
“Policy Recommendations”
Site Visit (Da Nang City, December)
Collaboration with the OECD
3-3 Summary of the LCMT Phase 3 Project - Policy Recommendations -3-3 Summary of the LCMT Phase 3 Project - Policy Recommendations -
9
http://publications.apec.org/publication-detail.php?pub_id=1521
http://publications.apec.org/publication-detail.php?pub_id=1518
3-4 Summary of the LCMT Phase 3 Project - Outcomes -3-4 Summary of the LCMT Phase 3 Project - Outcomes -
10
10 January 2014 Final Approval of BMC and SOM of LCMT Phase 4 project
May 2014 The suitable consultant was identified through the APEC project tender process for LCMT Phase 4 project
May 2014 Feasibility Study by selected consultant has been started
4-1 Progress of the LCMT Phase 4 Project - Feasibility Study - 4-1 Progress of the LCMT Phase 4 Project - Feasibility Study -
May 2014 Work Plan was proposed by the consultant at the 7th LCMT meeting
11
4-2 Progress of the LCMT Phase 4 Project - Concept (Indicator) -4-2 Progress of the LCMT Phase 4 Project - Concept (Indicator) -
Advantages of Low-Carbon Town Indicator
Simple and easy to understand LCT development
Reflect the circumstances of each economy and project characteristics
Reflect existing APEC LCMT Feasibility Study results, existing assessment indicators, and international trends
12
LCMT-TF7EWG47 EWG48
Con
cep
t of
the L
ow
-C
arb
on
Tow
n(R
efi
nem
en
t)
Policy
Recom
men
-d
ati
on
s2014
(May) (June) (July) (August) (September) (October) (November) (December)
Feasib
ilit
y
Stu
dy F/S
ReportProgres
sReport
Team Member
NominationNomination
InitialPresentatio
n
Draft Refined Concept
On-site Assessment
Team Member
NNomination
Site visits
Refined Concept
5 Plan of Actions for 20145 Plan of Actions for 2014
Agency for Natural Resources and Energy (ANRE)METI, Japan
13
May 2014Shobu Nagatani
ThankThank youyou
top related