91 PROJECT UPDATERiverside County Transportation Commission
Corona City Council Meeting
July 15, 2015
Location: Bridge 25 (SB I-15 to WB SR91 Connector) @ Abut 1 – Facing NortheastDescription: Backfill of abutment. Falsework removal ongoing.
Location: Bridge 27 (EB-91 @ W. Porphyry) – Facing WestDescription: BR-27 worksite. Column installation at Bent 4. CIDH drilling at Bent 5.
BR-27, Bent 4
BR-27, Bent 5
Location: Bridge 20 (EB SR-91) @ East Grand – Facing EastDescription: Pile cap formwork installation for BR-20, Abutment 1.
Retaining Wall Between BR-22 and BR-20
BR-22, Abut 1
BR-20, Abut 1
BR-22 Falsework
BR-20, Abut 2
Location: Bridge 21 (Main St. On-Ramp to I-15 @ East Grand), Abutment 1 & 2 – Facing WestDescription: Wall stem rebar and form installation for BR-21 Abut 1 and Abut 2.
BR-21, Abut 2
BR-21, Abut 1
Location: RW-217A (WB SR-91 Main St. Off-Ramp) – Facing WestDescription: Retaining wall stem installation along North Main Metrolink Park & Ride lot.
Location: Bridge 15 (EB SR-91 @ Buena Vista) – Facing EastDescription: Deck pour complete for BR-15. Prep for post tensioning.
Location: RW-207C (WB SR-91 Autocenter Off-Ramp) – Facing EastDescription: RW-207C stem wall complete.
Location: Bridge 10 (WB-91 Maple St. On-Ramp) – Facing WestDescription: Bridge 10 worksite along WB-91.
BR-10, Abut 1
BR-10, Bent 4L
BR-10, Bent 3
Location: RW-206B (WB SR-91) @ WB-91 Autocenter On-Ramp – Facing WestDescription: MSE panel installation.
Location: AutoCenter Dr./Serfas Club Dr., Stage 1A – Facing SouthDescription: Stage 1A traffic configuration implemented. Utility work along west side of roadway.
Location: Frontage Rd. (Between Ridgeview Terr. & Via Santiago) – Facing WestDescription: Curb & Gutter and aggregate base installed for new Frontage Rd. alignment.
Location: Frontage Rd. at Paseo Grande – Facing EastDescription: New Frontage Rd. realignment to Paseo Grande open to traffic.
Location: EB SR-91 Maple St. On-Ramp – Facing EastDescription: PCC paving along RW-109A for new EB SR-91 Maple St. on-ramp.
Location: Bridge 2 (WB 91/Green River Off-ramp) @ West Prado Rd. – Facing SouthDescription: Removal of falsework between Abutment 1 and Bent 3.
Location: Bridge 2 (WB 91/Green River Off-ramp) @ West Prado Rd. – Facing EastDescription: Falsework installed over Prado Rd. Stem/Soffit installation ongoing between Bent 4 and Abut 6.
Location: RW-200B (WB SR-91 @ Green River Rd.) – Facing WestDescription: Excavation along temp shoring for retaining wall construction.
Location: RW-200 & RW-200A (WB SR-91 @ BR-01) – Facing SouthwestDescription: MSE panel installation complete at BR-01.
Location: ROW Mitigation, EI Corona – Facing WestDescription: Structural steel installation for new building façade.
Upcoming ConstructionRIVERSIDE COUNTY TRANSPORTATION COMMISSION
• EB 91 to SB 15 Connector goes to 2 lanes – June 27• Serfas Club Squeeze 5 month (TBD) duration – June 27• Joy Street (right turn) to E. Grand for 4 months – July 22/(Aug 10)*• SB 71 to EB 91 Conn Lane & Meter 1 month closure – early-Aug*• New Frontage Road and EB Maple On-Ramp – mid-Aug*• Serfas Club EB On-Ramp 15 month closure – mid-Aug*• Serfas Club WB Off-Ramp 2 month closure – late-Aug*• NB 15 to WB 91 Connector Traffic Switch – mid-Aug*• Green River Road WB Off-Ramp Traffic Switch – Sep*
*Dates and durations subject to change
Stay ConnectedRIVERSIDE COUNTY TRANSPORTATION COMMISSION
sr91project.info
877-770-9191
@sr91project
sr91project.com
Real-time traffic updates, ie511.org
Check out our mobile website!
top related