A FLEET FACING A DEMANDING SOCIETY
International Seminar of Government & International Seminar of Government & Oil/Shipping Industry Cooperation Moving Oil/Shipping Industry Cooperation Moving
F d T thF d T th
ARNALDO ARCADIERARNALDO ARCADIERExecutive ManagerExecutive Manager
TRANSPETROTRANSPETRO
01
NOVEMBER 2009NOVEMBER 2009
Forward TogetherForward Together
TRANSPETROTRANSPETRO
PETROBRAS TRANSPORTATION AND LOGISTICS ENTERPRISEPETROBRAS TRANSPORTATION AND LOGISTICS ENTERPRISEACTIVITIES: TRANSPORTATION AND STORAGE OF CRUDE, OIL ACTIVITIES: TRANSPORTATION AND STORAGE OF CRUDE, OIL
PRODUCTS, NATURAL GAS AND BIOFUELSPRODUCTS, NATURAL GAS AND BIOFUELS
59 Million tons shipped by sea
670 Million m3 of crude, oil products and
ethanol
53 vessels53 vessels2.9 Million DWT2.9 Million DWT
02
47 Terminals47 Terminals10.3 Million m³ 10.3 Million m³
7,100 km7,100 kmOil PipelinesOil Pipelines
4,400 Km 4,400 Km Gas PipelinesGas Pipelines
TRANSPETRO SHIPPING TRANSPETRO SHIPPING
Typical Operations
03
COASTAL AND OCEAN NAVIGATIONS COASTAL AND OCEAN NAVIGATIONS –– NT PIRAJUÍNT PIRAJUÍ
04
INLAND NAVIGATION INLAND NAVIGATION –– NT NILZANT NILZA
05
OFSHORE BUNKERING OFSHORE BUNKERING –– NT MAÍSANT MAÍSA
06
2
OFFLOADING OPERATIONS WITH DP SHUTTLE TANKERSOFFLOADING OPERATIONS WITH DP SHUTTLE TANKERSNT ATAULFO ALVESNT ATAULFO ALVES
07
FSO IN SANTOS BASIN FSO IN SANTOS BASIN –– NT AVARÉNT AVARÉ
08
SHIP TO SHIPSHIP TO SHIP
09
LPG CARRIERS LPG CARRIERS –– NT GUAPORÉNT GUAPORÉ
10
PLATFORM SUPPLY VESSEL (PSV) PLATFORM SUPPLY VESSEL (PSV) –– TANGARÁTANGARÁ
11
SINGLE POINT MONOBUOY SINGLE POINT MONOBUOY –– NT BROTASNT BROTAS
12
3
FPSO/FSO OFFLOADING FPSO/FSO OFFLOADING –– OCEANIC TERMINALSOCEANIC TERMINALS
13
MARITIME INDUSTRIES CHALLENGESMARITIME INDUSTRIES CHALLENGES
Shipmanagers Shipowners
Port State Authorities
Flag State Authorities
Traders & Brokers
Maritime Terminals
IMO
Insurance Companies Classification
SocietiesShareholders Crews
Society
14
OPERATIONAL COMMITMENTSOPERATIONAL COMMITMENTS
HSE•Injury Rates Reduction •Nutrition and Physical Activities Program•Contingence Plans
SMT•Medical Prevention in Transpetro•Alcohol and Drugs Politics
15
g
Crew Management - 2300 Seamen
Training •Courses and Seminars•Cadets and Apprentices (Electricians and similars)
Key Performance Indicators
HSEHSE
HSE – Nutrition and Physical Activities Program• Started in 2006• Up to now 1500 seamen attended • Onboard visit of Nutrition and Physical Professionals• Evaluation for Glycemia, Tobacco, Overweight, Hypertension, Sedentarism• Healthy food
16
HSE – Contingency Plans - Influenza A (H1N1)• Kit for Individual Protection distributed for all the fleet• Masks, gloves, cloth protections, caps• Hygienical Behaviors Procedures• Antiviral Medicine distribution• Permanent Medical Orientation – 24 h / 7 days
COURSES AND SEMINARSCOURSES AND SEMINARS
Human Factor - 31 Courses with the participation of 539 employees
(sea and shore teams)
Risk Management - 8 Courses with the participation of 160 employees
(sea and shore teams)
17
Rating Seminars - 17 Courses with participation of 470 seamen
Onboard Training – Covering both officials and rating (average of 280 seamen per year)
FIRST WOMAN TO BE A CAPTAIN IN BRAZILIAN MARINE MERCHANTFIRST WOMAN TO BE A CAPTAIN IN BRAZILIAN MARINE MERCHANT
18
4
ONLINE FLEET POSITION CONTROL ONLINE FLEET POSITION CONTROL -- GEOABASTGEOABAST
19
ONLINE FLEET POSITION CONTROL ONLINE FLEET POSITION CONTROL -- GEOABASTGEOABAST
20
CNCO CNCO –– NATIONAL OPERATIONAL CONTROL CENTERNATIONAL OPERATIONAL CONTROL CENTER
21
BRAZILBRAZIL –– PETROBRASPETROBRAS
PROMEFFleet Modernization and
Expansion Program
22
GOVERNMENT GUIDELINESGOVERNMENT GUIDELINES
• All opportunities must be used to foster
national development and ensure the
well-being of Brazilians.
• Oil must be deployed as a tool for• Oil must be deployed as a tool for
generating jobs and incomes.
23
PROMEFPROMEF –– TRAJECTORYTRAJECTORY
PROMEFFleet Modernization and Expansion Program
24
5
SHIPPING HIGHLIGHTSSHIPPING HIGHLIGHTS
• 80% of world trade is carried on ships.
• In Brazil, trade handled by ships reaches 95%, with less than 4%
currently carried under the Brazilian flag.
• Last year, Brazil spent
US$ 16 billion on shipping andUS$ 16 billion on shipping, and
Petrobras spent US$ 2 billion
on charters.
25
SHIPBUILDING INDUSTRYSHIPBUILDING INDUSTRY
• The global portfolio reported by
shipyards is more than 8,000 vessels.
• This capacity is tightly clustered in
Korea, China and Japan.
• Investments in Shipbuilding reach
US$ 140 billion a year.
• The world’s second-largest
shipbuilder during the 1970s, Brazil
has slipped behind.
26
SHIPBUILDING INDUSTRYSHIPBUILDING INDUSTRY
27
SHIPBUILDING INDUSTRYSHIPBUILDING INDUSTRY
28
COASTLINE AND MAIN RIVERSCOASTLINE AND MAIN RIVERS
Brazil needs ships.
• 95% of its foreign trade
depends on maritime
transportation
• 8 000 km (5 000 miles) of
29
• 8,000 km (5,000 miles) of
coastline
• 42,000 km (26,000 miles) of
navigable rivers
BRAZILIAN CASE OF GLOBAL COMPETITIVENESS BRAZILIAN CASE OF GLOBAL COMPETITIVENESS -- EMBRAEREMBRAER
30
6
TASKS AND CHALLENGESTASKS AND CHALLENGES
31
TASKS AND CHALLENGESTASKS AND CHALLENGES
32
TASKS AND CHALLENGESTASKS AND CHALLENGES
• To reconstruct Brazil’s shipbuilding industry on competitive bases.
• To re-shape the logic underpinning Brazil’s transportation matrix.
• Almost 60% of Brazil’s transportation matrix is road-based, which is twice as
expensive as rail transportation, and four times dearer than maritime
transportation.
• New vessels required for coastal shipping and ocean going transportation.
• Qualify the work force.Qualify the work force.
• Exclusive financing through the Merchant Marine Fund (FMM).
33
TASKS AND CHALLENGESTASKS AND CHALLENGES
34
THE PATH TO GLOBAL COMPETITIVENESSTHE PATH TO GLOBAL COMPETITIVENESS
Shipyard facilities and TechnologyShipyard facilities and Technology
Longitudinal sleepway
Dry dock
Technology
Assembling
10 – 50 toncrane
100 – 300 toncrane / goliath
500 – 1500 ton crane / goliath
Manual/opticalcutting
Plasma cuttingsemiautom.
welding
Laser cuttingrobbot welding
CAD CAD/CAM CAD/CAM/CIM
35
Liftingcapacity
Steel processing
I T
SHIPBUILDING INDUSTRY COSTS STRUCTURE% costs in Brazil
Materials, parts and Materials, parts and equipment account equipment account for the highest costs for the highest costs in the shipbuilding in the shipbuilding industry industry
THE PATH TO GLOBAL COMPETITIVENESSTHE PATH TO GLOBAL COMPETITIVENESS
20
15
100
65
Total Labor Other costs
Materials, parts and equipment
yy
• Steel plates and profiles account for 20% - 25% of the final costs of a vessel. Transpetro
took over steel purchases negotiations in order to ensure competitive prices at global
standards for Brazil’s shipbuilding industry.
36
7
ASSUMPTIONS UNDERLYING THIS PROGRAMASSUMPTIONS UNDERLYING THIS PROGRAM
• Building ships in Brazil.
• Minimum local content of 65%.
• Competitive prices at international level after learning curve.
37
PROGRAM BASESPROGRAM BASES
• Shipyards equipped with modern production systems
and engineering expertise.
• Training and qualifying the work force.
• Investments in technology.
• Reduction costs driven, especially shipbuilding steel
plates and profiles.
38
PROMEFPROMEF
To modernize and expand the TRANSPETRO fleet of tankers, reaching 100% of coastal shipping and 50% of ocean going transportation.
• SCOPE: construction of 49 vessels
• PROGRAM PHASES:
PHASE 1: construction of 26 vessels (10 Suezmax 5 Aframax 4 Panamax 4 PHASE 1: construction of 26 vessels (10 Suezmax, 5 Aframax, 4 Panamax, 4
Products and 3 LPG)
PHASE 2: construction of 23 vessels (4 Suezmax DP, 3 Aframax DP, 8
Products, 5 LPG and 3 Bunker)
• 40,000 direct jobs
The first Suezmax vessel will be delivered in the first half of 2010.
39
ATLÂNTICO SUL SHIPYARDATLÂNTICO SUL SHIPYARDA CASE STUDY EXPLORING THE SUCCESS OF PROMEF A CASE STUDY EXPLORING THE SUCCESS OF PROMEF
INVESTMENT: US$ 610 million
AREA: 1,620.000 m2
This will be thelargest shipyard in
the SouthernH i hHemisphere
PRODUCTIONCAPACITY:
Steel processing: 160.000 ton
40
ATLÂNTICO SUL SHIPYARD ATLÂNTICO SUL SHIPYARD –– APRIL 2009APRIL 2009
41
8,000 peopleemployed
during shipyardconstruction
More than 4,000 people
employed duringshipyard operation
ATLÂNTICO SUL SHIPYARDATLÂNTICO SUL SHIPYARDA CASE STUDY EXPLORING THE SUCCESS OF PROMEF A CASE STUDY EXPLORING THE SUCCESS OF PROMEF
Already secured the construction of
15 tankers and 7 shuttle tankers
under the Fleet
Modernization andExpansionProgram
(PROMEF)
Partner:Samsung
42
8
ATLÂNTICO SUL SHIPYARDATLÂNTICO SUL SHIPYARDFIRST BLOCKS IN THE DRYFIRST BLOCKS IN THE DRY--DOCK (JUNE 2009)DOCK (JUNE 2009)
43
ATLÂNTICO SUL SHIPYARD ATLÂNTICO SUL SHIPYARD GENERAL VIEW OF PANEL LINE FACILITIESGENERAL VIEW OF PANEL LINE FACILITIES
44
ATLÂNTICO SUL SHIPYARD ATLÂNTICO SUL SHIPYARD –– DRYDRY--DOCKDOCK
45
ATLÂNTICO SUL SHIPYARD ATLÂNTICO SUL SHIPYARD DRYDRY--DOCK VIEW (SEPTEMBER 2009)DOCK VIEW (SEPTEMBER 2009)
46
ATLÂNTICO SUL SHIPYARD ATLÂNTICO SUL SHIPYARD KEEL LAYING (SEPTEMBER 2009)KEEL LAYING (SEPTEMBER 2009)
47
ATLÂNTICO SUL SHIPYARD ATLÂNTICO SUL SHIPYARD KEEL LAYING (SEPTEMBER 2009)KEEL LAYING (SEPTEMBER 2009)
48
9
ATLÂNTICO SUL SHIPYARD ATLÂNTICO SUL SHIPYARD KEEL LAYING (SEPTEMBER 2009)KEEL LAYING (SEPTEMBER 2009)
49
ATLÂNTICO SUL SHIPYARD ATLÂNTICO SUL SHIPYARD ASSEMBLY WORK IN PROGRESS (OCTOBER 2009)ASSEMBLY WORK IN PROGRESS (OCTOBER 2009)
50
MAUÁ SHIPYARD MAUÁ SHIPYARD –– PREPRE--ASSEMBLY ACTIVITIESASSEMBLY ACTIVITIES
51
MAUÁ SHIPYARD MAUÁ SHIPYARD –– PREPRE--ASSEMBLY SHOPASSEMBLY SHOP
52
MAUÁ SHIPYARD MAUÁ SHIPYARD –– DOUBLE BOTTOM BLOCKSDOUBLE BOTTOM BLOCKS
53
MAUÁ SHIPYARD MAUÁ SHIPYARD –– BLOCKS AT THE SLIPWAYBLOCKS AT THE SLIPWAY
54
10
Total Demands of (PROMEF): 680,000 tons
Fleet Modernization and Expansion Program (Fleet Modernization and Expansion Program (PROMEFPROMEF) ) STEEL DEMANDSSTEEL DEMANDS
55
Total Demands of the Fleet Modernization and Expansion Program (PROMEF): 680,000 tons
Fleet Modernization and Expansion Program (PROMEF) Fleet Modernization and Expansion Program (PROMEF) STEEL DEMANDSSTEEL DEMANDS
• 115,000 tons of steel plates
have already been
purchased from countries
such as China, Korea,
Ukraine and Brazil.
• In order to be competitive,
prices must be based on
international standards.
• This is why Transpetro is
seeking steel supply options
all over the world.
56
1. International Benchmarking for Performance Indicators in the Shipbuilding Industry;
2. Risk Evaluation Laboratories;
3. Manoeuvering Operations Model Tests;
4. Laboratory for Shipbuilding Simulations;
5. Multiuser Center Installations for Design of Ocean Going Vessels;
RESEARCH AND DEVELOPMENT INITIATIVESRESEARCH AND DEVELOPMENT INITIATIVES
6. Stress Analysis Calculations in Shipbuilding Fabrication Process;
7. Supplychain and Operations Management Center for Shipbuilding Industry;
8. Basic Design for CNG Vessel.
Amount : R$ 33 Millions, about US$ 19 millions
57
TANK TEST EXPANSION TANK TEST EXPANSION –– IPT SÃO PAULOIPT SÃO PAULO
06/11/2009
58
MODEL TEST FABRICATION MODEL TEST FABRICATION –– ROBOTIC ARMROBOTIC ARM
06/11/2009
59
MODEL TEST MODEL TEST –– IPT SÃO PAULOIPT SÃO PAULO
06/11/2009
60
11
BRASIL BRASIL –– NEW OPPORTUNITIESNEW OPPORTUNITIES
61
OPPORTUNITIES FOR REPAIR SHIPYARDS AND EQUIPMENT INDUSTRIES OPPORTUNITIES FOR REPAIR SHIPYARDS AND EQUIPMENT INDUSTRIES
• Construction of repair shipyards – each
year 4,600 ships sail along the Brazilian
coastline, where no modern repair
facilities are available.
E t bli h t i l i • Establish enterprises supplying
equipment, parts, services and repair for
shipyards and shipowners.
Main maritime trades
62
OPPORTUNITIES FOR SHIPYARDS OPPORTUNITIES FOR SHIPYARDS –– NEW BUILDINGS NEW BUILDINGS
• The 49 ships planned through the Fleet Modernization and Expansion Program
(PROMEF) are insufficient, unable to respond in full to future demands prompted
by Brazil’s pre-salt oilfields and the expansion of the biofuels market, including
ethanol.
• The development of the pre-salt oilfields and investments in biofuels are triggering
additional demands for ships, platforms, rigs, FPSOs and supply boats.
• Petrobras will sign contracts covering 40
drilling rigs, 70 tankers,146 supply boats and
10 FPSOs.
• Brazil’s National Shipbuilding Industry
Association estimates that orders from this
sector will reach 214 new vessels by 2015.
63
Shipbuilding in Brazil must reach competitivess at a world level, bein necessary to overcome challenges
related to steel plates price, labour productivity, R&D and equipment supplies Transpetro through
SHIPBUILDING SECTOR SUSTEINABILITY IN BRAZILSHIPBUILDING SECTOR SUSTEINABILITY IN BRAZIL
R&D and equipment supplies. Transpetro through PROMEF – Fleet Modernization and Expansion
Program - is promoting the first steps of this process and its continuity will lead Brazil to have a modern
and susteinable shipbuilding industry.
64
CHALLENGE OPPORTUNITYOPPORTUNITY
ENTREPRENEURSHIPENTREPRENEURSHIP
PARTNERSHIPPARTNERSHIP
MANY THANKSMANY THANKS