ats 20120224 v2

Post on 22-Apr-2015

124 Views

Category:

Business

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

 

TRANSCRIPT

ATS Information System report

Reporter : Paul Wang

Date:2012.02.24

Outline

• ATS test flow

• ATS Sever test relatived function

• ATS Client monitor and control

• History message trackable

• User account permission control

Test Model Design

Test model execution

ATSServer

ATS Testing Flow

New Test

Test Report

Launch Work

Project

• Create a project

Test model design

• Create model

• Model design– Project->task->property->component->profile

• Upload script

Test plan to design

Test report to design

Model design

Upload script

Script id

work

• Init work

• Open/close work

Init work

Work list

Open/close

Event

• Pass/fail result from client

• Assign bugid

result

Pass/fail

Assign bugid

Link to bug system

Bugid control

• Open/close

close

ATS Client monitor and control

• Receive client alive message and reponse.

Client alive

Win/mac

History message trackable

User action

User account permission control

Userid and name

For userid

Report End

Please comment it.

top related