baroid idp

Post on 15-Jan-2016

106 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

BAROID IDP. MYSTERIES OF LIFE. WHAT IS DRILLING FLUID?. DRILLING FLUIDS. WATER AND…. DRILLING FLUIDS. ADDITIVES ADDED TO MAKE THE WATER WORK FOR YOU! ADDITIVES THAT SUPPORT THE HOLE OR BREAK DOWN THE SOIL. COARSE SOILS SAND GRAVEL ROCK. FINE SOILS CLAY LOAM SILT. - PowerPoint PPT Presentation

TRANSCRIPT

1

BAROID IDP

2

MYSTERIES OF LIFE

WHAT

IS

DRILLING FLUID?

3

DRILLING FLUIDS

WATER

AND….

4

DRILLING FLUIDS

ADDITIVES ADDED TO MAKE THE WATER WORK FOR

YOU!

ADDITIVES THAT SUPPORT THE HOLE OR BREAK DOWN

THE SOIL.

5

SOIL TYPES

COARSE SOILS

• SAND

• GRAVEL

• ROCK

FINE SOILS

• CLAY

• LOAM

• SILT

6

SOIL TYPES

COLLAPSIBLE

• SAND

• GRAVEL

• ROCK

COMPACTIBLE

• CLAY

• LOAM

• SILT

7

SOIL TYPES

NEED TO “SUPPORT”

COLLAPSIBLE SOILS

8

SOIL TYPES

NEED TO “BREAK DOWN”

COMPACTIBLE SOILS

9

SOIL TYPES

WHAT SOILS DO YOU HAVE?

10

SOIL TYPES

SIMPLE!

DO A “COMPRESSION” TEST WITH YOUR HANDS.

LOOK AT YOUR POTHOLES !

11

DRILLING FLUIDS

DO YOU NEED DRILLING FLUIDS?

12

DRILLING FLUIDS

YES!

13

DRILLING FLUIDS

DO YOU WANT TO:

INCREASE PRODUCTION?

14

DRILLING FLUIDS

DO YOU WANT TO:

REDUCE WEAR ON TOOLING?

15

DRILLING FLUIDS

THEN USING AND “UNDERSTANDING”

MUD MIXES ARE “CRITICAL”

16

DRILLING FLUIDS

EVERYDAY!

17

DRILLING FLUIDS

EVERY BORE!

18

DRILLING FLUIDS

NO SOLO AGUA!

19

DRILLING FLUIDS

WHY?

20

DRILLING FLUIDS

EVER LIFTED A SIDEWALK? OR

CRACKED ASPHALT?

21

DRILLING FLUIDS

EVER HAD WATER RISE TO THE

SURFACE AND BOIL OUT AT LIP OF CURB

& GUTTER?

22

DRILLING FLUIDS

EVER SEEN THE CARRIAGE HEAD

“PULL BACK” AFTER YOU LET GO OF THE

CONTROLS?

23

DRILLING FLUIDS

EVER PLAY “TUG OF WAR” WITH THE

CONDUIT YOU ARE PULLING IN?

24

DRILLING FLUIDS

EVER “STICK” THE CONDUIT?

25

DRILLING FLUIDS

HAS YOUR CONDUIT BEEN TOUGH TO

“PROOF” OR BLOW FIBER INTO?

26

DRILLING FLUIDS

EVER HIT A UTILITY?

27

DRILLING FLUIDS

90% OF “HITS” ARE ON PULLBACK.

WHY?

28

DRILLING FLUIDS

DRILL ROD WANTS TO PULL BACK “STRAIGHT”

THROUGH EASIEST PATH!

29

DRILLING FLUIDS

THIS IS ALL CAUSED BY THE LACK OF THE

RIGHT “MIX”

30

DRILLING FLUIDS

PLUS, THE RIGHT MIX WILL REDUCE

THE TRIPS FOR THE VACUUMS!

31

DRILLING FLUIDS

PLUS, THE RIGHT MIX WILL REDUCE

THE FRICTION/GRAB ON THE DRILL ROD!

32

DRILLING FLUIDS

THE BASIC “5” CHEMICALS IN CALIFORNIA

33

DRILLING FLUIDS

FYI.

THERE ARE “60” PLUS CHEMICALS

FROM BAROID ALONE.

34

DRILLING FLUIDS

BOREGEL/QUICK GEL & WHY BOREGEL?

35

DRILLING FLUIDS

IN “COLLAPSABILE” SOILS, SUPPORTS THE BORE HOLE

LIKE TRENCH SHORING

36

DRILLING FLUIDS

BASIC MIX:

+(1) BAG PER 150 GALLONS OF WATER

37

Goal of fluids

SUPPORT & STABILIZE BOREHOLE

38

SAND SOIL

39

WATER ON SAND

40

5 SECONDS LATER

41

BORE-GEL ON SAND

42

AFTER 30 SECONDS

43

AFTER 24 HOURS

44

DRILLING FLUIDS

CONDET

1 GALLON PER 100 GALLONS OF WATER

45

DRILLING FLUIDS

KEEPS CUTTINGS “OFF” TOOLING

LIKE DIESEL ON ASPHALT TOOLS.

46

DRILLING FLUIDS

HELPS KEEP CLAYS FROM RE-FORMING

47

CON-DET

48

DRILLING FLUIDS

POLYMERS

POLY-BORE/EZ MUD

49

DRILLING FLUIDS

LUBRICATES CUTTINGS AND

PRODUCT

50

DRILLING FLUIDS

BUT CAREFUL, A LITTLE POLYMER GOES

A LONG WAY!

(1) CUP/1000 GALLONS

51

Poly Bore 1/2lbs to 2.4 lbs per 100 gallons

52

DRILLING FLUIDS

NO SAG

(ONLY ON LONG, LARGE BORES, OR

WHERE HEAVY ROCK)

53

DRILLING FLUIDS

HELPS SUSPENSION

INCREASES GEL STRENGTH

54

DRILLING FLUIDS

SODA ASH

55

DRILLING FLUIDS

HELPS CHEMCIALS “MIX” AND “STAY”

56

DRILLING FLUIDS

ph

DO YOU MEASURE IT? DO YOU KNOW

HOW? DO YOU KNOW WHY?

57

DRILLING FLUIDS

EVER SEE THE MUD MIX SEPARATE IN

THE TANK?

58

DRILLING FLUIDS

WHAT DO YOU THINK IT IS DOING

IN THE HOLE?

UNDER PRESSURE!

59

DRILLING FLUIDS

DRILLING FLUIDS MIXES (AND STAYS MIXED) BEST WITH

pH OF WATER @ +8.0-9.5

60

DRILLING FLUIDS

RECIPES

(JUST THE BASICS)

61

62

DRILLING FLUIDS

•CLAY•SANDY/ROCKY•HARD PAN•LOAM

63

DRILLING FLUIDS

QUESTION ALWAYS IS: AFFECT TO SURROUNDING

SOIL?

64

ANNULAR SPACE

EXCAVATION AFTER 24 HOURS

65

ANNULAR SPACE

EXCAVATION AFTER 7

DAYS

66

ANNULAR SPACE

EXCAVATION AFTER

14 DAYS

67

PERCEIVED

TO BE

CUTTING TOOLS

REAMERS / BITS

68

CHOOSE THE

“RIGHT”

CUTTING TOOLS

REAMERS / BITS

69

REAMERS / BITS

SECONDARY RESPONSIBILITY:

Delivering Drilling Fluids

Mixing Drilling Fluids & Soil

70

MIX SOIL WITH DRILLING FLUID

TO FORM A

FLOWABLE SLURRY

REAMERS / BITS

71

TUFF BIT

72

SAND BIT

73

FLUTED REAMERS

74

BEAVERTAIL

75

KODIAK

76

MX Mixer

77

BITS & REAMERS

THERE IS NO

UNIVERSAL

SOIL

78

BITS & REAMERS

THERE IS NO

UNIVERSAL

DRILLING FLUID MIX

79

BITS & REAMERS

THERE IS NO

UNIVERSAL

BIT OR REAMER

80

VOLUMES

THERE IS NO UNIVERSAL

VOLUME (GALLONS

PER FOOT)

81

VOLUMES

REAMER SIZE ² 25.5 =

GALLONS PER FOOT (SOIL)

82

VOLUMES

12” REAMER 12 x

12 = 144

144 25 = 6 GAL/ FT

83

Sample 12” reamer requires;

6 gallons per foot x 10’ rod = 60 gallons

(needed per rod)

30 gpm Pump x 2 minutes = 60 gallons

VOLUMES

Note* Most pumps are rated @ water viscosity

84

VISCOSITY

VISCOSITY CUP

MARSH FUNNEL

85

DRILLING FLUIDS

DO YOU MEASURE?

86

DRILLING FLUIDS

IF YOU DON’T MEASURE “VIS”,

THEN HOW DO YOU KNOW YOU HAVE THE RIGHT MIX?

87

DRILLING FLUIDS

HOW TO MEASURE

88

DRILLING FLUIDS

MAXIMUM VISCOSITY FOR MUD

PUMPS?

89

DRILLING FLUIDS

65 VIS

MAXIMUM!

90

DRILLING FLUIDS

Over 40 Vis up to 65 Vis

=

$$$$

91

DRILLING FLUIDS

IF YOU DON’T MEASURE “VIS”,

THEN HOW DO YOU KNOW YOU ARE NOT EXCEEDING PUMP?

92

DRILLING FLUIDS

IF YOU DON’T MEASURE “VIS”, THEN HOW DO YOU KNOW YOU HAVE

THE RIGHT MIX TO SUPPORT THE HOLE FROM COLLAPSE?

93

OVERALL VIEW

FACTORS TO DETERMINE HOW MUCH

& WHEN YOU NEED CHEMICALS TO ASSIST

94

OVERALL VIEW

•Distance•Diameter•Ground•Time

95

DRILLING FLUIDS

BEND RADIUS AND MUD MIXES

96

DRILLING FLUIDS

IF YOU DON’T USE MUDS, YOU WILL

“OVERSTEER” DRILL ROD ON

“PULLBACK”!

97

DRILLING FLUIDS

IF YOU DON’T USE MUDS, YOU WILL “OVER TORQUE” DRILL ROD ON “PULLBACK”!

98

DRILLING FLUIDS

HOW DO WE BREAK A WIRE?

DRILL ROD IS NO DIFFERENT!

99

DRILLING FLUIDS

IF YOU DON’T USE MUDS, ESPECIALLY GOING FROM

SOFT TO HARD FORMATIONS YOU WILL

“OVERSTEER” DRILL ROD ON “PULLBACK”!

100

CASE HISTORY

MONDAY MORNING•CONTRACTOR MAKES PILOT BORE•STARTS BACKREAM WITH PRODUCT•PULLS IN 70 FEET•GETS STUCK•HUMPS HIGHWAY

•SPENDS REST OF DAY EXTRACTING TOOLS

101

CASE HISTORY

Solution

102

CASE HISTORY

START WITH THE DRILLING SQUARE

103

THE DRILLING SQUARE

SOIL I.D.

BITS / REAMERS

FLUIDVOLUME FLOW

104

CASE HISTORY

If you make drilling chemicals “work”

for you, you will be successful. If you “don’t, you will lose money, you

will stick bores, you will wear out tooling.

Your choice.

Drilling fluids = $$$$$

105

DON’T LIKE YOUR WORK TRUCK?

106

Don’t Get It Overloaded

107

USE THE PROPER TOOLS

108

DON’T LIKE YOUR JOB?

109

ACCEPT HELP

110

DRILLING FLUIDS

Contacts:

S. Ca.: 800.491.9004

Central: 800.350.2595

N. Ca.: 800.510.6262

www.calditchwitch.com

111

DRILLING FLUIDS

DRILLING FLUID FORMULATOR

112

BAROID IDP

CONSTRUCTION APPLICATIONS

113

BAROID IDP

Gary WilliamsOffice

661-822-8072

Cell 661-345-9301

gary.williams@halliburton.com

top related