www.tge-gas.comPage 1

BASED ON EXPERIENCEINSPECTION SERVICES FOR

CRYOGENIC ABOVE GROUND STORAGE TANKS28.03.2019 – VDMA TECHNOLOGY EXCELLENCE FORUM STOCEXPO ROTTERDAM

www.tge-gas.comPage 2

CONTENT

YOUR ADDED VALUE

EVALUATIONPROCEDURE

THE RIGHT PARTNER

REASONS FOR CRYOGENIC

STORAGE TANK INSPECTIONS

www.tge-gas.comPage 3

REASONS FOR CRYOGENIC TANKINSPECTIONS

INTEREST IN INNOVATION/ REFURBISH-

MENT

RISK OF POTENTIAL

LOSS OF PRODUCTION

TERMINAL LIFETIME

ASSESSMENT

YOU DETECT POTENTIAL RISKS OR IRREGULARITIES WITHIN YOUR

TANK

THE DESIGNED LIFETIME OF YOUR TANK IS COMING TO AN

END

YOU WOULD LIKE TO REFURBISH YOUR TANK OR UPDATE TO THE

NEWEST STATE OF THE ART TECHNOLOGY, CHANGE OF LOCAL

REGULATIONS

www.tge-gas.comPage 4

REASONS FOR CRYOGENIC STORAGE TANK INSPECTIONSWE CAN HELP YOU:

TO ENSURE THE SAFETY OF YOUR ASSETS AND YOUR EMPLOYEES ON SITE;

TO EXTEND THE LIFETIME OF YOUR TANK;

TO KEEP TRACK OF THE LATEST INNOVATIONS AND TO UPDATE YOUR TANK TO THE NEWEST TECHNICAL STANDARDS;

TO SAVE MONEY WITH PRECISE CAPACITY / ACCURATE TANK CALIBRATION;

TO COMPLY TO CHANGES OF LOCAL REGULATIONS;

TO IDENTIFY ROOT CAUSE AND SOLVE PROBLEMS;

TO CONTINUE TO BE A RELIABLE AND PROFESSIONAL PARTNER IN THE OIL & GAS INDUSTRY.

www.tge-gas.comPage 5

THE RIGHT PARTNERLEADING ENGINEERING COMPANY FOR PROJECTS FOR THE STORAGE AND HANDLING OF LIQUEFIED PETROCHEMICAL GASES:

• WITH MORE THAN 35 YEARS BUSINESS EXPERIENCE; FROM THE INITIAL CONCEPT / FEASIBILITY STUDY TO THE TURN-KEY LUMP-SUM EXECUTION OF COMPLETE PROJECTS AS MAIN CONTRACTOR;

• REALIZING INSPECTIONS, REDESIGNS / EVALUATIONS OF STORAGE TANKS & PROCESS FACILITIES PLUS LEAD AND / OR SUPPORT OF ANY COMMISSIONING ACTIVITIES, WITH OUR OWN EXPERIENCED INSPECTION TEAM, QUALIFIED TO API 653, EEMUA 159;

• OPERATING WORLDWIDE WITH MAIN OFFICES LOCATED IN EUROPE AND ASIA, EMBEDDED WITHIN A LARGE INDUSTRIAL GROUP WITH STRONG PARTNERS AND SHAREHOLDERS.

www.tge-gas.comPage 6

THE RIGHT PARTNER

SPECIALIZED

TRUSTFUL

EXPERIENCED

REPUTABLE

RELIABLE

CONFIDENTIAL

PROFESSIONAL

www.tge-gas.comPage 7

EVALUATION PROCEDURE• OPTIONAL:

OUT-OF-SERVICE INSPECTION

• SITE SURVEY/ FEASIBILITY STUDY

PROPOSAL OF TAILOR MADE INSPECTION SOLUTION

PERFORMANCE OF TANK INSPECTION

LIFETIME ASSESSMENT

FINAL REPORT & PROPOSAL OF

POTENTIAL FOLLOW-UP-SOLUTIONS

www.tge-gas.comPage 8

EVALUATION PROCEDUREIN-SERVICE INSPECTION FOR CRYOGENIC TANKS

PRE-INSPECTION: • Review of existing Engineering and Construction Documents• Site Visit• Issue of detailed inspection procedures and schedule

INSPECTION: • Storage Tank• Steel Structures• Piping & Supports• Painting / Coating Condition• Crane / Hoist• Safety Installation• Instrumentation• Electrical Installations• Equipment• External Insulation Piping and Tank

FINAL REPORT • Post inspection meeting• Listing of results• Assessment of specific findings• Evaluation of need of further inspections or calculations• Recommendations for preventative maintenance• General maintenance consultancy• Evaluation of potential repair work or modification

www.tge-gas.comPage 9

EVALUATION PROCEDUREOUT-OF-SERVICE INSPECTION FOR CRYOGENIC TANKS

DECOMMISSIONING: • Liquid Removal• Remaining Liquid Vaporization and Tank Warming up• Purge• Gassing-up • Decommissioning of pipework• Where necessary removal of Insulation to gain access

INNER TANK ACCESS • Safety Precautions• Preparation Works for Inspection

TANK INSPECTION • Inner Tank – Inside and Outside Face• Outer Tank – Inner Face• Inner Tank Equipment: Pumps / Instruments• Insulation, Nozzles, Instruments, Structural members, Liners

PRE-COMMISSIONING • Checks and tests after inspection completion• Commissioning of utility systems• Check of Safety Systems• Test of equipment loop-check and interlocks• Inerting with Nitrogen

COMMISSIONING • Gassing-up• Cool down of the storage tank• First liquid filling• Functional tests

www.tge-gas.comPage 10

YOUR ADDED VALUEAN EXTENDED LIFE TIME OF YOUR TERMINAL!

UPDATE TO INNOVATIVE AND NEWEST STANDARDS!

PRESERVATION OF YOUR ASSETS & INVESTMENT!

SAFETY FOR THE ENVIRONMENT AND YOUR EMPLOYEES!

STATE-OF-THE-ART!

www.tge-gas.comPage 11

THANK YOU FOR YOUR ATTENTION!Das Bild kann nicht angezeigt werden.

Vielen Dank cпaсибо большое

Obrigado

www.tge-gas.comPage 12

TGE Gas Engineering GmbHMildred-Scheel-Str. 153175 BonnGermany

+49 228 60448 821+49 228 60448 893

www.tge-gas.comtobias.puklavec@tge-gas.com

CONTACTDas Bild kann nicht angezeigt werden.

www.tge-gas.comPage 13

China

Shanghai CIMC TGE Gas Engineering Co., LtdNew Shanghai International TowerUnit A, 30th Floor – 360 Pu Dong Nan Road200120 ShanghaiP. R. CHINA+ 86 21 6418 3069+ 86 21 6418 3071tso@tgeshanghai.com

India

TGE Gas Engineering PVT Ltd.German Centre for Industry and TradeOffice No. 22, 12th FloorBuilding No. 9 Tower BDLF Cyber City Phase IIIGurgaon 122002INDIA+ 91 124 4249080 83+ 91 124 4249084tge-service@tge-gas.com

Russia

OOO TGE Gas Engineering RUSPulkovskoe shosse 28 (Building A), Room 701196158 Saint PetersburgRUSSIA+7 981 9372220tge-service@tge-gas.com

United Kingdom

TGE Gas Engineering GmbHSuite 2a, Manchester International Office CentreStyal Road, Manchester M22 5WB UNITED KINGDOM+ 44 161 2040 000+ 44 161 2040 470tge-service@tge-gas.com

Technodyne International LtdBlack Horse House8-10 Leigh Road, EastleighHampshire SO50 9FHUNITED KINGDOM+ 44 2380 629929+ 44 2380 613113info@technodyne.co.uk

Taiwan

TGE Gas Engineering GmbH5F-1, No. 81, Chengde Road Section 4111 – TaipeiTAIWAN+ 886 2 2885 7885+ 886 2 2885 8895tgetaiwan@tgeshanghai.com

TGE WORLDWIDE - CONTACTS