BOM format
Tag/
Equipment
No
Description Material Thickness
(mm)
Length
(mm)
Width
(mm)
NB Class Schedule Size Other
details
Other
details
Ref drg
no.
Revision
No.
MR
Clause
Ref No
Licensor
Spen
Reference
IOCL Specn
Ref
For
job(QTY
)
Installation
spares
Commissioning
spares
Addition Requirement for
Transportation / Dispatch
102-V-05 PLATE SHELL SA 516 GR.60 2 201 1
102-V-05 PLATE DISH END SA 516 GR.60 2 202 1
102-V-05 FLANGE REDUCING FLANGE SA 105 2 204 1
102-V-05 FLANGE BLIND FLANGE SA 105 2 205 1 2
10 2- V-0 5 HARD WARE S TU D WI TH 2 NU TS
SA 193 GR.B7/SA
194 GR.2H 2 245 1
102-V-05 HARDWARE STIFNERS
SA 193 GR.B7/SA
194 GR.2H 2 401 1
102-V-05 GASKET GASKET ** 2 214 1
102-V-05 GASKET GASKET ** 2 215 1
4 218 1
102-V-05 PIPE NOZZLE NECK SA 516 GR. 60 4 219 1
102-V-05 PIPE NOZZLE NECK SA 106 GR. B 2 220 1
Note: Additional Gasket, Blind Flanges, Hardware required for Dispatch/ Transportation should be properly mentioned with quantity.
Qty
Corrigendum
In Column B items are to put in 6 categorizes, i.e. (1) Plates, (2) Flanges, (3) Hardware, (4) Gasket, (5) Pipe & (6) Others. (All rows should be of flange, then all rows of plates & so on).
Additional details against these items will now be put in Column C, i.e. against Plate in column B, you can mention Dish End in column C, against flange in column B you can mention reducing flange in column C.
The existing Column C details (material) will get shifted to Column D.
The existing Column D details (thickness, length, size etc) are to be put in separate columns, in column E onwards as under:
(1) Plates:Column E: Thickness
Column F: Length
Column G: Width.
(2) Flanges:
Column H: NB
Column I: Class
Column J: Schedule.
(3) Hardware:
Column F: Length
Column K: Size
(4) Gasket:
Column H: NB
Column I: Class.
(5) Pipe:
Column H: NB
Column I: Class.
(6) Others:
May use any relevant of above columns or may put details in column L, M etc.Note: The earlier & now revised format of BOM is just illustrative & actual format will be provided at time of placing Purchase Order. The BOM shall be in Excel format only.
-