buckman jet drill - maurer engineering© 2007 11 buckman patent 7,168,491 2007 abrasive jet casing...

Post on 04-Jul-2018

219 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

© 2007

BUCKMAN JET DRILLDr. William C. MaurerNOVEMBER 1, 2015

1

© 2007 2

BUCKMAN ABRASIVE JET CASING CUTTER

© 2007 3

BUCKMAN CASING JET PERFORATING TOOL

© 2007 4

BUCKMAN CASING JET PERFORATING TOOL

© 2007 5

BUCKMAN JET DRILL

© 2007 6

BUCKMAN JET DRILLING SYSTEM

© 2007 7

LATERALS DRILLED WITH JET BITS

CASING

LATERALS

SOLID CASING

SLOT IN CASING

JET BIT

ROCK

DRILLINGMUD

© 2007 8

BUCKMAN PATENTS

© 2007 9

BUCKMANPATENT

6,263,9842001

ROTATING JET NOZZLE

© 2007 10

BUCKMANPATENT

6,668,9482003

SWIRLINGCONICAL NOZZLE

© 2007 11

BUCKMANPATENT

7,168,4912007

ABRASIVE JETCASING CUTTER

ANDLOCKING MECHANISM

© 2007 12

LABORATORY TESTS

© 2007 13

© 2007 14

ROCK SCORPION DIVERTER

© 2007 15

ROCK SCORPION EXITS CASING THROUGH

HOLE CUT WITH HYRDAPERF TOOL.

© 2007 16

ROCK SCORPION IN CLEAR

PLASTIC TUBING

CONCRETE CUT WITH ROCK SCORPION.

FLEX HOSE STILL SHOWN IN DRILLED HOLE.

ROCK SCORPION DRILLING TESTS

© 2007 17

HOLE DRILLED WITH ROCK SCORPION

© 2007 18

WELL BORE CLEANING TOOL.

© 2007 19

FIELD OPERATIONS

© 2007 20

THOMAS DOTSON AND BILL BUCKMAN IN FRONT OR RIG 1

© 2007 21

JET DRILLING RIG 1. TO DEPTHS OF 6500FT. NOTE

THE INJECTOR HEAD ON THE REAR OF RIG.

© 2007 22

RIG 1 ON SITE IN TENNESSEE

© 2007 23

BUCKMAN SUPPORT TRUCK WITH PUMP 3

© 2007 24

BLOW OUT PREVENTION BELOW INJECTOR HEAD

© 2007 25

BUCKMAN PUMP 2. HIGH PRESSURE CUSTOM ABRASIVE PUMP

© 2007 26

6500 FT COILED TUBING INJECTOR

© 2007 27

ROCK SCORPION DIVERTER

BELOW THE HYDRAPERF TOOL

PERFORATION OF CASING WITH

HYRDAPERF TO ALLOW ENTRY OF

ROCK SCORPION NOZZLE

© 2007 28

BUCKMAN FIELD RESULTS

© 2007 29

FLOWING OIL AFTER ROCK SCORPION

STIMULATION IN MICHIGAN

© 2007 30

BUCKMAN 6500 FT RIG

© 2007 31

© 2007 32

BUCKMAN RIG 1; CRANE TRUCK; PUMP 1 (LEFT TO RIGHT)

© 2007 33

© 2007 34

NO INITIAL FLOW

© 2007 35

GAS PRESSURE POWERING FLOW

© 2007 36

KENTUCKY TEST SHOWED

FRACTURES IN LIMESTONE ISOLATED FROM VERTICAL WELLS

FRACTURES REMAINED UNDRAINED AFTER 10 TO 15 YEARS PRODUCTION FROM VERTICAL WELLS

LIMESTONE FORMATIONS IDEAL FOR JET DRILLING

© 2007 37

SANDSTONE RESERVOIRS

© 2007 38

POROUS SANDSTONE RESERVOIRS

POROUS SANDSTONE

OIL IN ROCK PORES

OIL FLOWS THROUGH PORES

RADIAL FLOW

© 2007 39

RADIAL FLOW EQUATION

FLOW RATE (bbl/day) = 2kh(pe – pw)/mu ln (re/rw)

Where

k = rock permeability

h = formation thickness

pe = fluid pressure at outer boundary

pw = fluid pressure in wellbore

mu = fluid viscosity

re = effective drainage radius

rw = wellbore radius

JET DRILLED HOLES INCREASE FLOW RATE BY INCREASING THE WELLBORE RADIUS

© 2007 40

EFFECT OF DRAINHOLES

=

DRAINHOLES

(200 FT)DRAINAGE RADIUS

200 FT200 FT

660 FT

© 2007 41

EFFECT OF DRAINHOLES

BEFORE

DRAINHOLESAFTER

DRAINHOLES

0.5 FT

200 FT

660 FT660 FT

© 2007 42

STIMULATION RATIO

STIMULATION RATIO = ln (660/0.5) / ln(660/200)= 6.01

THIS SHOWS THAT DRILLING MULTIPLE 200 FOOT DRAIN HOLES CAN

INCREASE OIL PRODUCTION UP TO 6 FOLD

© 2007 43

EFFECT OF LATERAL LENGTH(1000 FT DRAINAGE RADIUS)

WELLBORE RADIUS (FT) STIMULATION RATIO

0.7 1.00

5 1.37

10 1.58

20 1.86

40 2.26

60 2.58

100 3.15

150 3.83

200 4.51

300 6.03

© 2007 44

OIL PRODUCTION INCREASES

© 2007 45

© 2007 46

JET WELL PRODUCTION INCREASES200 WELLS

(JELSMA, 2007)

PRODUCTION

INCREASE

(%)

WELLS

EXCEEDING

(%)

0 100

50 85

100 70

150 50

200 25

© 2007 47

DICKINSON PRODUCTION ENHANCEMENTS(OPTOMISTIC)

DRILLING

AREA

TYPE

WELLS

PRODUCTION

INCREASE (%)

WYOMING LIGHT OIL 300

LOUISIANA LIGHT OIL

FRACTURED

LIMESTONE

60

VENEZUELA LIGHT OIL

FORMATION

DAMAGE

900

CALIFORNIA HEAVY OIL

STEAM

380

CALIFORNIA HEAVY OIL

STEAM

265

© 2007 48

VALUE OF INCREMENTAL OIL

© 2007 49

ASSUMED INCREMENTAL OIL DECLINE CURVE(2 YEAR, LINEAR)

0 BPD

100 BPD

YEARS

0 21

50 BPD

© 2007 50

INCREMENTAL OIL VALUE(2 YEAR DECLINE, $60/BBL)

INITIAL

PRODUCTION

BBL/DAY

PRODUCTION

INCREASE

%

INCREMENTAL

OIL

BBLS

INCREMENTAL

OIL

$ MILLION

50 0 0 0

50 50 9125 0.55

50 100 18250 1.10

50 150 27375 1.64

50 200 36500 2.19

50 300 54750 3.29

© 2007 51

INCREMENTAL OIL VALUE(2 YEAR DECLINE, $60/BBL)

INITIAL

PRODUCTION

BBL/DAY

PRODUCTION

INCREASE

%

INCREMENTAL

OIL

BBLS

INCREMENTAL

OIL

$ MILLION

10 150 5475 0.33

20 150 10950 0.66

50 150 27375 1.64

100 150 54750 3.28

500 150 273750 16.43

© 2007 52

CONCLUSIONS (2015)

This BJD jet drilling technology is fully developed and ready for full scale field implementation

Buckman Jet Drilling is currently attempting to sell BJD to an oilfield service company that can market this technology worldwide.

Interested parties should contact Dr William Buckman at www.buckmanjetdrilling.com

© 2007 53

THE ENDwcmaurer@aol.com

top related