buckman jet drill - maurer engineering© 2007 11 buckman patent 7,168,491 2007 abrasive jet casing...
TRANSCRIPT
© 2007
BUCKMAN JET DRILLDr. William C. MaurerNOVEMBER 1, 2015
1
© 2007 2
BUCKMAN ABRASIVE JET CASING CUTTER
© 2007 3
BUCKMAN CASING JET PERFORATING TOOL
© 2007 4
BUCKMAN CASING JET PERFORATING TOOL
© 2007 5
BUCKMAN JET DRILL
© 2007 6
BUCKMAN JET DRILLING SYSTEM
© 2007 7
LATERALS DRILLED WITH JET BITS
CASING
LATERALS
SOLID CASING
SLOT IN CASING
JET BIT
ROCK
DRILLINGMUD
© 2007 8
BUCKMAN PATENTS
© 2007 9
BUCKMANPATENT
6,263,9842001
ROTATING JET NOZZLE
© 2007 10
BUCKMANPATENT
6,668,9482003
SWIRLINGCONICAL NOZZLE
© 2007 11
BUCKMANPATENT
7,168,4912007
ABRASIVE JETCASING CUTTER
ANDLOCKING MECHANISM
© 2007 12
LABORATORY TESTS
© 2007 13
© 2007 14
ROCK SCORPION DIVERTER
© 2007 15
ROCK SCORPION EXITS CASING THROUGH
HOLE CUT WITH HYRDAPERF TOOL.
© 2007 16
ROCK SCORPION IN CLEAR
PLASTIC TUBING
CONCRETE CUT WITH ROCK SCORPION.
FLEX HOSE STILL SHOWN IN DRILLED HOLE.
ROCK SCORPION DRILLING TESTS
© 2007 17
HOLE DRILLED WITH ROCK SCORPION
© 2007 18
WELL BORE CLEANING TOOL.
© 2007 19
FIELD OPERATIONS
© 2007 20
THOMAS DOTSON AND BILL BUCKMAN IN FRONT OR RIG 1
© 2007 21
JET DRILLING RIG 1. TO DEPTHS OF 6500FT. NOTE
THE INJECTOR HEAD ON THE REAR OF RIG.
© 2007 22
RIG 1 ON SITE IN TENNESSEE
© 2007 23
BUCKMAN SUPPORT TRUCK WITH PUMP 3
© 2007 24
BLOW OUT PREVENTION BELOW INJECTOR HEAD
© 2007 25
BUCKMAN PUMP 2. HIGH PRESSURE CUSTOM ABRASIVE PUMP
© 2007 26
6500 FT COILED TUBING INJECTOR
© 2007 27
ROCK SCORPION DIVERTER
BELOW THE HYDRAPERF TOOL
PERFORATION OF CASING WITH
HYRDAPERF TO ALLOW ENTRY OF
ROCK SCORPION NOZZLE
© 2007 28
BUCKMAN FIELD RESULTS
© 2007 29
FLOWING OIL AFTER ROCK SCORPION
STIMULATION IN MICHIGAN
© 2007 30
BUCKMAN 6500 FT RIG
© 2007 31
© 2007 32
BUCKMAN RIG 1; CRANE TRUCK; PUMP 1 (LEFT TO RIGHT)
© 2007 33
© 2007 34
NO INITIAL FLOW
© 2007 35
GAS PRESSURE POWERING FLOW
© 2007 36
KENTUCKY TEST SHOWED
FRACTURES IN LIMESTONE ISOLATED FROM VERTICAL WELLS
FRACTURES REMAINED UNDRAINED AFTER 10 TO 15 YEARS PRODUCTION FROM VERTICAL WELLS
LIMESTONE FORMATIONS IDEAL FOR JET DRILLING
© 2007 37
SANDSTONE RESERVOIRS
© 2007 38
POROUS SANDSTONE RESERVOIRS
POROUS SANDSTONE
OIL IN ROCK PORES
OIL FLOWS THROUGH PORES
RADIAL FLOW
© 2007 39
RADIAL FLOW EQUATION
FLOW RATE (bbl/day) = 2kh(pe – pw)/mu ln (re/rw)
Where
k = rock permeability
h = formation thickness
pe = fluid pressure at outer boundary
pw = fluid pressure in wellbore
mu = fluid viscosity
re = effective drainage radius
rw = wellbore radius
JET DRILLED HOLES INCREASE FLOW RATE BY INCREASING THE WELLBORE RADIUS
© 2007 40
EFFECT OF DRAINHOLES
=
DRAINHOLES
(200 FT)DRAINAGE RADIUS
200 FT200 FT
660 FT
© 2007 41
EFFECT OF DRAINHOLES
BEFORE
DRAINHOLESAFTER
DRAINHOLES
0.5 FT
200 FT
660 FT660 FT
© 2007 42
STIMULATION RATIO
STIMULATION RATIO = ln (660/0.5) / ln(660/200)= 6.01
THIS SHOWS THAT DRILLING MULTIPLE 200 FOOT DRAIN HOLES CAN
INCREASE OIL PRODUCTION UP TO 6 FOLD
© 2007 43
EFFECT OF LATERAL LENGTH(1000 FT DRAINAGE RADIUS)
WELLBORE RADIUS (FT) STIMULATION RATIO
0.7 1.00
5 1.37
10 1.58
20 1.86
40 2.26
60 2.58
100 3.15
150 3.83
200 4.51
300 6.03
© 2007 44
OIL PRODUCTION INCREASES
© 2007 45
© 2007 46
JET WELL PRODUCTION INCREASES200 WELLS
(JELSMA, 2007)
PRODUCTION
INCREASE
(%)
WELLS
EXCEEDING
(%)
0 100
50 85
100 70
150 50
200 25
© 2007 47
DICKINSON PRODUCTION ENHANCEMENTS(OPTOMISTIC)
DRILLING
AREA
TYPE
WELLS
PRODUCTION
INCREASE (%)
WYOMING LIGHT OIL 300
LOUISIANA LIGHT OIL
FRACTURED
LIMESTONE
60
VENEZUELA LIGHT OIL
FORMATION
DAMAGE
900
CALIFORNIA HEAVY OIL
STEAM
380
CALIFORNIA HEAVY OIL
STEAM
265
© 2007 48
VALUE OF INCREMENTAL OIL
© 2007 49
ASSUMED INCREMENTAL OIL DECLINE CURVE(2 YEAR, LINEAR)
0 BPD
100 BPD
YEARS
0 21
50 BPD
© 2007 50
INCREMENTAL OIL VALUE(2 YEAR DECLINE, $60/BBL)
INITIAL
PRODUCTION
BBL/DAY
PRODUCTION
INCREASE
%
INCREMENTAL
OIL
BBLS
INCREMENTAL
OIL
$ MILLION
50 0 0 0
50 50 9125 0.55
50 100 18250 1.10
50 150 27375 1.64
50 200 36500 2.19
50 300 54750 3.29
© 2007 51
INCREMENTAL OIL VALUE(2 YEAR DECLINE, $60/BBL)
INITIAL
PRODUCTION
BBL/DAY
PRODUCTION
INCREASE
%
INCREMENTAL
OIL
BBLS
INCREMENTAL
OIL
$ MILLION
10 150 5475 0.33
20 150 10950 0.66
50 150 27375 1.64
100 150 54750 3.28
500 150 273750 16.43
© 2007 52
CONCLUSIONS (2015)
This BJD jet drilling technology is fully developed and ready for full scale field implementation
Buckman Jet Drilling is currently attempting to sell BJD to an oilfield service company that can market this technology worldwide.
Interested parties should contact Dr William Buckman at www.buckmanjetdrilling.com
© 2007 53