Case StudyMirvac Property GroupSydney
Sayfa Group1029 Mountain Highway Boronia VIC 3155Australia
T 1300 301 755F 1300 881 092sales@sayfa.com.auwww.kombiaccess.com
DIMENSION DIAMETER LENGTH0 - 250mm
250 - 750mm> 750mm
0.25mm0.50mm0.75mm
0.5mm1.0mm1.5mm
ABN 47 631 210 199
12345678
3665
784.5
EXISTING COOLING TOWER
5770
2835
2No. KOMBI 80 POSTAS PER ENGINEER DOCUMENATION
987
SENTRY KNEERAILINSTALLED AS PER MANFACTURE INSTRUCTIONS
900
900 900
4410
1080
400
CONC. BEAM (EXISTING)
900 (W) KOMBI STAIRWAY @ 40°189mm RISE 225mm RUN
600
POST CONNECTION DETAILAS PER ENGINEERING DOCUMENTATION
2809
3760.5
2No. KOMBI 80 POSTSUPPLIED IN 12 & SPLICED ON SITE
600 (W) KOMBI STAIRWAY @ 40°200mm RISE 238mm RUN
13mm ALUM WALKWAY MESHSCREW FIXED TO PLATFORM @ 600ctrs
2No. SCREW/BATTERN
SENTRY KICK RAIL - 100mm (H)FIX TO G/RAIL POSTS AS PER
MANUFACTURE INSTRUCTIONS
KOMBI 60 BRACEAS PER ENGINEER DOCUMENTATION
1082.1 2115.9 2328.2
4883.5
50 X 6 EA, 6106-T51No. M10 KOMBI BOLT EACH END
GENERAL NOTES:
1. THIS DESIGN CONFORMS TO THEHIERACHY OF CONTROLS ASSPECIFIED IN WHS REGULATIONS ANDWORKCOVER NSW GUIDELINES
2. CONTRACTOR TO CONFIRMMEASUMEMENTS ON SITE PRIOR TOCOMMENCING PROJECT
1319UNDER PLATFORM
Australia’s leading property groupHelping workers safelykeep their cool
Design - Create - Build
ProjectMirvac Property Group - St Martins Tower
InstallerSky 5
ProductsKOMBI Stair, Crossover & Platform Systems
SituationMirvac is a leading Australian property group who owns and manages assets across the office, retail and industrial sectors. The project was to be carried out at St Martins Tower, located within Sydney’s busy CBD district.
The client required a two level platform system that would provide access to their cooling towers. As the components could not be craned in, the only delivery option available was by the lift systems.
An extremely short installation time was requested as the client wanted minimal on-site disruption. The myriad of existing pipework and structures, where the system was to be installed, was also a challenge that would require out of the box thinking to deliver structurally sound systems.
SolutionPlanning and design for this project was key towards providing a system that would give the client ease of access to equipment, as well as no compromise on strength or integrity.
KOMBI’s modular design enabled easy delivery via lifts. On-site assembly and in situ customisation ensured the systems could be woven around existing pipework and structures.
Within 24 hours, an intricately designed KOMBI system was installed, resulting in an extremely happy client who praised not only KOMBI’s versatility but also it’s ability to provide such a high quality result.