Page 1: Case Study - Kombi · Case Study Mirvac Property Group Sydney Sayfa Group 1029 Mountain Highway Boronia VIC 3155 Australia T 1300 301 755 F 1300 881 092 sales@sayfa.com.au

Case StudyMirvac Property GroupSydney

Sayfa Group1029 Mountain Highway Boronia VIC 3155Australia

T 1300 301 755F 1300 881 [email protected]

Page 2: Case Study - Kombi · Case Study Mirvac Property Group Sydney Sayfa Group 1029 Mountain Highway Boronia VIC 3155 Australia T 1300 301 755 F 1300 881 092 sales@sayfa.com.au

DIMENSION DIAMETER LENGTH0 - 250mm

250 - 750mm> 750mm

0.25mm0.50mm0.75mm

0.5mm1.0mm1.5mm

ABN 47 631 210 199

12345678

3665

784.5

EXISTING COOLING TOWER

5770

2835

2No. KOMBI 80 POSTAS PER ENGINEER DOCUMENATION

987

SENTRY KNEERAILINSTALLED AS PER MANFACTURE INSTRUCTIONS

900

900 900

4410

1080

400

CONC. BEAM (EXISTING)

900 (W) KOMBI STAIRWAY @ 40°189mm RISE 225mm RUN

600

POST CONNECTION DETAILAS PER ENGINEERING DOCUMENTATION

2809

3760.5

2No. KOMBI 80 POSTSUPPLIED IN 12 & SPLICED ON SITE

600 (W) KOMBI STAIRWAY @ 40°200mm RISE 238mm RUN

13mm ALUM WALKWAY MESHSCREW FIXED TO PLATFORM @ 600ctrs

2No. SCREW/BATTERN

SENTRY KICK RAIL - 100mm (H)FIX TO G/RAIL POSTS AS PER

MANUFACTURE INSTRUCTIONS

KOMBI 60 BRACEAS PER ENGINEER DOCUMENTATION

1082.1 2115.9 2328.2

4883.5

50 X 6 EA, 6106-T51No. M10 KOMBI BOLT EACH END

GENERAL NOTES:

1. THIS DESIGN CONFORMS TO THEHIERACHY OF CONTROLS ASSPECIFIED IN WHS REGULATIONS ANDWORKCOVER NSW GUIDELINES

2. CONTRACTOR TO CONFIRMMEASUMEMENTS ON SITE PRIOR TOCOMMENCING PROJECT

1319UNDER PLATFORM

Australia’s leading property groupHelping workers safelykeep their cool

Design - Create - Build

ProjectMirvac Property Group - St Martins Tower

InstallerSky 5

ProductsKOMBI Stair, Crossover & Platform Systems

SituationMirvac is a leading Australian property group who owns and manages assets across the office, retail and industrial sectors. The project was to be carried out at St Martins Tower, located within Sydney’s busy CBD district.

The client required a two level platform system that would provide access to their cooling towers. As the components could not be craned in, the only delivery option available was by the lift systems.

An extremely short installation time was requested as the client wanted minimal on-site disruption. The myriad of existing pipework and structures, where the system was to be installed, was also a challenge that would require out of the box thinking to deliver structurally sound systems.

SolutionPlanning and design for this project was key towards providing a system that would give the client ease of access to equipment, as well as no compromise on strength or integrity.

KOMBI’s modular design enabled easy delivery via lifts. On-site assembly and in situ customisation ensured the systems could be woven around existing pipework and structures.

Within 24 hours, an intricately designed KOMBI system was installed, resulting in an extremely happy client who praised not only KOMBI’s versatility but also it’s ability to provide such a high quality result.