ISS INTERNATIONAL SpA COMMISSIONING & START UP SERVICES

Il pr

esen

te d

ocum

ento

è p

ropr

ietà

del

la IS

S In

tern

atio

nal S

pA e

non

può

ess

ere,

tota

lmen

te o

par

zial

men

te, d

iretta

men

te o

indi

retta

men

te, t

rasf

erito

, rip

rodo

tto, c

opia

to, r

ivel

ato

o us

ato,

sen

za l’

auto

rizza

zion

e de

lla IS

S In

tern

atio

nal S

pA.

The

pres

ent d

ocum

ent i

s pr

oper

ty o

f IS

S In

tern

atio

nal S

pA a

nd s

hall

not b

e to

tally

or p

artia

lly, d

irect

ly o

r ind

irect

ly, t

rans

ferr

ed, r

epro

duce

d, c

opie

d, d

iscl

osed

or u

sed,

with

out t

he a

utho

rizat

ion

of IS

S In

tern

atio

nal S

pA.

Commissioning & Start upCommissioning & Start up CLIENT PERIOD DESCRIPTION

Name Logo COUNTRY

Year Duration Plant / Unit Services

Saipem Spa

UAE 2010 3 months

Shah Gas Development Project. Development of sour gas reserves

• Precommissioning & Commissioning HSE Procedures Implementation

Foster Wheeler SpA

Italy 2010 6 months Thessaloniki, Greece • Commissioning Services

AHMADIAH Contracting & Trading Co.

Kuwait 2010 8 months Mina Abdulla WWT Mina Al Hamadi WWT Shuaiba WWT

• (Pre) Commissioning & Start-Up Supervision Services

AHMADIAH Contracting & Trading Co.

Kuwait 2010 8 months Mina Abdulla WWT Mina Al Hamadi WWT Shuaiba WWT

• Commissioning and Start-Up manuals.

Saipem Spa

Algeria 2009/2010 12 months Gas Treatment Plant • Commissioning & Start up up manual

Saipem SpA

Pakistan 2009 18 months Engro Site, UREA production, Pakistan • Commissioning Services

CEMIT Srl / ENI E&P

Italy 2010 8 months Oil & Gas Treatment Plant • (Pre) Commsissioning Procedures

Tozzi Sud Italy 2010 12 months LERs Fiend Ravenna • Commissioning Supervision Procedures

Technip KTI

Colombia 2010 2 months

SRU for Ecopetrol Hydrogen Unit Refinery in Barrancabermeja

• Commissioning Supervision Services

ISS INTERNATIONAL SpA COMMISSIONING & START UP SERVICES

CLIENT PERIOD DESCRIPTION

Name Logo COUNTRY

Year Duration Plant / Unit Services

Technip KTI

India 2010 2 months SUR for IOCL Refinery in Haldia, India

• Commissioning Supervision Services

Technip SpA

Egypt 2010 4 months Hydrogen Plant, Alexandria

• Precommissioning Supervision Activities

Saipem SpA

Italy 2010 7 months Treatment Gas Central “Fiume Trieste” / Cupello

• E&I Commissioning / Start-Up Activities

Technip KTI SpA

China 2010 2 months Acetic Acid Cracking furnace for Chemtex

• Commissioning Supervision Services

Edison SpA

Greece 2009/2010 6 months Combined Cycle Power Plant

• Commissioning and Start Procedure

Edison SpA

Greece 2009/2010 12 months Combined Cycle Power Plant • Commissioning Activities on site

Qcon

Qatar 2009/2010 10 months VOC Plant • Commissioning Activities on Site

Saipem Spa

Italy 2009/2010 5 months Pipe Line – Mantova/Bergantino

• E&I Commissioning / Start up Activities

Saipem Spa

Italy 2009 2 months Gas Compression Central

• E&I Commissioning / Start up Activities

Saipem Spa

Italy 2009/2010 6 months Pipe Line –Enna/Messina • Commissioning / Start up

ISS INTERNATIONAL SpA COMMISSIONING & START UP SERVICES

CLIENT PERIOD DESCRIPTION

Name Logo COUNTRY

Year Duration Plant / Unit Services

Technip KTI SpA

Sweden 2009/2010 8 months Hydrogen Plant • Commissioning on Site

Technip KTI SpA

India 2009 9 months Refinery Plant • Commissioning on Site

Tractbel /Suez Group

Greece 2009 10 months Power Plant – Thisvi • Precommissioning / Commissioning Servicies

Saipem Spa

Italy 2008 8 months Pumping station – Pipe Line – Cavalzere/Minerbio

• Commissioning / Start up

Saipem Spa

Italy 2008 10 months Pipe line – LNG Ferrara • Commissioning / Start up

Tractbel /Suez Group

Italy 2007 10 months Power Plant – Napoli Levante

• Precommissioning / Commissioning Servicies

Guascor SpA

Italy 2007 10 months Recovery Oil Plant - Gela • Precommissioning / Commissioning /Start up

Tractbel /Suez Group

Italy 2007 7months Power Plant – Rosignano • Commissioning Servicies

Bentini SpA

Algeria 2006 6 months Compression Station - Orano • Utility Commissioning

Technip KTI SpA

Egypt 2006 8 months Compression Station – El Harish • Precommissioning on Site

ISS INTERNATIONAL SpA COMMISSIONING & START UP SERVICES

CLIENT PERIOD DESCRIPTION

Name Logo COUNTRY

Year Duration Plant / Unit Services

Bentini SpA

Libya 2006 6 months Compression Station – Mellitah • Utility Commissioning

Tractbel /Suez Group

Italy 2006 6 months Power Plant – Vado Ligure • Commissioning Servicies

Technip KTI SpA

Croatia 2006 10 months Hydrogen Plant - Rjeka • Precommissioning on Site

Snamprogetti Ltd

Nigeria 2005/2006 16 months LNG – Bonny Island

• Precommissioning/Commissioning on Site

Snamprogetti

Libya 2005 6 months Gas Platform – Mellitah • Automation Commissioning on Site

Snamprogetti

Iran 2005 6 months Gas Platform – Mellitah

• Precommissioning/Commissioning on Site

Snamprogetti

Iran 2005 6 months Gas Platform – Mellitah • Commissioning on Site