committed to quality, cost & deliverycilegonfab.co.id/img/compro2015.pdf · 2015-09-15 ·...
Post on 11-Mar-2020
2 Views
Preview:
TRANSCRIPT
BOILER PRESSURE PART, PIPING, HRSG, STEEL STRUCTURE & HEAVY EQUIPMENTJl. Raya Bojonegara - Salira, Argawana
Pulo Ampel, Serang - Banten 42454 Indonesiawww.cilegonfab.co.id
PT. CILEGON FABRICATORS
PT. CILEGON FABRICATORS
committed to quality,cost & delivery
CONTENTS
committed to quality,cost & delivery
forewordCOMPANY introductionvalues & trustPRODUCTFACILITIEScertificatION
010305071113
FOREWORD
company profile PT. CILEGON FABRICATORS
We are PT.Cilegon Fabricators was established in March 1984 it by JEL Singa-pore and PT. Tri Usaha Bakti and has grown into reputable steel fabricators to supply products to customers in all over the world.
Management system has been applied in our company to make sure that all fabrication processes can be conducted to satisfy our customer international common standard.
Year 2009, IHI Corporation. Japan take over all local company share, together with IHI Corp. PT.Cilegon Fabricators has been expanded its business to cover demand of steel structure for industrial, handling heavy equipment (crane), boiler component and piping works.
With total area 25 hectares, shop facility and have private jetty, we are sure that we can serve you best quality products, competitive price and intime delivery.
Very Trully yours,
President Director
01 company profile PT. CILEGON FABRICATORS02
COMPANY INTRODUCTION COMPANY HISTORY
company profile PT. CILEGON FABRICATORS
PT. Cilegon Fabricators located at heavy industries area in Cilegon, Banten Province, approximate 100 km western of Jakarta, continues to exit Jakarta Merak high-way to Gate Cilegon Timur.
With total area 250,000 m2, with engineering capability support by X-Steel (TEKLA) and CAD which compatible used. 50,000 m2 total under roof fabrica-tion shop, open yard for full assembled of Heavy product and 300 m skid rail for load-out of heavy product, cover storage components.
Private seaport (jetty) and bounded area to make convenience for receiving raw material and shipping out of bulky products direct from PT. Cilegon Fabrica-tors Jetty.
Capital
Share Holder : US $ 34,4 Million
IHI Corporation, Japan : 88,76 %
Jurong Engineering Limited, Singapore : 11,24 %
03 company profile PT. CILEGON FABRICATORS04
1984
1985
1994
1995
1996
1998
2002
2003
2004
2007
2009
2011
2012
2013
:
:
:
:
:
:
:
:
:
:
:
:
:
:
Founded
Start fabrication of steel structure
Certi�ed ISO 9002
Start fabrication of packaged boiler
Start fabrication of heavy equipment
Investment by IHI Logistic Division (share 10.48%)
Investment by IHI Power Plant Division
(share 29.9% / 34.9% incl. preferred stock)
Certi�ed ISO 9001 : 2008 & certi�ed ASME S. U, PP stamp
Start fabrication of boiler pressure parts
Established 3D network for engineering
IHI become 100% share holder of PT.CF
(IHI took over all local shares of PTCF)
Certi�ed OHSAS 18001 : 2007 & SMK3
(Indonesian Government Certi�cation for Safety)
Start fabrication of HRSG pressure parts shop,
New investment by IHI in 2011
Start fabrication of new boiler pressure parts shop,
New investment by IHI in 2012
We continuously developed and applied our values that strongly support our mission.
Our values are :
company profile PT. CILEGON FABRICATORS05 company profile PT. CILEGON FABRICATORS06
VALUES
Integritytransparencyteamwork
creativitywinning spiritexcellence
When it comes to business it’s all about trust. Trust that your cooperations won’t fail and that you can count in your partner. PT. Cilegon Fabricators and IHI Corporation as new share holders will be increasing our facilities, technical capability and always improving technologies.As market requirement our factory could manufacture
With capability of 26,000 ton / year, at present condition and with our experi-ences we have grown into a reputable steel fabricators. We make it sure that PT. Cilegon Fabricators can serve you with best quality products, so don’t hesitate to meet your partnership to be trust on future project.
BOILER PRESSURE PARTS, PIPING , HRSG, STEEL STRUCTURE & HEAVY EQUIPMENT
trust
1. boiler presure parts and pipinGboiler presure parts and pipinG1.
2.
3.
company profile PT. CILEGON FABRICATORS07
PRODUCT
CAPABILITY
5,000 Ton per year
FACILITIES
Under Roof Workshop
21,600 m2 could cover all activities for
fabrication of boiler pressure part.
Common Device
Membrane Panel Welding 24+8,
Welding Manipulator, 4” Pipe Bender, 4” NC
Pipe Bender, 8 Electrode Panel Welder, 4
Electrode Gantry Welder, Equipment for
Surface Preparation using for Tube, Pipe,
and PWHT Furnace size 14m x 6m x 4m
steel structure and heavy equipment
HRSG ( Heat recovery steam generator )
MEMBRANE WELDING 24+8 BOROSCOPE VISUAL INSPECTION
BENDING PANELDELIVERY PRODUCT
MACHINING PROCESS
WELDING PROCESS
company profile PT. CILEGON FABRICATORS08
3. steel structure and heavy equipmentCAPABILITY
18,000 Ton per year (existing ave.) and
further expansion become 20,000 ton.
FACILITIES
Under Roof Workshop
19,827 m2 could cover all activities for
fabrication of boiler pressure part.
Common Device
CNC Cutting Machine, NC Sawing, Drilling
Machine, Bending & Rolling Machine,
Horizontal Boring & Milling Machine, Ringer
Crane Cap 150 ton shop for erection at
year, private jetty (width : 50m x
depth : 7m).
2. HRSG ( Heat recovery steam generator )CAPABILITY
3,000 Ton per year (existing ave.) and further
expansion become 4,000 ton.
FACILITIES
Under Roof Workshop
8,100 m2 could cover all activities for fabri-
cation of boiler pressure part.
Common Device
2 Unit Finning Machine,
2 Unit Bending Tube 3”,
1 Unit Bending Tube 4”, Assembled Area, and
Hydro test Area.
company profile PT. CILEGON FABRICATORS09 company profile PT. CILEGON FABRICATORS10
FINNING TUBE MACHINE
MODULARIZATION PROCESS
ASSEMBLING AREA
HARP ASSEMBLY
HARP HYDRO TEST
DELIVERY PRODUCT HRSG
CUTTING PROCESS ASSEMBLING PROCESS
WELDING
DELIVERY
MAGNETIC TEST
TRIAL ASSEMBLY PROCESS
CHAMBER BLASTINGENGINEERING FACILITY (TEKLA MODEL)
24 + 8 MEMBRANE PANEL MACHINE AUTOMATIC DRILLING MACHINE
PAINTING INSPECTION CLINIC OPEN 24 HOURS
PAINTING FACILITY UT/RT INSPECTION
MOSQUE PRIVATE JETTY
MAGNETIC PARTICAL TEST CNC CUTTING MACHINE
FACILITIES
CERTIFICATION
company profile PT. CILEGON FABRICATORS13
OSHAS 18001 : 2007
SMK 3
ISO 9001 : 2008
ASME STAMP
OUR EXPERIENCE ON WORLDWIDE
STEEL STRUCTURE & HEAVY EQUIPMENT BOILER PRESSURE PART HRSG
MOROCCO
CHILE
GERMANY
USA
ALGERIA
CAMEROON
SAUDIARABIA
YEMEN
KUWAIT
SRILANKA
AUSTRALIA
CHINA JAPANSOUTHKOREA
TAIWAN
PHILIPINESTHAILAND
MYANMAR
VIETNAM
MALAYSIA
CAMBODIA
SINGAPORE
INDONESIA
top related