corporate resume tpi - working on

Post on 09-Jan-2022

3 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

THIRDPARTYINSPECTIONLIMITED

“LeadersinOffshoreandOnshoreConstruction”STOWCertificateno:000228(HighRiskLevel)

CORPORATEPROFILE

CorporateHeadquarters :103WoodfordStreet, Newtown,Port‐of‐Spain, Trinidad,W.I.

Office :(868)628‐7316/622‐622‐9876Facsimile :(868)628‐6008Website :www.3piltd.comE‐mail :admin@3piltd.com

Table of Contents

1.0 COMPANY INFORMATION -------------------1

2.0 SERVICES OFFERED---------------------------2

3.0 QUALITY POLICY-------------------------------3

4.0 CONTRACTS-------------------------------------3-6

5.0 PREVIOUS PROJECTS---------------------------7-8

6.0 BANK INFORMATION---------------------------9

7.0 INSURANCE-------------------------------------- 9

8.0 PERSONNEL--------------------------------------10

9.0 REFERENCES-------------------------------------11

10.0 COMPANY REGISTRATION DOCS-------------12-15

11.0 STOW CERTIFICATE ----------------------------16-17

About Us Services PROJECTS HSE QA-QC

INSPECTION MANAGEMENT TECHNICAL ENGINEERING

API 1104 API 610/570/653 APIRP 2A ASME B31.3 AWS D1.1 Certified Welding Electrical Fabrication Instrumentation NACE Coating NDE Pipeline Process Pipeline QA/QC Inspection PMI Hot Works

Construction Rope Access Construction Site Engineers Fabrication Management Pipeline Planners Process Piping Project Management Project Planners Project Schedulers Specialists Structural

Capability

Studies Health Safety &

Environmental Advisors

Independent Auditing Services

Civil Electrical Mechanical

Third Party Inspection Limited

Page 1

1.0 COMPANYINFORMATION

1.1 Company Name: ThirdPartyInspectionLimited

1.2 Address for Communication:

103WoodfordStreet,Newtown,Port‐Of‐Spain Trinidad,WestIndies(W.I.)

1.3 Contact Names:

Chris Clement ManagingDirectorCell number 685‐4413(C) E-mail chris@3piltd.com DeloresTurton AdministrationManager Cell number 779‐7114(C) E-mail admin@3piltd.com

1.4 Office Telephone Numbers: (868)622‐9876/628‐7316

1.5 Fax Number: (868)628‐6008

1.6 Company Registration Country: RepublicofTrinidad&Tobago

1.7 Date of Company Registration: 23rdJanuary2006 (See Appendix 1: Company Registration Documents)

Third Party Inspection Limited

Page 2

2.0 SERVICESOFFERED

NatureofCompanyBusinessandServicesOffered

T.P.I. is leading the industry in providing specialized offshore and onshore support services for the construction and installation of dynamic steel structures, process modules, sub sea pipelines and manifolds, land lay pipelines, platforms and jackets including load outs and tie downs.

At TPI we offer construction management onshore and offshore inspection and we have a fabrication shop located in Chaguaramas where we do structural and process piping. Offshore we offer hook ups and structural modifications or upgrades We do our own in-house sandblasting and painting. At present we are working on projects for EOG, NGC, Gulf Mark, both onshore and offshore

Servicesinclude,butarenotlimitedtothefollowingcategories:

INSPECTION

WELDING&FABRICATION

SCAFFOLDING

TECHNICALASSESSMENTS

ENGINEERING

STRUCTURALANDPROCESSPIPING

ONSHOREANDOFFSHOREHOOKUPS

STRUCTURALMODIFICATIONANDUPGRADES

SANDBLASTINGANDPAINTINGINHOUSE

Third Party Inspection Limited

Page 3

3.0 QUALITYPOLICY

Our objectives are to:

Provide exceptional service and reliability,

Provide quality workmanship by committed and trained personnel,

Provide value for money using only suitable quality materials,

Satisfy our clients’ requirements, industry regulators and staff,

Provide these services in a professional and ethically responsible manner.

3.1 COMMITMENT & VISION

We  are  proactive  in  finding  solutions  for  our  clients  that  best  achieve  their goals.  Lasting  relationships  are  the  lifeblood  of  our  business.  We  want  the client  to  feel  that  our  staff  is  even more  committed  to  the  effort  than  their own  staff,  that’s  what  distinguishes  us.  Personal  attention  to  our  clients  as individuals, caring about them as individuals.   

VISION To be the Contractor and Employer of Choice by safely and consistently delivering successful and innovative projects and services. To that end, TPI’s motto is ‘We Deliver’.

4.0 CONTRACTS

CURRENTCONTRACTSBuoy/NustarEnergyPLEMInstallationInStEustatius/NustarEnergy

PLEM Fabrication- REDS Caribbean Ltd/ Jukes Group Embarkation Stand repair- Fairfield Nodal GangwayFitting - ROWAN Ralph Coffman- EOG Resources Repair fuel pipe on Discovery, Americas, Jack Ryan, Pathfinder, Enterprise Install Valves on the TOUCAN Platform for SERCAN Rigging and Rope Access Labour on BP Juniper Platform Scaffolding Labour services during SERCAN Drilling and Completion

Third Party Inspection Limited

Page 4

2016

 

CLIENT 

 

CONTRACT        DATE 

   

 (%)COMPLETED 

           

            DESCRIPTION 

McDermott  2016  100% 

NDE Platform Installation ‐ EOG Sercan project  

Coastal Dynamics   

2016   100% 

To uninstall davits and winch based system (Delta Skipper)  

Tidewater (Enabler)  

2016   100% 

Installation of ROV System   

ROWAN Trinidad  

2016   100% 

Repair of Crane Boom rest  

EOG Resources  

2016  

100% 26" Landing ring installation and conductor  

EOG Resources  

2016  

100% SERCAN Platform Offshore Construction & Hook‐up (Phase 1: Pre‐Drilling Campaign)  

ROWAN Drilling (Trinidad) Limited  

2016  

100%  BOP Setback Platform Fabrication  

Peterson Integrated Logistics TT Ltd  

2016  

100%  Davit fabrication: Swivel davit  

EOG Resources Trinidad 4(a) Unlimited  

2016  

100%  TOUCAN Compression Firewall: fabrication  

ROWAN Drilling (Trinidad) Limited 

2016  

100% To fabricate and supply Midship Crane Cab Foundation‐Joe Douglas  

 Fair Field Nodal  

2016   100% 

Embarkation platform‐NEC Explorer  

Third Party Inspection Limited

Page 5

2015

 

CLIENT 

 

CONTRACT        DATE 

    

(%)COMPLETED 

           

            DESCRIPTION 

EOG Resources 2015  

100%   Parula Helideck Structural Reinforcement  

Atlantic Maritime 

2015 

  100%  Miscellaneous work on Rowan Rig 3 

EOG Resources  2015  100%  Repairs to Kiskadee Platform 

Tidewater  2015  100% 

Installation of ROV & Equipment on  

Mss Jane 

Atlantic Maritime  2015  100%  Provision of Welders, Fitters &Scaffolders 

Peterson Integrated  2015  100%  Cold Stack access Office 

Peterson Integrated  2015  100%  Davit Fabrication/Swivel Stairway 

INTERMOOR  2015  100%  Flemish spliced soft eyes single leg swing 

NGC  2015  100% Replacement Of Compressor Deck Sheets On Teak Platform (Fixed Price) 

Superior Energy 

Service  2015  100%  Repairs of 20 40’ Sleepers 

EOG Resources  2015  100%  Pipe Support 

Peterson Integrated  2015  100%  Cold Stack access 3 

TISL  2015  100%   Fabricate Rope Access Tower 

 

  

Third Party Inspection Limited

Page 6

2014

NGC

Cellar & Compressor Deck Floor Sheet Replacements Teak Platform

Replacement of Wind Walls on Teak and Poui Platforms

CLIENT

CONTRACTDATE

(%)COMPLETED

DESCRIPTION

EOG Resources 2014

100% To Install Vent Scrubber On Kiskadee Platform 

EOG 2014 100%

Demolish & Refurbish The Interior Of The Kitchen On Kiskadee Platform 

Bourbon Offshore 2014 100%

To Supply Sprinklers & Chain Stopper

Bourbon Helios T&M

Subsea/Bidco 2014 100%

To Fabricate Two Rov Survey & Bracket &

Rov Work Basket (Fixed Price)

Procurement

Services Delaware 2014 100%

Installation Of Smit Towing Brackets - Petro

Saudi

Bourbon Offshore 2014 100%

Removing A Section Of The Deck On For

Bourbon Liberty

EOG Resources 2014 100%

Shop Fab. & Field Installation Of Pa-1a & Pa-2b Flowlines (Fixed Price)

EOG Resources 2014 100% 4 20' Conductor Casing 40' Long Painting 

NGC 2014 ongoingReplacement Of Compressor Deck Sheets On Teak Platform (Fixed Price) 

Trinity 2014 100%

To Fabricate & Install Piping For Dia. 3" Suction & Vent Line And Dia. 2" Discharge Line For Test Separator 

EOG Resources 2014 100%

Field Installation Of New Prod. Manifold

(Parula) (Fixed Price)

Tidewater Subsea

LLC 2014 100%Low Base Frame And Hipap Unit Removal (Fixed Price) 

Trinity 2014 100%

Fabrication & Installation of V-Notch on

Alpha Platform fix price

Third Party Inspection Limited

Page 7

Third Party Inspection Limited

Page 8

Previous Contracts Listing- 2013

CLIENT

CONTRACTDATE

(%)COMPLETED

DESCRIPTION

TRINITY 2013 100% FABRICATION OF TEMPORARY CONDUCTOR STABILIZATION BRACE  

TRINITY 2013

100%

INSTALLATION OF STABILIZATION CLAMPS FOR MP8 BRIGHTON REDEVEL OPMENT PROJECT  

TRINITY 2013

100%

MP8 DECK FABRICATION  

TRINITY 2013

100%

REMOVAL OF MP 8 PLATFORM  

TRINITY 2013

100%

TO FABRICATE AND INSTALL PIPE SUPPORTS  

TRINITY 2013

100%

INSTALLATION OF MP8 DECK  

  

5.0 PREVIOUSPROJECTS

Trinity Exploration MP8 Deck replacement.

BG Dolphin Platform Crane Boom Rest & Deck Extension.

EOG Kiskadee Platform North & East Deck Extension.

BP Ampleman structural Support Frame.

Trinity Exploration –Delta Platform Structural upgrades.

Trinity Exploration: Production Manifold fabrication.

Fluor Daniel South America Limited: ISOM Project: Petrotrin Refinery.

Eurtrue, s.r.l.: Inspection Services: Essau Oilfield Supplies Limited.

Junior Sammy Contractors Limited: ISOM Project: Petrotrin Refinery.

Fluor Daniel South America Limited: ISOM Project: Petrotrin Refinery.

Casbarian Engineering Associates LLC: Provision of

Services: Trinidad.

Third Party Inspection Limited

Page 9

Detailsoftypicalwarrantiesthatareofferedongoodsandservicesprovided.

With over twenty-five years experience in construction and installation, we are focused, dedicated and committed to providing the highest quality of service, which adheres to internationally recognized codes and standards (ASME 1X, ASME B31.3, ASME B31.8, API 1104, AWS D1.1 etc) including environmental health and safety which governs the petroleum industry.

At Third Party Inspection Ltd, we strive to develop mutually beneficial business relationships with our clients. We supply professionals who meet the demands of any project and we remain committed to providing competitive, efficient service without sacrifice to quality.

Ourphilosophycontinuestobringsuccessbecausewe:

Identify project requirements

Encourage customer feedback

Tailor services to satisfy the

needs of our customers

Promote teamwork

Supply qualified personnel

Third Party Inspection Limited

Page 10

6.0BANKINFORMATION

RepublicBankLimited58‐60TragareteRoad,Port‐of‐SpainTrinidad,WestIndies

7.0INSURANCE

Workmen’sCompensationInsurancecoverage

PublicLiabilityInsurancecoverage

(See information attached for Insurance Policies)

Third Party Inspection Limited

Page 11

8.0PERSONNEL

DetailsofManagersandKeyPersonnel

TPILPersonnelarehighlytrainedandqualified.

Name Position Qualifications

ChrisClement ManagingDirector

Fabrication&ConstructionSiteManager&QA/QCCoordinator

DeloresTurton AdministrationManager BusinessManagement

BrianFranco ProjectManager ProjectManagementProfessional

SteveBenjamin ProjectCoordinator ANSI/AWS/D1.1/ASMESec.IX6G

SumatieLalla Finance Accountant

StephanFrancis QA/QC CWI/NACE1

WallaceSampson HSEAdvisor

OSHAConstruction/GeneralCFR

Third Party Inspection Limited

Page 12

9.0 REFERENCES:

GULF MARK AMERICAS:MikePuckett

Manager

354-9231(M)

634-2071

EOG RESOURCES T’DAD LTD GeorgeVieria

Managing Director

822-5686 (O)

680-4213(M)

Third Party Inspection Limited

Page 13

10.0 Company Registration Document

CompanyRegistrationDocuments

&

Insurance&STOWCertificateNo:000228

Third Party Inspection Limited

Page 14

Third Party Inspection Limited

Page 15

Third Party Inspection Limited

Page 16

Third Party Inspection Limited

Page 17

11.0 STOW CERTIFICATE

Third Party Inspection Limited

Page 18

BACK

Third Party Inspection Limited

Page 19

Third Party Inspection Limited

Page 20

Third Party Inspection Limited

Page 21