corporate resume tpi - working on
TRANSCRIPT
THIRDPARTYINSPECTIONLIMITED
“LeadersinOffshoreandOnshoreConstruction”STOWCertificateno:000228(HighRiskLevel)
CORPORATEPROFILE
CorporateHeadquarters :103WoodfordStreet, Newtown,Port‐of‐Spain, Trinidad,W.I.
Office :(868)628‐7316/622‐622‐9876Facsimile :(868)628‐6008Website :www.3piltd.comE‐mail :[email protected]
Table of Contents
1.0 COMPANY INFORMATION -------------------1
2.0 SERVICES OFFERED---------------------------2
3.0 QUALITY POLICY-------------------------------3
4.0 CONTRACTS-------------------------------------3-6
5.0 PREVIOUS PROJECTS---------------------------7-8
6.0 BANK INFORMATION---------------------------9
7.0 INSURANCE-------------------------------------- 9
8.0 PERSONNEL--------------------------------------10
9.0 REFERENCES-------------------------------------11
10.0 COMPANY REGISTRATION DOCS-------------12-15
11.0 STOW CERTIFICATE ----------------------------16-17
About Us Services PROJECTS HSE QA-QC
INSPECTION MANAGEMENT TECHNICAL ENGINEERING
API 1104 API 610/570/653 APIRP 2A ASME B31.3 AWS D1.1 Certified Welding Electrical Fabrication Instrumentation NACE Coating NDE Pipeline Process Pipeline QA/QC Inspection PMI Hot Works
Construction Rope Access Construction Site Engineers Fabrication Management Pipeline Planners Process Piping Project Management Project Planners Project Schedulers Specialists Structural
Capability
Studies Health Safety &
Environmental Advisors
Independent Auditing Services
Civil Electrical Mechanical
Third Party Inspection Limited
Page 1
1.0 COMPANYINFORMATION
1.1 Company Name: ThirdPartyInspectionLimited
1.2 Address for Communication:
103WoodfordStreet,Newtown,Port‐Of‐Spain Trinidad,WestIndies(W.I.)
1.3 Contact Names:
Chris Clement ManagingDirectorCell number 685‐4413(C) E-mail [email protected] DeloresTurton AdministrationManager Cell number 779‐7114(C) E-mail [email protected]
1.4 Office Telephone Numbers: (868)622‐9876/628‐7316
1.5 Fax Number: (868)628‐6008
1.6 Company Registration Country: RepublicofTrinidad&Tobago
1.7 Date of Company Registration: 23rdJanuary2006 (See Appendix 1: Company Registration Documents)
Third Party Inspection Limited
Page 2
2.0 SERVICESOFFERED
NatureofCompanyBusinessandServicesOffered
T.P.I. is leading the industry in providing specialized offshore and onshore support services for the construction and installation of dynamic steel structures, process modules, sub sea pipelines and manifolds, land lay pipelines, platforms and jackets including load outs and tie downs.
At TPI we offer construction management onshore and offshore inspection and we have a fabrication shop located in Chaguaramas where we do structural and process piping. Offshore we offer hook ups and structural modifications or upgrades We do our own in-house sandblasting and painting. At present we are working on projects for EOG, NGC, Gulf Mark, both onshore and offshore
Servicesinclude,butarenotlimitedtothefollowingcategories:
INSPECTION
WELDING&FABRICATION
SCAFFOLDING
TECHNICALASSESSMENTS
ENGINEERING
STRUCTURALANDPROCESSPIPING
ONSHOREANDOFFSHOREHOOKUPS
STRUCTURALMODIFICATIONANDUPGRADES
SANDBLASTINGANDPAINTINGINHOUSE
Third Party Inspection Limited
Page 3
3.0 QUALITYPOLICY
Our objectives are to:
Provide exceptional service and reliability,
Provide quality workmanship by committed and trained personnel,
Provide value for money using only suitable quality materials,
Satisfy our clients’ requirements, industry regulators and staff,
Provide these services in a professional and ethically responsible manner.
3.1 COMMITMENT & VISION
We are proactive in finding solutions for our clients that best achieve their goals. Lasting relationships are the lifeblood of our business. We want the client to feel that our staff is even more committed to the effort than their own staff, that’s what distinguishes us. Personal attention to our clients as individuals, caring about them as individuals.
VISION To be the Contractor and Employer of Choice by safely and consistently delivering successful and innovative projects and services. To that end, TPI’s motto is ‘We Deliver’.
4.0 CONTRACTS
CURRENTCONTRACTSBuoy/NustarEnergyPLEMInstallationInStEustatius/NustarEnergy
PLEM Fabrication- REDS Caribbean Ltd/ Jukes Group Embarkation Stand repair- Fairfield Nodal GangwayFitting - ROWAN Ralph Coffman- EOG Resources Repair fuel pipe on Discovery, Americas, Jack Ryan, Pathfinder, Enterprise Install Valves on the TOUCAN Platform for SERCAN Rigging and Rope Access Labour on BP Juniper Platform Scaffolding Labour services during SERCAN Drilling and Completion
Third Party Inspection Limited
Page 4
2016
CLIENT
CONTRACT DATE
(%)COMPLETED
DESCRIPTION
McDermott 2016 100%
NDE Platform Installation ‐ EOG Sercan project
Coastal Dynamics
2016 100%
To uninstall davits and winch based system (Delta Skipper)
Tidewater (Enabler)
2016 100%
Installation of ROV System
ROWAN Trinidad
2016 100%
Repair of Crane Boom rest
EOG Resources
2016
100% 26" Landing ring installation and conductor
EOG Resources
2016
100% SERCAN Platform Offshore Construction & Hook‐up (Phase 1: Pre‐Drilling Campaign)
ROWAN Drilling (Trinidad) Limited
2016
100% BOP Setback Platform Fabrication
Peterson Integrated Logistics TT Ltd
2016
100% Davit fabrication: Swivel davit
EOG Resources Trinidad 4(a) Unlimited
2016
100% TOUCAN Compression Firewall: fabrication
ROWAN Drilling (Trinidad) Limited
2016
100% To fabricate and supply Midship Crane Cab Foundation‐Joe Douglas
Fair Field Nodal
2016 100%
Embarkation platform‐NEC Explorer
Third Party Inspection Limited
Page 5
2015
CLIENT
CONTRACT DATE
(%)COMPLETED
DESCRIPTION
EOG Resources 2015
100% Parula Helideck Structural Reinforcement
Atlantic Maritime
2015
100% Miscellaneous work on Rowan Rig 3
EOG Resources 2015 100% Repairs to Kiskadee Platform
Tidewater 2015 100%
Installation of ROV & Equipment on
Mss Jane
Atlantic Maritime 2015 100% Provision of Welders, Fitters &Scaffolders
Peterson Integrated 2015 100% Cold Stack access Office
Peterson Integrated 2015 100% Davit Fabrication/Swivel Stairway
INTERMOOR 2015 100% Flemish spliced soft eyes single leg swing
NGC 2015 100% Replacement Of Compressor Deck Sheets On Teak Platform (Fixed Price)
Superior Energy
Service 2015 100% Repairs of 20 40’ Sleepers
EOG Resources 2015 100% Pipe Support
Peterson Integrated 2015 100% Cold Stack access 3
TISL 2015 100% Fabricate Rope Access Tower
Third Party Inspection Limited
Page 6
2014
NGC
Cellar & Compressor Deck Floor Sheet Replacements Teak Platform
Replacement of Wind Walls on Teak and Poui Platforms
CLIENT
CONTRACTDATE
(%)COMPLETED
DESCRIPTION
EOG Resources 2014
100% To Install Vent Scrubber On Kiskadee Platform
EOG 2014 100%
Demolish & Refurbish The Interior Of The Kitchen On Kiskadee Platform
Bourbon Offshore 2014 100%
To Supply Sprinklers & Chain Stopper
Bourbon Helios T&M
Subsea/Bidco 2014 100%
To Fabricate Two Rov Survey & Bracket &
Rov Work Basket (Fixed Price)
Procurement
Services Delaware 2014 100%
Installation Of Smit Towing Brackets - Petro
Saudi
Bourbon Offshore 2014 100%
Removing A Section Of The Deck On For
Bourbon Liberty
EOG Resources 2014 100%
Shop Fab. & Field Installation Of Pa-1a & Pa-2b Flowlines (Fixed Price)
EOG Resources 2014 100% 4 20' Conductor Casing 40' Long Painting
NGC 2014 ongoingReplacement Of Compressor Deck Sheets On Teak Platform (Fixed Price)
Trinity 2014 100%
To Fabricate & Install Piping For Dia. 3" Suction & Vent Line And Dia. 2" Discharge Line For Test Separator
EOG Resources 2014 100%
Field Installation Of New Prod. Manifold
(Parula) (Fixed Price)
Tidewater Subsea
LLC 2014 100%Low Base Frame And Hipap Unit Removal (Fixed Price)
Trinity 2014 100%
Fabrication & Installation of V-Notch on
Alpha Platform fix price
Third Party Inspection Limited
Page 7
Third Party Inspection Limited
Page 8
Previous Contracts Listing- 2013
CLIENT
CONTRACTDATE
(%)COMPLETED
DESCRIPTION
TRINITY 2013 100% FABRICATION OF TEMPORARY CONDUCTOR STABILIZATION BRACE
TRINITY 2013
100%
INSTALLATION OF STABILIZATION CLAMPS FOR MP8 BRIGHTON REDEVEL OPMENT PROJECT
TRINITY 2013
100%
MP8 DECK FABRICATION
TRINITY 2013
100%
REMOVAL OF MP 8 PLATFORM
TRINITY 2013
100%
TO FABRICATE AND INSTALL PIPE SUPPORTS
TRINITY 2013
100%
INSTALLATION OF MP8 DECK
5.0 PREVIOUSPROJECTS
Trinity Exploration MP8 Deck replacement.
BG Dolphin Platform Crane Boom Rest & Deck Extension.
EOG Kiskadee Platform North & East Deck Extension.
BP Ampleman structural Support Frame.
Trinity Exploration –Delta Platform Structural upgrades.
Trinity Exploration: Production Manifold fabrication.
Fluor Daniel South America Limited: ISOM Project: Petrotrin Refinery.
Eurtrue, s.r.l.: Inspection Services: Essau Oilfield Supplies Limited.
Junior Sammy Contractors Limited: ISOM Project: Petrotrin Refinery.
Fluor Daniel South America Limited: ISOM Project: Petrotrin Refinery.
Casbarian Engineering Associates LLC: Provision of
Services: Trinidad.
Third Party Inspection Limited
Page 9
Detailsoftypicalwarrantiesthatareofferedongoodsandservicesprovided.
With over twenty-five years experience in construction and installation, we are focused, dedicated and committed to providing the highest quality of service, which adheres to internationally recognized codes and standards (ASME 1X, ASME B31.3, ASME B31.8, API 1104, AWS D1.1 etc) including environmental health and safety which governs the petroleum industry.
At Third Party Inspection Ltd, we strive to develop mutually beneficial business relationships with our clients. We supply professionals who meet the demands of any project and we remain committed to providing competitive, efficient service without sacrifice to quality.
Ourphilosophycontinuestobringsuccessbecausewe:
Identify project requirements
Encourage customer feedback
Tailor services to satisfy the
needs of our customers
Promote teamwork
Supply qualified personnel
Third Party Inspection Limited
Page 10
6.0BANKINFORMATION
RepublicBankLimited58‐60TragareteRoad,Port‐of‐SpainTrinidad,WestIndies
7.0INSURANCE
Workmen’sCompensationInsurancecoverage
PublicLiabilityInsurancecoverage
(See information attached for Insurance Policies)
Third Party Inspection Limited
Page 11
8.0PERSONNEL
DetailsofManagersandKeyPersonnel
TPILPersonnelarehighlytrainedandqualified.
Name Position Qualifications
ChrisClement ManagingDirector
Fabrication&ConstructionSiteManager&QA/QCCoordinator
DeloresTurton AdministrationManager BusinessManagement
BrianFranco ProjectManager ProjectManagementProfessional
SteveBenjamin ProjectCoordinator ANSI/AWS/D1.1/ASMESec.IX6G
SumatieLalla Finance Accountant
StephanFrancis QA/QC CWI/NACE1
WallaceSampson HSEAdvisor
OSHAConstruction/GeneralCFR
Third Party Inspection Limited
Page 12
9.0 REFERENCES:
GULF MARK AMERICAS:MikePuckett
Manager
354-9231(M)
634-2071
EOG RESOURCES T’DAD LTD GeorgeVieria
Managing Director
822-5686 (O)
680-4213(M)
Third Party Inspection Limited
Page 13
10.0 Company Registration Document
CompanyRegistrationDocuments
&
Insurance&STOWCertificateNo:000228
Third Party Inspection Limited
Page 14
Third Party Inspection Limited
Page 15
Third Party Inspection Limited
Page 16
Third Party Inspection Limited
Page 17
11.0 STOW CERTIFICATE
Third Party Inspection Limited
Page 18
BACK
Third Party Inspection Limited
Page 19
Third Party Inspection Limited
Page 20
Third Party Inspection Limited
Page 21