Cryoceiling Vendor Site VisitSolicitation Number: NNC10ZH0023J
August 17, 2010
Cre
w E
xplo
ratio
n V
ehic
le P
roje
ct O
ffice
2
Agenda
Cryoshroud wall panels
Cryoceiling &Cryoceiling Support Structure*
Cryoshroud structural mast
and support booms
Test Chamber
Cryoceiling toChamber AttachmentHardware*
Cryoceiling Supply andReturn piping
• Site Showing Considerations
• Scope of Procurement• Design Considerations• Facility Description• Key Procurement
Considerations
* Identifies elements that are part of this procurement
Cre
w E
xplo
ratio
n V
ehic
le P
roje
ct O
ffice
3
Site Showing Considerations
• Goal of Site Showing is to facilitate a background understanding of facility, existing equipment and logistics.
• Please submit all questions in written form.– Oral questions will be discussed ; however, official responses
will be in written form. – All questions shall be submitted as an e-mail to Mark Rebholz by
August 20th at 4:00 pm.
• Please sign-in.
Cre
w E
xplo
ratio
n V
ehic
le P
roje
ct O
ffice
4
• Procure Cryoshroud Ceiling (Cryoceiling) Assembly with nominal dimension of 40 foot in diameter.– Cryoceiling panel– Support Structure– Cryoceiling to Chamber Attachment Hardware
• Procure Cryoceiling Handling Fixture– Interface between cryoceiling assembly and cryofloor cart for transportation/ storage in SPF.
• Retain Cryoceiling Lifting Hardware– Special lifting equipment (non-COTS)
• Tasks include:– Design, Fabrication, Shipment, and Assembly– Acceptance Tests are Provided by Government
• Prior to Contract Completion– Low Pressure Leak Test– Helium Leak Test– Pneumatic Proof Test
• Post Contract Completion– Installation– Cold Shock– Integrated System Test
• Duration– Sixteen Months
Cryoceiling
Cryoceiling toChamber AttachmentHardware
Cryoceiling SupportStructure
Scope of Procurement
Cre
w E
xplo
ratio
n V
ehic
le P
roje
ct O
ffice
5
Key Design Considerations
• Size– Cryoceiling is 38.5 ft diameter
• Flow characteristics– Specified for both liquid nitrogen and gaseous nitrogen with an MAWP of
190 psi.– Performance characteristics consistent with other panels in terms of
pressure drop and temperature uniformity .• Coated with high-emissivity, low-outgassing black paint• Structural Considerations
– Designed to be integrated with existing cryoshroud panels and mast and boom support structure.
– Suspended from the 60,000 lb chamber hardpoints.– Installed into position using polar crane with cryowalls/doors open.– Transported from assembly area to chamber by cryofloor.
• Reliance upon National Consensus Codes and Standards (NCS) and NASA specifications for defining design, quality and execution considerations.– NASA GRC Pressure System Office buy-off is required for pressure
containing assemblies.• B31.3 is heavily relied upon.
Cre
w E
xplo
ratio
n V
ehic
le P
roje
ct O
ffice
6
Key Design Considerations
• Cryoceiling Hardware shall not interfere with other cryoshroud hardware including doors and mast.
6
Column Mast
WallBrace
Jib Rod
0o Open
I-BeamHanger
35o Full Retraction
-45o Closed
-80o Full Swing
Jib Boom
Cre
w E
xplo
ratio
n V
ehic
le P
roje
ct O
ffice
7
Cryofloor Cart Interface with Handling Fixture
• Description– Cryofloor Cart will be used as storage and
means of transporting the cryoceiling.– 40 ft by 40 ft cryofloor panel rests on a support
cart.– Support cart moves between the assembly
area – chamber - disassembly area on the facility railroad tracks
– Hardpoints penetrate through the cryoshroud floor panel between tube extrusions and carry test article load to the cart
– Rated for 50 lb/ft2 loading– Coated with black paint (Cat-a-Lac) with
measured emissivity of .88– Applicable Existing Drawings is PF-40632.
Cryo-floorPanel
Rail Wheel Sets StructuralSupport BeamsWith Hardpoints 6061 Aluminum I-Beam
S12 x 50
HardpointCold FloorExtrusions
Cre
w E
xplo
ratio
n V
ehic
le P
roje
ct O
ffice
Space Power Facility Description
Cre
w E
xplo
ratio
n V
ehic
le P
roje
ct O
ffice
Assembly Highbay
150 ft long x 75 ft wide x 88 ft high to girders (75 ft to crane bridge)
50 ft x 50 ft East door to outdoor loading area
50 ft x 50 ft West lightweight door to minimize dust entry into test chamber
Overhead bridge crane w/ 25-ton main hoist and 5-ton auxiliaryon same trolley (75 ft lift, 69 ft bridge span, ~62 ft hoist span). Currently no micro-motion capability on this crane.
Currently space is heated only, no air conditioning
Auxiliary penthouse with stationary 2-ton hoist with > 90 ft lift
Three sets of standard gauge rail tracks from outdoor loading area through highbay and into test chamber (100,000 lb per 4-wheel truck with 3’ on-center wheel spacing)
110 VAC, 208 VAC, 480 VAC power available
Middle 37’-4” floor is 1’-7” thick concrete, remaining 6” thick. (Floor live load 40,000 lb on 5’ wheel axle spacing)
Adjacent electrical, machine, welding, and fabrication shop
Cre
w E
xplo
ratio
n V
ehic
le P
roje
ct O
ffice
Vacuum Test Chamber
• Largest space simulation chamber in the world(100 ft diameter cylinder up to 72 ft height, hemisphere up to 122 ft)(Welded 3083 aluminum, shell plates 3003 alloy cladding)
• 6’ – 8’ thick concrete vacuum enclosure surrounds aluminum test chamber and is the primary pressure vessel (Operates @ 20 Torr (0.5 psia))
• Annulus and chamber volumes are each ~800,000 cubic feet• Polar crane Main hoist: 20 ton, Working radius: 0’ to 19’, 360 degree Polar
crane Auxiliary hoist: 10 ton, Fixed radius: 34’-6”, 360 degreeRefurbishment in-process including micro-motion controls
• Removable standard gauge rail tracks through chamber• Chamber pressure: Ambient (740 Torr) to high-vacuum (10-6 Torr)• Rough Vacuum:
– Two parallel roughing mechanical pumping trains(4,000 horsepower, 5-stages each train, pump to ~.01 Torr)
• High-Vacuum:– Ten, regenerating cryopumps (52” dia, high-vacuum isolation valves– Removed 16 oil diffusion pumps, and 16 oil diffusion pumps remain
(welded closed to chamber)(chamber interior ‘cleaned’ in 2007 to remove silicon oil deposits)
– Five turbomolecular pumps (Aid cross-over pumping, removal of non-condensable gases)
Cre
w E
xplo
ratio
n V
ehic
le P
roje
ct O
ffice
Thermal Vacuum Chamber
Cre
w E
xplo
ratio
n V
ehic
le P
roje
ct O
ffice
Existing Cryogenic Systems
LN2 & GN2 Distribution Systems • LN2 supply for cryoshroud, cryopumps, and test hardware
• 28,000 gallon LN2 Storage (150 psi supply)
• 217,000 gallon LN2 Dewar (atmospheric pressure)
• Cryoshroud GN2 recirculation with LN2 desuperheater (-250 F)
• 11,000 CFM compressors circulate GN2 thru cryoshrouds
• GN2 bottle storage ~136,000 SCFM @ 2400 psi
• 1 MW of heat removal capability
Existing Cryoshrouds GN2 CompressorsLN2 Storage Tanks
28,000 gal 217,000 gal
Cre
w E
xplo
ratio
n V
ehic
le P
roje
ct O
ffice
13
Procurement Considerations
• Solicitation Number is NNC10ZH0023J– SOW is Attachment A and reference in Section J of Solicitation– Amendment 1 revises SOW appendix A by updating drawing list and providing interfacing
drawings as PDF’s.• Posted on Federal Business Opportunities
– https://www.fbo.gov– Use Solicitation Number NNC10ZH0023J or keyword “cryoceiling”
• Type of Procurement– Request for Proposal– Competitive Procurement– Small-Business set aside– Best Value
• Two Options identified in SOW– Disruption for Government convenience during assembly period
• 1 day• 1 week
– Warranty to cover workmanship after cryoshock and installation.• Contracting Officer (Primary Point of Contact during proposal phase)
– Mark A Rebholz• Phone 216-433-8706, Fax 216-433-5489, Email Mark.A.Rebholz@nasa.gov -
• Contracting Officer Technical Representative– Henry Speier 419-621-3335
Cre
w E
xplo
ratio
n V
ehic
le P
roje
ct O
ffice
14
Procurement Considerations
• Site-Specific Safety and Health Plan is required.• Work Flow structured into three “phases”
– Design– Off-site Fabrication – On-site Assembly and Acceptance
• Contract does not cover actual installation in the chamber– Only installation procedures.
• Coldshock and in-position testing are not included in contract.– Include warranty as an option to cover workmanship after
cryoceiling is installed and tested in chamber.
Cre
w E
xplo
ratio
n V
ehic
le P
roje
ct O
ffice
15
Proposal Considerations
• Section L: Instructions, Conditions, and Notices to Offerors needs to be reviewed for preparation of proposal.– L15 through L18 define some of the specific information that will
be required as part of the proposal package.– Each element needs to be addressed.
• Section M describes how the information provided in L15 through L18 will be evaluated. – Is approach fundamentally sound?
• Technically• Project Control
– Does offeror have capability to provide the promised services?– Is offeror’s approach unduly disruptive to government activities?
• Proposals Due by August 30, 2010 by 4:00 pm