driffield sports centre
Post on 26-Mar-2016
232 Views
Preview:
DESCRIPTION
During my time at Atkins Global, Leeds, I was given the opportunity to work alongside the Architects on this scheme. I was responsible for the finishes packages which included carpet, tiles and paint finishes.
TRANSCRIPT
top related