1

Presented By:

Komonchanh PHET ASA

Electricite du Laos

EDL’S POWER DEVELOPMENT PLAN

2016-2025

Contents

Introduction

Present Status

PDP 2016-2025

Challenge for ASEAN Interconnection

2

2

Lao PDR has large hydro-power potential with

estimates varying from 18,000 MW to 26,000 MW, out

of which only 18% has been developed so far.

MOUs were signed with the Thai Government to supply

from 3,300 MW to 7,000 MW to Thailand, also with the

Vietnamese Government to supply power of about

5,000 MW by the year 2020 and planned Export to

Myanmar about 300 MW.

Introduction

3

Present Status

Increase of installed Capacity for the whole country up

to now

Power Plants in the Whole Country

Installed Capacity for the whole country in 2016

Total : 6,308 MW

EDL : 627 MW IPP(d) : 1,269 MW

IPP(e) : 4,410 MW SPP&IPP : 3.3 MW4

3

Present StatusSystem of EDL

At present, the high voltage

transmission system was

already linked from North-

Central 1-Central 2 areas while

Central 2 and Southern link is

under construction and

expected to be completed in

July 2016.

The National Control Centre

(NCC) in Vientiane Capital

was completed in 2013.

In the future, the NCC will be

able to operate all the grid

system and dispatch all the

power plants in the country.

North

Central 1

Central 2

South

Import from China

40-60 MW

International

connecting Lines

with EGAT for

Exchange Power

5

Present Status

6

System of EDL

8 locations are 230/115/22kV substations

52 locations are 115/22kV substations

Substation

1,926 km in Northern

1,775 km in Central 1

1,275 km in Central 2

808 km in Southern

5,784 km in Whole Country

Transmission Line

4

Present Status

Increase of installed Capacity for the whole country up

to now

Power Plants for Domestic Supply

Installed Capacity for the whole country (at Month 3/2016)

Total : 2,100 MW

EDL : 627 MW IPP(d) : 1,247 MW

IPP(e) : 202 MW Prov. : 3.3 MW7

System of EDL

Present Status

The peak load (MW) has been increased continuously by

13%-15% a year. The peak load of the whole country was

1,008 MW last year (2015).

System of EDL

8

Average increase about 13% a year

5

Gross Power Generation and Power Export/Import 2005-2015

Present StatusSystem of EDL

9

The average generation: 2,387 GWh p.a.

The average export: 480 GWh p.a

The average Import: 895 GWh. p.a.

Monthly Generation and Demand in 2015

Present StatusSystem of EDL

10

6

Monthly Generation, Export and Import in 2015

Present StatusSystem of EDL

11

Monthly Demand and Supply Balance in 2015

Present StatusSystem of EDL

12

In dry season (Nov-June) EDL import Power from neighboring

countries (Thailand, Vietnam and China, etc..) but In rainy season

(Jul-Sep) EDL export power to neighboring countries

7

The current Peak Load is only 63% of the total installed

capacity

EDL exports the surplus energy during the rainy season

and imports some energy during the dry season, because

most of the hydro-power plants are run-off river plants

and the firm capacities are relatively small.

The above conditions will continue a couple of years.

When the base load of the country increases in a large

scale, then the base-load power plants are required for

the secure supply, such as thermal plants in the future.

Present Status

System of EDL

13

14

To supply enough the electric energy sufficient to the domestic

demand and for the export to neighboring countries, to expedite

the development of electric energy source, EDL will set the

policies as follows:

1. EDL will put necessary investment as much as possible

on new power plants

2. EDL will buy all the power produced by IPP in the

country, which means that EDL will be the single and

only buyer of electric power in the country

3. EDL will purchase the power from foreign countries and

will sell the surplus power to neighboring countries.

Strategy on Power Plants Investment Plan

PDP 2016-2025System of EDL

8

15

Based on the Power Development Plan, the most of domestic

power plant are hydro. Thus, in order to make the power

system stable, EDL should diversify the power sources as

follows:

1)The hydropower plant with reservoir;

2)The Solar Power;

3)The Wind Power;

4)The thermal power plant;

5)Other clean power sources.

Strategy on Generation Development Plan

PDP 2016-2025System of EDL

Increase about 14% a year

Demand Forecasts Including System Losses

System of EDL

PDP 2016-2025

16

Average increase about 14% a year

9

Generation Expansion Plan

System of EDL

PDP 2016-2025

17

Increase about 20% a year

Demand and Supply Balance in 2016-2025

System of EDL

18

PDP 2016-2025

10

Summary in the years 2016-2025 composes of:

2,509 MW owned by EDL

10,314 MW owned by IPP(d)

689 MW owned by IPP(e)

Generation Expansion Plan

PDP 2016-2025System of EDL

There are 52 Locations of the planned substation in the whole

country to be developed in horizon 2016-2025:

14 locations are 500/230/115/22kV substations

16 locations are 230/115/22kV substations

22 locations are 115/22kV substations

Substation Development Plan

The total lengths of the planned transmission lines to be

developed in horizon 2016-2025, there are:

4,799 km owned by EDL

2,988 km owned by IPP(d)

87 km owned by IPP(e)

Transmission Line Development Plan

19

20

Network in 2025System of EDL

Planned International

connection lines with

neighboring countries

11

Network in 2025System of EDL Planned International connection lines with neighboring countries

21

From

China Thailand

(CSG) (EGAT) (kV)

China

1 Na Mo 2 Banna 2 500 2023

Thailand

1 Pakxan Boungkan 2 230 2019

2 Nabong Oudon 3 2 500 2019

3 Ban Lak 25 Obon 3 2 500 2019

4 M Houn Thawangpha 2 500 2023

Cambodia

1 Ban Hat Cambodia 2 500 2023

Vietnam

1 EDL Vietnam 2 500 2023

Myanmar

1 M Houn Myanmar 2 230 2020

1 4 1 1 1Total

Laos Cambodia

No.Voltage

CODNo. cct

Vietnam Myanmar

Transmission Line

To

Challenge for ASEAN Interconnection

To fulfill ASEAN Interconnection in the near future, EDL

would like to corporate with ASEAN countries as follow:

Joint-PDP- Electricity Demand Forecasts

- Generation Expansion Plan

- Demand and Supply Balance

- Transmission Expansion Plan

- Grid Interconnection between ASEAN Countries

Set up a Technical Team for Power System Analysis

- Net work analysis (Adequacy, Stability and etc.)

- Economic feasibility for interconnection projects

Set up the power market rules for fair trade of

electricity (Pricing mechanism)

22

12

Thank You