edl’s power development plan 2016-2025 · on new power plants 2. edl will buy all the power...
Post on 27-Apr-2020
2 Views
Preview:
TRANSCRIPT
1
Presented By:
Komonchanh PHET ASA
Electricite du Laos
EDL’S POWER DEVELOPMENT PLAN
2016-2025
Contents
Introduction
Present Status
PDP 2016-2025
Challenge for ASEAN Interconnection
2
2
Lao PDR has large hydro-power potential with
estimates varying from 18,000 MW to 26,000 MW, out
of which only 18% has been developed so far.
MOUs were signed with the Thai Government to supply
from 3,300 MW to 7,000 MW to Thailand, also with the
Vietnamese Government to supply power of about
5,000 MW by the year 2020 and planned Export to
Myanmar about 300 MW.
Introduction
3
Present Status
Increase of installed Capacity for the whole country up
to now
Power Plants in the Whole Country
Installed Capacity for the whole country in 2016
Total : 6,308 MW
EDL : 627 MW IPP(d) : 1,269 MW
IPP(e) : 4,410 MW SPP&IPP : 3.3 MW4
3
Present StatusSystem of EDL
At present, the high voltage
transmission system was
already linked from North-
Central 1-Central 2 areas while
Central 2 and Southern link is
under construction and
expected to be completed in
July 2016.
The National Control Centre
(NCC) in Vientiane Capital
was completed in 2013.
In the future, the NCC will be
able to operate all the grid
system and dispatch all the
power plants in the country.
North
Central 1
Central 2
South
Import from China
40-60 MW
International
connecting Lines
with EGAT for
Exchange Power
5
Present Status
6
System of EDL
8 locations are 230/115/22kV substations
52 locations are 115/22kV substations
Substation
1,926 km in Northern
1,775 km in Central 1
1,275 km in Central 2
808 km in Southern
5,784 km in Whole Country
Transmission Line
4
Present Status
Increase of installed Capacity for the whole country up
to now
Power Plants for Domestic Supply
Installed Capacity for the whole country (at Month 3/2016)
Total : 2,100 MW
EDL : 627 MW IPP(d) : 1,247 MW
IPP(e) : 202 MW Prov. : 3.3 MW7
System of EDL
Present Status
The peak load (MW) has been increased continuously by
13%-15% a year. The peak load of the whole country was
1,008 MW last year (2015).
System of EDL
8
Average increase about 13% a year
5
Gross Power Generation and Power Export/Import 2005-2015
Present StatusSystem of EDL
9
The average generation: 2,387 GWh p.a.
The average export: 480 GWh p.a
The average Import: 895 GWh. p.a.
Monthly Generation and Demand in 2015
Present StatusSystem of EDL
10
6
Monthly Generation, Export and Import in 2015
Present StatusSystem of EDL
11
Monthly Demand and Supply Balance in 2015
Present StatusSystem of EDL
12
In dry season (Nov-June) EDL import Power from neighboring
countries (Thailand, Vietnam and China, etc..) but In rainy season
(Jul-Sep) EDL export power to neighboring countries
7
The current Peak Load is only 63% of the total installed
capacity
EDL exports the surplus energy during the rainy season
and imports some energy during the dry season, because
most of the hydro-power plants are run-off river plants
and the firm capacities are relatively small.
The above conditions will continue a couple of years.
When the base load of the country increases in a large
scale, then the base-load power plants are required for
the secure supply, such as thermal plants in the future.
Present Status
System of EDL
13
14
To supply enough the electric energy sufficient to the domestic
demand and for the export to neighboring countries, to expedite
the development of electric energy source, EDL will set the
policies as follows:
1. EDL will put necessary investment as much as possible
on new power plants
2. EDL will buy all the power produced by IPP in the
country, which means that EDL will be the single and
only buyer of electric power in the country
3. EDL will purchase the power from foreign countries and
will sell the surplus power to neighboring countries.
Strategy on Power Plants Investment Plan
PDP 2016-2025System of EDL
8
15
Based on the Power Development Plan, the most of domestic
power plant are hydro. Thus, in order to make the power
system stable, EDL should diversify the power sources as
follows:
1)The hydropower plant with reservoir;
2)The Solar Power;
3)The Wind Power;
4)The thermal power plant;
5)Other clean power sources.
Strategy on Generation Development Plan
PDP 2016-2025System of EDL
Increase about 14% a year
Demand Forecasts Including System Losses
System of EDL
PDP 2016-2025
16
Average increase about 14% a year
9
Generation Expansion Plan
System of EDL
PDP 2016-2025
17
Increase about 20% a year
Demand and Supply Balance in 2016-2025
System of EDL
18
PDP 2016-2025
10
Summary in the years 2016-2025 composes of:
2,509 MW owned by EDL
10,314 MW owned by IPP(d)
689 MW owned by IPP(e)
Generation Expansion Plan
PDP 2016-2025System of EDL
There are 52 Locations of the planned substation in the whole
country to be developed in horizon 2016-2025:
14 locations are 500/230/115/22kV substations
16 locations are 230/115/22kV substations
22 locations are 115/22kV substations
Substation Development Plan
The total lengths of the planned transmission lines to be
developed in horizon 2016-2025, there are:
4,799 km owned by EDL
2,988 km owned by IPP(d)
87 km owned by IPP(e)
Transmission Line Development Plan
19
20
Network in 2025System of EDL
Planned International
connection lines with
neighboring countries
11
Network in 2025System of EDL Planned International connection lines with neighboring countries
21
From
China Thailand
(CSG) (EGAT) (kV)
China
1 Na Mo 2 Banna 2 500 2023
Thailand
1 Pakxan Boungkan 2 230 2019
2 Nabong Oudon 3 2 500 2019
3 Ban Lak 25 Obon 3 2 500 2019
4 M Houn Thawangpha 2 500 2023
Cambodia
1 Ban Hat Cambodia 2 500 2023
Vietnam
1 EDL Vietnam 2 500 2023
Myanmar
1 M Houn Myanmar 2 230 2020
1 4 1 1 1Total
Laos Cambodia
No.Voltage
CODNo. cct
Vietnam Myanmar
Transmission Line
To
Challenge for ASEAN Interconnection
To fulfill ASEAN Interconnection in the near future, EDL
would like to corporate with ASEAN countries as follow:
Joint-PDP- Electricity Demand Forecasts
- Generation Expansion Plan
- Demand and Supply Balance
- Transmission Expansion Plan
- Grid Interconnection between ASEAN Countries
Set up a Technical Team for Power System Analysis
- Net work analysis (Adequacy, Stability and etc.)
- Economic feasibility for interconnection projects
Set up the power market rules for fair trade of
electricity (Pricing mechanism)