emily li portfolio 2014-2015
Post on 06-Apr-2016
244 Views
Preview:
DESCRIPTION
TRANSCRIPT
-
EMILY LIPORTFOLIO 2014 - 2015
-
UNIVERSITY OF WATERLOO SCHOOL OF ARCHITECTURE
E: lirunyi@gmail.comT: +39 (389) 948 - 3619 (ITALIAN)
HI THERE,
I AM A PASSIONATE FOURTH-YEAR ARCHITECTURE STUDENT (CURRENTLY IN ITALY!) LOOKING FOR NEW EXPERIENCES.
PLEASE FEEL FREE TO LOOK THROUGH MY WORK AND CONTACT ME!
-
LIGHTWATER GARDEN (FALL 2013)
RETAIL PROJECTS (WINTER AND SPRING 2014)
GRAFTING HOUSE (FALL 2014)RSUM 6
10
16
24
30
TERRACING LANDSCAPE (WINTER 2013)
TABLE OF CONTENTS
4
-
TRADITIONAL ART
MISC. PROJECTS
BASILICA DI SAN CLEMENTE (FALL 2011)
NOH HOSPITAL (SPRING 2013)36
40
46
48
50
CYPRESS HILLS MODULAR HOUSING (FALL 2012)
OUTSIDE COVER: GIAMBATTISTA NOLLIS MAP OF ROME (1748)
INSIDE COVER: VENICIAN MORNING PHOTO BY ME (2014)
5
-
SUMMARY OF QUALIFICATIONS
Strong communication and interpersonal skills developed through extensive work experiencesResponsible team player proven by positive results in group assignmentsEnthusiastic hard worker willing to learn and accept constructive criticism from colleaguesExceptional organization skills established through managing multiple projects simultaneously Capable of adjusting to extra hours and flexible with schedules Ambitious, polite, and a supportive worker
TECHNICAL SKILLS SUMMARY
AutoCAD Autodesk Revit
Rhinoceros and V-RayGoogle SketchUpAdobe Photoshop Adobe Illustrator Adobe InDesign
Adobe Premier Pro Adobe Flash
Microsoft OfficeHand drafting skills
Model making abilitiesChinese Korean Italian
Japanese
EDUCATION
Graduated Cardinal Carter Academy for the Arts with honours in 2010University of Waterloo - School of Architecture, 2010-present
LEARNING PROFICIENT EXPERIENCED EXPERT
RSUM
EMILY (RUN YI) LI5338 BELLOWS AVE, MISSISSAUGA, ON, L5R3R7
E: lirunyi@gmail.comT: +39 (389) 948 - 3619 (ITALIAN)
AWARDS AND CERTIFICATES
Presidents Scholarship Award of University of Waterloo for great academic merits (90%+ entrance average) in 2010Awards of Distinction for 2007 Pascal and 2008 Caley math contestsCertification for National Lifesaving Society and First Aid in 2009
6
-
SUMMARY OF QUALIFICATIONS
Strong communication and interpersonal skills developed through extensive work experiencesResponsible team player proven by positive results in group assignmentsEnthusiastic hard worker willing to learn and accept constructive criticism from colleaguesExceptional organization skills established through managing multiple projects simultaneously Capable of adjusting to extra hours and flexible with schedules Ambitious, polite, and a supportive worker
AWARDS AND CERTIFICATES
Presidents Scholarship Award of University of Waterloo for great academic merits (90%+ entrance average) in 2010Awards of Distinction for 2007 Pascal and 2008 Caley math contestsCertification for National Lifesaving Society and First Aid in 2009
Proposed creative ideas for assigned projects, which pleased the clients and supervisors
Assisted fellow colleagues to complete projects at critical times. (ie. deadlines)
Provided young and fresh energy to the office with cheerful attitude
Improved in AutoCAD, correcting working drawings, filing, and various other skills
Studied and implemented NYC Building Codes in project designs
Completed site surveys for many projects, and constructed orthographic drawings for future use
Improved significantly in Google SketchUp, creating complex models and presentation renderings
Brought positive and bright spirits to the firm by friendly interactions with colleagues
Brainstormed ideas for the concept of the interior designs in NOH hospital
Assisted with the completion of the 100% Construction Documents for NOH hospital
Participated in designing a competition project situated in Vancouver
Aquired significant skills in Autodesk Revit working seamlessly with colleagues
Independently undertook projects with minimal support from supervisors
Managed direct communication with various clients, landlords, suppliers, contractors, and more
Extensively involved in various stages of multiple retail projects
Improved immensely in handling Construction Administration phases of projects
PILLON ARCHITECT INC.
Junior TechnicianToronto (2012)
(reference letter available)
LACINA - HEITLER ARCHITECTS
Architecture InternNew York (2012)
(reference letter attached)
PARKIN ARCHITECTS LTD.
Architecture InternToronto (2013)
QUADRANGLE ARCHITECTS LTD.
Architecture InternToronto (2014)
(reference letter attached)
WORK EXPERIENCES
7
-
12 November 2014 Re: Letter of Reference Emily Li To Whom It May Concern: During the summer of 2014 Emily worked with our office as a student. Her time with us included production of roll out retail spaces from the design phase to the construction of several projects, in addition, she aided in the contract administration of a large retail project. Emily completed her tasks quickly and accurately asking for direction when needed. She was a pleasure to work with and we would not hesitate to have her work with us again in the future. If you have any questions please do not hesitate to contact the undersigned. Yours truly, Quadrangle Architects Limited Greg Livingstone Emily Li 2014 Reference.docx
12 November 2014 Re: Letter of Reference Emily Li To Whom It May Concern: During the summer of 2014 Emily worked with our office as a student. Her time with us included production of roll out retail spaces from the design phase to the construction of several projects, in addition, she aided in the contract administration of a large retail project. Emily completed her tasks quickly and accurately asking for direction when needed. She was a pleasure to work with and we would not hesitate to have her work with us again in the future. If you have any questions please do not hesitate to contact the undersigned. Yours truly, Quadrangle Architects Limited Greg Livingstone Emily Li 2014 Reference.docx
8
-
LACINA HEITLER, INC. 135 FIFTH AVENUE NEW YORK, NY 10010 T: 212.533.4250 F: 212.533.4251 WWW.LACINA-HEITLER.COM
March 6, 2013 Recommendation for Run Yi (Emily) Li To Whom it May Concern, I am writing this letter with upmost sincerity in the recommendation of Emily Li. An Architectural Intern with our firm from September to December of 2012, Emilys responsibilities included the development of architectural design drawings, drawing management, drafting, presentation preparation and material research. In addition, she participated in the schematic design and concept development of several small and large-scale projects. A bright, highly-capable and valued member of our team, Emilys contributions not only aided the effectiveness and productivity of our firms initiatives, but directly contributed to the success of each project she participated in. Throughout her time with our firm, Emily proved herself a dependable and consistent employee. She was able to handle multiple tasks and ensured that each was executed promptly and efficiently. We were continually impressed with Emilys software utilization and design proficiency; as well as her ability to produce a quality of work exceeding that of most interns. Her professional manner and ability to deliver within extremely tight timelines gave senior staff confidence in her ability to meet the assignment requirements with minimal supervision. With a demonstrated dedication and dependability beyond her years, Emily was an absolute pleasure to have in our office. Considerate, clever and quite funny, we were sad to see her leave when the co-op semester ended. These qualities paired with her enthusiastic commitment to architectural practices suggest someone who will contribute much to the profession. We are excited to see what the future holds for Ms. Li, and I am therefore pleased to recommend her for any position she wishes to pursue. Sincerely,
Doug Houstoun, RA Senior Associate
9
-
GRAFTING HOUSEROME, ITALY(FALL 2014)
Tucked in a corner of the Aurelian Wall near piazza del popolo, this layered house suits the needs of an artist; a botanical illustrator. The peaceful location and the Italian climate zone allows the artist to not only research plant species from the nearby Villa Borghese gardens, but also to grow their own specimens.
SITE PLANGoogle SketchUp and Phtoshop10
-
AB
B
A
TOP LEVEL FLOOR PLANLIVING AREA FLOOR PLAN
LOWER LEVEL FLOOR PLANAutoCAD and Illustrator
11
-
The idea of grafting in this case is the process of restoring a ruined part of the Aurelian wall. These particular sections of the wall are covered almost completely in vegetation as nature slowly eats away at this archeological site. This house clears away the plants and aims to restore the wall to its original glory. Interstingly, this segment of the wall is solid on the interior, and so most of the interior spaces are built by carving out earth from behind the walls. Most parts of the wall remain intact throughout the house and acts as the buffer space between the gardens and the living quarters.
EXPERIENTIAL PERSPECTIVEGoogle SketchUp and Photoshop12
-
SOUTH ELEVATION RENDERFEATURE STAIRCASE RENDER
Google SketchUp and Photoshop13
-
The extreme level difference throughout the house allows for creative ways of assigning the various programmes. There are 5 major scissoring levels throughout the house, from the top garden level, the threshold level, studio level, living level, to the bottom-most low-light garden level. At the top entrance level, one can look out to see a breathtaking view of the Piazza del Popolo and when one gets down to the lowest level, there is a small trail that leads to the public road.
SECTION AAAutoCAD, Illustrator, and Photoshop14
-
SECTION BBAutoCAD, Illustrator, and Photoshop 15
-
LIGHTWATER GARDEN TORONTO, CANADA(FALL 2013)
The purpose of this garden is to appreciate the beauties of light and water. We encounter these two things too often in our everyday lives that we dont stop and think of what we see or consume. This garden, situated on a detached island from downtown Toronto, creates the perfect opportunity for the public to leave the city life and experience light and water.
D
D
6
NIGHT SITE PLANDAY SITE PLANAutoCAD, Illustrator, and Photoshop
16
-
1E
C
E
A
A
C
B
B
3
2
4
5
17
-
SITE SECTION AAAutoCAD, Illustrator, And Photoshop
1. Marshland Place of Repose
18
-
2. Winter Canal Through Swamp 3. Marshland Boardwalk
19
-
SECTION BBAutoCAD, Illustrator, and Photoshop
4. Lantern-filled Pond
20
-
5. Firefly Forest 6. Heavily Forested Canal
21
-
The design of this garden implements the ideals of a Fascinist architecture by focusing on the atmosphere of the site. It is influenced by the patterns created in a bubble chamber when two particles collide together. In direct contrast to the 17th century French formal gardens like the garden of Versailles which impose order over nature, this garden is to represent the chaos of todays society as a result of the collapse in time and space; anything can exist anywhere.
The garden has many paths, either by foot, bicycle or canoe, that pedestrians can take to experience the garden. It is surrounded by 4 large programmes: the piazza market, the beach, an outdoor amphitheatre, and a firefly conservatory. It accommodates all day, all season-long, creating unique experiences each time. The entire site becomes a recreational centre for shows, exhibitions, and more.
SECTION CCSECTION DDSECTION EEAutoCAD, Illustrator, and Photoshop
22
-
MARSHLAND
SWAMP
FOREST
BEACH
STREET CAR TRACK
FERRY WATERWAY
WATER CURRENT
CONTEXT PLANAutoCAD, Illustrator, and Photoshop 23
-
BAY S
T
BREADALBANE ST
WELLESLEY ST E
YO
NG
E S
T
TERRACING LANDSCAPEARCH 392 FINAL PROJECTRUN YI (EMILY) LI
SITE GROUND FLOOR PLAN 1:250
A
A.
B
B.
AB
PRODUCTION OFFICE
STAGE LOADING
UPPER THEATRE
LOBBY
THEATRE
STAGE HOUSE
GENERAL STORAGE
KITCHEN
BAR
BOX OFFICE SALES
WINDOW
CONTROL/DIM ROOM
RETAIL WITH
MEZZANINE
CAFEKITCHEN
LIVE-WORK GALLERY
SUPPORT SPACE
FRONT DESK
RETAIL WITH
MEZZANINE
RETAIL WITH
MEZZANINE
RETAIL WITH
MEZZANINE
CAFE
OFFICE LOBBY
STORAGE
BIKE STORAGE/
WORKSHOP
MULTI-PURPOSE
ROOM
OFFICE
LOBBY
MEETING ROOM
TERRACING LANDSCAPE TORONTO, ON(WINTER 2013)
This urban multi-use complex is situated in the heart of Toronto. The entire building system sits on a man-made typography site that entices pedestrians to go throuhgh the site, enjoying the urban park.
LEVEL 1 PLANAutoCAD and Illustrator24
-
BAY S
T
BREADALBANE ST
WELLESLEY ST EY
ON
GE
ST
TERRACING LANDSCAPEARCH 392 FINAL PROJECTRUN YI (EMILY) LI
SITE GROUND FLOOR PLAN 1:250
A
A.
B
B.
AB
PRODUCTION OFFICE
STAGE LOADING
UPPER THEATRE
LOBBY
THEATRE
STAGE HOUSE
GENERAL STORAGE
KITCHEN
BAR
BOX OFFICE SALES
WINDOW
CONTROL/DIM ROOM
RETAIL WITH
MEZZANINE
CAFEKITCHEN
LIVE-WORK GALLERY
SUPPORT SPACE
FRONT DESK
RETAIL WITH
MEZZANINE
RETAIL WITH
MEZZANINE
RETAIL WITH
MEZZANINE
CAFE
OFFICE LOBBY
STORAGE
BIKE STORAGE/
WORKSHOP
MULTI-PURPOSE
ROOM
OFFICE
LOBBY
MEETING ROOM
25
-
STAGE HOUSE
POOL
POOL MECHANIC
ROOM/ STORAGE
CHANGE ROOM
WEIGHT ROOM
CHANGE ROOM
UPPER LOBBY
REHEARSAL SPACE
REHEARSAL SPACE
REHEARSAL SPACE
REHEARSAL SPACE
CAFEUPPER LEVEL
STORAGE
ELEVATOR ROOM
W.C.
CONFERENCE ROOM
COMPUTER ROOM
OFFICE
W.C.
OFFICEOFFICEOFFICEOFFICEOFFICE OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICEOFFICE
CONFERENCE ROOM
LEVEL 2 PLANLEVEL 3 PLANAutoCAD and Illustrator
26
-
YOGA/DANCE
TO THE OUTDOOR
PATIO
LEVEL 4 PLANLEVEL 5 PLAN
AutoCAD and Illustrator27
-
SECTION BB 1:250SECTION AA 1:500
This complex consists of a theatre, a gallery, an office building with retail units on the first floor. Covered with trees, the site is stratigically shadowed by two bridges to create places of repose, with additional green area on the roof of the theatre. There is also a cafe to initiate people to stroll up to the upper levels of the park.
MODULAR UNITSGoogle SketchUp and PhotoshopSECTION AAAutoCAD and Illustrator
28
-
SECTION BB 1:250SECTION AA 1:500DAY RENDER
Google SketchUp and PhotoshopSECTION BB
AutoCAD and Illustrator
29
-
Project Description:
Item Ontario Building CodeData Matrix Part 9
OBC Reference
1.1.2. [A]9.10.1.3.
MajorOccupancy(s):
3.1.2.1.(1) 9.10.2.
Building Area (m) 1.4.1.2. [A]
Gross Area (m)
Number of Storeys 1.4.1.2. [A] & 3.2.1.1.
Number of Streets/Access Routes 3.2.2.10. & 3.2.5.5.
Building Classification 3.2.2.20.-.83. 9.10.2.
Sprinkler System Proposed 9.10.8.2.
3.2.2.20.-.83.
3.2.1.5.
3.2.2.17.
Standpipe required 3.2.9.
Fire Alarm required 3.2.4. 9.10.18.
Water Service/Supply is Adequate
High Building 3.2.6
Permitted Construction 3.2.2.20.-.83. 9.10.6.
Actual Construction
Mezzanine(s) Area (m) 9.10.4.1.3.2.1.1.(3)-(8)
Occupant load based on 9.9.1.3.3.1.17.
1st Floor
Mezzanine Floor
For additional floors refedit, stretch and copy text down
Barrier-free Design 3.8. 9.5.2.
Hazardous Substances 3.3.1.2. & 3.3.1.19. 9.10.1.3.(4)
Required FireResistance
Rating (FRR)
3.2.2.20.-.83. & 3.2.1.4. 9.10.8.Horizontal AssembliesFRR (Hours)
Listed Design No.or Description (SG-2) 9.10.9.
FRR of SupportingMembers
Listed Design No.or Description (SG-2)
Spatial Separation - Construction of Exterior Walls 9.10.14.3.2.3.
Wall Area ofEBF(m)
L.D.(m)
L/Hor
H/L
PermittedMax. % ofopenings
Proposed% of
Openings
FRR(Hours)
ListedDesign or
Description
CombConst
Comb.Constr. Nonc.
Cladding
Non Comb.Constr.
Occupancy
Occupancy
Load
Load
persons
persons
Floors Hours
Roof Hours
Mezzanine Hours
Floors Hours
Roof Hours
Mezzanine Hours
PART 11 PART 3 PART 9
1.1.2. [A]
9.10.20.
New
Addition
Alteration
Change of Use
11.1. to 11.4.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Existing to Remain New Total
Existing to Remain New Total
Above Grade Below Grade
Entire Building
Basement Only
In Lieu of Roof Rating
Not Required
Yes No
Yes No
Yes No
No
Non-Combustible BothCombustible
Non-Combustible BothCombustible
m/Person Design of Building
Yes No (Explain)
3.2.5.7. N/A
N/A
N/A
Yes No
Erase X's from inappropriate check boxes
References are to Division B unlessnoted [A] for Division A or [C] for Division
C.
1.4.1.2. [A]
1.4.1.2. [A] 1.4.1.2. [A]
1.4.1.2. [A]& 9.10.4.
Firm Name: Quadrangle Architects Limited
Certificate of Practice Number: 1254
Address: 901 King Street WestToronto, Ontario M5V 1E3T 416 598 1240F 416 598 3123
Name of Project:
Location of Project:
Plumbing Fixture Reauirements20
Male/Female Count @ % / %except as noted otherwise
1st Floor:
Mez. Floor:
Occupancy
Occupancy
Occupancy
Occupancy
PART 3 PART 9
21 Other (describe)
TotalOccupantLoad
BC TableNumber
FixturesRequiredper sex
FixturesProvidedper sex
3.7.4.7(2)
(Adjust as Required for Additional Floors or Occupancies)
RETAIL
X
GROUP EMERCANTILE
1
X
X
X
Bass Pro Shops
Niagara, Ontario
81222sf 81222sf
3.2.2.57 GROUP E, ANY HEIGHT ANY AREA
X
X
GROUP E
SERVICE
0
EAST
WEST
SOUTH
100%
100%
N/A
N/A
N/A
N/A
50 50
E
X
X
X
X
NORTH
-
X
100%
100%> 20 X
E
0
1420 3.7.4.7 5F, 3M 6F, 4M
1420
3
116 m2 (1250 sq.ft)
1
1
> 20
> 20
> 20
X
n/a
n/a
1
X
X
X
X
81222sf 81222sf
ULC # I516
ULC # W407
BASS PRO SHOPSNIAGARA-ON-THE-LAKE, ONISSUED FOR CONSTRUCTION4 FEBRUARY 2014
SHEET INDEX BUILDING CODE INFORMATION CONSULTANTS
GOVERNING CODES: BUILDING & STRUCTURAL: 2006 ONTARIO BUILDING CODE (OBC) ENERGY CONSERVATION: 2006 ONTARIO BUILDING CODE (OBC) MECHANICAL: 2006 ONTARIO BUILDING CODE (OBC) ELECTRICAL: 2006 ONTARIO BUILDING CODE (OBC) PLUBING: 2005 NATIONAL PLUMBING CODE OF CANADA FIRE PROTECTION: 2006 ONTARIO BUILDING CODE (OBC) ACCESSIBILITY: 2006 ONTARIO BUILDING CODE (OBC)
CURRENT ZONING: PLANNED DEVELOPMENT
USE GROUPS MERCANTILE. WITH BUSINESS AND S1 ACCESSORY USES
CONSTRUCTION TYPE 2B UNLIMITED, FULLY SPRINKLED
BUILDING AREA 81,222 SF.
ALLOWABLE AREA UNLIMITED, PER OBC SECTION 3.2.2.57. FULLY SPRINKLEDWITH 60'-0"+ PUBLIC WAY AROUND ENTIRETY OF THEBUILDING.
FIRE PROTECTION FULLY SPRINKLED (AUTOMATIC) COMPLYING WITH OBCWITH AUTOMATIC FIRE ALARM COMPLYING WITH OBCSECTION 3.2.4.
OCCUPANT LOAD 1,423, OCCUPANTS. DETERMINED THROUGH USE OFINDIVIDUAL SPACES. PLEASE SEE SHEET A0.1 FOREGRESS LOADS AND EXIT PATHS.
EXITS REQUIRED: 4 ACTUAL: 10
STRUCTURAL
S0.1 COVERS1.1 GENERAL NOTES AND TYPICAL DETAILSS1.2 GENERAL NOTES AND TYPICAL DETAILSS1.3 GENERAL NOTES AND TYPICAL DETAILSS1.4 GENERAL NOTES AND TYPICAL DETAILSS2.1 GROUND FLOOR/ FOUNDATION PLAN - OVERALLS2.1A GROUND FLOOR/ FOUNDATION PLAN - AREA 'A'S2.1B GROUND FLOOR/ FOUNDATION PLAN - AREA 'B'S2.1C GROUND FLOOR/ FOUNDATION PLAN - AREA 'C'S2.1D GROUND FLOOR/ FOUNDATION PLAN - AREA 'D'S2.2 MAIN ROOF FRAMING PLAN - OVERALLS2.2A ROOF FRAMING PLAN - AREA 'A'S2.2B ROOF FRAMING PLAN - AREA 'B'S2.2C ROOF FRAMING PLAN - AREA 'C'S2.2D ROOF FRAMING PLAN - AREA 'D'S2.3 HIGHER ROOF FRAMING PLANS3.1 COLUMN SCHEDULES3.2 COLUMN SCHEDULES4.1 ELEVATIONSS4.2 ELEVATIONSS4.3 ELEVATIONSS5.1 FOUNDATION SECTIONS
MECHANICAL
M0-1.0 HVAC GENERAL NOTES, DETAILS AND LEGENDM0-1.1 HVAC DETAILSM1-1.0 HVAC PLAN - AREA AM1-1.1 HVAC PLAN - AREA BM1-1.2 HVAC PLAN - AREA CM1-1.3 HVAC PLAN - AREA DM1-2.0 HVAC ROOF PLANM2-1.0 MECHANICAL SCHEDULES
PLUMBING
P0-1.0 PLUMBING GENERAL NOTES, SCHEDULES AND LEGENDP0-1.1 PLUMBING DETAILSP1-1.0 PLUMBING AND DRAINAGE PLAN - AREA AP1-1.1 PLUMBING AND DRAINAGE PLAN - AREA BP1-1.2 PLUMBING AND DRAINAGE PLAN - AREA CP1-1.3 PLUMBING AND DRAINAGE PLAN - AREA DP1-2.0 PLUMBING AND DRAINAGE ROOF PLANP2-1.0 ENLARGED FLOOR PLAN - DRAINAGEP2-1.1 ENLARGED FLOOR PLAN - WATER & GAS
FIRE PROTECTION PLAN
F1-1.0 FIRE PROTECTION PLAN - AREA AF1-1.1 FIRE PROTECTION PLAN - AREA BF1-1.2 FIRE PROTECTION PLAN - AREA CF1-1.3 FIRE PROTECTION PLAN - AREA D
ELECTRICAL
E1-1.0 ELECTIRICAL LEGEND AND DRAWING LISTE1-1.1 ELECTRICAL ROOM 'A' PANEL SCHEDULEE1-1.2 ELECTRICAL ROOM 'B' PANEL SCHEDULEE1-1.3 ELECTRICAL ROOM 'C' PANEL SCHEDULEE1-1.4 SINGLE LINE DIAGRAME2-1.0 UNDERSLAB POWER CONDUITS - OVERALL PLANE2-1.1 OVERALL POWER PLANE2-1.2 POWER PLAN - AREA 'A'E2-1.3 POWER PLAN - AREA 'B'E2-1.4 POWER PLAN - AREA 'C'E2-1.5 POWER PLAN - AREA 'D'E2-1.6 ELECTRICAL ROOF PLANE2-1.7 ELECTRICAL ROOMS, WIRING CLOSETS & DETAILSE2-1.8 ELECTRICAL DETAILSE3-1.0 OVERALL LIGHTING PLANE3-1.1 LIGHTING PLAN - AREA 'A'E3-1.2 LIGHTING PLAN - AREA 'B'E3-1.3 LIGHTING PLAN - AREA 'C'E3-1.4 LIGHTING PLAN - AREA 'D'E3-1.5 EXTERIOR SIGNAGE PLANE3-1.6 LIGHTING DETAILSE3-1.7 LIGHTING DETAILSE3-1.8 L CONNECTION AND LIGHTING CONTROLSES-1.9 L CONNECTION AND LIGHTING CONTROLSE4-1.0 OVERALL VOICE/DATA PLANE4-1.1 VOICE/DATA PLAN - AREA 'A'E4-1.2 VOICE/DATA PLAN - AREA 'B'E4-1.3 VOICE/DATA PLAN - AREA 'C'E4-1.4 VOICE/DATA PLAN - AREA 'D'E5-1.0 OVERALL SECURITY/ LOW VOLTAGE PLANE5-1.1 SECURITY/ LOW VOLTAGE PLAN - AREA 'A'E5-1.2 SECURITY/ LOW VOLTAGE PLAN - AREA 'B'E5-1.3 SECURITY/ LOW VOLTAGE PLAN - AREA 'C'E5-1.4 SECURITY/ LOW VOLTAGE PLAN - AREA 'D'E5-1.5 MISCELLANEOUS LOW VOLTAGE DETAILSE6-1.1 FIRE ALARM PLANE6-1.2 FIRE ALARM SYSTEM RISER DIAGRAM
ARCHITECTURAL
A0.0 COVER SHEETAS1.0 SITE PLANA0.1 EGRESS & CODE ANALYSIS PLAN - FIRST FLOORA0.2 EGRESS & CODE ANALYSIS PLAN - MEZZANINEA0.3 GENERAL NOTESA1.0 WALL AND PARTITION TYPESA1.1 OVERALL FIRST FLOOR PLANA1.1A ENLARGED FIRST FLOOR PLAN - AREA AA1.1B ENLARGED FIRST FLOOR PLAN - AREA BA1.1C ENLARGED FIRST FLOOR PLAN - AREA CA1.1D ENLARGED FIRST FLOOR PLAN - AREA DA1.2 OVERALL MEZZANINE PLANA1.3 MEZZANINE PLANA1.4 LOADING DOCK DETAILSA1.5 PLAN DETAILSA2.1 ROOF PLANA2.2 ROOF DETAILSA2.3 ROOF DETAILSA2.4 ROOF DETAILSA2.5 ROOF DETAILSA3.1 OVERALL EXTERIOR ELEVATIONSA3.2 ENLARGED EXTERIOR ELEVATIONS - EASTA3.3 ENLARGED EXTERIOR ELEVATIONS - NORTHA3.4 ENLARGED EXTERIOR ELEVATIONS - WESTA3.5 ENLARGED EXTERIOR ELEVATIONS - SOUTHA3.6 EXTERIOR SIGNAGEA3.7 INTERIOR SIGNAGEA4.1 OVERALL BUILDING SECTIONSA4.2 OVERALL BUILDING SECTIONSA4.3 WALL SECTIONSA4.4 WALL SECTIONSA4.5 WALL SECTIONSA4.6 WALL SECTIONSA4.7 WALL SECTIONSA4.8 WALL SECTIONS - GREETER'S LOG FEATUREA4.9 ENLARGED FIREPLACE PLAN & DETAILSA4.10 EIFS TYPICAL DETAILSA4.11 MISCELLANEOUS SECTIONSA4.12 LADDERSA4.13 MISCELLANEOUS SECTIONSA4.14 MISCELLANEOUS SECTION DETAILSA5.1 INTERIOR ELEVATIONS KEY PLANA5.2 OVERALL INTERIOR ELEVATIONSA5.3 ENLARGED INTERIOR ELEVATIONS - EASTA5.4 ENLARGED INTERIOR ELEVATIONS - WESTA5.5 ENLARGED INTERIOR ELEVATIONS - NORTHA5.6 ENLARGED INTERIOR ELEVATIONS - SOUTHA5.7 ENLARGED INTERIOR ELEVATIONSA5.8 ENLARGED INTERIOR ELEVATIONS
A5.9 INTERIOR ELEVATIONSA5.10 ENLARGED AQUARIUM PLANS AND DETAILSA5.11 ENLARGED LOBBY PLANS AND ELEVATIONSA5.12 ENLARGED ARCHERY RANGE PLANS AND DETAILSA5.13 SLAT WALL DETAILSA5.14 FRONT BUSINESS AREA INTERIOR ELEVATIONSA5.15 BACK BUSINESS AREA INTERIOR ELEVATIONSA5.16 BACK BUSINESS AREA INTERIOR ELEVATIONSA5.17 CASEWORK PLANS AND DETAILSA5.18 CAMPING STRUCTURE SECTIONS AND DETAILSA5.19 RESTROOM INTERIOR ELEVATIONSA5.20 TOILET PARTITION ELEVATIONS AND DETAILSA5.21 ENLARGED FITTING ROOM PLANS AND DETAILSA5.22 ENLARGED FITTING ROOM PLANS AND DETAILSA5.23 ENLARGED GIFT WALL PLANS AND DETAILSA5.24 CAMPING STRUCTUREA6.1 OVERALL FIRST FLOOR REFLECTED CEILING PLANA6.1A FIRST FLOOR REFLECTED CEILING PLAN - AREA AA6.1B FIRST FLOOR REFLECTED CEILING PLAN - AREA BA6.1C FIRST FLOOR REFLECTED CEILING PLAN - AREA CA6.1D FIRST FLOOR REFLECTED CEILING PLAN - AREA DA6.2 NOT USEDA6.3 NOT USEDA6.4 CEILING DETAILSA7.1 OVERALL FIRST FLOOR FINISH PLANA7.1A FIRST FLOOR FINISH PLAN - AREA AA7.1B FIRST FLOOR FINISH PLAN - AREA BA7.1C FIRST FLOOR FINISH PLAN - AREA CA7.1D FIRST FLOOR FINISH PLAN - AREA DA7.2 NOT USEDA7.3 DOOR AND WINDOW SCHEDULEA7.4 FINISH SCHEDULE & LEGENDA7.5 NOT USEDA7.6 NOT USEDA7.7 NOT USEDA7.8 HEAD / JAMB / SILL DETAILSA8.1 OVERALL FIRST FLOOR EMBED AND TRACK PLANA8.1A FIRST FLOOR EMBED AND TRACK PLAN - AREA AA8.1B FIRST FLOOR EMBED AND TRACK PLAN - AREA BA8.1C FIRST FLOOR EMBED AND TRACK PLAN - AREA CA8.1D FIRST FLOOR EMBED AND TRACK PLAN - AREA DA8.2 TRACKS, ETCHINGS, AND EMBEDS DETAILSA8.3 COMPASS ROSE DETAILSA9.1 FIRST FLOOR RETAIL PLANA9.1A PARTIAL FIRST FLOOR RETAIL PLAN - AREA AA9.1B PARTIAL FIRST FLOOR RETAIL PLAN - AREA BA9.1C PARTIAL FIRST FLOOR RETAIL PLAN - AREA CA9.1D PARTIAL FIRST FLOOR RETAIL PLAN - AREA D
LANDSCAPE
L0.0 OVERALL PLANL1.0 HARDSCAPE PLANL1.01 HARDSCAPE PLANL1.1 HARDSCAPE DETAILSL2.0 LANDSCAPE PLANL2.01 LANDSCAPE PLANL2.1 LANDSCAPE DETAILS
OWNER: PROJECT CONTACT: DAVE SLAVIN BASS PRO SHOPS
2500 E KEARNEY STREETSPRINGFIELD, MISSOURI, 65893, USA
(417) 873-4569dwslavin@basspro.com
LANDLORD CONTACT: PROJECT CONTACT: HEATHER MORRISON IVANHOE CAMBRIDGE
95 WELLINGTON STREET WESTSUITE 300TORONTO, ONTARIO, M5J 2R2
(416) 471-1364heather.morrison@ivanhoecambridge.com
ARCHITECT: PROJECT CONTACT: GREG LIVINGSTONE QUADRANGLE ARCHITECTS LIMITED
901 KING STREET WEST SUITE 701TORONTO, ONTARIO, M5V 3H5
(416) 598-1240glivingstone@quadrangle.ca
STRUCTURAL ENGINEER: PROJECT CONTACT: HANAKUMBO MWANANHONZE READ JONES CHRISTOFFERSEN
144 FRONT STREET WEST SUITE 500TORONTO, ONTARIO, M5J 2L7
(416) 977-5335hmwanangonze@rjc.ca
MEP ENGINEER: PROJECT CONTACT: STEPHEN HALL THOMAS A. FEKETE LTD
7181 WOODBINE AVE. UNIT 229MARKHAM, ONTARIO L3R 1A3
(905) 946 4260stephen@tafeng.ca
JEFFREY GUOjeffrey@tafeng.ca
LANDSCAPE: PROJECT CONTACT: RAY MYERS RAA DESIGN, LLC
1835 SAVOY DRIVE SUITE 107ATLANTA, GEORGIA, 30341, USA
(404) 352-2200rmyers@raa-design.com
RETAIL PROJECTSTORONTO, ON(WINTER AND SPRING 2014)
During this 8-month co-op term, I was mostly involved in extremely fast-paced retail projects. For some, Ive developed drawings from the beginning of the project to see the final construction within a 6-month period. Most other retail designs were completed with colleagues and I participated in schematic design, design development, construction documents, construction administration, as well as project-end follow-up. It was truly an unique and extensive learning experience.
BASS PRO SHOP NIAGARA CONSTRUCTION DRAWING SETAutoCAD
30
-
5'-0"5'-0"
11'-5
1/2
"34
8'-5
1/2
"11
'-5 1
/2"
40'-0
"40
'-0"
40'-0
"40
'-0"
20'-7
"20
'-7"
19'-5
"19
'-5"
40'-0
"40
'-0"
40'-0
"40
'-0"
40'-0
"40
'-0"
40'-0
"40
'-0"
4'-4
3/8
"
4'-4
3/8
"35
'-7 5
/8"
35'-7
5/8
"
5'-3
1/4
"
5'-3
1/4
"11
'-8 3
/4"
11'-8
3/4
"
42'-11 3/8"42'-11 3/8" 40'-0"40'-0" 40'-0"40'-0" 40'-0"40'-0" 26'-10"26'-10" 13'-2"13'-2" 40'-0"40'-0" 36'-3 3/8"36'-3 3/8" 5'-7"5'-7"
AREA D
AR
EA
C
AREA A
AR
EA
D
AREA C
AREA B
AR
EA
B
AR
EA
A
1 2 3.2 4 5 6 6.4 7 8 9 10
A
B
C
D
E
F
G
H
J
KL
MN
P
A
B
C
D
E
F
G
H
J
KL
MN
P
1 2 3.2 3.1 4 5 5.1 5.2 6 6.2 6.4 7 7.1 8 9 1011
'-5 1
/2"
348'
-5 1
/2"
11'-5
1/2
"40
'-0"
40'-0
"40
'-0"
40'-0
"21
'-3 3
/8"
21'-3
3/8
"18
'-8 5
/8"
18'-8
5/8
"40
'-0"
40'-0
"40
'-0"
40'-0
"40
'-0"
40'-0
"40
'-0"
40'-0
"
4'-4
3/8
"
4'-4
3/8
"35
'-7 5
/8"
35'-7
5/8
"
5'-3
1/4
"
5'-3
1/4
"11
'-8 3
/4"
11'-8
3/4
"
5'-0"289'-9 3/4"
5'-0" 40'-0" 34'-1 7/8"34'-1 7/8"
40'-0"
9'-10 1/4" 9'-10 1/2" 16'-7 1/2"32'-2 3/4" 7'-9 1/4" 5'-10" 34'-1 3/8"34'-2" 36'-3 3/8"36'-3 3/8" 5'-7"5'-7"
348'
-5 1
/2"
289'-9 3/4"
348'
-5 1
/2"
289'-9 3/4"7'-9 1/4"20'-3 1/4"9'-10 1/4"5'-10 1/8" 5'-10"20'-3 1/4" 9'-10 1/2" 15'-7 1/4"
289'-9 3/4"
+/- 2
05'-8
1/4
"E
XTE
NT
OF
STE
PP
ED
FO
UN
DA
TIO
N W
ALL
. RE
FER
TO
ELE
V. A
ND
STR
UC
. DW
GS
.
+/- 12'-9 1/2" +/- 45'-10 1/2"
+/- 60'-11 7/8"
+/- 2
7'-3
3/4
"
+/- 3
8'-1
"
+/- 65'-11"
3
2'-11 3/8"
4.3
5'-10 1/8"
4.24.1
34'-1 7/8"
40'-0"
6.1
348'
-5 1
/2"
40'-0
"
2A4.2
5A4.1
1A4.1
2A4.1
1A4.2
3A4.2
3A4.1
4A4.1
4A4.2
6A4.1
100
ENTRYVESTIBULE
101LOBBY
102
CUSTOMERSERVICE
103
COUNTROOM
104
CASHROOM
105
EXITVESTIBULE
106
WIRECLOSET 'B'
107CHECKOUT
108
FOOTWEARWAREHOUSE
110
WOMEN'SRESTROOM
111
MEN'SRESTROOM
112EXIT
113
POWDERSTORAGE
114
GUNSTOCK
115
ARCHERYRANGE
116
SECURITYOFFICE
118
GENERALOFFICE
109
ELECTRICALROOM
119
G.M.OFFICE
120
H.R.MANAGER 121
EXIT
122
VIDEOCONFERENCE
123
BREAKROOM
124
MAINTENANCECAGE
125
PCXROOM
126
RISERROOM
127
WIRECLOSET 'A'
128WAREHOUSE
129LSS
130AQUARIUM
131
LOADINGDOCK
132
BOATPARTS
133
PARTSCOUNTER
134
SERVICEMANAGER
135
WIRECLOSET 'C'
136
BOATRIGGING
137FISHING
138MARINE
139WATERSPORTS
140
BOATSALES
141COPY
142OFFICE
143OFFICE
144OFFICE
145
ELEC CARTSTORAGE146
CARTSTORAGE
148
DRESSINGROOM
149
DRESSINGROOM
150
DRESSINGROOM
151
WOMEN'SCLOTHING
152GIFTS
153RAINWEAR
154KIDS
155
DRESSINGROOM
156
HUNTINGCLOTHING
158
DRESSINGROOM
159
DRESSINGROOM
160
DRESSINGROOM
161REDHEAD
162GIFTS
163FOOTWEAR
164T-SHIRTS
165HUNTING
166ARCHERY
147
NATURALREFLECTIONS
157
MEN'SCLOTHING
SYSTEMS - FILTERSYSTEMS - FILTER SYSTEMS - FILTERSYSTEMS - FILTER
MAINTAINCE DESK
9 1/
8"10
'-10
3/4"
11'-1
0 3/
8"27
'-2 1
/8"
15'-0
1/2
"13
'-6 1
/4"
73'-6
3/4
"47
'-3 3
/4"
5'-4
"5'
-4"
14'-6
3/8
"15
'-11"
9'-7
3/8
"39
'-10
1/8"
26'-1 3/8"
6'-1
1 1/
8"
15'-1
1 1/
4"
6'-1
1 3/
4"
5'-6"
49'-5
1/2
"
5'-10 3/4" 12'-8 3/4"
61'-6 1/8" 15'-11 3/4"
10'-5
7/8
"
3'-2
1/8
"15
'-4"
4'-0
"7'
-4"
3 7/
8"
12'-7" 16'-6 3/4" 12'-1 3/8" 7'-3 1/4"
5'-6
"8'
-11
7/8" 1
0'-1
" 22'
-4 1
/8"
27'-9
"24
'-8 5
/8"
3'-2 1/8"8'-0 1/2"
3'-2 1/8"
12'-0
"
16'
-5 3
/8"
4'-1
1 3/
8"
10'-5
7/8
"10
'-8"
10'-8
"8'
-5"
12'-5
"
10'-10 1/2"
6'-8"
4'-0
"
39'-4
"
4'-4
3/8
"
27'-9
"12
6'-0
1/8
"28
'-6 1
/2"3'
-11
1/8"
30'-4 1/2"
4 1/4"5 3/8"
45'-6 7/8"
13'-7 3/8"
15'-11 1/2"
5'-11 5/8" 19'-7 1/2" 9'-7"
16'-6 1/2"
14'-4
"
11'-0 1/2"
5'-1 1/2"
5'-0 3/8"
28'-4 3/4"
57'-10 1/4"
54'-0
"
33'-9 7/8"35'-3 1/8"
45
7'-5"
24'-3
5/8
"
135
62'-1
"
9'-6 3/8" 6'-4 1/4"
20'-4 1/8" 10'-0" 147'-3 1/2"
14'-5"17'-4 5/8"
10'-9
3/8
"
16'-5
3/4
"34
'-8"
51'-9
1/2
"
25'-9
"
21'-8
7/8
"
33'-6 1/8"
11'-2
3/8
"11
'-3 3
/4"
135
62'-3
5/8
"
21'-2
"10
'-1 7
/8"
13'-4 5/8"
1
1
1
1
KEY PLAN
PLAN AREA - DPLAN AREA - C
PLAN AREA - APLAN AREA - B
SCALE :1 OVERALL FIRST FLOOR PLAN
1/16"=1'-0"
1 3.2 3.1 4 5 5.1 5.2 6 6.1 6.3 7 7.1 8 102 93
1/A
3.2
2/A
3.2
MATCH LINE
FINISH FLOOR391'-10.75" (119.45m)
APEX OF TRUSS451'-2.25" (137.53m)
T.O. PARAPET423'-4.75" (129.05m)
T.O. EAVE407'-11.75" (124.35m)
U/S DECK AT H.P.418'-11.25" (127.69m)
OFOI-RP SIGNAGE.REFER TO SHEET A3.6.
2A4.5
1A4.5
3A4.3
FLAT ROOF
STONE BASE2X VERTICAL WD. TRM 2X VERTICAL WD. TRM 2X VERTICAL WD. TRM
1/A
3.3
2/A
3.3
FINISH FLOOR391'-10.75" (119.45m)
APEX OF TRUSS451'-2.25" (137.53m)
T.O. PARAPET423'-4.75" (129.05m)
T.O. EAVE407'-11.75" (124.35m)
U/S DECK AT H.P.418'-11.25" (127.69m)
MATCH LINEBAHAMA SHUTTER.SEE DETAIL 5/A3.1
OFOI-RP SIGNAGE.REFER TO SHEETA3.6.
116'-4 3/8"V.I.F.
OFOI-RP SIGNAGE.REFER TO SHEETA3.6.
3A4.6FLAT ROOF
FLAT ROOF
STONE BASE STONE BASEDOCK
BUMPERS
FIREPLACECHIMNEY
TAPERED FIBER GLASS LOG WRAPPEDCOLUMNS REFER TO DETAIL 2/A4.13
FIBER GLASS LOG WRAPPED BEAMREFER TO DETAIL 2/A4.13
2X VERTICAL WD. TRM
1/A
3.4
2/A
3.4
FINISH FLOOR391'-10.75" (119.45m)
APEX OF TRUSS451'-2.25" (137.53m)
T.O. PARAPET423'-4.75" (129.05m)
T.O. EAVE407'-11.75" (124.35m)
U/S DECK AT H.P.418'-11.25" (127.69m)
MATCH LINE
FLAT ROOF FLAT ROOF
STONE BASE
E.I.F.S CONTROLJOINTS. (TYPICAL)
1/A
3.5
2/A
3.5
FINISH FLOOR391'-10.75" (119.45m)
APEX OF TRUSS451'-2.25" (137.53m)
T.O. PARAPET423'-4.75" (129.05m)
T.O. EAVE407'-11.75" (124.35m)
U/S DECK AT H.P.418'-11.25" (127.69m)
MATCH LINE
OFOI-RP SIGNAGE.REFER TO SHEETA3.6.
116'-4 3/8"V.I.F.
OFOI-RP SIGNAGE.REFER TO SHEETA3.6.
FLAT ROOF
OFOI-RP SIGNAGE.REFER TO SHEETA3.6.
2X VERTICALWD. TRM
18" DIA. FIBERGLASS LOGFEATURES (VERTICALHALF ROUNDS, BEAM ANDOUTRIGGERS) C/WFASTENERS (OFCI)REFER TO DETAIL 10/A4.14
50'-0"6'-6" 20'-0" 20'-0" 20'-0" 20'-0" 50'-0" 19'-11" 19'-11"
AT BOAT SALES WINDOWS = 19'-0 1/2" FIELD VERIFY
ALIGN VERTICALS WITH WINDOWMULLIONS,COORDINATE WITHWINDOW SCHEDULE
EQEQ EQ EQ EQ
AT
TREL
LIS
WIN
DO
WS
= 4'
-4"HINGE ABOVE
ENGINEERING SHALL BE BY SHUTTER MFR. TO MEETLOCAL CODES INCLUDING WALL ANCHORING. SEEEXTERIOR ELEVATIONS FOR LOCATIONS.
CL CL CL CL
SCALE :4 SOUTH ELEVATION
1/16"=1'-0"
SCALE :3 WEST ELEVATION
1/16"=1'-0"
SCALE :2 NORTH ELEVATION
1/16"=1'-0"
SCALE :1 EAST ELEVATION
1/16"=1'-0"SCALE :
5 ENLARGED BAHAMA SHUTTER ELEVATION1/4"=1'-0"
1
1
1
1
1
CONCRETE FOOTING BEYONDPER STRUCTURAL DRAWINGS.
GRADE.
TIMBER AND CHINK(WD-58/STCC-11/SF-43)
10A2.2
CONCRETE FOOTINGBEYOND PERSTRUCTURALDRAWINGS.
GRADE.
TIMBER AND CHINK(WD-58/STCC-11/SF-43)
10A2.2
10A2.2
CONCRETE FOOTINGBEYOND PER STRUCTURALDRAWINGS.
12" SMOOTH PREPAREDSUBGRADE FREE OF SHARPSTONES AND ROOTS
NOTE: WEEPING ANDWATERPROOFING ONLYREQUIRED WHERE THELANDSCAPE BERMS ABOVETHE FINISHED FLOORELEVATIONS AND THEWEEPERS TIE INTO THESTORM LINE SAME AS THEDOWNSPOUTS
CONCRETE FOOTING BEYOND PERSTRUCTURAL DRAWINGS.
GRADE.
POURED CONCRETE FOUNDATION
4A4.14
10A2.3
TIMBER AND CHINK(WD-58/STCC-11/SF-43)2
A4.14
1A4.14
SCALE :1 TYPICAL WALL SECTION (AT TOWER)
3/4"=1'-0" SCALE :2 TYPICAL WALL SECTION (AT WINDOWS)
3/4"=1'-0" SCALE :3 TYPICAL WALL SECTION (ADJACENT TO ENTRY)
3/4"=1'-0" SCALE :4 TYPICAL WALL SECTION (AT BERM)
3/4"=1'-0"
134566.278 29 A5.31 A5.32
3A4.2
2A4.2
1A4.2
FOOTWEARWAREHOUSE
FOOTWEARCHECKOUTCUSTOMERSERVICE
STORE ENTRANCECART STORAGE
BOAT SALES
OPEN TOBOAT SALES
ELEC. CARTSTORAGE
1 3 3.1 4 5 5.1 5.2 6 6.1 6.3 7 7.1 82 A5.41 A5.42
1A4.2
2A4.2
3A4.2
BOAT RIGGINGSERVICE MGR
OFFICE
RAINWEAR
KIDSAQUARIUMCAMPINGSECURITYOFFICE
BOATPARTS
A B C D E F G H J K LA5.51 A5.52
4A4.1
3A4.1
2A4.1
1A4.1
LOADING DOCK AREA BOAT RIGGING FISHING / MARINE / WATERSPORTS BOAT SALES
OPEN TOBOAT SALES
OPEN TOFISHING
9'-0
7/8
"10
'-4 3
/8"
36'-2" 36'-2"16'-3"
T
A5.61
A5.62 ABCDEFGHJKL 4A4.1
3A4.1
2A4.1
1A4.1
FOOTWEAR WAREHOUSE
FOOTWEAR RESTROOMS HUNTING / ARCHERY CAMPING WAREHOUSE DATA ROOM
OPEN TOCORRIDOR
SCALE :1 OVERALL INTERIOR ELEVATION - EAST
1/16"=1'-0"
SCALE :2 OVERALL INTERIOR ELEVATION - WEST
1/16"=1'-0"
SCALE :3 OVERALL INTERIOR ELEVATION - NORTH
1/16"=1'-0"
SCALE :4 OVERALL INTERIOR ELEVATION - SOUTH
1/16"=1'-0"
1
BASS PRO SHOP NIAGARA CONSTRUCTION DRAWING SET
AutoCAD31
-
SEPHORA CALABASAS FACADE DESIGNAutoCAD32
-
SEPHORA CALABASAS FACADE RENDERPhotoshop 33
-
LULULEMON PARK ROYAL TEST FITAutoCAD34
-
PZA AND THE LOCAL IN OTTAWA AIRPORTAutoCAD and Photoshop
Photo of final built product
Photo of final built product
Rendered design
Rendered design
35
-
NOH HOSPITALOAKVILLE, CANADA(SPRING 2013)
This project is planned to be the largest hospital in Ontario. It is such a large project, that to make a digital model, the entire building needed to be broken down into 3 larger parts.
There are many elements throughout the building that will tie the three buildings together, while giving each building its unique style, depending on the programme of the spaces.
LEVEL 1 FEATURE ELEMENTS PLANRevit and Illustrator36
-
SOUTH ENTRANCE RENDERED DRAWINGSRevit and Photoshop 37
-
PUBLIC SPACE RENDERSCCC RENDERED PLANLIBRARY RENDERED PLANRevit and Photoshop
38
-
SH-2 SH-2
SH-2SH-2
SH-2
ZONE 3 / Ad3-013ZONE 3 / Ad3-013
13 14 15 16 17
18 19 20 21 22 23 2417.516.515.5 15.614.513.512.912.7
d23
a0
a1
a3
a4
a5
a6
a6.4
a7
a8
a9
a10
a11
a12
a13
a14
a15
GOWN
CONSULTCONSULT
TEAM
CONSULTEXAM
PROC,BARRIATRIC
TEAM
PHYSICIAN
CLEAN
MED
PROC/RECOVERY
STERILE PROC
EXITVESTIBULE
SUBWAIT
RECPT
CENTRAL WAIT
EXAM
PHYSICIAN
APR
CONSULT CONSULT CONSULT
HSKP
WAITOFFICEOFFICE
OFFICE
SOILED
CLEAN
CLEAN
EXAMCONSULT
TEAM RM
US PROC (OCTROOM)
EXAM
EXAM
VIS FIELD EXAM
CLASS
CONSULT
EXAM
PROC
PROC
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
CLASS
SUB WAIT
PROC
PROC
PROC
PROC
PROC
PROC
PROC
SOILED
EXAM(BARIATRIC)
EXAM
CONSULT
STOR
CONSULT
CONSULT
SOILED
ST FACIL
RESOURCE
CONSULT
OFFICE
MEET
US PROCLASER PROC
RECPT
ST FACIL
HSKP
STOR
REPORT
CLEAN
SOILED
WKSTN
SUB WAIT
?
ASSESS
WKRM
LIGHT RM
LIGHT RM
SUBWAIT RECPT
CLEANFABRICATE/GRINDING
CAST
FITTING
STORAGE
TEAM
CLERK
OFFICE
TEAM
RESOURCE
EXERCISE
CLASS
RECPT
DINING
OFFICE
THERAPY
OFFICE
OFFICE
TEAM
?
STORAGEROOM
NEURO TREATTEAM WKRM
COG ASSESS
TEAM WORKFIT
OFFICE
POOL
ST CHG
OFFICE OFFICE
OFFICE
OFFICE
EXAM EXAM
SUBWAIT
TREAT
TREAT
TREAT
TREAT
WAIT
OFFICE
OFFICE
OFFICE OFFICE
ASSESS
ASSESS OFFICE
OFFICE
CHG M
CHG F
WHIRLPOOL
HAND THER
TREAT
TREAT
STOR
CONSULT CONSULT
OFFICE
OFFICE
SHOWER SHOWER
CHANGE
CHANGE
STOR
STOR
HSKP
HSKP
OUTPATIENTREHAB
COURT YARD
STORRECPT
PHLEB QUIET
CONF
RECPT
WAIT
WKRMVP DIR
DIR
CONF
WAIT
WKSTNWAIT/WKSTN
VESTIBULE
KIOSK
VESTIBULEVESTIBULE
EXAM
ELECTRICAL
ELECTRICAL
ELECTRICAL
IT/LV
IT/LV
RECPT
TREATMENTCUBICLES
TREATMENTCUBICLES
TREATMENTCUBICLES
TREATMENTCUBICLES
TREATMENTCUBICLES
TREATMENTCUBICLES
TREATMENTCUBICLES
TREAT
HSKP
HSKP
STERILE/ SOIL
HSKP
HSKP
PT-WR-BF
PT-WR-BF
STAIR
STAIR
STAIRSTAIR
ELEVATORELEVATORELEVATOR
ELEVATOR
ELEVATOR
ELEVATOR
ELEVATOR
ELEVATOR
ELEVATORSTAIR
STAIR
STAIR
ZONE 3 / Ad3-013ZONE 3 / Ad3-013
a2
44.65m
34.7m
39.1m
40.1m
42.0m
39.1m
45.0m
35.2m
42.8m
44.7
m
42.1m
40.9
m
32.7
m30
.7m
37.7m
1550 3550 6900 9000 400 8600 9000 4500 9000 9000 4500 6600 8650 3790
700
4500
9000
9000
4800
9000
9000
6750
6750
5340
3660
9000
4800
9000
9000
4500
4730
4800 9000 9000 9000
DOOR
LEGEND FOR FIRE SEPARATIONS (REFER TO Aa3-0xx & Ac3-0xx & Ad3-0xx SERIES DRAWINGS)DOOR/SCREENFRAME
FLOOR ROOF LOAD BEARINGELEMENTS
PARTITION WALLLINETYPE LEGEND FIRE RESISTANCE RATING
0 HR 0 HRNON-RATED NONE NON-RATED
3/4 HR 3/4 HR1 HOUR FIRE RATING NONE 2 HRBUILDING 'd' 2 HR
1 HR 1 HR1.5 HOUR FIRE RATING NONE 2 HRBUILDING 'i' 2 HR
1 1/2 HR 1 1/2 HR2 HOUR FIRE RATING
LEGEND FOR LEAD LINED PARTITIONS
ALL PARTITION LEAD LINED PATERN TYPE
H
TRUE NORTHCONSTRUCTION NORTH
A Partnership of Corporations
A R C H I T E C T S L I M I T E D
KEY PLAN
NO. ISSUED DATE
REVISIONS
Discrepancies must be reported immediately to theArchitect before proceeding. Only figured dimensons areto be used. Contractors must check all dimensions onsite. This drawing is protected by copyright.
ALL DIMENSIONS ARE SHOWN IN METRIC.
DRAWING TITLE
DRAWN CHECKED
SCALE @ A0 DATE
PROJECT NO.
DRAWING NO. ISSUED NO.
PROJECT
STAMP
ARCHITECTS IN JOINT VENTURE
+
STAMP
DRAWING STATUS
a
dc
p
MMM
29 July 20111 : 250
7/15
/201
3 3:
10:1
9 PM
C:\R
evit
Loca
l File
s\10
05-n
oh-b
uild
ing-
ab_A
dam
War
d.rv
t
Aa3-001
Interior Fit -up PackageBlock A Level 1 Floor Plan - Fire
Separation
211005-1003
NOT FOR CONSTRUCTION
01 ISSUED FOR 50% DD SUBMISSION 21.SEPT.2011
02 ISSUED FOR PROGRESS SET 14.OCT.2011
03 ISSUED FOR BUILDING ENVELOPEPERMIT 12.DEC.2011
04 ISSUED FOR 100% DD SUBMISSION 22.FEB.2012
05 ISSUED FOR 50% CD SUBMISION 22.JUN.2012
06 ISSUED FOR FULL PERMIT APPLICATION 06.JUL.2012
07 ISSUED FOR OFM REVIEW 06.JUL.2012
08 ISSUED FOR MASONRY T.P. #21 24.AUG.2012
09 ISSUED FOR PROGRESS SET 02.OCT.2012
11 ISSUED FOR FULL PERMIT LEVEL B2 TOL2 23.NOV.2012
12 ISSUED FOR PROGRESS SET 30.NOV.2012
13 ISSUED FOR DRYWALL & ACOUSTICSTP#57 12.FEB.2013
14 ISSUED FOR BUILDING PERMIT 22.MAR.2013
15 ISSUED FOR 100% CD 15.JUL.2013
10 ISSUED FOR PROGRESS SET 02.NOV.2012
PR
KP
RK
Ac7-4202c
2dAc7-420
2eAc7-420
12
d17
d18
WAIT
15a.3c01-637
Ac7-420
2f
375
REFER TO FIREPLACEENTRANCE TILE MODULE C
FLOOR BASE REFER TO SCHEDULE
100
254BULKHEAD
12
d17
d18
254
Ac7-420
1c
1d
8
d16
d17
SSCG-1SSCG-1
STAIR
11C-111C-01
CORRIDOR
?c01-C45
CORRIDOR
?c01-C42
Ac7-384
2
Ac7-3843
8
400
1200
REFER TO ENTRANCE TILE PATTERN CSEE 1/Ax7-400
CURVED BULKHEAD
ACRYLIC CEILING PANELS
FLOOR BASE REFERTO SCHEDULE
PLAM2 WALL PANELSEE 2/Ac7-384
1200
50
100
2925
ACCENT PAINT
VERTICAL REVEAL
ALIGN VERTICAL REVEALWITH FLOOR PATTERN
REFER TO DOOR SCHEDULE FOR DOOR TYPE
8
d16
d17
5851245
666
441
400 400 346
700
R3373
460
566
1790
548
EQEQ
EQEQ
EQEQ
BULKHEAD
REFER TO ENTRANCEFIREPLACE TILE MODULE C
14741524
d17
REFER TO ENTRANCETILE MODULE CSEE 1/Ax7-400
CURVED BULKHEAD
FLOOR BASE REFER TO SCHEDULE
CORRIDOR
400
EQ 600 EQ
Ac7-420
3c
3dAc7-420
3eAc7-420
7 8
d17HRL8
HRL8HRL8
HRL8
HRL6CG-1
WAIT
21c.2c02-514
CORRIDOR
?c02-C39
STAIR
11C11C-02
CONF
32.23c02-545
Ac7-384
4A
Ac7-3844B
Ac7-384 4D
Ac7-384 4E
HRL8
PLAM2 WALL PANEL REFER TO 4/Ac7-384FLOOR BASE REFER TO SCHEDULE
BULKHEAD
50
REFER TO ENTRANCE TILE MODULE C1/Ax7-400
1200 384100
2650
1200 100
2450
200
REFER TO ENTRANCETILE MODULE C
FLOOR BASE REFER TO SCHEDULE
ACCENT PAINT
VERTICAL REVEAL
ALIGN VERTICAL REVEAL WITHFLOOR PATTERN
FILM 1
FLOOR BASE REFERTO SCHEDULE
PLAM2 WALL PANELSEE 4/Ac7-384
BULKHEAD
CORRIDOR
100
2450
175
100
2450
200
FLOOR BASE REFERTO SCHEDULE
PLAM2 WALL PANELSEE 4/Ac7-384
BULKHEAD
CORRIDOR
3dAc7-420
3eAc7-420
7 8
d17
707
610
807
254 455
295
254
153 1875
1114
1125
EQ EQ
11
600
REFER TO ENTRANCETILE MODULE C ON 1/Ax7-400
WWP1
WCP2
FLOOR BASE REFERTO SCHEDULE
2398 1830
Fireplace
100
2950
898
5
Ax7-410
4
Ax7-410
600600249
REFER TO FIREPLACEENTRANCE TILE MODULE C
ACCENT PAINT
FLOOR BASE REFERTO SCHEDULE
CONTROL JOINT
1200
50
HRL8
BULKHEAD
H
TRUE NORTHCONSTRUCTION NORTH
A Partnership of Corporations
A R C H I T E C T S L I M I T E D
KEY PLAN
NO. ISSUED DATE
REVISIONS
Discrepancies must be reported immediately to theArchitect before proceeding. Only figured dimensons areto be used. Contractors must check all dimensions onsite. This drawing is protected by copyright.
ALL DIMENSIONS ARE SHOWN IN METRIC.
DRAWING TITLE
DRAWN CHECKED
SCALE @ A0 DATE
PROJECT NO.
DRAWING NO. ISSUED NO.
PROJECT
STAMP
ARCHITECTS IN JOINT VENTURE
+
STAMP
DRAWING STATUS
a
dc
p
MMM
29 July 2011 1 : 50
7/14
/201
3 1:
32:1
1 PM
C:\R
evit
Loca
l File
s\10
05-n
oh-b
uild
ing-
c_O
scar
2.rv
t
Ac7-420
Department EntrancesPlans, Elevations, RCPs
Block C
211005-1003
NOT FOR CONSTRUCTION
01 ISSUED FOR PROGRESS SET 30.NOV.2012
02 ISSUED FOR DRYWALL & ACOUSTICSTP#57 12.FEB.2013
03 ISSUED FOR BUILDING PERMIT 22.MAR.2013
04 ISSUED FOR 100% CD 15.JUL.2013
1 : 502 Waiting c01-637 (15a.3) - Entrance
1 : 502c Waiting c01-637 (15a.3) - Entrance
1 : 502b Waiting c01-637 (15a.3) - Entrance_RCP
1 : 501 Waiting c01-383 (15b.1) - Entrance
1 : 501c Waiting c01-383 (15b.1) - Entrance - S
1 : 501b Waiting c01-383 (15b.1) - Entrance_RCP
1 : 502d Waiting c01-637 (15a.3) - Entrance - N
1 : 501d Waiting c01-383 (15b.1) - Entrance - E
1 : 503 Waiting c02-505 (21) - Entrance
1 : 503c Waiting c02-505 (21) - Entrance
1 : 503d Waiting c02-505 (21) - Entrance - E
1 : 503e Waiting c02-505 (21) - Entrance - W
1 : 50Ac4-021Waiting c02-505 (21) - Entrance_RCP3b
1 : 50Ac7-420Waiting c01-637 (15a.3) - Entrance - S2e
Waiting c01-383 (15b.1) - Entrance1:501a
Waiting c01-637 (15a.3) - Entrance1:502a
Waiting c02-505 (21) - Entrance1:503a
1 : 50Ac7-420Waiting and Entrance c01-367 (15a.2) - N2f
13 14
HRL4+SWP2b
ACRYLIC CEILING PANELS
TV-WF
2925
100
WAYFINDING KIOSKSEE 3/Ax0-053
PLAM2 WALL PANELSEE 6/Ad7-385
FLOOR BASE REFERTO SCHEDULE
FILM3
REFER TO ELEVATORLOBBY TILE MODULE DON 4/Ax7-400
FILM3
WOOD WALL PANELSEE 5/Ad7-385
REFER TO DOOR SCHEDULEFOR DOOR TYPE
FLOOR BASE REFERTO SCHEDULE
REFER TO ELEVATORTILE MODULE(ROTATE 90 DEGREE)
ACOUSTIC PANEL
1630
1630
330 440 220 660 450 220 530 220 220 530 220 440 660 230 440
100
3260
330 660 440 220 670 750 750 660 230 430 670
AP2 AP2 AP2 AP2
AP2AP2AP2AP2AP2 AP2AP1 AP1 AP1 AP1 AP1 AP1 AP1 AP1
AP1AP1AP1AP1AP1AP1AP1AP1
AP1 AP2
1868
ON 4/Ax7-400
FLOOR BASE REFERTO SCHEDULE
3260
REFER TOELEVATOR TILEMODULE (ROTATE90 DEGREE)
5460
ON 4/Ax7-400
d3
2750
100
3260
FILM4
FLOOR BASE REFERTO SCHEDULE
REFER TO DOOR SCHEDULEFOR DOOR TYPE
REFER TOELEVATOR TILE
MODULE (ROTATE90 DEGREE)
1871 4149
FILM4 FILM4 FILM4
WCP1
ON 4/Ax7-400
VENDINGNIC
VENDINGNIC
VENDINGNIC
CT13
d14
765
710
600
500
375
ACOUSTIC PANEL
ACOUSTIC PANEL
ACOUSTIC PANEL
ACOUSTIC PANEL
ACOUSTIC PANEL
AP1
AP1
AP1
AP1
AP1
100
2950
FLOOR BASE REFERTO SCHEDULE
300
1700 2550 1438
BULKHEAD
1213
760
1424
566
300
2495 1625 150
4270 3981 3050
100
2950TV-HHS-C
HRL6
HS-1
PLAM2 WALL PANELSEE 4/Ad7-386
FLOOR BASE REFERTO SCHEDULE
REFER TO DOOR SCHEDULEFOR DOOR TYPE
50
915
400
725 900
48
ACOUSTIC PANEL
765
710
600
500
AP1
AP1
AP1
AP1
AP1
50
d7
REFER TO FIREPLACETILE MODULE D
2100
WCP2
EQ EQ
1125
O.C
.
Fireplace
FLOOR BASE REFERTO SCHEDULE
TV-HHS-C
100
2650
ON 6/Ax7-400
d18
500
2000
2184
ACOUSTIC PANEL ACOUSTIC PANEL
ACOUSTIC PANELACOUSTIC PANELAP1
AP1
AP1
AP1
100
2750
FLOOR BASE REFERTO SCHEDULE
AP1 AP1
AP1AP1
ACOUSTIC PANEL ACOUSTIC PANEL
ACOUSTIC PANELACOUSTIC PANEL
500
2000
2184
REFER TO DOOR SCHEDULEFOR DOOR TYPE
FLOOR BASE REFERTO SCHEDULE
100
2750
200
AP1
AP1
AP1
AP1
50
BULKHEAD
AP1 AP1
AP1AP1
1314
500
1550
0
2000 15 2000
2184
ACOUSTIC PANELACOUSTIC PANEL
ACOUSTIC PANELACOUSTIC PANEL
FLOOR BASE REFERTO SCHEDULE
5095
REFER TO DOOR SCHEDULEFOR DOOR TYPE
REFER TO DOOR SCHEDULEFOR DOOR TYPE
100
2950
HS-1
AP1
AP1
AP1
AP1AP1 AP1
AP1AP1
d3
WWP1
WCP2
12
WCP2
WWP1 2750
100
100
1830
2600
205
500
1550
015
500
2000
2600
2000
205
500
1550
015
500
ACOUSTIC PANELAP1
FLOOR BASE REFERTO SCHEDULE
ACOUSTIC PANELAP1
ACOUSTIC PANELAP1
ACOUSTIC PANELAP1
ACOUSTIC PANELAP1
ACOUSTIC PANELAP1
100
2750
d18
1000
1000
2043
ACOUSTIC PANELAP1
FLOOR BASE REFERTO SCHEDULE
ACOUSTIC PANELAP1
ACOUSTIC PANELAP1
ACOUSTIC PANELAP1
100
2650
H
TRUE NORTHCONSTRUCTION NORTH
A Partnership of Corporations
A R C H I T E C T S L I M I T E D
KEY PLAN
NO. ISSUED DATE
REVISIONS
Discrepancies must be reported immediately to theArchitect before proceeding. Only figured dimensons areto be used. Contractors must check all dimensions onsite. This drawing is protected by copyright.
ALL DIMENSIONS ARE SHOWN IN METRIC.
DRAWING TITLE
DRAWN CHECKED
SCALE @ A0 DATE
PROJECT NO.
DRAWING NO. ISSUED NO.
PROJECT
STAMP
ARCHITECTS IN JOINT VENTURE
+
STAMP
DRAWING STATUS
a
dc
p
MMM
29 July 2011 1 : 50
7/14
/201
3 5:
42:2
1 PM
C:\R
evit
Loca
l File
s\10
05-n
oh-b
uild
ing-
d_Am
ir 3.
rvt
Ad7-401
Interior ElevationsBlock D - All Levels
211005 / 1003
NOT FOR CONSTRUCTION
01 ISSUED FOR PROGRESS SET 30.NOV.2012
02 ISSUED FOR DRYWALL & ACOUSTICSTP#57 12.FEB.2013
03 ISSUED FOR BUILDING PERMIT 22.MAR.2013
04 ISSUED FOR 100% CD 15.JUL.2013 1 : 50Ad3-0115Workstation d01-008 (27.3-a-04) - Elev_N
1N 1E 1S 1W
4SE4N
2W2S
1 : 50Ad3-021Waiting Room d02-150 (11.2) - Elev_E8
6E 6W
1 : 50Ad3-012Library d01-171 (25) - Elev_S3
1 : 50Ad3-011Workstation d01-010 (27.33-a) - Feature Wall7
1 : 50Ad3-023Workstation d02-204 (3a.1-a) - Feature Wall9
6S
1 : 50Ad3-033Board Room d03-272 (29a.1) - Elev_E10
Quiet d01-014 (20.1-A) - Elevations1 : 501
Info d01-179 (25.34) - Elevations1 : 502
Cafeteria d01-119 (27.29) - Elevations1 : 504
Conference d01-207 (25.24) - Elevations1 : 506
4
Ax7-410
4
Ax7-410
5
Ax7-410
5
Ax7-410
5
Ax7-410
FHC
CR
CR
PB-W
PB-WFAP
Ad7-422 1e1f
Ad7-422
1d
Ad7-4221g
Ad7-422
1c
1h
13 14
d16
d17
d18
ELEVATORLOBBY
D-01-S4d01-C18
HRL8
HRL8
HRL8
HRL8
HRL8
HRL8 SSCG-1 SSCG-1
HRL8
HRL8 HRL8
HRL8
HRL8
HRL8
SSCG-1
Ad7-382
Ad7-383
7A
Ad7-383
6A
Ad7-382
9A
Ad7-382
13B
Ad7-382
17B
Ad7-382 13A
Ad7-38217C
14A
Ad7-38412A
Ad7-384 12B
Ad7-386
2
13 14
d16
d17
d18
ACRYLIC CEILING PANELS
WCP1
EQ 2858 EQ 713
610
1482
1482
1482
1482
EQ EQ
385 392
EQEQ
1917 1840 1840
1125
900
7310
461
2440
2440
2440
2440
2440
2440
1500 1664
2500 2500 1278
734
800
1600
3771
13 14
HRL8HRL8
175
FLOOR BASEREFER TO SCHEDULE
WCP1
REFER TO ELEVATORLOBBY TILE MODULE D
CORRIDOR
HRL8
BENCH
2925
100
3043 3604 SITE VERIFY
d16d17
HRL8HRL8
ELEVATOR DOOR
50
PLAM3 TO U/SOF GB CEILING
ELEVATOR DOOR
PLAM3 TO U/SOF GB CEILING
ALIGN TILE WITHELEVATOR DOOR FRAME
FLOOR BASEREFER TO SCHEDULE
WCP1
TILE TO U/S OF CEILINGREFER TO ELEVATOR
LOBBY TILE MODULE D
BENCH
50 50 50 50 50HRL8
ON 4/Ax7-400
d16 d17
50HRL8 HRL8 HRL8 HRL8HRL8
ELEVATOR DOOR
PLAM3 TO U/SOF GB CEILING
ELEVATOR DOOR
PLAM3 TO U/SOF GB CEILING
100
2750
175
ALIGN TILE WITHELEVATOR DOOR FRAME
FLOOR BASEREFER TO SCHEDULE
WCP1
TILE TO U/S OF CEILINGREFER TO ELEVATOR
LOBBY TILE MODULE D
505050
ON 4/Ax7-400
1314
HRL8 HRL8
BENCH
HRL8
50
WCP1
ACRYLIC CEILING PANELS
FLOOR BASEREFER TO SCHEDULE
REFER TO ELEVATORLOBBY TILE MODULE D
CORRIDOR
175
100
2925
3216360430351760
WAYFINDING KIOSKSEE 3/Ax0-053ON 4/Ax7-400
d16 d17 d18
HRL850 50
ACRYLIC CEILING PANELS
FLOOR BASE REFERTO SCHEDULE
REFER TO ELEVATORLOBBY TILE MODULE D
(ROTATED 90 DEGREES)
BACK PAINTED GLASS DISPLAY CASE
CORRIDOR
100
2925
SITE VERIFY 3974 3799 930
BENCH
ON 4/Ax7-400
12 13 14ACRYLICCEILING PANELS
PLAM2 WALL PANELSEE 2/Ad7-386
FLOOR BASE REFERTO SCHEDULE
BACK PAINTEDGLASS DISPLAY CASE
2925
100
50 50HRL8
H
TRUE NORTHCONSTRUCTION NORTH
A Partnership of Corporations
A R C H I T E C T S L I M I T E D
KEY PLAN
NO. ISSUED DATE
REVISIONS
Discrepancies must be reported immediately to theArchitect before proceeding. Only figured dimensons areto be used. Contractors must check all dimensions onsite. This drawing is protected by copyright.
ALL DIMENSIONS ARE SHOWN IN METRIC.
DRAWING TITLE
DRAWN CHECKED
SCALE @ A0 DATE
PROJECT NO.
DRAWING NO. ISSUED NO.
PROJECT
STAMP
ARCHITECTS IN JOINT VENTURE
+
STAMP
DRAWING STATUS
a
dc
p
MMM
29 July 2011 1 : 50
7/14
/201
3 5:
45:5
7 PM
C:\R
evit
Loca
l File
s\10
05-n
oh-b
uild
ing-
d_Am
ir 3.
rvt
Ad7-422
Public Elevator LobbyPlans, Elevations, RCPs
Block D
211005 / 1003
NOT FOR CONSTRUCTION
01 ISSUED FOR PROGRESS SET 30.NOV.2012
02 ISSUED FOR DRYWALL & ACOUSTICSTP#57 12.FEB.2013
03 ISSUED FOR BUILDING PERMIT 22.MAR.2013
04 ISSUED FOR 100% CD 15.JUL.2013
1 : 501a Elevator Lobby d01-C18 (27) - Plan
1 : 501b Elevator Lobby d01-C18 (27) - RCP
1 : 501c Elevator Lobby d01-C18 (27) - Elev_N-a
1 : 501e Elevator Lobby d01-C18 (27) - Elev_E
1 : 501f Elevator Lobby d01-C18 (27) - Elev_W-b
1 : 501d Elevator Lobby d01-C18 (27) - Elev_S
1 : 501g Elevator Lobby d01-C18 (27) - Elev_W-a
1 : 50Ad7-422Elevator Lobby d01-C18 (27) - Elev_N-b1h
Elevator Lobby d01-C18 (27)1 : 501
100% CONSTRUCTION DRAWINGSRevit 39
-
Cypress Hills LDC LLPoctober 24, 2012
PITKIN-BERRIMAN, BROOKLYN, NY
exTerIor scheMe B
STREET VIEW RENDERING - SCHEME B WITH WOOD PANELS AND GRAY BRICK
CYPRESS HILLSMODULAR HOUSINGNEW YORK, USA(FALL 2012)
This is an afordable housing project located in upper Brooklyn area. It was designed to be the first building in its community to initiate an up-zoning for the area.
EXTERIOR RENDERGoogle SketchUp and Photoshop40
-
Cypress Hills LDC LLPoctober 24, 2012
PITKIN-BERRIMAN, BROOKLYN, NY
exTerIor scheMe B
STREET VIEW RENDERING - SCHEME B WITH WOOD PANELS AND GRAY BRICK
41
-
Cypress Hills LDC LLPoctober 24, 2012
PITKIN-BERRIMAN, BROOKLYN, NY
sITe PlAN
P I T K I N A V E
156'-3" BUILDING DIMENSION 10'-512"
74'-1
01 2"
BU
ILD
ING
DIM
ENSI
ON
30'-0"
REAR YARDSETBACK (ZR 23-47)
NEW STREET TREE AND PIT, TYP.
EXISTING TRAFFIC LIGHT
EXISTING CURB CUTEXISTINGLIGHT POLE
15'
61'-7
1 2"
3 S
TOR
IES
3 S
TOR
IES
B E
R R
I M
A N
S
T
S H
E P
H E
R D
A V
E
SU
BW
AY
SHEPHERD AVE(A, C)
17'-9"25'-0"25'-0"25'-0"25'-0"25'-0"13'-6"
14'-2"7'-0"18'-0"7'-0"7'-0"7'-0"7'-0"7'-0" 18'-0"18'-0"18'-0"18'-0"10'-1"
104'-412"
44'-812"
TO ADJ.BLDG
LINE OF FRONT,REAR AND SIDE
YARD SETBACKS
5'-4
"9'
-5"
60'-0" 10'-0"
PAVEDSIDEWALK(ZR 23-892)
50'-0
"
EXISTING CURB CUT
25'-0
"
7'-0
"11
'-1"
25'-0
"
7'-0
"18
'-0"
6'-1
1"7'
-0"
25'-0
"25
'-0"
18'-0
"7'
-0"
18'-0
"7'
-0"
17'-1
11 2"
5'-4" 10'
-51 2"
25'-0
"
7'-0
"
PLANTEDFRONT YARD
SETBACK(ZR 23-45)
SIDE YARDSETBACK
(ZR 23-462)
8'-0
"
TO A
DJ.
BLD
G
7'-8
"10'-512"5'-4"
17'-1
11 2"
14'-7
"
25'-2
"
1'-2"
10'-5
1 2"
7-STORYT.O. S. EL: 78'-0"
6-STORY T.O.S. EL:68'-0"
51'-2
"
10'-1"
PROPERTY LINE
PROPERTY LINE
15'-0"
4'-11"
4'-1
1 2"46
'-91 2"
23'-1
1"
24'-1"132'-2"
13'-3
"
30"X48"AREA OF REFUGE
30"X48"AREA OF REFUGE
13'-3
"
74'-1
01 2"
35'-6"
1-STORYT.O. S. EL: 15'-0"
3 STORIES
2 STORIES
2 STORIES
3 STORIES
RESIDENTIALLOBBYENTRANCE
STAIR BULKHEADEL: 88'-0"
231 SQ. FT.
SERVICE ENTRY
2 STORIES
2 STORIES
STAIR BULKHEADEL: 88'-0"
189 SQ. FT.
ELEV BULKHEADEL: 88'-0"
231 SQ. FT.
RETAILENTRANCE
RETAILENTRANCE
RETAILENTRANCE
RETAILENTRANCE
RETAILENTRANCE
RETAILENTRANCE
AMENITYACCESS
MECHANICAL ROOMEL: 88'-0"
271 SF
PLAYGROUND255 SF
COMMUNITYGARDEN2082 SF
GREEN HOUSE400 SF
BICYCLESTORAGE
GARDENSTORAGE
LAWN
PICNIC AREA
EGRESS
33'-3
1 2"41
'-10"
A.052
LANDSCAPE PLAN
1011
22-C
HPB
CYPRESS HILLSPITKIN-BERRIMAN
Pro
ject
No.
135
5TH
AV
EN
UE
- 6T
H F
L, N
EW
YO
RK
, NY
100
10T:
212
.533
.425
0 F
: 212
.533
.425
1W
WW
.LAC
INA-
HE
ITLE
R.C
OM
THIS DRAWING AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF LACINA HEITLERARCHITECTS AND MAY NOT BE REPRODUCED WITHOUT THE ARCHITECT'S PERMISSIONAND UNLESS THE REPRODUCTION CARRIES THE ARCHITECT'S NAME. ALL DESIGN ANDOTHER INFORMATION SHOWN ON THE DRAWINGS ARE FOR THE USE ON THE SPECIFIEDPROJECT ONLY AND SHALL NOT BE USED OTHERWISE WITHOUT WRITTEN PERMISSIONFROM THE ARCHITECT. COPYRIGHT LACINA HEITLER, INC. 2012
Description
1
RevisionNo. Date
-
-
-
-
-
--
--
--
--
--
DOB BSCAN
- --
- --
- --
100% SD Review10/10/12
- --
DOB STAMP / SIGNATURES
ARCH STAMP / SIGNATURES
OWNERCYPRESS HILLS LOCAL DEVELOPMENT CORPABDULLA DARRAT625 JAMICA AVENUEBROOKLYN, NY 11208T: 718.647.2800F: 718.647.2805
ENERGY CONSULTANTROSE KARONSTEVE WINTER ASSOCIATEDBUILDING SYSTEMS CONSULTANTS307 SEVENTH AVENUE, SUITE 1701NEW YORK, NY 10001T: 212.564.5800 x128
STRUCTURAL ENGINEERMARK RIDDLEDE NARDIS ENGINEERING, LLC15 RESERVOIR ROADWHITE PLAINS, NY 10603T: 914.948.8844F: 914.948.8868MECHANICAL ENGINEERPETER JOSELOW, P.C.ABE JOSELOW, P.C.45 WEST 34TH STREET, SUITE 1101NEW YORK, NY 10001T: 212.736.2584F: 212.736.0241
LIFE SAFETY CONSULTANTCODE CONSULTANTS, INC330 WEST 38TH STREETNEW YORK, NY 10018T: 212.216.9596F: 212.216.9619
ACCESSIBILITY CONSULTANTKIM GOSSACCESS BY DESIGN12720 HILLCREST ROAD, SUITE 580DALLAS, TX 75230T: 214.348.7758F: 214.348.7867
SOLAR ARRAY CONSULTANTJAMES HANNAHBRIGHT POWER, INC.11 HANOVER SQUARE, 21ST FLOORNEW YORK, NY 10005T:212.803.5868 x2106
.00PLOTTED O
N: 1
0/22
/201
2 10
:28
AM
3/32" = 1'-0"SITE PLAN1
SITE PLANAutoCAD42
-
Cypress Hills LDC LLPoctober 24, 2012
PITKIN-BERRIMAN, BROOKLYN, NY
FIrsT Floor PlAN
12'-012"
12
34
56
7
2.13.1
5.16.1
6.2
2
A
BCDEFGHIJKLMNO
C.1D.1 B.1FGHIJKLMNO
13'-3
"10
'-7"
12'-3
1 2"11
'-01 2"
11'-0
1 2"11
'-01 2"
17'-6
"9'
-8"
5'-8
"9'
-8"
17'-6
"
61'-7
1 2"
14'-212" 12'-312" 10'-2"
11'-012" 12'-312" 11'-0
12" 11'-0
12" 11'-0
12" 11'-0
12" 11'-0
12" 11'-0
12" 11'-0
12"12'-3
12" 12'-3
12" 12'-3
12"
1
1'-0"TO P.L.
5'-9" TO P.L.
4'-9
1 2" T
O P
.L.
13'-8"
25'-1
11 2"
EGRESSHALL
124 SF
SERVICE230 SF
30"X48"AREA OF REFUGE
STAIR A
BIKE ROOM303 SF
ENTRANCEVESTIBULE
104 SF
MAIL77 SF
ELEVELEV (svc)
LOBBY587 SF
RETAIL7941 SF
MAILBOXES
MAILBOXES
KITCHEN67 SF
STORAGE78 SF
7'1"x9'6"
13'4"x26'10"8'0"x13'1"23'1"x13'2"6'0"x13'2"
8'0"x9'7"
01A11 01A08
01B06
01A03 01A02
01B02
01C07 01C06
01C05
01A07
01D11
01008
ELEVATORLOBBY
6'11"x18'5"
01D07
STAIR B30"X48"
AREA OF REFUGE01F05
TRASH
20'3"x13'4"
EXERCISE ROOM230 SF
01B07
W/C45 SF
5'6"x9'6"
STORAGE65 SF
4'10"x12'0"
UPUP
DN
DNDN
UP
MULTIPURPOSEROOM705 SF
01A05
21'0"x33'6"
ALIGN
CONSTRUCTION PLAN NOTES1. SEE DRAWING [A.XX.XX] FOR SYMBOL LEGEND AND DRAWING
[A.XX.XX] FOR GENERAL CONSTRUCTION NOTES [PLUMBING NOTESSUSTAINABLE NOTES]
2. DO NOT SCALE DRAWINGS. USE ONLY FIGURED DIMENSIONS. LARGDETAILS TAKE PRECEDENCE OVER SMALL SCALE DRAWINGS.
3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN FIELD.4. ALL ROUGH OPENINGS FOR DOORS TO BE OFFSET 6 FROM
ADJACENT WALL UNLESS OTHERWISE NOTED.5. ALL ROUGH OPENINGS FOR CLOSET DOORS ARE TO BE CENTERED
UNLESS OTHERWISE NOTED.6. DIMENSIONS
6.1. ALL PARTITION DIMENSIONS ARE MEASURED FROM THEFINISHED SURFACE, U.O.N..
6.2.
CONSTRUCTION PLAN KEYNOTES
1 NOTE.
2 NOTE.
3 NOTE.
4 NOTE.
5 NOTE.
6 NOTE.
A.201
CONSTRUCTIONPLAN - 1ST FLOOR
1011
22-C
HPB
CYPRESS HILLSPITKIN-BERRIMAN
Pro
ject
No.
135
5TH
AV
EN
UE
- 6T
H F
L, N
EW
YO
RK
, NY
100
10T:
212
.533
.425
0 F
: 212
.533
.425
1W
WW
.LAC
INA-
HE
ITLE
R.C
OM
THIS DRAWING AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF LACINA HEITLERARCHITECTS AND MAY NOT BE REPRODUCED WITHOUT THE ARCHITECT'S PERMISSIONAND UNLESS THE REPRODUCTION CARRIES THE ARCHITECT'S NAME. ALL DESIGN ANDOTHER INFORMATION SHOWN ON THE DRAWINGS ARE FOR THE USE ON THE SPECIFIEDPROJECT ONLY AND SHALL NOT BE USED OTHERWISE WITHOUT WRITTEN PERMISSIONFROM THE ARCHITECT. COPYRIGHT LACINA HEITLER, INC. 2012
Description
1
RevisionNo. Date
-
-
-
-
-
--
--
--
--
--
DOB BSCAN
- --
- --
- --
100% SD Review10/10/12
- --
DOB STAMP / SIGNATURES
ARCH STAMP / SIGNATURES
OWNERCYPRESS HILLS LOCAL DEVELOPMENT CORPABDULLA DARRAT625 JAMICA AVENUEBROOKLYN, NY 11208T: 718.647.2800F: 718.647.2805
ENERGY CONSULTANTROSE KARONSTEVE WINTER ASSOCIATEDBUILDING SYSTEMS CONSULTANTS307 SEVENTH AVENUE, SUITE 1701NEW YORK, NY 10001T: 212.564.5800 x128
STRUCTURAL ENGINEERMARK RIDDLEDE NARDIS ENGINEERING, LLC15 RESERVOIR ROADWHITE PLAINS, NY 10603T: 914.948.8844F: 914.948.8868MECHANICAL ENGINEERPETER JOSELOW, P.C.ABE JOSELOW, P.C.45 WEST 34TH STREET, SUITE 1101NEW YORK, NY 10001T: 212.736.2584F: 212.736.0241
LIFE SAFETY CONSULTANTCODE CONSULTANTS, INC330 WEST 38TH STREETNEW YORK, NY 10018T: 212.216.9596F: 212.216.9619
ACCESSIBILITY CONSULTANTKIM GOSSACCESS BY DESIGN12720 HILLCREST ROAD, SUITE 580DALLAS, TX 75230T: 214.348.7758F: 214.348.7867
SOLAR ARRAY CONSULTANTJAMES HANNAHBRIGHT POWER, INC.11 HANOVER SQUARE, 21ST FLOORNEW YORK, NY 10005T:212.803.5868 x2106
.00PLOTTED O
N: 1
0/22
/201
2 10
:30
AM
1/8" = 1'-0"1 FLOOR CONSTRUCTION PLAN1
A.644 9
Cypress Hills LDC LLPoctober 24, 2012
PITKIN-BERRIMAN, BROOKLYN, NY
cellAr PlAN
12'-012"
12
34
56
7
2.13.1
5.16.1
6.2
2
A
BCDEFGHIJKLMNO
C.1D.1 B.1FGHIJKLMNO
13'-3
"10
'-7"
12'-3
1 2"11
'-01 2"
11'-0
1 2"11
'-01 2"
17'-6
"9'
-8"
5'-8
"9'
-8"
17'-6
"
61'-7
1 2"
14'-212" 12'-312" 10'-2"
11'-012" 12'-312" 11'-0
12" 11'-0
12" 11'-0
12" 11'-0
12" 11'-0
12" 11'-0
12" 11'-0
12"12'-3
12" 12'-3
12" 12'-3
12"
1
1'-0"TO P.L.
5'-9" TO P.L.
4'-9
1 2" T
O P
.L.
13'-8"
25'-1
11 2"
STAIR A
TRASHCOMPACTOR
ROOM418 SQ. FT.
LAUNDRYROOM418 SF
30"X48"AREA OF REFUGE
RETAILSTORAGE5164 SF
ELEVELEV
STAIR B30"X48"
AREA OF REFUGE
154'4"x26'7"
21'5"x12'9"
12'6"x26'5"
FIRE PUMPROOM
TEL/CABLEROOM
SEWER/WATERMETER ROOM
GASMETERROOM
66 SF67 SF 136SF
103 SF
5'1"x8'7"
J.C.43 SF
9'6"x7'0" 9'6"x7'0" 10'6"x13'0"
10'6"x9'8"
ELECTRICALMETERROOM154 SF
20'7"x7'6"
STORAGEROOM89 SF
10'1"x8'9"
STORAGEROOM66 SF
7'6"x8'9"
UNEXCAVATED
ELEVATORLOBBY
CORRIDOR
UP
UP
CONSTRUCTION PLAN NOTES1. SEE DRAWING [A.XX.XX] FOR SYMBOL LEGEND AND DRAWING
[A.XX.XX] FOR GENERAL CONSTRUCTION NOTES [PLUMBING NOTESSUSTAINABLE NOTES]
2. DO NOT SCALE DRAWINGS. USE ONLY FIGURED DIMENSIONS. LARGDETAILS TAKE PRECEDENCE OVER SMALL SCALE DRAWINGS.
3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN FIELD.4. ALL ROUGH OPENINGS FOR DOORS TO BE OFFSET 6 FROM
ADJACENT WALL UNLESS OTHERWISE NOTED.5. ALL ROUGH OPENINGS FOR CLOSET DOORS ARE TO BE CENTERED
UNLESS OTHERWISE NOTED.6. DIMENSIONS
6.1. ALL PARTITION DIMENSIONS ARE MEASURED FROM THEFINISHED SURFACE, U.O.N..
6.2.
CONSTRUCTION PLAN KEYNOTES
1 NOTE.
2 NOTE.
3 NOTE.
4 NOTE.
5 NOTE.
6 NOTE.
A.200
CONSTRUCTIONPLAN - CELLAR
1011
22-C
HPB
CYPRESS HILLSPITKIN-BERRIMAN
Pro
ject
No.
135
5TH
AV
EN
UE
- 6T
H F
L, N
EW
YO
RK
, NY
100
10T:
212
.533
.425
0 F
: 212
.533
.425
1W
WW
.LAC
INA-
HE
ITLE
R.C
OM
THIS DRAWING AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF LACINA HEITLERARCHITECTS AND MAY NOT BE REPRODUCED WITHOUT THE ARCHITECT'S PERMISSIONAND UNLESS THE REPRODUCTION CARRIES THE ARCHITECT'S NAME. ALL DESIGN ANDOTHER INFORMATION SHOWN ON THE DRAWINGS ARE FOR THE USE ON THE SPECIFIEDPROJECT ONLY AND SHALL NOT BE USED OTHERWISE WITHOUT WRITTEN PERMISSIONFROM THE ARCHITECT. COPYRIGHT LACINA HEITLER, INC. 2012
Description
1
RevisionNo. Date
-
-
-
-
-
--
--
--
--
--
DOB BSCAN
- --
- --
- --
100% SD Review10/10/12
- --
DOB STAMP / SIGNATURES
ARCH STAMP / SIGNATURES
OWNERCYPRESS HILLS LOCAL DEVELOPMENT CORPABDULLA DARRAT625 JAMICA AVENUEBROOKLYN, NY 11208T: 718.647.2800F: 718.647.2805
ENERGY CONSULTANTROSE KARONSTEVE WINTER ASSOCIATEDBUILDING SYSTEMS CONSULTANTS307 SEVENTH AVENUE, SUITE 1701NEW YORK, NY 10001T: 212.564.5800 x128
STRUCTURAL ENGINEERMARK RIDDLEDE NARDIS ENGINEERING, LLC15 RESERVOIR ROADWHITE PLAINS, NY 10603T: 914.948.8844F: 914.948.8868MECHANICAL ENGINEERPETER JOSELOW, P.C.ABE JOSELOW, P.C.45 WEST 34TH STREET, SUITE 1101NEW YORK, NY 10001T: 212.736.2584F: 212.736.0241
LIFE SAFETY CONSULTANTCODE CONSULTANTS, INC330 WEST 38TH STREETNEW YORK, NY 10018T: 212.216.9596F: 212.216.9619
ACCESSIBILITY CONSULTANTKIM GOSSACCESS BY DESIGN12720 HILLCREST ROAD, SUITE 580DALLAS, TX 75230T: 214.348.7758F: 214.348.7867
SOLAR ARRAY CONSULTANTJAMES HANNAHBRIGHT POWER, INC.11 HANOVER SQUARE, 21ST FLOORNEW YORK, NY 10005T:212.803.5868 x2106
.00PLOTTED O
N: 1
0/22
/201
2 10
:29
AM
1/8" = 1'-0"CELLAR CONSTRUCTION PLAN1
Cypress Hills LDC LLPoctober 24, 2012
PITKIN-BERRIMAN, BROOKLYN, NY
seveNTh Floor PlAN
30"X48"AREA OF REFUGE
12'-012"
12
34
56
7
2.13.1
5.16.1
6.2
2
A
BCDEFGHIJKLMNO
C.1D.1 B.1FGHIJKLMNO
13'-3
"10
'-7"
12'-3
1 2"11
'-01 2"
11'-0
1 2"11
'-01 2"
17'-6
"9'
-8"
5'-8
"9'
-8"
17'-6
"
61'-7
1 2"
14'-212" 12'-312" 10'-2"
11'-012" 12'-312" 11'-0
12" 11'-0
12" 11'-0
12" 11'-0
12" 11'-0
12" 11'-0
12" 11'-0
12"12'-3
12" 12'-3
12" 12'-3
12"
1
1'-0"TO P.L.
5'-9" TO P.L.
4'-9
1 2" T
O P
.L.
13'-8"
25'-1
11 2"
7G09 7G08
7F07
7G07 7G06
JC
STAIR A
LR/DA/K280 SF
BR2121 SF
BR 1155 SF
2BRUNIT
861 SF
BR2121 SF
BR1140 SF
2BRUNIT
839 SF
LR/DA/K280 SF
LR/DA/K280 SF
BR2121 SF
BR1140 SF
2BRUNIT
839 SF
LR/DA/K301 SF
BR2121 SF
BR1140 SF
2BRUNIT
880 SF
BR1135 SF
BR2114 SF
LR/DA/K288 SF
2BRUNIT
913 SF
LR/DA/K316 SF
BR1158 SF
LR/DA/K/SA303 SF
0BRUNIT
484 SF
0BRUNIT
505 SFLR/DA/K/SA332 SF
1BRUNIT
691 SF
7A03
7B03
7A05
7C04
7A04
7B05
7C05
7B067B077B08
7C077C08
7D077D09
7C09
7B09
7D10
7C10
7B107B11
7D12
7B127B13
7C13
7D13
7B14
7C14
7D14
7E14
7F14
7G14 7G13
7F12
7G127G11
7F10
7G10 7G09 7G08
7F07
7G07
7F06
7G05
7F05 7F04
7G04
7E08
7F03
7D03
7D08
7G06
7B04
7D04
48"X48"ANSI A.117.1:FIG 404.2.3.1
48"X48"ANSI A.117.1:FIG 404.2.3.1 48"X48"
ANSI A.117.1:FIG 404.2.3.1
48"X48"ANSI A.117.1:FIG 404.2.3.1
48"X48"ANSI A.117.1:FIG 404.2.3.1
48"X48"ANSI A.117.1:FIG 404.2.3.1
48"X48"ANSI A.117.1:FIG 404.2.3.1
48"X48"ANSI A.117.1:FIG 404.2.3.1
48"X48"ANSI A.117.1:FIG 404.2.3.1
48"X48"ANSI A.117.1:FIG 404.2.3.1
48"X48"ANSI A.117.1:FIG 404.2.3.1
7F14
7G14 7G13
7F12
7G127G11
7F10
7G10
ELEVELEV
TRASH
STAIR B30"X48"
AREA OF REFUGE
7D05
1STFLOORROOF
BELOW
6THFLOORROOF
DN
DN
CONSTRUCTION PLAN NOTES1. SEE DRAWING [A.XX.XX] FOR SYMBOL LEGEND AND DRAWING
[A.XX.XX] FOR GENERAL CONSTRUCTION NOTES [PLUMBING NOTESSUSTAINABLE NOTES]
2. DO NOT SCALE DRAWINGS. USE ONLY FIGURED DIMENSIONS. LARGDETAILS TAKE PRECEDENCE OVER SMALL SCALE DRAWINGS.
3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN FIELD.4. ALL ROUGH OPENINGS FOR DOORS TO BE OFFSET 6 FROM
ADJACENT WALL UNLESS OTHERWISE NOTED.5. ALL ROUGH OPENINGS FOR CLOSET DOORS ARE TO BE CENTERED
UNLESS OTHERWISE NOTED.6. DIMENSIONS
6.1. ALL PARTITION DIMENSIONS ARE MEASURED FROM THEFINISHED SURFACE, U.O.N..
6.2.
CONSTRUCTION PLAN KEYNOTES
1 NOTE.
2 NOTE.
3 NOTE.
4 NOTE.
5 NOTE.
6 NOTE.
A.203
CONSTRUCTIONPLAN - 7TH FLOOR
1011
22-C
HPB
CYPRESS HILLSPITKIN-BERRIMAN
Pro
ject
No.
135
5TH
AV
EN
UE
- 6T
H F
L, N
EW
YO
RK
, NY
100
10T:
212
.533
.425
0 F
: 212
.533
.425
1W
WW
.LAC
INA-
HE
ITLE
R.C
OM
THIS DRAWING AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF LACINA HEITLERARCHITECTS AND MAY NOT BE REPRODUCED WITHOUT THE ARCHITECT'S PERMISSIONAND UNLESS THE REPRODUCTION CARRIES THE ARCHITECT'S NAME. ALL DESIGN ANDOTHER INFORMATION SHOWN ON THE DRAWINGS ARE FOR THE USE ON THE SPECIFIEDPROJECT ONLY AND SHALL NOT BE USED OTHERWISE WITHOUT WRITTEN PERMISSIONFROM THE ARCHITECT. COPYRIGHT LACINA HEITLER, INC. 2012
Description
1
RevisionNo. Date
-
-
-
-
-
--
--
--
--
--
DOB BSCAN
- --
- --
- --
100% SD Review10/10/12
- --
DOB STAMP / SIGNATURES
ARCH STAMP / SIGNATURES
OWNERCYPRESS HILLS LOCAL DEVELOPMENT CORPABDULLA DARRAT625 JAMICA AVENUEBROOKLYN, NY 11208T: 718.647.2800F: 718.647.2805
ENERGY CONSULTANTROSE KARONSTEVE WINTER ASSOCIATEDBUILDING SYSTEMS CONSULTANTS307 SEVENTH AVENUE, SUITE 1701NEW YORK, NY 10001T: 212.564.5800 x128
STRUCTURAL ENGINEERMARK RIDDLEDE NARDIS ENGINEERING, LLC15 RESERVOIR ROADWHITE PLAINS, NY 10603T: 914.948.8844F: 914.948.8868MECHANICAL ENGINEERPETER JOSELOW, P.C.ABE JOSELOW, P.C.45 WEST 34TH STREET, SUITE 1101NEW YORK, NY 10001T: 212.736.2584F: 212.736.0241
LIFE SAFETY CONSULTANTCODE CONSULTANTS, INC330 WEST 38TH STREETNEW YORK, NY 10018T: 212.216.9596F: 212.216.9619
ACCESSIBILITY CONSULTANTKIM GOSSACCESS BY DESIGN12720 HILLCREST ROAD, SUITE 580DALLAS, TX 75230T: 214.348.7758F: 214.348.7867
SOLAR ARRAY CONSULTANTJAMES HANNAHBRIGHT POWER, INC.11 HANOVER SQUARE, 21ST FLOORNEW YORK, NY 10005T:212.803.5868 x2106
.00PLOTTED O
N: 1
0/22
/201
2 10
:30
AM
1/8" = 1'-0"7 FLOOR CONSTRUCTION PLAN1
/A.6101 /A.6121 /A.620# /A.6281
/A.6301
Cypress Hills LDC LLPoctober 24, 2012
PITKIN-BERRIMAN, BROOKLYN, NY
secoNd - sIxTh Floor PlAN
12'-012"
12
34
56
7
2.13.1
5.16.1
6.2
2
A
BCDEFGHIJKLMNO
C.1D.1 B.1FGHIJKLMNO
13'-3
"10
'-7"
12'-3
1 2"11
'-01 2"
11'-0
1 2"11
'-01 2"
17'-6
"9'
-8"
5'-8
"9'
-8"
17'-6
"
61'-7
1 2"
14'-212" 12'-312" 10'-2"
11'-012" 12'-312" 11'-0
12" 11'-0
12" 11'-0
12" 11'-0
12" 11'-0
12" 11'-0
12" 11'-0
12"12'-3
12" 12'-3
12" 12'-3
12"
1
1'-0"TO P.L.
5'-9" TO P.L.
4'-9
1 2" T
O P
.L.
13'-8"
25'-1
11 2"
JC
LR/DA/K280SF
BR 2121SF
BR 1153SF
2BRUNIT861SF
BR 1140SF
BR 2121SF
LR/DA/K280SF
2BRUNIT839SF
BR 1140SF
BR 2121SF
LR/DA/K280SF
2BRUNIT839SF
BR 1140SF
BR 2121SF
LR/DA/K280SF
2BRUNIT839SF
LR/DA/K280SF
BR 1139SF
1BRUNIT643SF
LR/DA/K280SF
BR 1139SF
1BRUNIT643SF
LR/DA/K280SF
BR 1139SF
1BRUNIT643SF
1BRUNIT644SF
LR/DA/K296SF
BR 1130SF
LR/DA/K329SF
30"X48"AREA OF REFUGE
STAIR A
BR3121SF
BR2121SF
BR1139SF
LR/DA/K329SF
BR1126SF
BR2126SF
BR3165SF
3BRUNIT
1232SF
3BRUNIT
1248SF
26A02
26B02
26A03
26B03
26A05
26B04
26A04
26B05
26C05
26B0626B0726B08
26C0726C08
26D0726D09
26C09
26B09
26D10
26C10
26B1026B11
26D12
26B1226B13
26C13
26B14
26C14
26D14
26E14
26F14
26G14
26H14
26F13
26G13
26H13
26F12
26G12
26H12
26F11
26G11
26H11
26F10
26G10
26H10
26F09
26G09
26H09
26F08
26G08
26H08
26F07
26G07
26H07 26H06 26H05
26G05
26F05 26F04
26G04
26H04
26E08
26G03
26F03
26G02
26F02
26E02
26C02
26D02
26C03
26D03
26D08
48"X48"ANSI A.117.1:FIG 404.2.3.1
48"X48"ANSI A.117.1:FIG 404.2.3.1
48"X48"ANSI A.117.1:FIG 404.2.3.1
48"X48"ANSI A.117.1:FIG 404.2.3.1
48"X48"ANSI A.117.1:FIG 404.2.3.1
48"X48"ANSI A.117.1:FIG 404.2.3.1
48"X48"ANSI A.117.1:FIG 404.2.3.1
48"X48"ANSI A.117.1:FIG 404.2.3.1
48"X48"ANSI A.117.1:FIG 404.2.3.1
48"X48"ANSI A.117.1:FIG 404.2.3.1
48"X48"ANSI A.117.1:FIG 404.2.3.1
48"X48"ANSI A.117.1:FIG 404.2.3.1
ELEVELEV
TRASH26D05
STAIR B30"X48"
AREA OF REFUGE
26F06
26D13
1STFLOORROOF
BELOW
48"X48"ANSI A.117.1:FIG 404.2.3.1
48"X48"ANSI A.117.1:FIG 404.2.3.1
DN
DN
CONSTRUCTION PLAN NOTES1. SEE DRAWING [A.XX.XX] FOR SYMBOL LEGEND AND DRAWING
[A.XX.XX] FOR GENERAL CONSTRUCTION NOTES [PLUMBING NOTESSUSTAINABLE NOTES]
2. DO NOT SCALE DRAWINGS. USE ONLY FIGURED DIMENSIONS. LARGDETAILS TAKE PRECEDENCE OVER SMALL SCALE DRAWINGS.
3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN FIELD.4. ALL ROUGH OPENINGS FOR DOORS TO BE OFFSET 6 FROM
ADJACENT WALL UNLESS OTHERWISE NOTED.5. ALL ROUGH OPENINGS FOR CLOSET DOORS ARE TO BE CENTERED
UNLESS OTHERWISE NOTED.6. DIMENSIONS
6.1. ALL PARTITION DIMENSIONS ARE MEASURED FROM THEFINISHED SURFACE, U.O.N..
6.2.
CONSTRUCTION PLAN KEYNOTES
1 NOTE.
2 NOTE.
3 NOTE.
4 NOTE.
5 NOTE.
6 NOTE.
A.202
CONSTRUCTIONPLAN - 2-6 FLOOR
1011
22-C
HPB
CYPRESS HILLSPITKIN-BERRIMAN
Pro
ject
No.
135
5TH
AV
EN
UE
- 6T
H F
L, N
EW
YO
RK
, NY
100
10T:
212
.533
.425
0 F
: 212
.533
.425
1W
WW
.LAC
INA-
HE
ITLE
R.C
OM
THIS DRAWING AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF LACINA HEITLERARCHITECTS AND MAY NOT BE REPRODUCED WITHOUT THE ARCHITECT'S PERMISSIONAND UNLESS THE REPRODUCTION CARRIES THE ARCHITECT'S NAME. ALL DESIGN ANDOTHER INFORMATION SHOWN ON THE DRAWINGS ARE FOR THE USE ON THE SPECIFIEDPROJECT ONLY AND SHALL NOT BE USED OTHERWISE WITHOUT WRITTEN PERMISSIONFROM THE ARCHITECT. COPYRIGHT LACINA HEITLER, INC. 2012
Description
1
RevisionNo. Date
-
-
-
-
-
--
--
--
--
--
DOB BSCAN
- --
- --
- --
100% SD Review10/10/12
- --
DOB STAMP / SIGNATURES
ARCH STAMP / SIGNATURES
OWNERCYPRESS HILLS LOCAL DEVELOPMENT CORPABDULLA DARRAT625 JAMICA AVENUEBROOKLYN, NY 11208T: 718.647.2800F: 718.647.2805
ENERGY CONSULTANTROSE KARONSTEVE WINTER ASSOCIATEDBUILDING SYSTEMS CONSULTANTS307 SEVENTH AVENUE, SUITE 1701NEW YORK, NY 10001T: 212.564.5800 x128
STRUCTURAL ENGINEERMARK RIDDLEDE NARDIS ENGINEERING, LLC15 RESERVOIR ROADWHITE PLAINS, NY 10603T: 914.948.8844F: 914.948.8868MECHANICAL ENGINEERPETER JOSELOW, P.C.ABE JOSELOW, P.C.45 WEST 34TH STREET, SUITE 1101NEW YORK, NY 10001T: 212.736.2584F: 212.736.0241
LIFE SAFETY CONSULTANTCODE CONSULTANTS, INC330 WEST 38TH STREETNEW YORK, NY 10018T: 212.216.9596F: 212.216.9619
ACCESSIBILITY CONSULTANTKIM GOSSACCESS BY DESIGN12720 HILLCREST ROAD, SUITE 580DALLAS, TX 75230T: 214.348.7758F: 214.348.7867
SOLAR ARRAY CONSULTANTJAMES HANNAHBRIGHT POWER, INC.11 HANOVER SQUARE, 21ST FLOORNEW YORK, NY 10005T:212.803.5868 x2106
.00PLOTTED O
N: 1
0/22
/201
2 10
:30
AM
1/8" = 1'-0"2-6 CONSTRUCTION PLAN1
/A.626# /A.6241
/A.6161 /A.6181
/A.6341
/A.6361
TYPE A-ACCESSIBLEUNIT (5%)
BUILDING PLANSAutoCAD 43
-
Cypress Hills LDC LLPoctober 24, 2012
PITKIN-BERRIMAN, BROOKLYN, NY
exTerIor scheMe B
STREET VIEW
Cypress Hills LDC LLPoctober 24, 2012
PITKIN-BERRIMAN, BROOKLYN, NY
exTerIor scheMe B
VIEW OF RESIDENTS ENTRANCE
It is mostly comprised of 3 types of modules that repeat and rotate to create practical, yet interesting plans. The modules make 4 different unit configurations ranging from studio units to three-bedroom units. The materi
top related