PRODUCTION SOP # 6.001
MANDATORY TIMINGS FOR ENGINEERS
Dated: December 13, 2013 Modified by: _______________Version: (01) Original Author: Ibni-Amin Pages: Two (02) Original Date: December 13, 2013
1. Mandatory timings for Electrical Engineer and Mechanical Maintenance
Engineer: -
a. Mandatory timings for Electrical Engineer and Mechanical Maintenance
Engineer are five (05) hours before Peak hours to two hours after Peak hours
if, the lunch break is to be taken by Mechanical Maintenance and Electrical
team.
b. Mandatory timings for Electrical Engineer and Mechanical Maintenance
Engineer are four (04) hours before Peak hours to two hours after Peak hoursif, the lunch break is not to be taken by Mechanical Maintenance and
Electrical team.
c. For Mechanical Maintenance engineer and Electrical engineer duty timings
during the whole calendar year will be as follows: -
Duration Peak Hours Mandatory Timings
1st Dec to 1st March 1700hrs to 2100hrs 1200hrs to 2300hrs
1st March to 1st June 1800hs to 2200hrs 1400hrs to 2400hrs
1st June to 1st Sept 1900hrs to 2300hrs 1500hrs to 100hrs
1st Sept to 1st Dec 1800hrs to 2200hrs 1400hrs to 2400hrs
2. Mandatory timings for Quality Engineer: -
Mandatory timings for Quality Engineer will be as follows:-
Duration Peak Hours Mandatory Timings
1st Dec to 1st March 1700hrs to 2100hrs
600hrs to 800hrs1200hrs to 1700hrs2100hrs to 2300hs
1st March to 1st June 1800hrs to 2200hrs
600hrs to 800hrs1300hrs to 600hrs2200hrs to 2400hrs
1st June to 1st Sept 1900hrs to 2300hrs
600hrs to 800hrs
1400hrs to 1900hrs2300 hrs to 100hrs
1st Sept to 1st Dec 1800hrs to 2200hrs
600hrs to 800hrs1300hrs to 600hrs2200hrs to 2400hrs
8/13/2019 engg sop
http://slidepdf.com/reader/full/engg-sop 2/3
3. Mandatory timings for Workshop and Fabrication Engineer: -
Mandatory timings for Workshop and Fabrication Engineer will be as follows:-
Duration Peak Hours Mandatory Timings
1st Dec to 1st March 1700hrs to 2100hrs800hrs to 1100hrs1600hrs to 2200hrs
1st March to 1st June 1800hs to 2200hrs800hrs to 1100hrs1700hrs to 2300hrs
1st June to 1st Sept 1900hrs to 2100hrs800hrs to 1100hrs1800hrs to 2200hrs
1st Sept to 1st Dec 1800hrs to 2200hrs800hrs to 1100hrs1700hrs 2300hrs
4. Mandatory timings for Production Engineer: -
Mandatory timings for Production Engineer will be as follows:-
Duration Peak Hours Mandatory Timings
1st Dec to 1st March 1700hrs to 2100hrs
800hrs to 1100hrs
1600hrs to 2200hrs
1st March to 1st June 1800hs to 2200hrs800hrs to 1100hrs1700hrs to 2300hrs
1st June to 1st Sept 1900hrs to 2100hrs800hrs to 1100hrs1800hrs to 2200hrs
1st Sept to 1st Dec 1800hrs to 2200hrs800hrs to 1100hrs1700hrs 2300hrs
5. Mandatory timings for Audit Engineer: -
Mandatory timings for Audit Engineer will be as follows:-
Duration Peak Hours MandatoryTimings
1st Dec to 1st March 1700hrs to 2100hrs700hrs to 900hrs1500hrs to 2200hrs
1st March to 1st June 1800hs to 2200hrs700hrs to 900hrs1600hrs to 2300hrs
1st June to 1st Sept 1900hrs to 2100hrs700hrs to 900hrs1700hrs to 2200hrs
1st Sept to 1st Dec 1800hrs to 2200hrs700hrs to 900hrs1600hrs to 2300hrs
8/13/2019 engg sop
http://slidepdf.com/reader/full/engg-sop 3/3
-2-
Electrical Engineer: ________________
Mechanical and Maintenance Engineer: ________________
Quality Engineer: ________________
Workshop and Fabrication Engineer: ________________
Production Engineer: ________________
Audit Engineer: ________________
GM Production ________________
Director: _______________ Chief Executive: _______________
top related