Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
01 HUM 211 R074.4/ 079.2 No Nick
MAINTENANCE
01‐0A1504
IN HUMBOLDT COUNTY FROM FERNDALE TO FERNBRIDGE 900 5/1/2012
01 HUM 299 000.0/R005.9 No Nick
MAINTENANCE
01‐0A2004
IN HUMBOLDT COUNTY NEAR ARCATA ON ROUTE 299 FROM ROUTE 101 TO 0.4 MI EAST OF BLUE LAKE UNDERCROSSING AND ON ROUTE 101 AT TRINIDAD ROAD UNDERCROSSING 950 5/1/2012
01 HUM 101 069.9/ 074.8
Replace AC Surfacing
MAINTENANCE
01‐0A2104
IN HUMBOLDT COUNTY NEAR EUREKA FROM 0.7 MILE SOUTH OF FIELDS LANDING OVERHEAD TO HERRICK AVENUE OVERCROSSING 950 4/1/2012
01 MEN 020 R000.0/R000.1
Fort Bragg ADA SHOPP
01‐0A2304
IN MENDOCINO COUNTY NEAR FORT BRAGG FROM THE JUNCTION OF ROUTE 1 AND 20 TO 0.1 MI EAST OF THE JUNCTION OF ROUTE 1 AND 20 434 6/23/2012
01 HUM 101 088.2/ 088.3
Arcata Curve Improvement SHOPP
01‐0A2504
IN HUMBOLDT COUNTY NEAR ARCATA AT THE ROUTE 101‐299 JUNCTION 320 10/15/2012
01 HUM 299 019.3/ 019.8 Acorn Curve SHOPP
01‐0A3604
IN HUMBOLDT COUNTY ABOUT 14 MILES EAST OF BLUE LAKE FROM 0.3 MILE EAST TO 0.8 MILE EAST OF BAIR ROAD 2,834 2/1/2014
01 HUM 255 000.2/ 001.3 No Nick SHOPP
01‐0A3804
IN HUMBOLDT COUNTY IN AND NEAR EUREKA AT VARIOUS LOCATIONS FROM EUREKA CHANNEL BRIDGE TO SAMOA CHANNEL BRIDGE
Repair Bridge,Rehabilitate Bridge Deck,Replace Joint Seals 1,894 150 10/17/2012
Polyester Concrete Overlay on all three bridges
01 VAR C0999 VAR/ No Nick
MAINTENANCE
01‐0A3904
IN DEL NORTE & HUMBOLDT COUNTIES AT VARIOUS LOCATIONS
Rehabilitate Bridge Deck,Replace Bridge 686 0 4/15/2013 14 Bridges
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
01 HUM C0999 VAR/ No Nick
MAINTENANCE
01‐0A4004
IN HUMBOLDT COUNTY ON ROUTES 96, 169, 200 & 299 AT VARIOUS LOCATIONS
Repair Bridge,Rehabilitate Bridge 190 0 4/26/2012 7 Locations
01 MEN 101 R089.2/ No Nick MAINTENANCE
01‐0A4104
IN MENDOCINO COUNTY NEAR LEGGETT AT CEDAR CREEK CULVERT Modify Culverts 639 0 5/3/2013
01 MEN C0999 VAR/ No Nick
MAINTENANCE
01‐0A4204
IN MENDOCINO COUNTY ON ROUTES 101 AND 253 AT VARIOUS LOCATIONS
Repair Bridge,Rehabilitate Bridge 706 50 12/15/2012 14 Structures
01 LAK C0999 VAR/
Bridge Repair
MAINTENANCE
01‐0A4304
IN LAKE COUNTY ON ROUTES 20 & 29 AT VARIOUS LOCATIONS
Repair Bridge,Rehabilitate Bridge 345 80 1/1/2013 20 Bridges
01 MEN C0999 VAR/ No Nick
MAINTENANCE
01‐0A4404
IN MENDOCINO COUNTY ON VARIOUS ROUTES AND AT VARIOUS LOCATIONS
Clean and Paint Bridge 1,853 200 12/15/2012 10 Bridges
01 HUM C0999 VAR/ No Nick
MAINTENANCE
01‐0A4504
IN HUMBOLDT COUNTY ON VARIOUS ROUTES AND AT VARIOUS LOCATIONS
Clean and Paint Bridge 1,763 150 12/15/2012 6 Bridges
01 VAR C0999 VAR/ No Nick
MAINTENANCE
01‐0A4604
IN HUMBOLDT AND MENDOCINO COUNTIES AT VARIOUS LOCATIONS 377 9/1/2013
01 VAR C0999 VAR/ No Nick
MAINTENANCE
01‐0A4704
IN MENDOCINO AND LAKE COUNTIES AT VARIOUS LOCATIONS 295 9/1/2013
01 HUM 299 025.0/ 025.7
Circle Point Curve SHOPP
01‐0A4904
IN HUMBOLDT COUNTY ABOUT 13 MILES WEST OF WILLOW CREEK FROM 0.4 MILES EAST TO 1.1 MILES EAST OF CHEZEM ROAD 3,800 1/1/2014
01 MEN 001 042.5/ 044.4 No Nick SHOPP
01‐0A5904
IN MENDOCINO COUNTY NEAR ELK AT SALMON CREEK BRIDGE #10‐134 AND AT ALBION RIVER BRIDGE #10‐136
Repair Bridge,Clean and Paint Bridge 3,731 0 5/1/2012 Clean & Paint
01 VAR C0099 VAR/ No Nick
MAINTENANCE
01‐0A6804
IN HUMBOLDT AND LAKE COUNTIES AT VARIOUS LOCATIONS 250 9/1/2012
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
01 MEN 101 081.4/R084.7 No Nick
MAINTENANCE
01‐0A7004
IN MENDOCINO COUNTY NEAR LEGGETT FROM 0.1 MI SOUTH OF RATTLESNAKE CREEK BRIDGE #10‐0027 TO CUMMINGS ROAD UNDERCROSSING 2,000 2/7/2012
01 MEN 020 007.0/ 017.3 Men 20
MAINTENANCE
01‐0A7304
IN MENDOCINO COUNTY NEAR FORT BRAGG FROM 10.3 MILES WEST OF CHAMBERLAIN CREEK BRIDGE TO CHAMBERLAIN CREEK BRIDGE 2,000 3/1/2012
01 DN 101 012.7/ 015.5 DN 101
MAINTENANCE
01‐0A7404
IN DEL NORTE COUNTY NEAR KLAMATH FROM WILSON CREEK BRIDGE TO 2.8 MILES NORTH OF WILSON CREEK BRIDGE 2,500 3/1/2012
01 HUM 255 000.5/ 008.3
255/101 Bond
MAINTENANCE
01‐0A7804
IN HUMBOLDT COUNTY IN AND NEAR EUREKA AND ARCATA FROM EUREKA CHANNEL BRIDGE TO 0.1 MILE SOUTH OF K STREET 2,690 8/15/2012
01 MEN 128 026.8/ 030.7
Robinson Creek Rubberized Gap
MAINTENANCE
01‐0A8004
IN MENDOCINO COUNTY AT BOONVILLE FROM 0.2 MILE EAST OF PEACHLAND ROAD TO ROBINSON CREEK BRIDGE 1,428 7/1/2012
01 MEN C0999 VAR/ No Nick
MAINTENANCE
01‐0A8104
IN MENDOCINO COUNTY ON ROUTE 1 AT VARIOUS LOCATIONS 347 8/1/2013
01 VAR CO999 VAR/
Men 101, VAR
MAINTENANCE
01‐0A8504
IN HUMBOLDT AND MENDOCINO COUNTIES AT GARBERVILLE MAINTENANCE PARK AND RIDE AND AT EMPIRE CAMP SAFETY ROADSIDE REST AREA 280 6/1/2012
01 LAK 020 013.5/ 031.4
LAK‐20 CAPM SHOPP
01‐0B0004
IN LAKE COUNTY IN & NEAR LUCERNE FROM 0.1 MI WEST OF SAYRE AVE TO 0.2 MI WEST OF JUNCTION ROUTE 53 21,190 2/1/2014
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
01 HUM 101 086.3/ 087.8
Arcata Cable Median Barrier SHOPP
01‐0B1004
IN HUMBOLDT COUNTY IN ARCATA FROM THE 11TH STREET OVERCROSSING #2‐424 TO THE ARCATA OVERHEAD #4‐79 772 3/1/2013
01 HUM 101 054.3/ 056.8
Eel River to Van Duzen Median Barrier SHOPP
01‐0B1904
IN HUMBOLDT COUNTY NEAR RIO DELL FROM THE EEL RIVER BRIDGE #4‐16 TO 0.3 MILE SOUTH OF VAN DUZEN RIVER BRIDGE 950 5/1/2013
01 DN 101 012.2/ 040.1 No Nick SHOPP
01‐0B2304
IN DEL NORTE COUNTY AT WILSON CREEK BRIDGE #01‐5, SMITH RIVER BRIDGE #1 ‐20 AND AT ROWDY CREEK BRIDGE #1‐23 1,034 8/1/2013
01 HUM C0999 VAR/ No Nick
MAINTENANCE
01‐0B2404
IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS 571 8/1/2013
01 DN 101 015.1/ 015.3
Last Chance Slips SHOPP
01‐0B2704
IN DEL NORTE COUNTY ABOUT 10 MILES SOUTH OF CRESCENT CITY FROM 1.3 TO 1.5 MILES NORTH OF RUDISILL ROAD 4,390 3/17/2014
01 DN 101 017.5/Historic Log Fill SHOPP
01‐0B2804
IN DEL NORTE COUNTY ABOUT 10 MILES SOUTH OF CRESCENT CITY AT 2.8 MILES NORTH OF MILL CREEK PARK ENTRANCE RD#8068 1,650 3/17/2014
01 DN 101 021.7/ 022.9
Hamilton 2 Slip Repair SHOPP
01‐0B2904
IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 1 MILE SOUTH TO 0.2 MI NORTH OF HAMILTON ROAD #8070 1,000 9/1/2013
01 DN 101 022.0/
South Hamilton Slipout SHOPP
01‐0B3004
IN DEL NORTE COUNTY NEAR CRESCENT CITY AT 0.6 MI SOUTH OF HAMILTON ROAD #8070 1,500 12/1/2013
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
01 DN 199 008.7/
Patrick Creek Slipout SHOPP
01‐0B3104
IN DEL NORTE COUNTY NEAR PATRICKS CREEK AT 2.3 MILES SOUTH OF HARDSCRABBLE CR BR #1‐8 AND AT 0.3 MI SOUTH OF PATRICKS CR CAMPGROUND 1,250 12/1/2013
01 DN 199 024.6/Middle Fork Wall SHOPP
01‐0B3204
IN DEL NORTE COUNTY NEAR PATRICKS CREEK AT 0.6 MI NORTH OF MID FK SMITH RIVER BR #1‐15 3,000 12/1/2013
01 DN 199 026.3/Siskiyou Fork Slipout SHOPP
01‐0B3304
IN DEL NORTE COUNTY NEAR PATRICKS CREEK AT 0.9 MI NORTH OF SISKIYOU FORK RD 850 12/1/2013
01 HUM 036 022.8/ 027.7
Larabe 3 Slip Repair SHOPP
01‐0B3404
IN HUMBOLDT COUNTY NEAR SWAINS FLAT FROM 1.3 MILES WEST TO 3.9 MILES WEST OF VAN DUZEN RIVER BR#4‐293 1,410 9/1/2013
01 HUM 036 030.2/ Maple Wall SHOPP 01‐0B3504
IN HUMBOLDT COUNTY NEAR BRIDGEVILLE AT 0.1 MI WEST OF MCCLELLAN MTN RD #7F010 1,350 12/1/2013
01 HUM 036 035.5/ 040.5
Dinsmore Slipouts/Sinks SHOPP
01‐0B3604
IN HUMBOLDT COUNTY NEAR DINSMORE FROM 0.1 MI EAST OF SFK VAN DUZEN RIVER BR#4‐119 TO 0.1 MI EAST OF VAN DUZEN RIVER BR#4‐129 4,630 9/1/2013
01 HUM 036 044.4/ Cobb Slide SHOPP 01‐0B3704
IN HUMBOLDT COUNTY NEAR DINSMORE AT 1.2 MILES WEST OF THE HUMBOLDT‐ TRINITY COUNTY LINE 1,600 12/1/2013
01 HUM 096 004.1/Pipeline Slide SHOPP
01‐0B3804
IN HUMBOLDT COUNTY NEAR WILLOW CREEK AT 1.0 MILES EAST OF PIPELINE OC #4‐100 1,600 12/1/2013
01 HUM 096 008.5/ 008.7
Hoopa Vista Point Slide SHOPP
01‐0B3904
IN HUMBOLDT COUNTY NEAR WILLOW CREEK FROM 0.2 TO 0.4 MI EAST OF END SIDEHILL VIADUCT2 #4‐289 8,000 12/1/2013
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
01 HUM 101 R015.0/
So. Hum Storm Repairs SHOPP
01‐0B4004
IN HUMBOLDT COUNTY NEAR REDWAY AT 1.5 MILES SOUTH OF HURLBUTT UC# 4‐213 AND AT 1.1 MILES SOUTH OF WILLIFORD RD UC# 4‐117 2,180 12/1/2013
01 HUM 101 R040.9/Redcrest Slide SHOPP
01‐0B4104
IN HUMBOLDT COUNTY NEAR REDCREST AT 1.1 MILES NORTH OF REDCREST NB ONRAMP 1,450 9/1/2013
01 HUM 101 110.6/Lagoons Slip / Slide SHOPP
01‐0B4204
IN HUMBOLDT COUNTY NEAR TRINIDAD AT 1.9 MILES SOUTH OF KANE ROAD AND AT 1.3 MILES NORTH OF KANE ROAD 1,950 3/17/2014
01 HUM 101 111.4/ 111.6
Big Lagoon Wall SHOPP
01‐0B4304
IN HUMBOLDT COUNTY NEAR BIG LAGOON FROM 1.9 TO 2.1 MILES NORTH OF GEORGIA PACIFIC RD 4,500 12/1/2013
01 HUM 169 026.4/ 029.9
Weitchpec Slipouts SHOPP
01‐0B4404
IN HUMBOLDT COUNTY NEAR WEITCHPEC FROM 0.6 MI WEST OF MINERS CREEK BR #4‐299 TO MARTINS FERRY BR#4‐223 2,770 12/16/2013
01 HUM 299 R010.7/R026.1
299 Slip / Slides SHOPP
01‐0B4504
IN HUMBOLDT COUNTY NEAR BLUE LAKE FROM 0.3 MI WEST OF N FORK MAD RIVER BR#4‐194 TO 1.3 MILES WEST OF OLD THREE CR RD#6L250 2,560 12/1/2013
01 HUM 299 032.0/Willow Creek Wall SHOPP
01‐0B4604
IN HUMBOLDT COUNTY NEAR WILLOW CREEK AT 1.2 MILES WEST OF EAST FORK WILLOW CREEK BR#4‐115 1,350 12/1/2013
01 MEN 001 035.7/Satori Gulch Slip SHOPP
01‐0B4704
IN MENDOCINO COUNTY NEAR ELK AT 1.8 MILES NORTH OF PHILO GREENWOOD RD‐ 132 450 12/1/2013
01 MEN 101 003.7/ 005.3
Peregrine Slides SHOPP
01‐0B5004
IN MENDOCINO COUNTY NEAR HOPLAND FROM 0.6 MI NORTH OF COMMINSKY STA RD‐103 TO 0.6 MI NORTH OF PIETA CR BRIDGE #10‐83 7,100 12/1/2013
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
01 MEN 101 R087.4/R100.4
MEN 101 Pushup and Slips SHOPP
01‐0B5104
IN MENDOCINO COUNTY ABOUT 18 MILES NORTH OF LAYTONVILLE FROM 0.3 MI SOUTH OF THE ROUTE 101/271 JUNCTION TO RED MOUNTAIN CREEK BR#10‐35 2,550 12/1/2013
01 MEN 128 039.5/ 039.8
Beebe Creek Slip and Slide SHOPP
01‐0B5204
IN MENDOCINO COUNTY NEAR YORKVILLE FROM 0.7 TO 1.0 MILES EAST OF BEEBE CR BR#10‐52 3,800 12/1/2013
01 MEN 162 013.9/ 022.7
Dos Rios Slips SHOPP
01‐0B5404
IN MENDOCINO COUNTY NEAR DOS RIOS FROM 1.2 MILES WEST OF MID FK EEL RIVER #10‐252 TO 2.8 MILES EAST OF SAND BANK CREEK 1,750 12/1/2013
01 MEN 162 016.1/Middle Way Wall SHOPP
01‐0B5504
IN MENDOCINO COUNTY NEAR DOS RIOS AT 0.9 MI EAST OF LAYTONVILLE‐DOS RIOS 2,800 12/1/2013
01 MEN 253 001.5/ 001.8
Boonville Slide SHOPP
01‐0B5604
IN MENDOCINO COUNTY NEAR BOONVILLE FROM 0.2 MI WEST TO 0.1 MI EAST OF SINGLY CATTLE PASS 650 12/1/2013
01 MEN 253 006.8/253 Slip Wall SHOPP
01‐0B5704
IN MENDOCINO COUNTY NEAR BOONVILLE AT 3.4 MILES EAST OF SODA CREEK BR# 10‐229 2,500 12/1/2013
01 DN 101 022.5/ 023.0
Hamilton Road HFST SHOPP
01‐0B6304
IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 0.2 MI SOUTH TO 0.3 MI NORTH OF HAMILTON ROAD INTERSECTION 1,020 7/1/2012
01 HUM 101 079.9/ 085.5 No Nick SHOPP
01‐0B7004
IN HUMBOLDT COUNTY NEAR EUREKA FROM EUREKA SLOUGH BRIDGES (#4‐22) TO JUST SOUTH OF THE ROUTE 101/255 SEPARATIONS (#4‐49) 460 5/15/2012
01 HUM 096 023.1/ 029.9 No Nick
MAINTENANCE
01‐0B7704
IN HUMBOLDT COUNTY NEAR WEITCHPEC FROM KLAMATH RIVER BRIDGE #4‐144 TO SLATE CREEK BRIDGE 600 5/1/2013
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
01 VAR C0999 VAR/ No Nick
MAINTENANCE
01‐0B7904
IN HUMBOLDT AND MENDOCINO COUNTIES AT VARIOUS LOCATIONS 260 7/1/2013
01 MEN 001 040.3/ 043.7 No Nick
MAINTENANCE
01‐0B8004
IN MENDOCINO COUNTY NEAR ALBION FROM NAVARRO RIVER BRIDGE TO ALBION RIVER BRIDGE 1,000 2/1/2013
01 MEN 101 R084.7/T091.3 No Nick
MAINTENANCE
01‐0B8104
IN MENDOCINO COUNTY NEAR LEGGETT FROM CUMMINGS ROAD UNDERCROSSING TO 0.6 MILE SOUTH OF JITNEY GULCH BRIDGE 1,300 2/1/2013
01 MEN 101 R043.1/ 049.0
Willits Bypass STIP
01‐262004
IN AND NEAR WILLITS FROM 1.3 KM SOUTH OF HAEHL OVERHEAD TO 2.9 KM SOUTH OF REYNOLDS HIGHWAY
Asphalt Concrete Surfacing,Bridge,Bridge Railing,Concrete Barrier,Culverts,Culverts,Drainage,Earthwork,Electrical Facilities,Erosion Control,Expressway,Fence,Flashing Beacons,Reconstruct Freeway,Freeway and Structures,Grading and Paving,Guard Railing,Interchange,Lighting,Overcrossing,Overhead,Pavement Markers,Pavement Markings,Ramp,Re 126,929 520 5/1/2012 82,000 153,000 34,800 120,000 8,000,000 700,000 960,000
01 HUM 255 007.7/
MAD RIVER MITIGATION 1 SHOPP
01‐296114
IN HUMBOLDT COUNTY NEAR ARCATA AT MCDANIEL SLU BRIDGE #4‐222 500 6/15/2013
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
01 HUM 299 R004.2/
MAD RIVER MITIGATION 2 SHOPP
01‐296124
IN HUMBOLDT COUNTY NEAR BLUE LAKE AT MILL CREEK BRIDGE #4‐188 530 5/15/2012
01 HUM 036 R005.8/ 007.6
Carlotta Shoulders SHOPP
01‐323304
IN HUMBOLDT COUNTY AT CARLOTTA FROM WILSON LANE TO 0.5 MILE WEST OF CUMMINGS CREEK ROAD Widening 350 165 8/1/2012 9,800 20 3,000 5,400
01 HUM 101 079.8/ 087.8
Eureka/Arcata CAPM SHOPP
01‐363304
IN HUMBOLDT COUNTY FROM EUREKA SLOUGH BRIDGE #4‐22 TO ARCATA OVERHEAD BRIDGE #4‐79 (KP 128.4/141.3) 15,340 5/15/2012
01 MEN 128 031.0/ 038.8
CAPM Men‐128 #1 SHOPP
01‐363604
IN MENDOCINO COUNTY NEAR BOONVILLE FROM 0.3 MI EAST OF ROBINSON CREEK BRIDGE TO 2.6 MI EAST OF MAPLE CREEK BRIDGE (KP 49.9/62.4) 4,000 5/15/2011
01 MEN 128 038.8/ 050.9
CAPM Men‐128 #2 SHOPP
01‐363704
IN MENDOCINO COUNTY NEAR YORKVILLE FROM BEEBE CREEK BRIDGE TO THE SONOMA COUNTY LINE 5,900 5/15/2011
01 MEN 020 013.8/R032.0
50 culverts at various locations SHOPP
01‐364324
IN MENDOCINO COUNTY NEAR WHISKEY SPRING AND WILLITS FROM SOUTH OF SOUTH FORK NOYO RIVER TO WEST OF CROPLEY LANE; ALSO ON ROUTE 1 AND ON ROUTE 101 Replace Culverts 1,883 100 9/1/2012
Rehabilitate 49 drainage systems. Estimated 2350 LF of alternative pipe culvert.
01 MEN 128 048.6/ 050.3
21 Culverts ‐ Men 128, 253, Minor A Split Project SHOPP
01‐378124
IN MENDOCINO COUNTY NEAR YORKVILLE ON RTE 128 ROM 0.2 TO 1.9 MILES EAST OF MOUNTAIN HOUSE RD AND ON ROUTE 253 FROM 0.2 MI WEST TO 9.9 MI EAST OF SODA CREEK BR #10‐229 Replace Culverts 824 70 6/26/2012
Rehabilitate 21 drainage systems. Estimated 1000 LF of alternative pipe culvert.
01 MEN 128 030.1/ 048.4
22 Culverts ‐ Men 128 Minor A Split Project SHOPP
01‐378134
IN MENDOCINO COUNTY NEAR BOONVILLE FROM 0.5 MILE EAST OF THE ROUTE 253 /128 JUNCTION TO MOUNTAIN HOUSE RD Replace Culverts 1,000 70 8/1/2012
Rehabilitate 22 drainage systems. Estimated 1000 LF of alternative pipe culvert.
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
01 MEN 128 010.6/ 023.3
21 Culverts ‐ Men 128 Minor A Split Project SHOPP
01‐378144
IN MENDOCINO COUNTY NEAR PHILO FROM 1.0 MILE WEST OF NAVARRO RIDGE ROAD TO INDIAN CREEK BRIDGE #10‐67 950 2/15/2013
01 MEN 128 014.3/ 040.6
51 Culverts ‐ Middle Navarro River Split SHOPP
01‐378164
IN MENDOCINO COUNTY AT VARIOUS LOCATIONS Replace Culverts 4,715 170 9/1/2012
Rebabilitate 51 draiinage systems. Estimated 2500 LF of alternative pipe
01 MEN 128 000.2/ 011.1
76 Culverts ‐ Lower Navarro River Split SHOPP
01‐378174
NEAR NAVARRO FROM EAST TO ROUTE 1 TO WEST OF FLYNN CREEK BRIDGE REHAB CULVERTS Replace Culverts 3,500 150 9/1/2013
Rehabilitate 76 drainage systems. Estimated 4000 LF of alternative pipe
01 MEN 001 088.7/ 092.8
Dunn Creek Fish Passage SHOPP
01‐385724
IN MENDOCINO COUNTY NEAR ROCKPORT, 2.0 MILES NORTH OF USAL ROAD
Replace Culverts,Repair Drainage 3,530
120 ‐ 240 7/15/2012
May involve culvert replacement or bridge structure 150 400 4,000
01 MEN 175 000.0/ 009.9 No Nick SHOPP
01‐398704
IN MENDOCINO & LAKE COUNTIES NEAR HOPLAND FROM THE JUNCTION OF ROUTES 101 & 175 TO 0.6 MI EAST OF THE MENDOCINO/LAKE COUNTY LINE
Asphalt Concrete Surfacing 6,180 40 5/15/2011 32,000 0 0 0 3,500 0
01 LAK 175 004.9/ 028.0
CAPM Lak‐175 SHOPP
01‐399404
IN LAKE COUNTY NEAR KELSEYVILLE FROM 4.9 MI EAST OF THE MENDOCINO/ LAKE COUNTY LINE TO ROUTE 175/29 JUNCTION.
Asphalt Concrete Surfacing 12,380 30 5/15/2011 24,500 70,100 0 0 900 0
01 MEN 101 046.2/R084.6
36 LOCATIONS SHOPP
01‐402804
IN MENDOCINO COUNTY AT VARIOUS LOCATIONS FROM 0.3 MILES NORTH OF BAECHTEL CREEK BRIDGE TO 0.1 MILES SOUTH OF CUMMUNGS RD UNDERCROSSING Culverts 1,600 80 10/31/2012
Quantities are for PA&ED phase. 550 1,150
01 HUM 254 006.8/ 042.1
Avenue Culvert Rehab SHOPP
01‐409504
IN HUMBOLDT COUNTY NEAR MIRANDA FROM 2.3 MILES SOUTH OF MIRANDA POST OFFICE TO 0.9 MILE SOUTH OF BEAR CREEK BRIDGE #4‐12 881 8/1/2013
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
01 MEN 101 R084.0/Rattlesnake 2 SHOPP
01‐412214
IN MENDOCINO COUNTY ABOUT 7.1 MILE SOUTH OF LEGGETT AT RATTLESNAKE CREEK
Reconstruct Culverts,Erosion Control,Establish Existing Planting,Rock 659
76 to 90 12/24/2012
Repair invert slad of 18' w x 17.5' h x 245' l culvert. Repair upsteam debris rack. Access to the 0 0 0 0 12,000 0 0
01 HUM 299 020.2/ 020.5
Green Point Sink SHOPP
01‐423704
IN HUMBOLDT COUNTY ABOUT 14 MILES EAST OF BLUE LAKE FROM 0.2 TO 0.5 MI WEST OF CHEZEM ROAD #6L200 11,500 8/1/2012
01 HUM 169 033.5/ 033.8
Weitchpec Curve SHOPP
01‐430504
IN HUMBOLDT COUNTY ABOUT 13.6 KM EAST OF PECWAN FROM 0.5 KM TO 0.3 KM WEST OF JUNCTION 96/169 (KP 54.0/54.1)
Realign Curve,Widening 500 100 4/1/2014
Quantities from preliminary estimate dated 11/06. 780 340 105 2,360
01 HUM 254 000.8/ 043.1
Avenue of the Giants‐Four Bridges Project SHOPP
01‐430604
IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS FROM OHMAN CREEK BRIDGE #4‐7 TO BEAR CREEK BRIDGE #4‐12 (KP 1.3/69.4) 9,510 1/1/2014
01 HUM 101 002.3/ 066.3
10 LOCATIONS (101=6; 254=4) SHOPP
01‐431704
IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS Culverts 514 50 4/1/2012
Culvert Project (10 locations)‐ AC, striping,earthwork fully compensated into the price of 22 52
01 HUM 299 030.7/Low Gap Buttress SHOPP
01‐437404
IN HUMBOLDT COUNTY ABOUT 8 MI WEST OF WILLOW CREEK AT 2.5 MI WEST OF E FORK WILLOW CREEK BRIDGE
Repair Slope,Repair Roadway 280 60‐120 10/1/2012
Scope will be defined when geotechnical work is complete.
01 DN 199 026.3/ 026.5
Washington Curve SHOPP
01‐448304
NEAR PATRICK CREEK FROM 2.3 KM TO 2.5 KM NORTH OF MIDDLE FORK SMITH RIVER BR #1‐16 (KP 42.3/42.6) 1,520 4/1/2013
01 DN 199 022.7/ 023.0 Narrows SHOPP
01‐450004
IN DEL NORTE COUNTY NEAR PATRICKS CREEK FROM 0.6 MI TO 0.9 MI NORTH OF PATRICKS CREEK ROAD (KP 36.5/37.0) Widening 2,540 120 4/1/2012
Difficult Excavation of rock. Blasting and/or pre‐splitting 750 240 3,000
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
01 HUM 169 013.6/ 033.8
Widening and MBGR SHOPP
01‐450904
IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS FROM 0.8 MILES WEST OF PECWAN CREEK BRIDGE TO 1 MILE EAST OF CAPPELL CREEK BRIDGE
Asphalt Concrete Surfacing,Modify Drainage,Earthwork,Erosion Control,Grading and Paving,Guard Railing,Pavement Markers,Pavement Markings,Realign Curve,Retaining 4,916 350 5/15/2013
Widen and MBGR construction 1,100 0 0 20 56,000 130 280
01 DN 197 003.2/ 004.0 Ruby 2 SHOPP
01‐454904
IN DEL NORTE COUNTY NEAR FORT DICK FROM 1.3 MI TO 0.5 MI SOUTH OF RUBY VANDEVENTER COUNTY PARK (PM 3.2/4.0) Widening 910 65 4/1/2013 4,590 1,060 717 450 720
01 HUM C0999 VAR/ No Nick
MAINTENANCE
01‐459104
IN HUMBOLDT COUNTY FROM DIMMICK RD UNDERCROSSING TO APPROXIMATELY 1 MI NORTH OF ENGLEWOOD PARK UC AT VARIOUS LOCATIONS. Repair Culverts 300 40 6/15/2013
250 lf 24" pipe liner. 345 lf 36" pipe liner.
01 HUM 101 098.1/ 100.7
Hum 101 Seismic Retrofit SHOPP
01‐459704
IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS FROM WESTHAVEN DRIVE UC TO TRINIDAD ROAD UNDERCROSSING 8,688 3/1/2013
01 HUM CO999 VAR/
Hum Various MBGR SHOPP
01‐463904
IN HUMBOLDT COUNTY AT VARIOUS LOCATIONS
Replace Guard Railing 8,200
100‐160 11/1/2012
01 HUM 101 001.1/ 002.2
Richardson Grove STAA SHOPP
01‐464804
IN HUMBOLDT COUNTY NEAR GARBERVILLE FROM 0.5 MI SOUTH TO 0.5 MI NORTH OF RICHARDSON GROVE UC
Asphalt Concrete Surfacing,Erosion Control,Grading and Paving,Realign Curve,Realignment,Retaining Wall 5,500
170‐190 4/18/2011
01 DN 101 R002.7/ 008.8 Klamath TE STIP
01‐465304
IN DEL NORTE COUNTY NEAR KLAMATH FROM 2.4 MILES NORTH OF NB ON NEWTON B DRURY PARKWAY TO NEW HUNTER CREEK ROAD. 257 5/1/2012
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
01 MEN 001 014.9/ 021.7
Pac Coast Bike Trail STIP
01‐465804
IN MENDOCINO COUNTY IN AND NEAR POINT ARENA AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF MILL STREET TO 0.3 MILE NORTH OF KINNEY ROAD 515 2/1/2012
01 MEN 001 021.0/ 024.6
PAC COAST BIKE TRAIL III STIP
01‐465904
IN MENDOCINO COUNTY BETWEEN MANCHESTER AND POMO LAKE DR 532 11/1/2013
01 HUM 299 R008.5/Blue Lake Sink SHOPP
01‐474404
IN HUMBOLDT COUNTY NEAR BLUE LAKE AT 1.8 MI EAST OF BUCKLEY ROAD AND AT 0.1 MILE EAST OF OLD THREE CREEKS ROAD
Asphalt Concrete Surfacing,Replace Culverts,Culverts,Drainage,Erosion Control,Grading and Paving,Realign Curve,Repair 5,004 200 12/1/2011
Dewater Slide with drainage galleries and horizontal drains. 2,200 1,800 5,000
01 HUM 299 R008.5/ No Nick SHOPP 01‐474414
IN HUMBOLDT COUNTY NEAR BLUE LAKE AT 1.8 MILES EAST OF BUCKLEY ROAD 5,000 12/1/2011
01 MEN 001 070.5/Seaside Beach SHOPP
01‐474904
IN MENDOCINO COUNTY NEAR WESTPORT FROM 0.8 MI NORTH OF TEN MILE RIVER BRIDGE TO 4.2 MI SOUTH OF BLUE SLIDE GULCH BRIDGE
Repair Slope,Repair Storm Damage 3,800 45 12/2/2012 125 125 0 375 1,000 700 800
01 HUM 254 011.0/ 011.1 No Nick SHOPP
01‐475024
IN HUMBOLDT COUNTY NEAR MIRANDA AT 0.2 MILE NORTH OF BRIDGE CREEK
Asphalt Concrete Surfacing,Replace Culverts,Repair Storm Damage,Reconstr 781 40 8/1/2012 1,100 800
01 MEN 128 034.5/ 035.5 SMOOT Sink SHOPP
01‐476604
IN MENDOCINO COUNTY ABOUT 4.9 MILES EAST OF BOONVILLE FROM SHEARING CREEK BRIDGE #10‐59 TO 0.7 MI WEST OF MAPLE CREEK BRIDGE #10‐55
Repair Storm Damage 9,485 180 10/1/2012
600 LF of tie‐back wall w/ H = approx. 12'. Also, 150‐foot long RSP buttress. 2,000 0 200 1,500 20,000 0 9,000
01 DN 101 R004.0/
Klamath River ‐ Hinge‐201.110 SHOPP
01‐476904
IN DEL NORTE NEAR KLAMATH AT THE KLAMATH RIVER BRIDGE #01‐0028 3,429
180‐200 10/1/2012
This is exclusively structure work 410 61,800
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
01 DN 199 020.5/ 025.7
Realignment and Widening at Patrick STIP
01‐479404
IN DEL NORTE COUNTY NEAR PATRICK CREEK FROM 1.5 MI SOUTH OF PATRICK CREEK TO 5 MI NORTH OF PATRICK CREEK. 12,960 10/30/2013
01 DN 197 004.5/ Ruby 1 SHOPP 01‐481104
IN DEL NORTE COUNTY NEAR FORT DICK AT THE ENTRANCE TO RUBY VAN DEVENTER COUNTY PARK Widening 480 50 8/15/2012 816 0 1 96 4 130
01 MEN 001 040.1/ 040.9
Albion/Navarro MBGR SHOPP
01‐484704
IN MENDOCINO COUNTY NEAR ALBION ON ROUTE 1 FROM 0.1 MILE SOUTH OF NAVARRO RIVER BRIDGE TO 0.6 MILE NORTH OF NAVARRO RIVER BRIDGE AND ON ROUTE 128 AT NAVARRO RIVER BR
Asphalt Concrete Surfacing,Guard Railing,Widening 2,500 80 3/15/2013 1,400 1,300 3,000
01 LAK 020 008.1/ 008.6
20/29 Roundabout SHOPP
01‐488604
IN LAKE COUNTY NEAR UPPER LAKE AT THE INTERSECTION OF ROUTES 20/29
Asphalt Concrete Surfacing,Channelize,Culverts,Drainage,Earthwork,Electrical Facilities,Erosion Control,Flashing Beacons,Grading and Paving,Highway Planting,Lighting,P 3,900 110 12/1/2013
Construct Roundabout or signalize intersection 4,000 300 4,400 2,500 400
01 MEN 020 019.9/ 026.3
James Creek OGFC SHOPP
01‐490704
IN MENDOCINO COUNTY ABOUT 7 MILES WEST OF WILLITS FROM 0.1 MILE WEST TO 6.2 MILES EAST OF JAMES CREEK BRIDGE #10‐102
Asphalt Concrete Surfacing 3,200 50‐70 3/15/2012
Rubberized hot mix asphalt open graded friction course 100 11,700 0 0 0 300 0
01 LAK 029 011.9/ 019.1 No Nick
MAINTENANCE
01‐491214
IN LAKE COUNTY ON ROUTE 29 FROM COYOTE CREEK BRIDGE TO JUNCTION ROUTE 53 1,000 10/1/2012
01 DN 101 022.5/ 023.0
Hamilton Road Safety Project SHOPP
01‐495604
IN DEL NORTE COUNTY NEAR CRESCENT CITY FROM 0.2 MI SOUTH TO 0.3 MI NORTH OF HAMILTON ROAD 7,300 9/1/2012
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
01 HUM 101 060.3/
Fortuna Maintenance SHOPP
01‐496504
IN HUMBOLDT COUNTY IN FORTUNA AT THE FORTUNA MAINTENANCE STATION 1,880 2/1/2014
01 VAR C0999 VAR/ No Nick
MAINTENANCE
01‐496604
IN HUMBOLDT & MENDOCINO COUNTIES ON ROUTES 101 & 271 AT VARIOUS LOCATIONS
Repair Bridge Railing,Rehabilitate Bridge Deck,Replace Bridge 279 100 2/3/2012 13 Locations
01 MEN 271 007.2/Leggett Ozone SHOPP
01‐497104
IN MENDOCINO COUNTY NEAR LEGGETT AT THE LEGGETT MAINTENANCE STATION
Maintenance Station 505 60‐100 6/15/2013
7/13/11 Project has not been desugned yet. Installation of ozone sparging
01 MEN 001 002.3/ 002.5 Big Gulch SHOPP
01‐497714
IN MENDOCINO COUNTY NEAR GUALALA FROM 0.1 TO 2.5 MI NORTH OF BIG GULCH ROAD RD# 543
Repair Culverts,Guard Railing,Repair Storm Damage 1,830 160 11/1/2013 Working Days TBD.
01 DN 101 000.9/ 020.3 No Nick
MAINTENANCE
01‐499104
IN DEL NORTE COUNTY FROM THE HUMBOLDT/DEL NORTE COUNTY LINE TO 3.0 MILES SOUTH OF MILL CREEK ROAD AT VARIOUS LOCATIONS 300 4/1/2013
02 TEH 005 010.5/Corning NB & SB SRRAs SHOPP
02‐0E3604
IN TEHAMA COUNTY NEAR CORNING AT CORNING SAFETY ROADSIDE REST AREA
Replace Building,Erosion Control,Highway Planting,Replace Irrigation System,Replace 6,000 300 6/18/2012 0 0 650 650 25,000 0 0
02 SHA 005 062.3/
Castella Vista Point‐STIP TE STIP
02‐0E4004
IN SHASTA COUNTY NEAR DUNSMUIR AT CASTELLA VISTA POINT 370 8/15/2012
02 SIS 097 002.5/ 002.9
Carrick Subdivision Two‐Way Left Turn STIP
02‐0E4405
IN SISKIYOU COUNTY NEAR WEED FROM 0.1 MILE SOUTH OF MAPLE AVENUE TO 0.1 MILE NORTH OF FIRST AVENUE. 118 11/12/2012
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
02 TEH 005 R000.0/ 042.1
Teh 5 Native Landscaping STIP
02‐0E4504
IN TEHAMA COUNTY AT VARIOUS LOCATIONS FROM 0.2 MILE SOUTH OF LIBERAL AVENUE OVERCROSSING TO 0.1 MILE SOUTH OF BOWMAN ROAD OVERCROSSING 1,400 8/15/2012
02 SIS 003 047.7/ 048.5
Juniper Dr. Left Turn Lane (Yreka) STIP
02‐0E8405
IN SISKIYOU COUNTY IN YREKA FROM 4‐H WAY TO LAWRENCE LANE. 118 9/28/2012
02 MOD 299 022.4/Canby Maint Station HAR STIP
02‐1E0004
IN MODOC COUNTY AT CANBY AT CANBY MAINTENANCE STATION 300 1/20/2014
02 PLU 910 000.0/Plu 36 & 89 SuperHAR, SHOPP
02‐1E2404
IN PLUMAS COUNTY AT VARIOUS LOCATIONS. 658 3/5/2012
02 MOD 299 039.3/ 040.6
Alturas 299 Improvements STIP
02‐299714
IN MODOC COUNTY IN AND NEAR ALTURAS FROM 0.2 MILE WEST OF MILL STREET TO ROUTE 299/395 SEPARATION 2,483 11/19/2013
02 PLU 070 050.3/ 053.0
Spring Garden Br SHOPP
02‐2C0904
IN PLUMAS COUNTY NEAR QUINCY FROM 0.3 MI WEST TO 0.5 MI EAST OF SPRING GARDEN BOH BR #09‐0062 15,400 2/17/2014
02 TEH 099 013.9/ 014.3
North Fork Mill Cr Bridge SHOPP
02‐2C1124
IN TEHAMA COUNTY NEAR LOS MOLINOS AT 0.1 MILE NORTH OF NORTH FORK MILL CREEK. Replace Bridge 3,860 180 7/23/2012 500 36,000 40
02 TEH 036 091.4/Mill Crk Br Scour SHOPP
02‐2C2254
IN TEHAMA COUNTY ABOUT 8 MILES EAST OF MINERAL AT MILL CREEK BRIDGE 1,090 12/10/2012
02 TRI 299 000.4/ 000.8
Whole Enchilada SHOPP
02‐2E3504
NEAR SALYER FROM 0.7 MILE TO 0.2 MILE WEST OF CAMBEL RIDGE ROAD.
Culverts,Earthwork,Realign Curve,Retaining 2,385 90 10/15/2012
Proposing 3‐retaining walls ‐ Nail Wall, MSE wall, and 4,000 2,500 10,000 40,000
02 SHA 299 004.3/ 005.5
Twin Gulches Curve Improvemen SHOPP
02‐2E5104
IN SHASTA COUNTY ABOUT 17.3 MILES WEST OF REDDING FROM 4.3 TO 5.5 MILES EAST OF TRINITY COUNTY
Culverts,Earthwork,Guard Railing,Realignment 8,866 240 6/18/2012
Expect pre‐cast culverts under deep fills 7,500 4,500 600,000
02 TEH 036 039.7/ 040.2
Baker Curve Improvement SHOPP
02‐2E6204
IN TEHAMA COUNTY NEAR RED BLUFF FROM BAKER ROAD TO 0.5 MILE EAST OF BAKER ROAD.
Culverts,Earthwork,Realignment,Rock Slope Protection 2,500 70 11/26/2012 5,500 2,500 15,000 30,000
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
02 TEH 032 022.3/ 022.8
Deer Crk Curve Improvement SHOPP
02‐2E7304
NEAR FROEST RANCH FROM EAST OF DEER CREEK BRIDGE #08‐0072 TO DEER CREEK BRIDGE. CURVE IMPROVEMENT AND SHOULDER WIDENING. 1,900 3/11/2013
02 SHA 299 083.0/ 084.0
SR299 Hat Creek Curves SHOPP
02‐2E7404
NEAR BURNEY FROM 1.0 MILE WEST OF HAT CREEK BRIDGE TO HAT CREEK BRIDGE. ________________________________ CURVE IMPROVEMENT. 2,417 4/21/2014
02 SIE 395 000.0/ 000.1
Scott Road Intersection Access SHOPP
02‐2E8204
IN SIERRA COUNTY NEAR HALLELUJAH JUNCTION FROM NEVADA STATE LINE TO 0.1 MILE NORTH OF NEVADA STATE LINE
Earthwork,Widening 220 20 3/18/2013
I can't believe I wasted my time with this! 100 50 50
02 SHA 005 031.1/
O'Brien SRRA Updated SHOPP
02‐2e8704
IN SHASTA COUNTY ABOUT 9 MILES NORTH OF SHASTA LAKE CITY AT ___ O'BRIEN SAFETY ROADSIDE REST AREA 319 7/30/2012
02 SIS 005 045.7/Truck Wash Rack
MAINTENANCE
02‐2E9604
IN SISKIYOU COUNTY IN YREKA AT 0.7 MILE SOUTH OF OBERLIN ROAD UNDERCROSSING 250 4/2/2012
02 TRI 299 051.4/ 051.8
Weaverville Sidewalk Restoration SHOPP
02‐2E9905
IN TRINITY COUNTY AT WEAVERVILLE FROM COURT STREET TO BREMER STREET 30 3/15/2012
02 SHA 299 030.3/ 040.7 Bella Diddy SHOPP
02‐360704
IN SHASTA COUNTY AT AND NEAR BELLA VISTA FROM 0.3 MILE EAST OF INTERMOUNTAIN DRIVE TO 0.3 MILE WEST OF BACKBONE RIDGE ROAD
Asphalt Concrete Surfacing,Replace Bridge,Modify Culverts 26,995 240 1/7/2013 71,000 32,000 141,000
02 TRI 299 023.3/FRENCH CR BR SHOPP
02‐374304
IN TRINITY COUNTY NEAR DEL LOMA AT BIG FRENCH CREEK BRIDGE (NO. 5.8)
Modify Bridge,Replace Bridge 1,196 100 4/27/2012 300,000 7,000 300,000
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
02 LAS 395 061.6/ 076.6
Johnstonville PFR SHOPP
02‐3C0714
IN AND NEAR JOHNSTONVILLE FROM 0.4 MILE SOUTH OF BANGHAM LANE TO 0.3 MILE SOUTH OF WENDEL RD. 16,500 11/12/2012
02 LAS 395 056.5/R061.0
Bass Hill CAPM SHOPP
02‐3C0724
IN LASSEN COUNTY AT AND NEAR JOHN STONVILLE FROM 0.1 MILE NORTH OF SUNNYSIDE ROAD TO 0.1 MILE SOUTH OF ROUTE 36. 2,500 4/11/2012
02 PLU 070 000.1/ 035.1
MBGR‐BUTTE CO. LINE TO RT. 89 SHOPP
02‐3C3004
IN PLUMAS COUNTY AT VARIOUS LOCATIONS FROM GRIZZLY CREEK BRIDGE TO 0.1 MILE WEST OF SPANISH CREEK BRIDGE.
Reconstruct Guard Railing 8,000 300 5/14/2012 3,300 450
02 SIS 005 R050.6/R052.1
Yreka Shasta River Bridges SHOPP
02‐3C9204
IN SISKIYOU COUNTY NEAR YREKA FROM 0.6 MILE SOUTH OF SHASTA RIVER BRIDGES TO 0.2 MILE SOUTH OF VISTA POINT
Modify Bridge,Replace Bridge Railing,Reconstruct Drainage,Earthwork,Freeway and Structures,Replace Guard Railing,Pavement 5,363 360 5/1/2012
Crossovers for traffic handling will be constructed by the Anderson Grade Project. Traffic handling for the first season will be done by the Anderson Grade contractor. 500 200 356,720 500
02 SIS 096 023.2/ 105.0
Jefferson's Culverts SHOPP
02‐3E0704
IN SISKIYOU COUNTY AT VARIOUS LOCATIONS FROM SWILLUP CREEK BRIDGE TO 1.6 MILES EAST OF ROUTE 263 700 4/16/2012
02 SIS 096 068.9/
Hamburg Shoulder Widening SHOPP
02‐3E0804
IN SISKIYOU COUNTY AT HAMBURG AT 2.3 MILES WEST OF SCOTT RIVER BRIDGE Widening 520 20‐30 11/15/2012 1,500 1,400 4,000
02 TEH 099 012.3/ 012.6
Teh‐99 Bke/Ped Paved Shoulder SHOPP
02‐3E5604
IN TEHAMA COUNTY AT LOS MOLINOS FROM ARAMAYO WAY TO LOS MOLINOS CREEK BRIDGE
Asphalt Concrete Surfacing,Drainage,Widening 350
100‐150 2/20/2012 4,200 300 3,700 3,500
02 SHA 299 024.0/ 024.8 RDI 2 SHOPP
02‐3E6004
IN SHASTA COUNTY AT VARIOUS LOCATIONS. 901 4/16/2012
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
02 PLU 070 009.0/
Las/ Plu Bridge Maintenanc
MAINTENANCE
02‐3E6104
IN LASSEN AND PLUMAS COUNTIES AT VARIOUS LOCATIONS. 1,405 2/27/2012
02 TEH 005 019.2/
Sha & Teh Cos Br Maint
MAINTENANCE
02‐3E6404
IN SHASTA AND TEHAMA COUNTIES AT VARIOUS LOCATIONS. 2,034 2/21/2012
02 SHA 910 000.1/Beaucoup Bridges SHOPP
02‐3E6504
IN SISKIYOU AND SHASTA COUNTIES AT VARIOUS LOCATIONS. REHABILITATE BRIDGE DECKS. 3,305 1/7/2013
02 MOD 299 035.9/ 036.2
Heard Ranch SHOPP
02‐3E6904
IN MODOC COUNTY NEAR ALTURAS FROM 1.2 MILES TO 0.9 MILES WEST OF CROWDER FLAT ROAD. SHOULDER WIDENING. 1,293 11/26/2012
02 VAR 036 030.4/ 030.7
Blue Pt Curve SHOPP
02‐3E7104
NEAR FOREST GLEN FROM 1.7 MILES TO 2.1 MILES EAST OF ROUTE 3. IMPROVE ROAD ALIGNMENT. 960 3/18/2013
02 TRI 299 036.6/ 036.8
North Fork Curve SHOPP
02‐3E8204
IN TRINITY COUNTY NEAR HELENA FROM 0.3 MILE TO 0.1 MILE WEST OF NORTH FORK TRINITY RIVER BRIDGE 211 4/16/2012
02 SHA 299 018.3/ 020.2
Old Shasta Overlay
MAINTENANCE
02‐3E8704
IN SHASTA COUNTY AT SHASTA FROM 0.1 MILE WEST OF TRINITY ALLEY TO 0.1 MILE WEST OF IRON MOUNTAIN 750 2/27/2012
02 SHA 005 028.8/ 039.2
Pit River to Antlers Overlay
MAINTENANCE
02‐3E8904
IN SHASTA COUNTY ABOUT 6 MILES NORTH OF SHASTA LAKE CITY FROM PIT RIVER BRIDGE TO 0.2 MILE NORTH OF ANTLERS SUMMIT OVERCROSSING 4,700 2/13/2012
02 MOD 299 033.5/ 037.5
Rattlesnake Crk CIR
MAINTENANCE
02‐3E9604
IN MODOC COUNTY NEAR ALTURAS FROM 1.8 MILES WEST OF COUNTY ROAD 75 TO 0.3 MILE WEST OF RATTLESNAKE CREEK BRIDGE. 1,700 3/12/2013
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
02 TEH 099 011.6/ 012.6
Los Molinos Phase 2
99 CORRIDOR
02‐4C58U4
IN TEHAMA COUNTY AT LOS MOLINOS FROM 0.1 MILE SOUTH OF PALM STREET TO LOS MOLINOS CREEK. 3,054 2/27/2012
02 TRI 003 007.1/ 007.7
Hayfork II TE Bike Lane STIP
02‐4C9604
IN TRINITY COUNTY AT HAYFORK FROM MAIN STREET TO 0.1 MILE NORTH OF FOREST AVENUE. 970 6/11/2012
02 SIS 005 023.3/ 023.9
Edgewood Chain‐on Area SHOPP
02‐4E1404
IN SISKIYOU COUNTY NEAR WEED FROM 0.3 MILE TO 0.9 MILE NORTH OF EDGEWOOD UNDERCROSSING. 450 10/7/2013
02 SIS 005 025.8/ 025.9
SIS‐5 Monitoring Well SHOPP
02‐4E2305
IN SISKIYOU COUNTY ABOUT 6 MILES NORTH OF WEED AT WEED SAFETY ROAD‐ SIDE REST AREA. 15 2/15/2012
02 SHA 299 083.0/ 083.8
Hat Creek Truck Climbing SHOPP
02‐4E2704
IN SHASTA COUNTY NEAR FALL RIVER MILLS AT 0.2 MILE WEST OF HAT CREEK BRIDGE. 648 4/21/2014
02 SIS 005 046.8/ 062.1
Yreka Chain‐On Areas SHOPP
02‐4E2804
IN SISKIYOU COUNTY IN AND NEAR YREKA FROM YREKA CREEK BRIDGE TO 0.2 MI SO OF MINER ST UNDERCROSSING & FRM 0.8 MI SO TO 0.4 MI SO OF DITCH CREEK ROAD OVERCROSSING. 1,000 7/22/2013
02 TRI 299 045.5/ 046.2
Poison Pond Curve Improvemen SHOPP
02‐4E3104
NEAR WEAVERVILLE FROM 2.0 MILES TO 1.2 MILES WEST OF CASTLE ROAD. 945 10/7/2013
02 LAS 395 070.1/
Honey Lake Wetlands Mit Bank SHOPP
02‐4E3205
IN LASSEN COUNTY AT STANDISH AT BUNTINGVILLE ROAD. 30 5/22/2012
02 LAS 147 000.5/ 001.2
Clear Creek 3R SHOPP
02‐4E3404
IN LASSEN COUNTY NEAR WESTWOOD FROM 0.3 MILE NORTH TO 0.5 MILE SOUTH OF SPRING CREEK BRIDGE. 1,000 2/25/2013
02 PLU 070 019.0/ 019.1
PLU 70 Slip‐out SHOPP
02‐4E3504
IN PLUMAS COUNTY AT RICH BAR AT 0.2 MILE EAST OF RICH BAR ROAD. 931 2/25/2014
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
02 PLU 070 023.8/ 023.9 Plu 70 RSP SHOPP
02‐4E3604
IN PLUMAS COUNTY NEAR RICH BAR AT 0.1 MILE EAST OF RUSH CREEK ROAD. 575 2/25/2013
02 SHA 151 005.8/ 006.9
Shasta Dam Blvd CAPM SHOPP
02‐4E3804
IN SHASTA COUNTY IN SHASTA LAKE CITY FROM LOCUST AVENUE TO ROUTE 5. 1,000 3/12/2012
02 SHA 005 025.7/ 026.0
Fawndale Drainage Restoration
MAINTENANCE
02‐4E4905
IN SHASTA COUNTY NEAR SHASTA LAKE CITY FROM 0.3 MILE SOUTH OF FAWNDALE OVERCROSSING TO FAWNDALE OVERCROSSING 120 4/15/2012
02 SHA 910 000.1/ 000.2
Waterworks Park Fence Restoration
MAINTENANCE
02‐4E5005 120 3/15/2012
02 SIS 005 025.8/ 025.8
Weed SRRA Slurry Seal
MAINTENANCE
02‐4E5104
IN SISKIYOU COUNTY NEAR WEED AT WEED SAFETY ROADSIDE REST AREA. 175 3/15/2012
02 SHA 044 021.1/ 021.3
Black Butte Rd LTL SHOPP
02‐4E5204
IN SHASTA COUNTY ABOUT 10 MILES WEST OF SHINGLETOWN FROM 0.3 MILE TO 0.1 MILE WEST OF BLACK BUTTE ROAD. 530 2/4/2013
02 TRI 003 030.8/ 031.2
Weaverville Elementary School Sidewalks SHOPP
02‐4E6004
IN TRINITY COUNTY AT WEAVERVILLE FROM TRINITY RIVER BRIDGE TO WASHINGTON STREET. 200 1/7/2014
02 SIS 096 056.0/Ft Goff Culvert SHOPP
02‐4E6304
IN SISKIYOU COUNTY NEAR SEIAD VALLEY AT 3.5 MILES EAST OF THOMPSON CREEK BRIDGE 200 1/1/2014
02 TEH 005 034.3/
Herbert Miles SRRA Lighting SHOPP
02‐4E6605
IN TEHAMA COUNTY ABOUT 8 MILES NORTH OF RED BLUFF AT HERBERT MILES SAFETY ROADSIDE REST AREA. 10 8/1/2012
02 SHA 299 018.4/ 018.7
Old Shasta Sidewalks SHOPP
02‐4E7004
IN SHASTA COUNTY AT SHASTA FROM 0.1 MILE WEST OF FRENCH ALLEY TO RED BLUFF ROAD. 524 1/7/2014
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
02 SIS 161 009.0/ 011.3 161 Rehab SHOPP
02‐4E8004
IN SISKIYOU COUNTY ABOUT 12 MILES EAST OF DORRIS FROM 2.2 MILES WEST TO 0.2 MILES EAST OF FUGATE ROAD. 80 8/5/2013
02 SHA 911 000.0/ 000.1
Pavement Marker Replacemen
MAINTENANCE
02‐4E8404
IN PLUMAS, SHASTA, AND SISKIYOU COUNTIES AT VARIOUS LOCATIONS. 300 2/27/2012
02 TEH 099 017.6/ 018.0
Lassen View Sch Flashing Beacons SHOPP
02‐4E9405
IN TEHAMA COUNTY NEAR DAIRYVILLE FROM 65TH AVENUE TO ANTELOPE CREEK BRIDGE. 15 2/1/2013
03 PLA 267 000.4/ 001.2
Martis Creek Left Turn SHOPP
03‐0F0104
NEAR TRUCKEE AT MARTIS CREEK LAKE ROAD Widening 970 60 3/1/2012
03 PLA 080 000.8/ 002.3 No Nick SHOPP
03‐0F0904
IN PLACER COUNTY ON ROUTE 80 AT VARIOUS LOCATIONS 200 3/1/2012
03 ED 050 R031.3/
Sly Creek Road UC Replacemen SHOPP
03‐0F2204
ABOUT 11.0 MILES EAST OF PLACERVILLE AT SLY PARK ROAD UNDERCROSSING 25‐42 5,807 2/15/2014
03 BUT 099 045.5/
Pine Creek Scour Mitigation SHOPP
03‐0F2605
ABOUT 10 MILES NORTH OF CHICO AT PINE CREEK BRIDGE 12‐28 100 3/1/2013
03 ED 050 017.8/ 019.6
Coloma St. POC and Smith Flat UC Seismic SHOPP
03‐0F3004
IN PLACERVILLE AT COLOMA STREET OVERCROSSING AND AT SMITH FLAT ROAD UNDERCROSSING 4,960 3/15/2013
03 GLE 045 003.1/ 007.5 No Nick SHOPP
03‐0F4804
ON ROUTE 45 AT COUNTY ROAD 61 AND AT JUNCTION ROUTE 162 WEST AND ON ROUTE 162 AT COUNTY ROAD Z 140 3/1/2013
03 SAC 080 M008.1/M011.1
Sac 80 Bridge Rehab SHOPP
03‐0F6804
IN AND NEAR SACRAMENTO AT NORTH AVENUE OVERCROSSING 24‐106 AND AT THE 80/244 SEPARATION BRIDGE 24‐292 R/L 1,500 1/15/2013
03 SUT 099 R019.5/R020.5
SR 99/113 Interchange
99 CORRIDOR
03‐1A4644
NEAR TUDOR FROM 1.8 MILE NORTH OF WILSON ROAD TO 2.1 MILE SOUTH OF OBANION ROAD 15,000 7/18/2012
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
03 ED 050 067.6/ 072.9
Gateway to the Tahoe Basin SHOPP
03‐1A7314
NEAR SOUTH LAKE TAHOE FROM JOHNSON PASS ROAD TO INCLINE ROAD 9,000 12/15/2012
03 ED 050 073.7/ 075.4
Airport to "Y" Junction SHOPP
03‐1A7324
IN AND NEAR SOUTH LAKE TAHOE FROM SOUTH TAHOE AIRPORT ENTRANCE ROAD TO ROUTE 89 (KP 118.6/121.3)
Asphalt Concrete Surfacing,Replace Culverts,Culverts,Repair Drainage,Earthwork,Erosion Control,Pavement Markers,Pavement 9,052 96 10/17/2012 4,400 978 650 1,640
03 ED 089 008.6/ 013.8
EIP ‐ Route 50 to Cascade Rd SHOPP
03‐1A8424
IN AND NEAR SOUTH LAKE TAHOE FROM ROUTE 50 TO CASCADE ROAD
Asphalt Concrete Surfacing,Modify Culverts,Replace Drainage,Earthwork,Erosion Control,Reconstruct Guard Railing,Pavement Markers,Pavement Markings,Rehabilitate 15,730 110 7/15/2013 14,050 520 5,600
03 ED 089 018.0/ 024.9 Meeks Bay SHOPP
03‐1A8444
ABOUT 8.3 MILES NORTH OF SOUTH LAKE TAHOE FROM NORTH OF THE SIDEHILL VIADUCTS TO MEEKS CREEK
Asphalt Concrete Surfacing,Replace Culverts,Reconstruct Drainage,Earthwork,Rock Slope 15,400 350 10/15/2012
This is a water quality improvement project which involves, culvert replacement, ditch 19,000 2,000 7,000 18,000
03 PLA 089 013.7/ 021.7
Squaw Valley to Nev Co Line SHOPP
03‐1E0004
NEAR TRUCKEE FROM SQUAW VALLEY ROAD TO THE NEVADA COUNTY LINE 8,136 4/1/2012
03 BUT 070 028.2/
West Branch Feather River bridge SHOPP
03‐1E5104
ABOUT 12.3 MILES EAST OF OROVILLE AT WEST BRANCH FEATHER RIVER BRIDGE #12‐0134
Reconstruct Bridge 11,333
700‐800 6/15/2012
Temp. work Platforms ~ 200,000 sf 472,000
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
03 NEV 020 016.7/ 017.4 No Nick SHOPP
03‐1F0404
IN NEVADA CITY FROM SACRAMENTO STREET OVERCROSSING TO UREN STREET AT JUNCTION ROUTE 49 NORTH 230 7/15/2011
03 SAC 050 007.0/ 007.5
Install guardrail SHOPP
03‐1F2504
IN SACRAMENTO COUNTY AT VARIOUS LOCATIONS 250 3/1/2012
03 SIE 089 000.0/ 002.3
Two Wildlife Undercrossings STIP
03‐1F2604
IN SIERRA COUNTY ON ROUTE 89 FROM NEVADA COUNTY LINE TO LITTLE TRUCKEE RIVER BRIDGE 13‐09 2,055 4/1/2014
03 GLE 005 000.0/ 029.0
GLEN‐5 Native Planting STIP
03‐1F2804
IN GLENN COUNTY ON ROUTE 5 FROM COLUSA COUNTY LINE TO TEHEMA COUNTY LINE 626 11/15/2013
03 COL 005 000.0/ 034.0
COL‐5 Native Planting STIP
03‐1F2904
IN COLUSA COUNTY ON ROUTE 5 FROM YOLO COUNTY LINE TO GLENN COUNTY LINE 626 11/15/2013
03 ED 193 018.6/ 018.8
Super Elevation SHOPP
03‐1F3304
IN EL DORADO COUNTY FROM POSTMILE 18.6 TO 18.8 1,670 4/15/2013
03 SIE 089 015.6/ No Nick SHOPP 03‐1F4905
ABOUT 13.0 MILES NORTH OF TRUCKEE AT 0.5 MILE NORTH OF STATE ROUTE 49 130 11/1/2013
03 PLA 193 009.4/
Pla 193, Widen Dutch Ravine SHOPP
03‐1F5904
ABOUT 8.9 MILES EAST OF LINCOLN AT 0.2 MILE WEST OF NEWCASTLE TUNNEL UNDERCROSSING 450 4/1/2013
03 ED 193 023.4/
ED 193 Reconstruct Embankmen SHOPP
03‐1F6004
NEAR PLACERVILLE ABOUT 2.0 MILES NORTH OF SOUTH FORK AMERICAN RIVER BRIDGE 880 4/15/2012
03 NEV 049 031.3/ 032.6
NEV 49 embankment repair and overlay SHOPP
03‐1F6204
ABOUT 16 MILES NORTH OF NEVADA CITY FROM 1.3 MILES SOUTH OF MIDDLE YUBA RIVER BRIDGE 17‐09 TO NEVADA/YUBA COUNTY LINE 900 12/1/2012
03 NEV L5729
Truckee Maintenena SHOPP
03‐1F6904
IN TRUCKEE AT THE TRUCKEE MAINTENANCE STATION 525 11/1/2013
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
03 COL 020 000.0/ 010.2
Colusa 20 CAPM SHOPP
03‐1F7404
ABOUT 10 MILES WEST OF WILLIAMS FROM LAKE COUNTY LINE TO 6.8 MILES EAST OF ROUTE 16 SOUTH 9,800 8/15/2012
03 BUT L5703 No Nick SHOPP
03‐1F9004
ON ROUTE 32 AT CHICO MAINTENANCE STATION 200 2/1/2013
03 NEV 049 004.5/ 005.8
Nev 49, Right Turn Pockets @ three locations SHOPP
03‐1F9104
9 MILES SOUTH OF GRASS VALLEY AT CARRIAGE ROAD, LADYBIRD DRIVE, AND HOLCOMB/CHERRY CREEK ROAD 780 1/2/2013
03 SAC 104 000.0/ 000.1
104/99 Ped ADA Compliance SHOPP
03‐2E9204
IN SACRAMENTO COUNTY ON SR 104 AT THE INTERSECTION OF EAST STOCKTON AND WEST STOCKTON BLVD Modify Signals 1,000 TBD 3/29/2012
03 VAR 000 000.0/R022.9
COL 20 Upgrade G.R. SHOPP
03‐2F0004
IN BUTTE,COLUSA,GLENN,SACRAMENTO, SUTTER, YOLO, AND YUBA COUNTIES AT VARIOUS LOCATIONS 7,000 11/1/2013
03 ED 049 031.0/ 031.2
ED 49,Turn Pocket at Rattlesnake SHOPP
03‐2F1504
ABOUT 8.8 MILES SOUTH OF AUBURN AT RATTLESNAKE BAR ROAD 627 6/1/2013
03 COL 005 000.0/ 034.4 No Nick SHOPP
03‐2F1804
IN COLUSA, GLEN, AND YOLO COUNTIES ON ROUTE 5 AT VARIOUS LOCATIONS 193 12/10/2011
03 PLA 080 034.9/Stabilize Cut Slope SHOPP
03‐2F2604
NEAR COLFAX AT 0.1 MILE WEST OF LONG RAVINE UNDERCROSSING BRIDGE #1990 1,030 8/1/2012
03 PLA L5727
Tahoe City Sandhouse SHOPP
03‐2F2804
IN TAHOE CITY AT TAHOE CITY MAINTENANCE STATION 650 4/30/2012
03 BUT 070 009.2/ 017.0
But 70 Rehab. Pavement SHOPP
03‐2F3004
IN AND NEAR OROVILLE FROM 0.1 MILE EAST OF PALERMO ROAD TO 0.4 MILE EAST OF GARDEN DRIVE OVERCROSSING 9,600 8/1/2012
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
03 ED 050 017.1/ No Nick SHOPP 03‐2F3804
IN PLACERVILLE AT PLACERVILLE DRIVE AND EASTBOUND ONRAMP TO ROUTE 050 200 4/1/2012
03 YOL 113 R000.3/R010.3
Upgrade ADA Curb Ramps SHOPP
03‐2F6704
AT VARIOUS LOCATIONS IN AND NEAR DAVIS AND IN WOODLAND AT VARIOUS LOCATIONS FROM 0.3 MILE NORTH OF SOLANO COUNTY LINE TO EAST WOODLAND OVERHEAD 430 3/1/2012
03 SAC 051 005.3/ 005.6 No Nick SHOPP
03‐2F6904
IN THE CITY AND COUNTY OF SACRAMENTO FROM 0.2 MILE SOUTH OF MARCONI AVENUE TO 0.1 MILE NORTH OF MARCONI AVENUE 250 5/1/2012
03 YOL 080 002.5/ 002.9
Yolo 80 Embankmen SHOPP
03‐2F7004
IN THE CITY OF DAVIS AT MACE BOULEVARD OVERCROSSING 950 5/1/2012
03 PLA 065 R007.7/M008.1 No Nick SHOPP
03‐2F8104
IN AND NEAR ROSEVILLE AT BLUE OAKS BOULEVARD OVERCROSSING ONRAMPS 130 6/1/2012
03 SAC 099 035.4/ 036.0
Elverta Rd./99 Interchange
99 Corridor
03‐371504
NEAR SACRAMENTO AT ELVERTA ROAD 24,876 4/12/2012
03 YOL 005 R006.4/R006.8
I5‐SR113 CONNECTOR STIP
03‐374224
CONSTRUCT NORTHBOUND I‐5 TO SOUTHBOUND SR 113 DIRECT CONNECTOR (YOL‐5 KPR10.3/R10.9) & 37,311 12/1/2012
03 ED 050 075.4/ 077.3
U.S. 50 Phase 2 Water Qlty SHOPP
03‐3C3804
IN SOUTH LAKE TAHOE FROM ROUTE 89 NORTH TO TROUT CREEK BRIDGE #25‐13 22,690 8/15/2013
03 PLA 080 008.1/ 037.8
9 Vertical Clearances for Permit Vehicles SHOPP
03‐3E1004
IN AND NEAR LOOMIS AT VARIOUS LOCATIONS FROM BRACE ROAD OVERCROSSING TO MAGRA ROAD OVERCROSSING 26,000 2/1/2013
03 BUT 099 028.1/ 029.6
Butte Creek Bridge SHOPP
03‐3E6204
NEAR CHICO FROM ESTATES DRIVE TO 0.4 MILE NORTH OF BUTTE CREEK BRIDGE 12‐126R 8,952 8/1/2012
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
03 ED 049 009.6/ 010.1
Overlay and Upgrade Drainage SHOPP
03‐3E6304
FROM PLEASANT VALLEY ROAD NORTH TO 0.1 MILE SOUTH OF OAK DELL ROAD
Replace Culverts,Modify Drainage,Grading 850 40 5/7/2012
Quantities are pre‐Project Report. Overlay is minimal if 74 100 5,000 1,300
03 BUT 032 R009.5/
Chico Complete Signal Modification SHOPP
03‐3E9104
IN CHICO AT 9TH AND MAIN STREET, AT 9TH AND OROVILLE STREET, AND AT PARK AVENUE AND HUMBOLDT AVENUE 800 4/15/2012
03 NEV 080 R012.3/ 013.4
Nev 80 Concrete Median Barrier SHOPP
03‐3F0304
IN TRUCKEE FROM 0.9 MILE WEST OF DONNER PARK OVERCROSSING TO 0.1 MILE WEST OF CALIFORNIA AGRICULTURE INSPECTION STATION 712 1/1/2013
03 NEV L5917 15 5/
South Lake Tahoe City Wash Rack SHOPP
03‐3F3104
AT THE SOUTH LAKE TAHOE AND TRUCKEE MAINTENANCE STATIONS 800 2/1/2013
03 SAC 050 014.1/ 023.1 No Nick
MAINTENANCE
03‐3M5704
NEAR SACRAMENTO ON ROUTE 50 FROM 1.6 MILE EAST OF SUNRISE BOULEVARD TO EL DORADO COUNTY LINE AND ON ROUTE 51 FROM CAPITOL AVENUE TO 0.4 MILE NORTH OF EL CAMINO AVENUE 4,600 1/1/2014
03 BUT 099 044.5/ 046.0 No Nick
MAINTENANCE
03‐3M5804
ABOUT 10 MILES NORTH OF CHICO FROM 0.2 MILE NORTH OF BROYLES ROAD TO TO TEHEMA COUNTY LINE 400 12/1/2012
03 SAC 160 005.9/L007.0 No Nick
MAINTENANCE
03‐3M7204
NEAR ISLETON AT THE ISLETON BRIDGE AND AT THE THREE MILE SLOUGH BRIDGE
Clean and Paint Sign Structure 6,000 280 3/1/2013 0 0 0 0 0 0
03 NEV 020 036.0/ 038.2 No Nick
MAINTENANCE
03‐3M8104
IN NEVADA AND PLACER COUNTIES AT VARIOUS LOCATIONS 500 4/1/2012
03 ED 193 006.0/ 012.7 No Nick
MAINTENANCE
03‐3M9204
FROM 0.2 MILE WEST OF SLIGER MINE ROAD TO GEORGETOWN 2,700 1/1/2014
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
03 PLA 049 003.1/ 007.5 No Nick
MAINTENANCE
03‐3M9304
IN AND NEAR AUBURN FROM 0.1 MILE SOUTH OF ROUTE 80/49 SEPARATION TO WISE CANAL BRIDGE AND FROM 0.1 MILE NORTH OF WILLOW CREEK DRIVE TO 0.1 MILE NORTH OF DRY CREEK ROAD 675 3/1/2012
03 PLA 174 001.7/ 002.4 No Nick
MAINTENANCE
03‐3M9504
NEAR COLFAX AT VARIOUS LOCATIONS FROM 0.1 MILE NORTH OF OLD GRASS VALLEY ROAD TO 0.4 MILE SOUTH OF BEAR RIVER BRIDGE 500 4/1/2012
03 SUT 099 000.0/ 001.6
RIEGO ROAD INTERCHANGE
99 Corridor
03‐406604
IN SACRAMENTO AND SUTTER COUNTIES FROM 0.6 MILES SOUTH OF SUTTER COUNTY LINE TO 0.7 MILES NORTH OF RIEGO ROAD MITIGATED NEGATIVE DECLARATION
Asphalt Concrete Surfacing,Bridge,Bridge Railing,Channelize,Culverts,Drainage,Earthwork,Electrical Facilities,Erosion Control,Establish Existing Planting,Fence,Grading and Paving,Guard Railing,Highway Planting,Interchange,Irrigation 22,000 400 5/1/2012 36,721 1,500 62,248 537,685 243,664 23,648
03 NEV 020 R013.6/R014.8
Dorsey Drive Interchange STIP
03‐412404
NEAR GRASS VALLEY, AT DORSEY DRIVE OVERCROSSING.
Interchange,Modify Roadway,Widenin 14,226 300 9/1/2012 20,000 0 16,000 100,000 0 50,000
03 SAC 160 L006.9/ No Nick SHOPP 03‐4E3805
NEAR ISLETON AT THREE MILE SLOUGH BRIDGE 100 2/1/2012
03 SIE 089 004.5/ 005.5
SIE‐89 Wildlife Crossing (Phase 2) STIP
03‐4E5004
ABOUT 12.0 MILES NORTH OF TRUCKEE FROM 1.6 MILES NORTH OF LITTLE TRUCKEE RIVER BRIDGE TO 1.0 MILE SOUTH OF COTTONWOOD ROAD
Fence,Rock Slope Protection 440 30 4/1/2013
Construct wildlife barrier channelization, such as fencing, RSP, slippery slope surface, etc.
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
03 SIE 049 048.3/ 049.2
Lemon Canyon Road Culvert Upgrades SHOPP
03‐4E5404
ABOUT 10 MILES SOUTH OF LOYALTON FROM 0.5 MILE TO 1.3 MILES NORTH OF LEMON CANYON ROAD
Asphalt Concrete Surfacing,Culverts 1,000 50 11/1/2012
03 ED 049 003.7/ 003.9
ED 49 Correct Superelevati SHOPP
03‐4E5904
ON ROUTE 49 FROM POSTMILE 3.7 TO 3.9 IN THE VICINITY OF MICA STREET 1,495 2/15/2013
03 SAC 005 024.5/ No Nick SHOPP 03‐4E7605
IN SACRAMENTO, YOLO, AND PLACER COUNTIES AT VARIOUS LOCATIONS 90 3/1/2013
03 PLA 049 000.9/ No Nick SHOPP 03‐4E9704
NEAR AUBURN AT 1.0 MILE NORTH OF EL DORADO COUNTY LINE 147 4/1/2012
03 BUT 099 026.0/Butt 99 and Neal Rd SHOPP
03‐4E9904 NEAR CHICO AT NEAL ROAD 725 6/13/2012
03 NEV 020 027.6/ 038.0 No Nick
MAINTENANCE
03‐4M0704
ABOUT 18 MILES EAST OF NEVADA CITY FROM MISSOURI BAR ROAD TO 0.4 MILE EAST OF EXCELSIOR POINT ROAD 500 5/1/2013
03 ED 050 051.6/ 053.2 No Nick
MAINTENANCE
03‐4M0804
NEAR KYBURZ FROM 0.5 MILE WEST OF WRIGHTS LAKE ROAD TO 0.4 MILE WEST OF 41 MILE TRACT ROAD 500 2/1/2013
03 COL 005 R021.0/R034.4
RAC OVERLAY
MAINTENANCE
03‐4M1204
NEAR WILLIAMS FROM 1.7 MILES NORTH OF FRESHWATER ROAD OVERCROSSING TO THE GLENN COUNTY LINE 6,000 4/1/2012
03 BUT 032 011.7/R023.5
PCC PROFILE GRINDING
MAINTENANCE
03‐4M1604
NEAR CHICO FROM BRUCE ROAD TO 0.4 MILE WEST OF NOPEL AVENUE 3,300 1/1/2014
03 GLE 045 000.0/ 023.2 No Nick
MAINTENANCE
03‐4M1804
AT AND NEAR HAMILTON CITY AT VARIOUS LOCATIONS FROM COLUSA/GLENN COUNTY LINE TO ROUTE 32 700 2/1/2014
03 COL 005 R022.3/
Subscour Mitigation at 7 Locations SHOPP
03‐4M2004
IN COLUSA, BUTTE, AND GLENN COUNTIES ON ROUTES 5, 20, 32,149, AND 162 AT VARIOUS LOCATIONS
Rock Slope Protection 990 1‐1000 2/1/2014
7/13/11 Project has not been designed yet
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
03 COL 005 007.1/R029.2 No Nick
MAINTENANCE
03‐4M2104
IN COLUSA,GLENN, SUTTER, AND YUBA COUNTIES AT VARIOUS LOCATIONS 1,000 4/1/2012
03 SAC 051 001.4/ No Nick MAINTENANCE
03‐4M2404
IN SACRAMENTO COUNTY AT VARIOUS LOCATIONS 3,500 4/1/2012
03 SIE 089 027.8/ 029.6 No Nick
MAINTENANCE
03‐4M2604
NEAR CALPINE FROM SULPHUR CREEK ROAD TO THE SIERRA/PLUMAS COUNTY LINE 600 10/1/2013
03 BUT 191 000.0/ 011.4 No Nick
MAINTENANCE
03‐4M2704
ABOUT 7 MILES NORTH OF OROVILLE FROM JUNCTION ROUTE 70 TO PEARSON ROAD IN PARADISE 2,300 4/1/2013
03 SAC 016 T002.5/R023.9 No Nick
MAINTENANCE
03‐4M2804
IN AND NEAR SACRAMENTO FROM PERKINS JUNCTION AT HOWE AVENUE TO AMADOR COUNTY LINE 3,700 3/1/2013
03 YOL 505 000.0/ 013.2 No Nick
MAINTENANCE
03‐4M2904
IN YOLO COUNTY FROM SOLANO COUNTY LINE TO 0.4 MILE SOUTH OF LONG CREEK BRIDGE 22‐57 3,000 3/1/2012
03 NEV 080 000.0/R002.6 No Nick
MAINTENANCE
03‐4M3004
IN PLACER COUNTY FROM TROY UNDERCROSIING TO NEVADA COUNTY LINE AND IN NEVADA COUNTY FROM PLACER COUNTY LINE TO 0.1 MILE EAST OF SODA SPRINGS UNDERCROSSING 1,600 4/1/2012
03 NEV 174 000.0/ 010.2 No Nick
MAINTENANCE
03‐4M3104
IN AND NEAR GRASS VALLEY FROM PLACER COUNTY LINE TO ROUTE 20 1,900 9/1/2012
03 ED 049 015.6/ 023.9 No Nick
MAINTENANCE
03‐4M3404
ON ROUTE 49 FROM ROUTE 193 TO LOTUS ROAD AND ON ROUTE 153 FROM ROUTE ROUTE 49 TO MARSHALL MONUMENT 820 3/1/2012
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
03 PLA 065 R004.9/R009.0 No Nick
MAINTENANCE
03‐4M3504
IN AND NEAR ROSEVILLE FROM ROUTE 80 TO 0.6 MILE SOUTH OF SUNSET BOULEVARD OVERCROSSING 525 4/1/2012
03 SAC 005 001.5/ No Nick MAINTENANCE
03‐4M3704
IN EL DORADO, PLACER, SACRAMENTO, AND YOLO COUNTIES AT VARIOUS LOCATIONS 300 12/1/2013
03 YOL 080 008.9/ 011.3 No Nick
MAINTENANCE
03‐4M3804
IN YOLO COUNTY ON ROUTES 50 AND 80 300 3/1/2012
03 SIE 049 031.0/ No Nick MAINTENANCE
03‐4M4204
NEAR SIERRA CITY AT 2.5 MILES WEST OF OLD GOLD LAKE ROAD 275 4/1/2012
03 ED 050 049.0/ 052.0 No Nick
MAINTENANCE
03‐4M4404
NEAR KYBURZ FROM SILVER FORK ROAD TO 36 MILE STONE ROAD 500 1/1/2014
03 NEV 020 028.6/ 032.3 No Nick
MAINTENANCE
03‐4M4504
ABOUT 11.2 MILES EAST OF NEVADA CITY FROM WHITE CLOUD ROAD TO 1.0 MILE WEST OF ALPHA ROAD 500 3/1/2014
03 SIE 089 025.9/ 027.9 No Nick
MAINTENANCE
03‐4M4604
NEAR CALPINE AT VARIOUS LOCATIONS FROM CALPINE SUMMIT TO SULPHUR CREEK ROAD 500 12/1/2013
03 COL 005 000.0/R034.4 No Nick
MAINTENANCE
03‐4M4804
IN COLUSA, GLENN, AND SACRAMENTO COUNTIES ON ROUTE 5 AT VARIOUS LOCATIONS 1,150 2/1/2013
03 YOL 113 000.0/ 022.1 No Nick
MAINTENANCE
03‐4M4904
IN SUTTER AND YOLO COUNTIES ON ROUTES 113/45/80 AT VARIOUS LOCATIONS 982 12/1/2012
03 NEV 080 005.0/ No Nick MAINTENANCE
03‐4M5004
IN NEVADA, PLACER, AND SIERRA COUNTIES AT VARIOUS LOCATIONS 400 1/1/2013
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
03 ED 050 000.0/ 080.4 No Nick
MAINTENANCE
03‐4M5104
IN EL DORADO, SACRAMENTO, AND YOLO COUNTIES AT VARIOUS LOCATIONS ON ROUTES 50, 51, AND 193 1,600 3/1/2013
03 SAC 080 000.0/ 018.0 No Nick
MAINTENANCE
03‐4M5204
IN AND NEAR SACRAMENTO ON ROUTES 80 , 99, AND 160 AT VARIOUS LOCATIONS 4,600 2/1/2013
03 BUT 099 013.0/ 020.6 No Nick
MAINTENANCE
03‐4M5304
ABOUT 10 MILES SOUTH OF CHICO FROM 0.2 MILE SOUTH OF NORTHERN JUNCTION ROUTE 162 TO DRY CREEK BRIDGE 1,300 3/1/2013
03 ED 050 018.1/ 019.1 No Nick
MAINTENANCE
03‐4M5404
IN PLACERVILLE ON ROUTE 50 FROM 0.1 MILE EAST OF BEDFORD AVENUE TO WILTSE ROAD UC AND ON ROUTE 193 NEAR PLACERVILLE FROM SOUTH FORK AMRICAN RV BRIDGE 25‐33 TO ROUTE 49 800 11/1/2012
03 GLE 162 067.2/ 084.6 No Nick
MAINTENANCE
03‐4M5504
NEAR WILLOWS FROM CENTRAL IRRIGATION CANAL BRIDGE 11‐0009 TO BUTTE COUNTY LINE 1,400 3/1/2013
03 GLE 032 L000.0/ 001.3 No Nick
MAINTENANCE
03‐4M5604
IN ORLAND FROM I‐5 TO COUNTY ROAD M 1/2 300 2/1/2013
03 PLA 174 000.0/ 002.9 No Nick
MAINTENANCE
03‐4M5704
IN AND NEAR COLFAX FROM 174/80 SEPERATION BRIDGE 19‐0086 TO NEVADA COUNTY LINE 500 3/1/2013
03 SAC 160 R044.5/ 047.1 No Nick
MAINTENANCE
03‐4M5804
IN THE CITY AND COUNTY OF SACRAMENTO FROM AMERICAN RIVER BRIDGE 24‐001 TO 0.8 MILE NORTH OF TRIBUTE ROAD 1,000 2/1/2013
Dist Co Rte PostMile NicknameType of Project
Contract No
Location Type of Work
Estimate Cost Range (x $1,000)
Work Days Range
Proposed Ad
CommentsHot Mix Asphalt (tons)
Rubber HMA (tons)
PCC (cy) AB (cy) Steel (lbs)ImportBorrow (cy)
Road Excavation (cy)
03 PLA 080 044.8/ 049.0 No Nick
MAINTENANCE
03‐4M6004
ABOUT 11 MILES EAST OF COLFAX FROM ALTA ROAD UNDERCROSSING 19‐111 TO 0.2 MILE EAST OF DRUM FOREBAY OVERCROSSING 19‐114 6,000 5/1/2012
03 NEV 080 028.0/ No Nick MAINTENANCE
03‐4M6104
NEAR FLORISTAN AT TRUCKEE RIVER BRIDGE 17‐0063 R/L 1,000 10/1/2013
Totals: 588756 307425 40201 267179 9700922 974305 221016