• KAR Pipeline LTD, HKN RETM, Piping (from 28/Nov/2018 to 01-Dec-2019),

➢ Working as Mechanical Supervisor Engineer in piping construction, was in charge of pipe

welding map mark, site construction quality check (delivery checklist of pipes,

welding, sandblasting, coating, painting).

➢ Prepare hydro-test Package and relevant certificates (such as the mechanical

complete certificates, Provisional Acceptance certificate, Commissioning Certificate,

Ready to Start-up Certificate, Start-up Certificate, etc.)

➢ Material checking with certificate for piping in RETM HKN Materials.

➢ hydrostatic test of piping.

• KAR Pipeline LTD, GKPI (PF1,RETM) and pipeline 16'' (from 01/Nov/2018 to 01-Dec-2019),

➢ Working as Mechanical engineer in Pipeline construction, was in charge of pipe welding

map mark, site construction quality check (delivery checklist of pipes, stringing,

bending, welding, coating, lowering) 12.850 Km.

➢ Material checking with certificate for piping in PF1.

➢ Torqueing the flanges and valves.

Experiences

F A W A Z M I R O

Supervisor Mechanical Engineer at KAR GROUP

Duhok, Iraq

+964-7508359100

fawazmeiro@hotmail.com

LinkedIn: Fawaz Miro

Personal Information

Nationality: Syrian Sex: Male Family status: Married, I have two children Date of Birth: 20\12\1983

Scientific Certification

University: Damascus University, the Faculty of Mechanical and Electrical Engineering.

Department: Mechanical Engineering /

Mechanical Power Department

Graduation Project: Economic Survey of the

Feasibility at Spinning and Textile factory in Damascus, Syria.

Degree: Good Rate: (62, 43 %) 2011

➢ hydrostatic test of piping.

➢ Prepare hydro-test Package and relevant certificates (such as the mechanical

complete certificates, Provisional Acceptance certificate, Commissioning

Certificate, Ready to Start-up Certificate, Start-up Certificate, etc.)

• KAR Pipeline LTD, KPS2 (KURDISTAN PUMP STATION 2) PIPELINE EXPORT SYSTEM OIL and GAS

(February2018- to 01/Nov/2018) SHEKHAN, KURDISTAN, IRAQ.

Main Duties:

➢ Working as Mechanical engineer in Pipeline (Piping)construction, was in charge of pipe

welding map mark, site construction quality check.

➢ Punch list incorrect item of piping installation, close the punch list items.

➢ Prepare hydro-test Package and relevant certificates (such as the mechanical

complete certificates, Provisional Acceptance certificate, Commissioning Certificate,

Ready to Start-up Certificate, Start-up Certificate, etc.)

➢ Construction coordination with Client for pre-commission and hand over working.

➢ Be familiar with sand blasting, Coating, And Welding.

➢ Installing pumps with motor skid in the Foundation, pre- alignment, final alignment. Install

3 pumps, alignment, hot commissioning.

➢ Install 3 pumps, alignment, hot commissioning.

➢ Prepare hydro-test Package and relevant certificates (such as the mechanical

complete certificates, Provisional Acceptance certificate, Commissioning Certificate,

Ready to Start-up Certificate, Start-up Certificate, etc.)

• KAR Pipeline LTD, GULF KEYSTONE BESAT PIPELINE EXPORT SYSTEM OIL and GAS (PF2) (October 2017 –

February 2018) BESAT TO ATRUSH PIPELINE, Kurdistan, Iraq

Main Duties:

➢ Working as Mechanical engineer in Pipeline construction, was in charge of pipe welding

map mark, site construction quality check.

➢ Punch list incorrect item of piping installation, close the punch list items.

➢ Prepare hydro-test Package and relevant certificates (such as the mechanical

complete certificates, Provisional Acceptance certificate, Commissioning Certificate,

Ready to Start-up Certificate, Start-up Certificate, etc.)

➢ Construction coordination with Client for pre-commission and hand over working.

➢ Be familiar with sand blasting, Coating, And Welding.

➢ Install 3 pumps, alignment, hot commissioning.

• KAR Pipeline LTD, ATRUSH PIPELINE EXPORT SYSTEM oil and gas (March 2017- October 2017)- ATRUSH TO SHEKHAN, Kurdistan, Iraq

Main Duties:

➢ Working as Mechanical engineer in Pipeline construction, was in charge of pipe welding

map mark, site construction quality check.

➢ Punch list incorrect item of piping installation, close the punch list items.

➢ Be familiar with sand blasting, Coating, And Welding.

• KAR Group LTD, Khormala Power Plant (1000 MW) (January 2013- Febriwary-2017) - Erbil, Kurdistan, Iraq

Field Engineer

Main Duties:

➢ Supervising the installation of the 5000 CUBIC METERS Tank Farm (Erection,

hydrostatic test, commissioning).

➢ Supervising the installation of the 400 KV switchyard towers.

➢ Supervising the installation of the central air-conditioning HVAC in (Project administration building, social building, control building, reception building and firefighting building).

➢ Supervising the Welding processes and installing the pipes within the project (Erection,

Blowout, Hydrostatic test, flashing).

➢ Arranging the working sheets that satisfy the work demand of the contractor

(SIEMENS, ABB & ACCORU) and sub-contractor (SEC, Power China, and NYCO).

➢ Arranging the Notification Sheets that report the issues occur during work. ➢ QA/QC completion that related to the NDT Company (NYCO). ➢ Electrical ECC (Erection Clearance Certificate) & FQP (Field Quality Plan) for all power

plant units. ➢ Placing all KKS labels regarding the power plant elements according to P&ID diagrams.

➢ Work in commissioning of fuel gas supply system and fuel oil supply system. ➢ Embedded part (install anchor bolts, plats and H-beam) in the foundation in power

plant, phase one (four units) and phase three (two units).

➢ Supervising the installation of the power island, SIEMENS part (turbine, generator, air intake, exhaust stack, and auxiliary), phase three (two units).

➢ Cold commissioning and hot commissioning of the power plant with SIEMENS teams in Khormala power plant.

➢ Commissioning of Demin water System Capacity 10 m3 per day.

• Avro City (Duhok / Kurdistan / Iraq), (April 2012- December 2012).

Main Duties:

➢ Installation and maintenance of air conditioners individual, multilateral and central air conditioning with VRV system.

➢ Expertise in engineering drawing more than four years in Damascus. ➢ Installation, Welding, and insulation of the brass pipes. ➢ Work in Electricity car workshop for three Years. ➢ A member of Association of Engineers in Syria.

➢ Kurdish: Native Language.

➢ Arabic: Excellent Read and write.

➢ English: good Read and write.

Relative Skills:

Languages:

➢ Turkish: good conversation.

➢ Proficient in Microsoft Office, Data Base (ICDL) and Computer Maintenance in

Software and Hardware.

➢ Proficient in Mechanical Desktop and AutoCAD Desktop.

➢ Knowledgeable in operating Mechanical Desktop and AutoCAD for HVAC Planning

➢ ASNT – Level I & II (VT, PT & MT).

SAMI ABDULZAHRA ALI,

Project Manager at KAR Group, Erbil-Iraq.

Phone No: +964-7508230860, Email sami_irq@yahoo.com

Computer: Skills

References

-6-6 !,%r"9.@""tyf"n

,9r, 9/Drt"t4Magnetic Particle Testing- MT

Level II

.//lat'

Fawoz Miro

Hqs Met the Requirements as Per Guidelines of American Societyfor NonDestructive Testing Document SNT-TC-IA as

Examination Result:Average: 80%Fundamental: 80okCode: 80%Practical: 8A%

Certification DeptManaging Director

Issue Date: July. 3 1 .2019Expiration Date: July. 31 .2022

Certificate Number:

QAL-266874-19-256230

Vision ExaminationLeft: JI Right: JlNear Vision: NormalColor Vision: Normal

Issued By:Mr. Shamaghdari

ASNT III No. :1

*rt

Applicable SpecificatiAWS Dl.l (2015) & ASME Sec. v & VIII (2017), ASME 831.1 (2016), ASME 83l.l (2016)

www.qalcert.co.uk

ALUKLIMITED

-

.,!A

7

(9r02) r'rts s'.,rsv '(9t02) t r ts ansv '( 0z) IA a A 'tes ahrsv ? (s r0z) I IC s,,r\v

--16-a6i

.L

6t.ON

III IA^A'I INSVrrepqSPueqs 'rr{

:Ig panssl

lotlttoN :uorsu toloSlDuloN :uolsu fiaN

It:ry8!tr If :{aT

E€qs'It[

6ZZ9 97,- 6r -n 18992-TVb

:JequnN elBcglueS

ZZ0Z' IE ',(1ng:e1eg uorleldxg610Z' lE '.(1n1 :e1eq enssl

ropalq Sur8eueylldag uopuegp.ra3

% 08 :lorlpDrd% 08 :apoJ9%08 : loluzuopunc

% 0g :a8ota,tyuolDutaoxg uolsll :qnsaf, uououtuoxg

II PM7Jd -Sulsal tuD,Uauad prublT

//r?"1316 ":%: ,r

sD 7I1J-JNS tuawrucoq Suttsal atlpnusaeuoTJ totilalcog uon"tawylo saulpplng "od sD suaua"4nba[ aqt pIA[ sDH

ottru zDtADl

va{taag/r-%; trtr

In' o J' ua J Ieb',u,,r,r.,r,t

:(s) uosecgrcadg alqecqddy

ClfI'In.I

T r

L"

I

Fawaz Mtro

Has Met the Requirements as Per Guidelines of American Societyfor NonDestructive Testing Document SNT-TC-IA as

-{",',%,!,,XGl"rt4Yisual Testing - W

Level IIExamination Result:

Average: 80 %Fundamental: 8096Code: 80%Practical: 80%

Certification DeptManaging Director

Vision ExqminationLefi: Jl Right: JlNear llision: NormalColor Vision: Normal

Issue Date: July. 3l .2019Expiration Date: July. 31 .2022

Certificate Number;

QN--266874-19-2s6228

lssued By:Mr. Shamaghdari

ASNT III No.

Applicable SpecificatiAwS Dl,l (2015) & ASME Sec. V & VIll (2017), ASME 83l.l (2016), ASME 83l.l (2016)

9

www.qalceft.co.uk

n

I

UKL

-% -% !%:,*9, C"rgf"d %r,

!

I

/

t

ASN'a i : Irlf/T. t:'! M'i' r;

top related