fawaz miro
TRANSCRIPT
• KAR Pipeline LTD, HKN RETM, Piping (from 28/Nov/2018 to 01-Dec-2019),
➢ Working as Mechanical Supervisor Engineer in piping construction, was in charge of pipe
welding map mark, site construction quality check (delivery checklist of pipes,
welding, sandblasting, coating, painting).
➢ Prepare hydro-test Package and relevant certificates (such as the mechanical
complete certificates, Provisional Acceptance certificate, Commissioning Certificate,
Ready to Start-up Certificate, Start-up Certificate, etc.)
➢ Material checking with certificate for piping in RETM HKN Materials.
➢ hydrostatic test of piping.
• KAR Pipeline LTD, GKPI (PF1,RETM) and pipeline 16'' (from 01/Nov/2018 to 01-Dec-2019),
➢ Working as Mechanical engineer in Pipeline construction, was in charge of pipe welding
map mark, site construction quality check (delivery checklist of pipes, stringing,
bending, welding, coating, lowering) 12.850 Km.
➢ Material checking with certificate for piping in PF1.
➢ Torqueing the flanges and valves.
Experiences
F A W A Z M I R O
Supervisor Mechanical Engineer at KAR GROUP
Duhok, Iraq
+964-7508359100
LinkedIn: Fawaz Miro
Personal Information
Nationality: Syrian Sex: Male Family status: Married, I have two children Date of Birth: 20\12\1983
Scientific Certification
University: Damascus University, the Faculty of Mechanical and Electrical Engineering.
Department: Mechanical Engineering /
Mechanical Power Department
Graduation Project: Economic Survey of the
Feasibility at Spinning and Textile factory in Damascus, Syria.
Degree: Good Rate: (62, 43 %) 2011
➢ hydrostatic test of piping.
➢ Prepare hydro-test Package and relevant certificates (such as the mechanical
complete certificates, Provisional Acceptance certificate, Commissioning
Certificate, Ready to Start-up Certificate, Start-up Certificate, etc.)
• KAR Pipeline LTD, KPS2 (KURDISTAN PUMP STATION 2) PIPELINE EXPORT SYSTEM OIL and GAS
(February2018- to 01/Nov/2018) SHEKHAN, KURDISTAN, IRAQ.
Main Duties:
➢ Working as Mechanical engineer in Pipeline (Piping)construction, was in charge of pipe
welding map mark, site construction quality check.
➢ Punch list incorrect item of piping installation, close the punch list items.
➢ Prepare hydro-test Package and relevant certificates (such as the mechanical
complete certificates, Provisional Acceptance certificate, Commissioning Certificate,
Ready to Start-up Certificate, Start-up Certificate, etc.)
➢ Construction coordination with Client for pre-commission and hand over working.
➢ Be familiar with sand blasting, Coating, And Welding.
➢ Installing pumps with motor skid in the Foundation, pre- alignment, final alignment. Install
3 pumps, alignment, hot commissioning.
➢ Install 3 pumps, alignment, hot commissioning.
➢ Prepare hydro-test Package and relevant certificates (such as the mechanical
complete certificates, Provisional Acceptance certificate, Commissioning Certificate,
Ready to Start-up Certificate, Start-up Certificate, etc.)
• KAR Pipeline LTD, GULF KEYSTONE BESAT PIPELINE EXPORT SYSTEM OIL and GAS (PF2) (October 2017 –
February 2018) BESAT TO ATRUSH PIPELINE, Kurdistan, Iraq
Main Duties:
➢ Working as Mechanical engineer in Pipeline construction, was in charge of pipe welding
map mark, site construction quality check.
➢ Punch list incorrect item of piping installation, close the punch list items.
➢ Prepare hydro-test Package and relevant certificates (such as the mechanical
complete certificates, Provisional Acceptance certificate, Commissioning Certificate,
Ready to Start-up Certificate, Start-up Certificate, etc.)
➢ Construction coordination with Client for pre-commission and hand over working.
➢ Be familiar with sand blasting, Coating, And Welding.
➢ Install 3 pumps, alignment, hot commissioning.
• KAR Pipeline LTD, ATRUSH PIPELINE EXPORT SYSTEM oil and gas (March 2017- October 2017)- ATRUSH TO SHEKHAN, Kurdistan, Iraq
Main Duties:
➢ Working as Mechanical engineer in Pipeline construction, was in charge of pipe welding
map mark, site construction quality check.
➢ Punch list incorrect item of piping installation, close the punch list items.
➢ Be familiar with sand blasting, Coating, And Welding.
• KAR Group LTD, Khormala Power Plant (1000 MW) (January 2013- Febriwary-2017) - Erbil, Kurdistan, Iraq
Field Engineer
Main Duties:
➢ Supervising the installation of the 5000 CUBIC METERS Tank Farm (Erection,
hydrostatic test, commissioning).
➢ Supervising the installation of the 400 KV switchyard towers.
➢ Supervising the installation of the central air-conditioning HVAC in (Project administration building, social building, control building, reception building and firefighting building).
➢ Supervising the Welding processes and installing the pipes within the project (Erection,
Blowout, Hydrostatic test, flashing).
➢ Arranging the working sheets that satisfy the work demand of the contractor
(SIEMENS, ABB & ACCORU) and sub-contractor (SEC, Power China, and NYCO).
➢ Arranging the Notification Sheets that report the issues occur during work. ➢ QA/QC completion that related to the NDT Company (NYCO). ➢ Electrical ECC (Erection Clearance Certificate) & FQP (Field Quality Plan) for all power
plant units. ➢ Placing all KKS labels regarding the power plant elements according to P&ID diagrams.
➢ Work in commissioning of fuel gas supply system and fuel oil supply system. ➢ Embedded part (install anchor bolts, plats and H-beam) in the foundation in power
plant, phase one (four units) and phase three (two units).
➢ Supervising the installation of the power island, SIEMENS part (turbine, generator, air intake, exhaust stack, and auxiliary), phase three (two units).
➢ Cold commissioning and hot commissioning of the power plant with SIEMENS teams in Khormala power plant.
➢ Commissioning of Demin water System Capacity 10 m3 per day.
• Avro City (Duhok / Kurdistan / Iraq), (April 2012- December 2012).
Main Duties:
➢ Installation and maintenance of air conditioners individual, multilateral and central air conditioning with VRV system.
➢ Expertise in engineering drawing more than four years in Damascus. ➢ Installation, Welding, and insulation of the brass pipes. ➢ Work in Electricity car workshop for three Years. ➢ A member of Association of Engineers in Syria.
➢ Kurdish: Native Language.
➢ Arabic: Excellent Read and write.
➢ English: good Read and write.
Relative Skills:
Languages:
➢ Turkish: good conversation.
➢ Proficient in Microsoft Office, Data Base (ICDL) and Computer Maintenance in
Software and Hardware.
➢ Proficient in Mechanical Desktop and AutoCAD Desktop.
➢ Knowledgeable in operating Mechanical Desktop and AutoCAD for HVAC Planning
➢ ASNT – Level I & II (VT, PT & MT).
SAMI ABDULZAHRA ALI,
Project Manager at KAR Group, Erbil-Iraq.
Phone No: +964-7508230860, Email [email protected]
Computer: Skills
References
-6-6 !,%r"9.@""tyf"n
,9r, 9/Drt"t4Magnetic Particle Testing- MT
Level II
.//lat'
Fawoz Miro
Hqs Met the Requirements as Per Guidelines of American Societyfor NonDestructive Testing Document SNT-TC-IA as
Examination Result:Average: 80%Fundamental: 80okCode: 80%Practical: 8A%
Certification DeptManaging Director
Issue Date: July. 3 1 .2019Expiration Date: July. 31 .2022
Certificate Number:
QAL-266874-19-256230
Vision ExaminationLeft: JI Right: JlNear Vision: NormalColor Vision: Normal
Issued By:Mr. Shamaghdari
ASNT III No. :1
*rt
Applicable SpecificatiAWS Dl.l (2015) & ASME Sec. v & VIII (2017), ASME 831.1 (2016), ASME 83l.l (2016)
www.qalcert.co.uk
ALUKLIMITED
-
.,!A
7
(9r02) r'rts s'.,rsv '(9t02) t r ts ansv '( 0z) IA a A 'tes ahrsv ? (s r0z) I IC s,,r\v
--16-a6i
.L
6t.ON
III IA^A'I INSVrrepqSPueqs 'rr{
:Ig panssl
lotlttoN :uorsu toloSlDuloN :uolsu fiaN
It:ry8!tr If :{aT
E€qs'It[
6ZZ9 97,- 6r -n 18992-TVb
:JequnN elBcglueS
ZZ0Z' IE ',(1ng:e1eg uorleldxg610Z' lE '.(1n1 :e1eq enssl
ropalq Sur8eueylldag uopuegp.ra3
% 08 :lorlpDrd% 08 :apoJ9%08 : loluzuopunc
% 0g :a8ota,tyuolDutaoxg uolsll :qnsaf, uououtuoxg
II PM7Jd -Sulsal tuD,Uauad prublT
//r?"1316 ":%: ,r
sD 7I1J-JNS tuawrucoq Suttsal atlpnusaeuoTJ totilalcog uon"tawylo saulpplng "od sD suaua"4nba[ aqt pIA[ sDH
ottru zDtADl
va{taag/r-%; trtr
In' o J' ua J Ieb',u,,r,r.,r,t
:(s) uosecgrcadg alqecqddy
ClfI'In.I
T r
L"
I
Fawaz Mtro
Has Met the Requirements as Per Guidelines of American Societyfor NonDestructive Testing Document SNT-TC-IA as
-{",',%,!,,XGl"rt4Yisual Testing - W
Level IIExamination Result:
Average: 80 %Fundamental: 8096Code: 80%Practical: 80%
Certification DeptManaging Director
Vision ExqminationLefi: Jl Right: JlNear llision: NormalColor Vision: Normal
Issue Date: July. 3l .2019Expiration Date: July. 31 .2022
Certificate Number;
QN--266874-19-2s6228
lssued By:Mr. Shamaghdari
ASNT III No.
Applicable SpecificatiAwS Dl,l (2015) & ASME Sec. V & VIll (2017), ASME 83l.l (2016), ASME 83l.l (2016)
9
www.qalceft.co.uk
n
I
UKL
-% -% !%:,*9, C"rgf"d %r,
!
I
/
t
ASN'a i : Irlf/T. t:'! M'i' r;