financing options for brouwersdam in zuid holland
Post on 25-Jan-2017
819 Views
Preview:
TRANSCRIPT
Tidal Power Plant BrouwersdamEIP Action Group Energy & Water Works9 February 2016
Zjev AmbagtsProvince of Zuid-Holland / Project Bureau TPP BD z.ambagts@pzh.nl
2
Table of contents
1. Introduction: water problem, water solution and energy-from-water opportunity- Lake Volkerak-Zoommeer - Lake Grevelingen - > Tidal Power Plant Brouwersdam
2. ‘Multi level governance’; role for European Regions
3. ‘Blending’ of subsidies and finance from NL and EU
3
Delta in South West of Netherlands
4
Envisaged location of Tidal Power Plant Brouwersdam
City of Antwerp
City of Rotterdam
Storm surge in 1953: 1835 casualties
5
1971: Brouwersdam; 1 of 14 Deltaworks
6
Brouwersdam today
7
Water quality/ ecology problem today
8
Negative impact on regional economy (shell fish, tourism, …)
Water solution: restoration of tidal range
9
Integrated design of culvert (water) and tidal power plant (energy from water)
Value of culvert (water):
1. Water quality, under water/ inter tidal ecology Lake Grevelingen
2. Regional economy: shell fishery, recreation, tourism
Added value of integrated design of culvert and tidal power plant:
3. Energy transition: predictable renewable energy, CO2-emission reduction
4. Innovation: cost-effective and fish friendly capture of energy at low tidal range
5. Export potential: showcase for European industry
Opportunity: Tidal Power Plant Brouwersdam
10
‘Multi level governance’Steering Group Tidal Power Plant Brouwersdam
National
- Ministry of Economic Affairs (Energy from Water, Narura 2000)- Ministry of Infrastructure and Environment / Rijkswaterstaat (Water)
Regional
- Province of Zuid-Holland (chair)- Province of Zeeland
Local
- Municipality of Goeree-Overflakkee- Municipality of Schouwen-Duiveland
11
13
Noordzee
GrevelingenN57
bestaande Brouwersdam
combiwand
Duct-turbine
stormschuivenkerende wand
technische ruimtedoorstroom-openingen
grondlichaam
fietspad
Grevelingenbestaande caissons in Brouwersdam
Noordzee
30 meter
NAP +11m NAP+9m
fiets-pad
N57secundaire
weg
NAP -11mNAP -9m
NAP -1m
NAP +0,5m
turbine
storm-schuif
technische ruimte
Modellenteam GCBD 14
Public reference- Culvert of 135 meter long en 40 meter wide- 15 turbines, diameter of 6 meter; 22 MW installed capacity- Energy production: 67 GWh/ year; circa 22.000 household equivalents
Water: € 105-115 million, mainly public budget required
Energy from water: additional costs +€ 75-100 million, mainly private investment/ finance required
Optimum at 25 MW for 25.000 household equivalents
14
Modellenteam GCBD 15
Potential support from Ministry of Economic Affairs (NL) and from European Commission/ European
Investment Bank (‘blending’)50 cm of tidal range; loan 60% at 6% interest; return of investment = 7%
Energy Innovation subsidy NL,up-front
Energy exploitation subsidy NL,first 15 years
Need for additional support from e.g. European Innovation Fund, up-front or during operation
€ 6,0 mln € 0,12 per kWh € 20,8 mln
15
Counting with, not yet counting on …
EFSI loan and/ or guarantee could lower values
Ocean Energy received funding under NER 300
16
Ocean Energy projects € million under NER
MW € million/ MWunder NER
Under NER300:
Sound of Islay, UK 21 10 2.1
Stroma Tidal Turbine Array, UK 16.8 9 1.9
Under ‘Innovation Fund’ (NER400)?
Tidal Power Plant Brouwersdam 20.8 22 0.9
Bargain!
Roadmap2016: arranging public conditions; preparation of public procurement
2017: selection of private consortium water/ energy from water (x -> 3 -> 1)
2018-2019: project development in hybride public-private alliance, decision making on investments
2020 – 2022: construction of culvert/ tidal power plant combination
2022: start of exploitation of tidal power plant
Condition: budget for culvert/ tidal range at Lake Grevelingen in 2016
17
Tidal Technology Center GrevelingendamCertification of turbine technology
Tests, demo’s, certification
Energy 4,5MW
18
Role for European regions (and RWS)• Interconnection of sectoral policies in integral solution
• Teaming-up public and private parties in hybride alliance
• ‘Blending’, financial innovative arrangement:– Energy Innovation subsidy NL– Energy exploitation subsidiy NL– Energy Innovation subsidy EU, e.g. NER400/ Innovation Fund– EFSI guarantee and/ or loan
19