flat roof frame inst - alpha-innovation.co.uk roof... · 1 installation instructions alpha...
Post on 19-Mar-2018
229 Views
Preview:
TRANSCRIPT
1
Installation Instructions Alpha SolarSmart 100
Flat roof frame for solar collectors. General recommendations
The installation of the following kit must be carried out in compliance with the relevant building regulations and in according to manufacturer’s instruction. This kit is designed for use with Alpha Landscape collectors only. These instructions must be read in conjunction with the instructions supplied with the SolarSmart 100 Cylinder and Drain Back system.
The kit described below allows the installation of up to two solar collectors on a flat roof only.
Important Notes: - a) To obtain the highest efficiency from the collector, place the collector as near to south facing as possible, it must be between South East and South West. b) The flat roof must be strong enough to withstand the total weight that will be placed on the frame to secure it against the maximum wind gusts for the location in which the collector is being installed. c) If the wind speed for the location of the installation is higher than 25 metre per second or falls into the 'grey' area of the table in Section 1, then the frame must be secured to the roof structure using suitable fixings to withstand the high forces. d) Avoid positions where objects may cast shadows on the collector. e) Place the collector as close as possible to the drain back unit (DBU). The maximum height from the bottom of the DBU to the top of the collector is 4 metres. Do not use more than 12 metres for one collector or 8 metres for two collectors for each of the flow and return pipe between the DBU and collector/s. The DBU must always be positioned lower than the collector. f) Both the flow and return pipes from the collector to the DBU must be mounted with a minimum slope of 40 mm per metre. Ensure that the flexible pipework is also mounted with a slope to the DBU. g) The flow and return pipes must be insulated with high temperature insulation, i.e. 150°C plus. h) The collector must always be level. The frame offers some adjustment by the slotted holes in the vertical supports, i) We recommend some extra roofing material is used on the location where the Flat Roof frame will be placed to protect the surface of the roof and maintain a water tight seal. k) A suitable flashing or similar will need to used, to allow the collector flow and return pipes and the sensor cable to enter the inside of the building.
j) If using ballast to fix the frame; ensure that the slabs/weights are positioned on each corner of the frame. If using weight to secure the frame ensure that the correct amount of weight is placed on the frame to prevent movement in strong wind conditions refer to the table below to determine the correct amount of ballast required. IMPORTANT: Ensure that the weight is evenly distributed and attached suitably to the frame using the four brackets in each corner supplied.
1. MOUNTING THE FRAMES Mounting must only be performed on flat roof surfaces that are suitable for installation of such kits. The suitability of the flat roof must be checked by a suitably qualified designer or architect before mounting the kit. If the sub-structure is in metal, consult an expert regarding any requirement for lightening protection
Each fraframe ha
ame must beas four angle
secured to ted fixing brac
the roof eitheckets in the p
er by mechanpositions sho
nical fixing oown below.
r using ballaast weight. Ea
2
ach
2. DET
To determIMPORTA
Note: If tper seconthe BRE Note: To
Fig. 3 - Map reprod
TERMINE
mine the weigANT: Ensure
the topographynd, then the frdocument Di
o determine yo
Map of UK wuced from Digest
E THE WE
ht to be placethat the weigh
y is significantrame must notgest 489 - Win
our altitude abo
wind speed 489 with permiss
EIGHT TO
d onto the framht is evenly dis
t and the windt be fitted on tnd Loads on Rove sea level,
zones ion of BRE
O BE PLA
me refer to thestributed and
d speed for thehe flat roof us
Roof - Based S, refer to www
CED ON F
e table below.is placed insid
e location of thsing this methoSystems, avai
w.ordnancesurv
FRAME
de the channe
he installation od. For furtherlable at www.vey.co.uk
els on each co
is higher thanr information r.bre.co.uk
3
rner.
n 25 metre refer to
3. INS1) Fix ththe nutstriangle
Fix the asurfacesdiagram
STALLATIe angle brac (a) to make
angle brackes and roof typ
m below only
ION OPERckets (i) to th
the first fixin
ets to the flat pe. The plugas an examp
RATIONSe angle leng
ng triangle. C
roof surfaces (A) and theple.
S gths (m) andCarry out the
e or ballast use screws (B)
(k) using thesame opera
sing the mos (both not su
e screws (h), ation to moun
st suitable meupplied) are s
the washersnt the next fix
ethod for theshown in the
4
s (b) and xing
e type of e
Mount thit in posicollectorthe bottonot used
N.B. TheOnce the
he upper andition with ther as shown inom to suppord for the top f
e upper ande positioning
d lower suppe washer (b) n diagram Grt the collectofixing of the
d lower suppg of both sup
ort profiles (jand nut (a) p. The bottomor. The top scollector.
port profilesport profiles
j) inserting thpaying attent
m section shosection must
s must be mis complete,
hem on the wtion to the poould have the
have this lip
mounted par, tighten the
wide head scosition of the e protruding lp positioned o
allel to eachnuts (a).
crews (d) andprofile relati
lip positionedon either side
h other and
5
d locking ve to the d along e, it is
level!
For the isupport tighten t
Positionchannel N.B. Po45 mm f
installation oprofiles (j) us
the nuts (a).
the solar coon the lowesition the sofrom the en
of two collecsing the clam
ollector on thr support proolar collectods.
ctors two framp plate (l), w
he support pofile as showor in the cen
mes are conwashers (b) a
profile makingwn below. ntre of the s
nected togetand nuts (a).
g sure to ins
support prof
ther as detai. Once positi
sert the colle
files with a d
iled below. Joning is com
ector groove
distance of
6
Join the mplete,
onto the
about
The imaInsert thInsert thwithout t
Positionsupport PositionN.B. Motighteni
ages shownhe fixing clamhe plate (e) otightening.
the solar coprofile (g). ing the colle
ount the secng them in
below descmp (f) in the u
n the thread
ollector on the
ctors distanccond collectposition.
cribe the opupper suppored stud of th
e support pro
ced about 55or compres
perations whrt profile in th
he fixing clam
ofiles as befo
5 mm apart. ssion pipe u
hen installinhe centre of tmp (f) and fix
ore and plac
nions betwe
g more thanthe solar collwith the was
e the distanc
een the two
n two colleclectors. sher (b) and
ce piece on t
panels befo
7
ctors.
nut (a)
the lower
ore
After enslock in p
Lock theshowing(a).
suring that thpositions tigh
e solar collecg the letter “C
he solar colletening the nu
ctor to the upC” into the gro
ectors are pout.
pper support oove on the
ositioned cor
profile usingcollector), us
rectly and lev
g the fixing plsing the bolt
Doc No 1.03
vel, rotate th
ates (c) (pos(d), the was
33859 Rev 15
he clamp (e)
sitioning the her (b) and t
5.037932 ‐ 0
8
90 and
end the nut
00
top related