Frenchmarketandprojectsrevisited

6thJune2017–London

FranceEnergieEolienne(FEE)

FEE–theFrenchWindEnergyAssociaDonCreated in 1996, France Energie Eolienne (FEE) supports and represents the windenergysector(bothonshore&offshore)inFrance.

Missions

ü  FEE represents the wind industry at public, naDonal, European and regionalauthoriDesandregulaDngbodies,

ü  The associaDon acDvely par@cipates in the crea@on of legisla@ve and regulatorytexts,

ü  It supports its members and facilitates their development in France. TheassociaDon promotes the interests of the associa@on members and organisesnetworking events as the annual na@onal summit: “colloque naDonaléolien”(around1000parDcipantsinSeptember2016).

•  300members(June2017):theybuiltmorethan90%oftheinstalledwindturbines

inFranceandoperate85%ofthem.

•  www.fee.asso.fr@feeasso

2

TheactualFrenchWindEnergyMarket

3

-  14470jobsinthewindindustryon31.12.2015

-  +1950jobsin2015(i.e.+15%)

-  790companies-  ~12GWinstalled

capacity(onshore)on31.12.2016

-  +1560,5MWinstalledcapacity(onshore)in2016

-  1stoffshorewindfarms(boYomfixed)commissionedfrom2021.

à2017edi@on(2016figures)tocome:September2017!

PlayersoftheFrenchmarket–mid-2016

4

Theenergyplan(PPE–10/2016)

•  BoZom fixed offshore wind: between 0,5 and 6 GWaddi@onalcapaci@esawardedby2023.

•  Floa@ngoffshorewind:–  a«MRE»objecDf(withDdalwave),between0,2and2GWaddi@onalcapaci@esawardedby2023.

•  Ongoing process concerning the preparaDon of the 1stFOWcommercialtender(zoning):–  IntheMediterraneanSea–  InBriYany(NorthandSouth)

•  PPEtobeupdatedinthenextmonths5

FEE recommandation

(2030)

15 000 MW

6 000 MW

OffshorewindinFrance–theawardedprojects(boYomfixed)

6

3GWawardedthrough2rounds

7

FécampEMF-WPD

CourseullesEMF-WPD

LocaDon Seine-MariDme Calvados

Power 498MW 450MW

Nbofturbines 83 75

FoundaDon GBS Monopile

Waterdepth 26à36m 21à32m

Distancefromthecoast 13km 10km

Area 65km² 50km²

Offshorewindopportuni@esinFrance…FocusonRound1“EMF-wpd”Projects

EPCI Foundations FCP / COU - SNA

EPCI OSS COU – FCP - SNA

Onshore Grid

EPCI IAC COU – FCP - SNA

EPCI Export Cables COU – FCP - SNA

EPC / T&I WTG COU – FCP - SNA

2007-2013 2014-2015 2016 2017 From2018

Preliminarydialogue

Publicdebate

EnvironmentalandTechnical

studies

Endofmi@ga@onperiod

SubmissionoftheApplica@onfor

Authoriza@on(EIA)

Gran@ngof

authoriza@ons[Q2]

Nego@a@onofthemaincontracts

Selec@onofsuppliers[S22016]

FinancialInvestmentDecision

Closing

Firmorders

Startoffabrica@on

Construc@onon2years:supplyof

components,installa@on&commissioning

Opera@on

during25ans

ProjectsDevelopment Construc@onandopera@on

Engineeringandriskassessment

Startoftheprocurementprocessfor

construc@onlots(Direc@ve2014/17)

Offshorewindopportuni@esinFrance…Provisionalscheduleànewonetobeprecised

Newtenderingprocess–thecompeDDvedialogue

•  Tenderingprocessin2steps:–  Pre-qualificaDonontechnical&financialcapaciDes;–  Aoer a pre-selecDonof the EnergyMinister : technical dialoguebetween

the State (ministry + other services, TSO etc.) and the prequalifiedcandidatesonthetendercondiDons.

•  Aimoftheprocedure:–  createatransparentandflexibletenderàincreasedconcurrenceinorder

toobtainthebestpriceandproject.•  Addi@onalinforma@on:

–  TheprocedurecanbebasedonpreliminaryinvesDgaDons(windresourcesdata, geophysical survey + environmental survey), coordinated by theState.

àTheprocedureshouldrulethenextoffshorewindtenders (fromthe3rdroundoffDunkerque).

10

Ongoingtenders(3rdand4throunds)

•  Dunkerque(250-750MW)–3rdround–  Launched:OngoingcompeDDvedialogueprocedure/phase1achieved:i.e.

pre-selecDon of the candidates (10 candidates pre-selected according tothepress)+startofthediscussionsonthetender.

•  Oléron(~500MW-tbc)–4thround–  PublicconsultaDononthesiteachieved;startofthecompeDDvedialogue

proceduretocome(summer2017?)withphase1–postponedbecauseofgeneralelecDon.

•  Bassure-de-Baas/Berck-LeTouquet(~250MW/+-tbc)–  1st public consultaDon – a few informaDon available at the moment.

ShouldbeclarifiedwiththenewGovernment.

11

WindenergyinFrance–stateoftheart

12

OffshorewindinFrance,abiggerpotenDaltodevelop

13

TakingintoaccountthepotenDalseaboardarea,theindustrialcapacityofthesector’splayers, and the necessary coordinaDon,FEE es@mates that 15GW of installedcapacityisarealis@ctargetfor2030.

An emerging industrial sector in France

Significant assets for the offshore wind industry

14

France benefits from significant assets to develop a wind energy industrywhich will createemploymentsandeconomicacDviDes:

•  An industrial know-how with significant experience in automoDve, aeronauDcs,manufacturing of large ships, O&G, nuclear or mechanical and electromechanicalcomponents

•  Ac@veinvestmentbyFrenchregionswiththefoundaDonofseveralclustersaroundportandinfrastructureacDviDes

•  Ports are already preparing to adapt their infrastructures to welcome new acDviDesdedicated to offshorewindfarms (assembly, logisDcs, operaDon andmaintenance,…) :Dunkerque,Dieppe,Fécamp,LeHavre,Cherbourg,Brest,Nantes-SaintNazaire,Bordeaux

•  Large researchanddevelopment resources (technical centres,university, laboratories,dedicatedsitesfortests…)

AnemergingmarketsectorinFrance–Industrialinvestmentsannounced

15

Anemergingsector–thechallenge

16

A completely new market to develop, based on long standing governmentaldecisions.ThismeanslotsofOPPORTUNITIES!Butthereareplentlyofchallenges:

-  UnprecedentsoilcondiDons-  ImplementaDonofnewtechnologies-  AvailabilityandperformanceofnewmanufacturingfaciliDesandharbours-  Lackoftrackrecordandexperience-  MarketdevelopmentthroughM&A-  RiskoflegalrecourseagainstauthorizaDons-  Long-termvisionforinvestors:FrenchgovernmenthascommiYedtocut

relianceonnuclearenergy(75to50%by2030)-operatedbystate-controlledEDF–butstrugglestofinallyactthisstrategyinthemulD-yearinvestmentplan.

WhataboutfloaDngoffshorewindinFrance?

17

FOWPilotfarms-ADEME

•  AcallfortenderslaunchedinAugust2015andclosedinApril2016.4projectsawardedinJulyandNovember2016.

•  Operated by the ADEME (agency of the Ministry ofEnvironment,EnergyandtheSea).

•  Financedbyan investmentprogramcalled«ProgrammedesInvesDssements d’Avenir » (PIA – management by CGI andoperatedbyADEME)

•  Ini@alsupportoftheGovernment:–  150M€foralltheprojects+aFiTforeachproject.àHasbeenincreasedtoup300M€+FiTforeachproject

18

FloaDngoffshorewind–pilotfarms(1/2)

19

ü  4awardedprojects:3intheMediterranean,1inBriZany(4x24MW)

ü  2siteswereawardedon22thJuly2016(Gruissan&Groix)

ü  2siteswereawardedon3rdNovember2016(Leucate&Faraman)

FloaDngoffshorewind–pilotfarms(2/2)

20

Thepilotfarmscalenders

•  July & November 2016: 4 projects – 96MW (4x24MW)awarded.

•  2017*: conciliaDon meeDngs + start of the surveysprocess

•  Endof2017*:permitsapplicaDon•  Endof2018-2019*:permitsdelivery•  2020*:installaDon•  2021*:commissioning*ExampleforGruissan–EolmedconsorDum

21

ApathwayforFOWdevelopment

07.06.17 22

2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2030

Callforp

rojects

Commercial

tend

er

6GWofFOWcommissionedby2030

Preparations (zoning) and Competitive

dialogue

Surveys and permits Manufacturin

g and installation

Operation

≈3yearsbetweenthepilotandcommercialfarmscommissionings

Call for projects pilot farms

Surveys and permits

Manufacturingand

installation Operation

TheFrenchpotenDal–1/2

•  BriYany

23

TheFrenchpotenDal–2/2

•  MediterraneanSea

24

LeadingFOWfoundaDons

25

AnemergingindustrialsectorinFranceFrenchcomponentsuppliersknow-howandexperDse

26

FacilitaDnginternaDonalcooperaDon

Whyhavingpartnership?

27

•  Maximizemarketopportuni@es!•  Exchangerespec@veknow-howandexperience

•  Diversifyandgrowmorerapidly

•  Getaccesstobiggercontracts

•  Mutualizetherisksandinvesment(technical,financial…)andthusreassureinvestors,bankers

•  Exportanddemonstratecapabili@esinterna@onally

•  Benchmarkthebestavailableprac@ceandtechnologies

•  ShareknowledgeaboutNa@onalenvironment(regulaDon,culture,andwayofdoingbusiness)

•  Valorizeinnova@vetechnologiesandtechniques(althoughnotyetappliedintheOFWsector)

OngoingworksatFEE

•  Mari@me spa@al planning: contribuDons of the industry(awardedprojectsandfuturesitesforoffshorewind)

•  Reformofthegridconnec@onsystem(shareoftherisks)•  WGonthelegalframework(deriskingandpermits)•  WG on the Works rules for employees on the Sea (legal

framework)

28

Agenda2017-2018

•  8thnaDonalwindenergycongress–«colloquenaDonaléolien»:19-20September2017–Paris–  www.colloque-naDonal-eolien.com–  Nearly1000parDcipants,40exhibitors–  FocusedontheFrenchmarket

•  FOWT2018:25-26April2018–Marseille(Provence)

–  FOWTistheworldwidelargesteventforfloaDngoffshorewindwww.fowt-conferences.com

–  NB:theNorwegiandelegaDonwasoneofthemostimportantin2017!

29

ThankyouforyouraYenDon

MaYhieuMonnierHeadofUnit–Industry,Offshore,Technical

Works&Territories

30