Fuji Test Beam Linecommissioning
Y.SudoUniv. of Tsukuba
Room for test beam @Fuji B3
We can control currents of magnets from this room.Network is ready.
M1M2
M3 M4M5
M6M7
position of magnets and monitors ( Fuji strait section )
Trigger counter
Target + rate monitor Electron monitor(strip scintillator )
10/11 at 18:00 Magnets are turned on with 3.0GeV/c.
10/12 at 11:00HER started injection of beam.
Beam shutter
lead-glass counter
This stage is able to move only vertically.
Controller of the stage
Concreteblock
Beam line
Beam shutter Beam shutter
Result of last week and planHER 700mA, LER 1200mAWe observed beam ~ 30Hz.Beam energy looks constant.(according to oscilloscope)When shutter is closed, rate of the beam goes down 0Hz.
Plans of this week•Measurement of correlation between beam intensity and - HER current - condition of the vacuum correlation of intensity between upper side of shutter and lower side • Measurement of beam profile with electron monitor.• Adjustment of magnets adjust currents of B2-4 between -1% and +1%
Pulse shape of lead-glass counter