2017

2018

2019 Secured U.S. Army Corps of Engineers Record of Decision and 404 Permit

Begin final dam design and secure FERC hydropower license amendment

Final design engineering and test quarry

2020

2021-23

Site development, road improvements, continued test quarrying. Recreation access at Osprey Point and access on both sides of dam will be closed.

Build dam foundation, application of Roller Compacted Concrete

2024

2025

Tree clearing, hydropower modification andspillway work

Reservoir fills