Construction Works: 23rdMarch to 6th April

Project Pegasus

Issue #4020th March 2020

SRM Special Projects Site Team offices

are now located within the basement

of the building with access through the

East hoarding opposite Kings Bench

Walk where ‘Visitor Entrance:’ signage

can be found on the hoarding door to

assist. Please press the bell to attract

attention.

Site working hours will be from:

8.00am – 6.00pm Monday – Friday

9.00am – 2.00pm Saturday

Project Manager: John Walker

SRM Special Projects

E: john.walker@srm.com

T: 07866 783710

If unavailable contact,

Chief Engineer: Joshua Murray

T: 07875 190945

Contact Us

• Demolition of existing level 3 floor slab in the North

East corner

• M&E installation within the basement plant rooms,

kitchen and new book store

• Internal brickwork and blockwork infills throughout

the building

• Brickwork for the new fire escape stairs on the North

façade

• Scaffold tower to facilitate the formation of the new lift

shaft brickwork

• Waterproofing within the basement

• Concrete work on level 3 to support the new structural

steel

• Installation of structural steel

Concrete Works on 3rd Floor