jvz comp profile electronicjvzconstruction.co.za/wp-content/uploads/2019/07/... · jvz construction...
Post on 09-Aug-2020
6 Views
Preview:
TRANSCRIPT
www.jvzconstruction.co.za
INDEX
ABOUT US (PAGE 3, 4)
Company overview, Our history, Our accreditations
Our safety policy, Our social responsibilty
3
4
5
6
7
8
9
10
11
12
13
OUR PROJECTS (PAGE 5-13)
Introduction
Bulk Sewer Projects
Bulk Water Projects
Reservoir Projects
Bulk Earthworks
Civil Services
Roads and Stormwater
Dams
General Building
PLANT HIRE (PAGE 14)
JVZ CONSTRUCTION COMPANY PROFILE2
ABOUT US
JVZ Construction has become well-known in the civil construction industry for our reliability and success in providing our clients with professional services of the highest quality.
The JVZ Construction team can boast with many years of experience gathered in various sectors within the civil construction industry. This is proven by a wide variety of specialised projects completed since 2006. We believe in good internal relations as well as a constant on-the-job training program for junior and senior employees.
COMPANY OVERVIEW
OUR ACCREDITATIONS
OUR HISTORY
Faheem Crombie - DirectorJohan Van Zyl - Director
Marisa Matthee – Director
JVZ Construction was founded in January 2006 by Mr Johan van Zyl, and since then has successfully undertaken various civil construction projects. Our contract capacity ranges up to R200 million per contract. Since 2006, JVZ Plant CC and Vakala Construction (Pty) Ltd joined our group and strengthened our capacity to deliver high quality work. JVZ Construction has a dedicated and professional team that always strives to achieve a high standard of work.
JVZ CONSTRUCTION COMPANY PROFILE 3
BCCEI - BARGAININGCOUNCIL FOR THE CIVIL
ENGINEERING INDUSTRY
FEM – FEDERATED EMPLOYER'SMUTUAL ASSURANCE COMPANY
(RF) PROPRIETARY LIMITED
CIDB – 8CE - CONSTRUCTIONINDUSTRY DEVELOPMENT
BOARD (CIDB)
BBBEE – LEVEL 2(51.4% BLACK OWNERSHIP,
30.94% BLACK FEMALEOWNERSHIP AND
EMPOWERING SUPPLIER)
CSD – CENTRALSUPPLIER DATABASE MBA BOLAND
250MORE THAN
COMPLETED SINCE
CONTRACTS COMPLETED
06NUMBER OFACCREDITATIONS2006
WIDE VARIETY OFSPECIALISED PROJECTS
JVZ Construction recognizes the right to work in a safe and healthy work environment, and is committed to providing such a workplace for all our employees and subcontractors. No activity is more important than protecting the health and safety of our employees as well as the public who live and work adjacent to our operations. It is JVZ Construction’s policy to prevent occupational injury and property damage through full compliance with the Occupational Health and Safety Act and Regulations for construction projects, and abiding to all other applicable legislation.
OUR SAFETY POLICY
OUR SOCIAL RESPONSIBILITY
We as a company have a focused awareness of the important role we play in the development of our local social environment, as well as to protect and preserve our environment.
A FOCUSED AWARENESS OF OUR ROLEIN THE PROTECTION OF THE ENVIRONMENT.
ABOUT US
JVZ CONSTRUCTION COMPANY PROFILE4
GENERAL BUILDINGCATEGORY 8
DAMSCATEGORY 7
BULK SEWERCATEGORY 1
BULK WATERCATEGORY 2
RESERVOIRSCATEGORY 3
BULK EARTHWORKSCATEGORY 4
CIVIL SERVICESCATEGORY 5
ROADS AND STORMWATERCATEGORY 6
We are extremely proud of our portfolio. Our projectscan be classified into eight major categories.
OUR PROJECT PORTFOLIO
JVZ CONSTRUCTION COMPANY PROFILE 5
BULK SEWER
JVZ CONSTRUCTIONtakes pride in working and creating
a safe working environment for all its’ employees.
JVZ CONSTRUCTION COMPANY PROFILE6
THE CONSTRUCTION OF THE PLANKENBRUGMAIN OUTFALL SEWER: PHASE 1
Date: Completed - March 2017Contract Amount: R 47.5 m
BULK SEWER TO SOUTHERN PAARL:PHASE 3: PORTION 3
Date: Completed - September 2017Contract Amount: R 41.2 m
BULK SEWER TO SOUTHERN PAARL:PHASE 1
Date: Completed - January 2012Contract Amount: R 37 m
JVZ CONSTRUCTIONis proud of its’ dedicated employees whohelps in striving towards engineering excellence.
JVZ CONSTRUCTION COMPANY PROFILE 7
BULK WATER
CONSTRUCTION OF 11 ML NEWTON RESERVOIRWELLINGTON: PHASE 1
Date: Completed - March 2015Contract Amount: R 25.4 m
AUGMENTATION OF THE STETTYNSKLOOFSUPPLY PIPELINE: PHASE 2
Date: Completed - October 2014Contract Amount: R 39.2 m
TOUWSRIVIER: REHABILITATION OF WATER SUPPLYPIPELINE FROM BOKRIVER: PHASE 5
Date: Completed - September 2014Contract Amount: R 2.2 m
JVZ CONSTRUCTION COMPANY PROFILE8
RESERVOIRS
CONSTRUCTION OF1.5 ML RESERVOIRFOR DORING BAY
Date: Completed - May 2015Contract Amount: R 3.4 m
CONSTRUCTION OFSPES BONA II 35 MLRESERVOIR, DURBANVILLE
Date: Completed -August 2017Contract Amount: R 56 m
CONSTRUCTION OF 11 MLNEWTON RESERVOIRWELLINGTON: PHASE 1
Date: Completed - March 2015Contract Amount: R 25.4 m
JVZ CONSTRUCTION COMPANY PROFILE 9
BULKEARTHWORKS
RAWSONVILLE WATER SUPPLY PIPELINEAND 2 ML RESERVOIR
Date: Completed - December 2014Contract Amount: R 17.6 m
CONSTRUCTION OF 11 ML NEWTONRESERVOIR WELLINGTON: PHASE 1C
Date: Completed - March 2015Contract Amount: R 25.4 m
CONSTRUCTION OF11 ML NEWTONRESERVOIRWELLINGTON: PHASE 2
Date: Completed -June 2016Contract Amount:R 19.2 m
CONSTRUCTION OF CIVIL ENGINEERING WORKS FORTHE CLOSURE AND REHABILITATION OF THEDECOMMISSIONED SARON, GOUDA ANDHERMON LANDFILL SITES
Date: Completed - May 2018Contract Amount: R 11.5 m
CIVIL SERVICES
THE CONSTRUCTIONOF A 4 ML RESERVOIR INKAYAMANDI ANDASSOCIATED WATERSUPPLY PIPELINESDate:Completed -December 2015Contract Amount:R 14 m
CONSTRUCTION AND UPGRADING OF WATER ANDSEWERAGE SYSTEMS IN PAARL, WELLINGTONAND GOUDA.
Date: Completed - November 2011Contract Amount: R 5 m
JVZ CONSTRUCTION COMPANY PROFILE10
BULK SEWER TOSOUTHERN PAARL:PHASE 1 –VOORSCHOTEN STREET
Date:Completed - January 2012Contract Amount:R 37 m
ROADS &STORMWATER
VISIT OUR WEBSITEFOR OUR EXTENDED PORTFOLIO.
www.jvzconstruction.co.za
JVZ CONSTRUCTION COMPANY PROFILE 11
BULK SEWER TO SOUTHERN PAARL:PHASE 3: PORTION 3
Date: Completed - September 2017Contract Amount: R 41.2 m
THE CONSTRUCTION OF AN ACCESS ROAD INEBENHAEZER, LOCATED WITHIN THE MATZIKAMA MUNICIPAL AREA
Date: Completed - June 2012Contract Amount: R 2.3 m
WASTE WATERTREATMENT WORKSAT HOCROFT: PHASE 2Date:Completed - June 2011Contract Amount:R 8.7 m
KLEINBERG DAM SCHEME: PHASE 1
Date: Completed - December 2016Contract Amount: R 39.2 m
JVZ CONSTRUCTION COMPANY PROFILE12
DAMS
THE CONSTRUCTION OF A BOUNDARY WALLAT THE WELTEVREDE SPORTS GROUNDS
Date:Completed - October 2014Contract Amount:R 5.6 m
RAWSONVILLE WATER SUPPLY PIPELINEAND 2 ML RESERVOIR
Date: Completed - December 2014Contract Amount: R 17.6 m
NEWTON – LELIEFONTEIN BOOSTER PUMP STATION:PHASE 1 (CIVIL WORKS), PAARL
Date: Completed - September 2017Contract Amount: R 15.6 m
JVZ CONSTRUCTION COMPANY PROFILE 13
GENERALBUILDING
JVZ CONSTRUCTIONhas become well-known for our reliability andsuccess in providing our clients with durableand professional services of thehighest quality.
JVZ CONSTRUCTION COMPANY PROFILE14
PLANT HIRE
We provide a diverse range of modern plant covering the industrial, groundcare, civil, agricultural and amenity sectors. Our machinery and trucks are well maintained and operated by competent and experienced staff.
Request a quote via our website or sendan email to info@jvzconstruction.co.za.
HIRE OUR WELL MAINTAINEDEQUIPMENT TO SUIT YOUR NEEDS.
EQUIPMENT INCLUDE
ADT Bell: B20 | B25
Excavator: 21 ton | 24 ton | 30 ton | 33 ton
Excavator: with 24 / 30 ton hammer
Loadbed: 40 ton
Tipper: 6m3
Roller: 2,7 ton, Smooth: 10 ton, Padfoot: 10 ton
Loader: 10 ton
Digger Loader: 8,5 ton
Water Truck: 6000L / 18000L
Bell Water Truck: 23000L
Rough Terrain Crane: 20 ton
Crane Truck: 14 tonner
A VARIETY OFCONSTRUCTIONEQUIPMENTAVAILABLE FOR HIRE
REQUEST A
OPERATING SINCE
2008
QUOTE info@jvzconstruction.co.za
RELIABILITY • SUCCESSDURABLE • PROFESSIONAL • QUALITY
QUALITY CIVILCONSTRUCTION SERVICES
Physical Address: Stokery Road, Wellington, 7655Email: info@jvzconstruction.co.za
Phone: +27(0) 21 862 1973Fax: +27(0) 21 862 1975
Web: www.jvzconstruction.co.za
top related